HydroHelp 1 - for turbine selection. HydroHelp 2 - for design and costing of Francis-trurbine equipped hydro plants with a surface
powerhouse. HydroHelp 3 - for design and costing of Impulse-turbine equipped hydro plants with a surface powerhouse. HydroHelp
4 - for design and costing of Kaplan-turbine equipped hydro plants with a surface powerhouse. HydroHelp 5 - for design and costing
of Francis-pump-turbine equipped hydro plants with an underground powerhouse. HydroHelp 6 - for design and costing of Francisturbine equipped hydro plants with an underground powerhouse.
2 Project Classification
Technological Categories
Target Categories
Key Categories
Key Words
3 Organizations
Funding Organization
CANMET
Development Organization
James L.Gordon
4 Abstract
Turbine selection, general layout and sizing of key structures, quantity and cost estimation. The programs calculate quantities and costs, based on the data input for all
work and all E&M equipment from initial clearing to the substation and transmission
5 Features and
Advantages
Technological Performance
Allows the user to undertake a pre-feasibility design-cost of a hydro facility with about 4 to 6 hours of work. All programs provide
guidance on data entry, so that the programs can be used by engineers with only a few years of hydro experience.
Cost Performance
Programs allow the user to design-cost hydro facilities with only a few hours of work, as compared to weeks or months by a team of
engineers.
Environmental Performance
Basic Specifications
Programs require Windows XP and Excel 2003 or later. Program size varies from 2Mbytes to 60Mbytes.
Purpose of Application
6 Scope of Application
7 Status of Project
8 Results of Application
9 Evaluation
Present Status
Commercial Stage
Period
Results of Experiments or
Demonstration Tests
Results of Sales/Practical
Applications
The design cost can be considerably reduced because overall plans for hydraulic power generation can be prepared on a computer.
However, the plans need to be changed to meet the conditions of each region because the design standards and estimation
standards differ depending on each region.
Improvement of Efficiency
Time required for designing can be considerably reduced because overall plans for hydraulic power generation can be prepared on
a computer. However, the plans need to be changed to meet the conditions of each region because the design standards and
estimation standards differ depending on each region.
10 References
- Using GIS to calculate Potential for Small Hydro Power Plant in Norway
11 Appendices
- HydroHelp 1 An Excel Program Developed for Turbine-Generator Selection for Hydroelectric Sites
- The HydroHelp Series of hydro design and cost programs - a description with examples of program screens
12 Inquires
Organization / Department
TELFAX
URLEmail
jim-gordon@sympatico.ca, info@hydrohelp.ca
Example of Output