HOLY TRINITY CHURCH

CLAPHAM COMMON
Living Stones Working Group
Presentation #5
EPCM
22 November 2009
Longing for shelter, many are homeless
Longing for warmth, many are cold.
Make us your building, sheltering others,
Walls made of living stone Bernadette Farrell

1
Living Stones 22 November 2009
The last presentation was on 14 June 2009
What have the Living Stones Group been up to?
• We have updated the brief
• The design team is re-engaged
• The LSG has met 6 times since
• We have reported to the PCC
• We have met the DAC
• We have met the Clapham Soc.
• We have talked as a group
• We have listened
• And now we would like to
update the congregation.
Living Stones 22 November, 2009 2
The framework of projects
1. The Sanctuary A. Accessibility
2. The Chancel B. Sustainability
3. The Narthex C. Lighting
4. The Galleries D. Acoustics + AV
5. The Nave (Pews) E. Fire Safety
6. An Extension F. Storage
7. The Churchyard G. The Undercroft

Living Stones 22 November, 2009 3


Ground Floor Plan

Living Stones 22 November, 2009 4


1. The Sanctuary

Living Stones 22 November, 2009 5


1. The Sanctuary

reredos high altar

Living Stones 22 November, 2009 6


2. The Chancel

Living Stones 22 November, 2009 7


1903 - New Chancel by Pite
Living Stones 22 November, 2009 8
2. The Chancel
and Sanctuary
Existing view

Living Stones 22 November, 2009


2. The Chancel
and Sanctuary
Proposed view
Option 1

Living Stones 22 November, 2009


2. The Chancel
and Sanctuary
Proposed view
Option 2

Living Stones 22 November, 2009


2. The Chancel

Living Stones 22 November, 2009


2. The Chancel

Living Stones 22 November, 2009


3. The Narthex - Welcome

Living Stones 22 November, 2009 14


3. The Narthex - Welcome

Living Stones 22 November, 2009 15


4. The Galleries

Living Stones 22 November, 2009 16


4. The former Children’s Galleries

1842 Looking West


4. The upper galleries - existing

Living Stones 22 November, 2009


4. The upper galleries - proposed

Living Stones 22 November, 2009 19


4. New staircases at the west end

Living Stones 22 November, 2009 20


5. The Nave (Pews)

Living Stones 22 November, 2009


6. An Extension

Living Stones 22 November, 2009 22


6. An Extension

Living Stones 22 November, 2009


6. East Elevation

Living Stones 22 November, 2009 24


6. An Extension - option 1

Living Stones 22 November, 2009 25


6. East Elevation

Living Stones 22 November, 2009 26


6. An Extension - option 2

Living Stones 22 November, 2009 27


7. The Churchyard

Living Stones 22 November, 2009 28


7. The Churchyard

Living Stones 22 November, 2009 29


7. The Churchyard

Living Stones 22 November, 2009 30


7. Met Police Statistics - Clapham Town

Living Stones 22 November, 2009 31


A. Accessibility

Living Stones 22 November, 2009 32


A. Accessibility

Living Stones 22 November, 2009 33


B. Sustainability

Living Stones 22 November, 2009 34


C. Lighting

Living Stones 22 November, 2009 35


C. Lighting

Living Stones 22 November, 2009 36


D. Acoustics (including Audio Visual)
E. Fire Safety
F. Storage

Living Stones 22 November, 2009 37


G. The Undercroft - Tunnels

Living Stones 22 November, 2009 38


Suggested sequence of works

1. Sanctuary and Chancel


2. West end and driveway
3. Nave decorations
4. Extension and churchyard
5. Lower Vestry
6. Lower Wilberforce Centre

Living Stones 22 November, 2009 39


What might it cost?
Ground Floor Alterations £351,400
First Floor Alterations £86,800
Upper Galleries £107,000
Single Storey Extension £231,100
General Refurbishment £374,200
Building Services £303,700
External Works £175,400
Enhanced Environmental measures £83,700
Subtotal net construction cost £1,713,300
Client advised VAT £70,000
Professional fees 15% + VAT £302,000
Allowance for consultations £20,000
Allowance for fundraiser £25,000
Living Stones
Living Stones 7
22 November, 2009 Total Overall Indicative Budget £2,130,300 40
December 2008
Programme
Immediate Steps Future
Congregation feedback November - December 2009 Stage D Design February - April 2010

