Вы находитесь на странице: 1из 1

Current

CUP
Physical Plant

One Main Building

Total sq <

84,178

Total AddiJonal Sq Ft of buildings

Parking Garage (sq <)


Total Physical Plant with Garage
% Increase of Physical Plant

Five buildings**

Six Buildings**

150,203

164,578

12,709

66,025

80,400

Above ground garage 38,150

Underground garage 85,500

Underground garage 96,000

135,037

235,703

260,578

15%

78%

96%

One residenJal house demolished to


expand footprint on Chaparal/half of
residenJal lot on Barrington used for
intsJtuJonal use

Two residenJal houses demolished and


enJre lots used for school footprint

25 <

25 <

Two residenJal houses not part of


school footprint

School footprint

Setback of buildings on Chaparal

75 <

No buildings currently fronJng Chaparal

Parking

109 above ground parking spaces

250 linear < of buildings fronJng


250 linear < of buildings fronJng
Chaparal: Chaparal:


170< for MPR 85< for PAC
170< for MPR 85< for PAC
185 underground parking spaces 212
u nderground parking spaces
251 stacked parking with a^endant
282sStacked parking with a^endant

M-Saturday all 36 weeks of school (30%


Mon - Fri; No Sats of
e nrollment allowed on campus on
Saturdays)

Days of OperaJon

Field Use

Original Proposal in DEIR


North Wing RenovaJon 300 < North
W
ing RenovaJon 9,000 sq <

MulJ-purpose Facility** 39,300
MulJ-purpose Facility** 41,400
Gym 12,000 sq <
Performing Arts Center 19,025
Performing Arts Center 22,600
Maintenance Building 709 sq <
Visual Arts Center 7,400 Visual
Arts Center 7,400

Proposed buildings

Visual Impact

Archer Modied Plan

4 Saturdays for a four hour period***

North Garden

Outside Use

Parking Spaces
Special Events

Every Saturday 9am to 6pm

Stairs leading to gym and court of


Stairs leading to gym and court of
leaders; primary exit from garage; small
leaders; primary exit from garage;
congregaJon of students permi^ed
capacity to hold 500 people for an event
during day
Six week summer school for Archer Outside use of all faciliJes for a fee plus
No outside use
students only unlimited lming
No summer school
No outside use except for lming
Six week summer school
109 above ground

185 parking spaces 212underground


parking spaces
251 cars stacked with a^endant
282 cars stacked with a^endant

47
86
(originally 38)

98

Five years Six


y ears

14 months for North Wing renovaJon; 14 months for North Wing renovaJon;
four years for all other buildings to
ve years for all other buildings to
commence a<er North Wing renovaJon commence a<er North Wing renovaJon

ConstrucJon

Enrollment

10 Saturdays for a four hour period

M-Saturday all 36 weeks of


school/enJre campus

450

518

* assume 350 sq < per parking space for a total of 38,150 sq < for parking.
**AquaJc Center not part of calculaJon since Councilman Bonin's direcJve to eliminate it.
MulJpurpose Facility contains two buildings in one--one gym underground, one gym with stage above ground
North wing will be torn down and rebuilt.
***Archer has NEVER used the eld on a Saturday for the enJre Jme it has operated in its current locaJon.