DMCI ROYALTON AT CAPITOL COMMONS - MANPOWER DISTRIBUTION

As of July 31, 2015

ITEM

WORK DESCRIPTION

GRP #

ENGR. / FOREMAN

CAPATAZ / SUB.
BUDGET

1.0
a.
b.
c.
d.
e.
f.
g.
h.
2.0

STRUCTURAL WORKS
FORMWORKS/CARPENTRY
Mamallas, Jerwin T.
Romano, Benedicto G.
Orfinada Jr., Abraham C.
Luyao, Rayan R.
Ignacio, Ronald D.
Luyao, Gaudioso R.
Zamora, Rito L.
Moreno, Marito S.
CONCRETING and TOPPING

a. Hanginon, Darwin D.
b. Galisanao, Reynaldo B.
c. Intigro, Jerry L.
3.0
WIREMESH INSTALLATION
a. Bulanadi, Arthuro S.

ARCHITECTURAL WORKS
PLASTERING
1.1 Interior
a. Baraquel, Camilo S.
b. Madara, Carlos M.
2.0
CHB LAYING
2.1 Interior
a. Floriano III, Jose B.
b. Baraquel, Camilo S.
c. Madara, Carlos M.
2.2 Handling
a. Geronimo Jr., Jose M.
3.0
RUBBED CONCRETE/SANDING
3.1 Interior
a. Bulanadi Jr., Arthuro S.
b. Pacana Sr., Reynaldo O.
3.2 Exterior

101
103
104
106
108
109
111
112
201
301
203
302

Arzobal, A.
Salazar, JD.
Arzobal, A.
Salazar, JD.
Arzobal, A.

Arzobal, A.

Mirafuentes, P.
Soriano, W.
Mirafuentes, P.
Soriano, W.
Flores, R.
Soriano, W.
Gueta, R.
Flores, R.

Peralta, BF.

Yabes, E.

Salazar, JD.

N/S

Galisanao, R.

MASON
ACTUAL

VARIANCE

BUDGET

QUANTITY
CARP
ACTUAL

15
11
14
12
12
11
11
12
2
11

BUDGET

LABOR
ACTUAL

9
10

11

Salazar, JD.
Gueta, R.
SUBTOTAL =

24

100

304
303

Macaraig, R.
Tria, D.

10
3

305
304
303

Macaraig, R.

204

Macaraig, R.

Pagobo, E.

207
307

Tria, D.

Yabes, E.

308
309

Tria, D.

Somino, C.

8
5

306

Pabuna, LM.

Yabes, E.

307

Foreman Paggabao

Yabes, E.

202

N/S

Galisanao, R.

206

Peralta, BF.

Pagobo, E.

306

Pabuna, LM.
Yabes, E.
SUBTOTAL =

207

VARIANCE

TOTAL

ACTIVITY

LOCATION

18
11
14
12
12
14
11
12

Tableforms
Parapet/Balcony Walls
Conventional Slab Formworks
Dropwall and Exterior RC walls
Corewall
Deflection Walls
Stairs and RC walls
Corewall

Level 16
Level 11
Level 16
Level 8
Level 17
Level 8-9
Level 12
Level 17

VARIANCE

11
11
10
13

28

152

Concreting and Topping


Shift, Active)

(Day

Concreting (Night Shift)

Level 16, B5
Level 16, B5
Level 16, B5
Level 16, B5

Deflection Walls

Level 7-8

10
3

Plastering
Stair Rectification

Level 7-9
Level 9

17
3
8

CHB Laying

Level 7-9
Level 7-9
Level 2

12

12

Material Handling for Masonry

GF-L9

3
4

Rubbed Concrete/Sanding

Tower
Tower

8
7

Rubbed Concrete

Tower
Tower

Topping/Balance

Basement

Opening of RC/Deflection

Level 6-7

1.0

a. Ybanez Jr., Primitivo U.


4.0
5.0
6.0
7.0
8.0

TOPPING/BALANCE
a. Dino, Gregorio V.
OPENING OF RC/DEFLECTION
a. Pacana Sr., Reynaldo O.
MATERIAL HANDLING
a. Barbero, Marcos F.
STRIPPING AND BACKLOADING
a. Soriano, Alexander A.
DOWELS INSTALLATION FOR CONCRETE
TOPPING
a. Dino, Gregorio V.

a.
b.
c.
d.

OTHERS
Utility/Expediter/SC & TK/CQC Crew
Line & Grade
Safety Crew
Motorpool Crew

1
3
205
5

Borda, S.
Yabes, E.

Borda, S.
Yabes, E.

Foreman Paggabao

Admin
Jose, RM.
Mendoza, G.
Muyco, C.

SUBTOTAL =
TOTAL =

14
3
5

Material Handling (Night Shift)

GF-L10

11

12

Stripping, Backloading and Recovery

Level 10-11

Dowels Installation

Basement

70

41

112

1
2

5
4
10
4

7
6
10
4

23

27

95

104

92

291