Planning Application May 2010


Conclude Stage C December 2009
Statutory Consents and June - September 2010
Report to PCC 31 December 2009 Approvals
PCC review and voting 13 January 2010 Detail Design June - October 2010

PCC approval to proceed to January 2010 Tender Information and Summer 2010
Stage D Tender
Stage 1 works Autumn 2010

Fundraising Early 2010 onwards Major works on site January 2011 onwards

(Fundraising ongoing through projects)

The above timescale has already been significantly revised and reflects the nature of the consultative
process within the church and the time commitments of the individuals involved in the project.

The input of the fundraising committee will be critical to the smooth progress of the projects.

Living Stones 22 November, 2009 41


Consultees
Congregations Diocesan Advisory Committee
8.00 am Sunday Lambeth Planning
10.00 am Sunday Lambeth Conservation Officers
6.00 pm Sunday Statutory Consultees
12.30 pm Wednesday English Heritage
Church of Christ Georgian Group
Youth Victorian Society
Sunday Groups Clapham Society
Chicks Amenity Societies
Doves Friends of Clapham Common
Sparrows
Ravens User Groups not yet formally consulted
Eagles Pixies
Further Teenage Group? London Dance Academy
Trinity Toddlers N.A.
7 Ups O.A.
The Mix Other Users not yet formally consulted
Staff Macaulay, School
Choir Music Festival
Bellringers Eaton House, Thomas’ School
Living Stones 22 November, 2009 42
What happens next?

• Stage C - Mid December 2009


• LSG issues report to PCC
31 December 2009
• PCC meets 13 January 2010
• PCC votes on the way forward

We would welcome further feedback?

Living Stones 22 November, 2009 43


Thank You
to everyone who responded to the consultation and

The Living Stones group Further Input

Julian Tollast - Chair Marcus Beale – MBA


Peter Jefferson Smith Kate Saunders - MBA
Richard Long Barry Stow - MBA
David Isherwood Stephen Tandy - Pierce Hill
David Hills Sinclair Johnston - SJP
Caroline Clarke Martin Dow - ENG
Anna Post Glen Macfarlane - MW
Euan Kennedy Oliver McIlvenna - MW
Harriet de Swiet
(June Stevenson) Justin Worsley - Sense Consultants
Rosey Treherne Pollock Sue Riley - Sense Consultants
Sarah Jarvis – HT Website
The Building Committee Suzi Smith – Treasurer
R&DTF Trustees
Euan Kennedy – Chair
(Richard Clayson) The Churchwardens
Nick Hawkins
Julian Tollast Jonathon Burdett
Living Stones 22 November, 2009 Karen Simmonds
44
Supplementary Slides

Living Stones 22 November, 2009 45


The Revised Brief
• Create something
beautiful for God
• A “connected and
connecting building”
• Statement of significance
• Current usage
• Statement of need
• A framework for projects
• Funding
• Appendices
• Maintain something
beautiful for God
Living Stones 14 June 2009 46
Living Stones 22 November, 2009 47
Ground Floor Plan

Living Stones 22 November, 2009 48


First Floor Plan - Gallery

Living Stones 22 November, 2009 49


Second Floor Plan - Upper Gallery

Living Stones 22 November, 2009 50


Long Section

Living Stones 22 November, 2009 51


Cross Section

Living Stones 22 November, 2009 52


Cross Section

Living Stones 22 November, 2009 53


Cross Section

Living Stones 22 November, 2009 54


South Elevation

Living Stones 22 November, 2009 55


East Elevation

Living Stones 22 November, 2009 56


North Elevation

Living Stones 22 November, 2009 57


Alternative stair study

Living Stones 22 November, 2009 58


Alternative stair study

Living Stones 22 November, 2009 59