Академический Документы
Профессиональный Документы
Культура Документы
Projects
Intelligent well completion in water flood projects (Oct 2009)
Research on the added value of intelligent completion in water flooding
Selection criteria for the application of intelligent well
Study of the types of sensors employed in intelligent completion
Economical benefit of the application of I-wells
Design and Construction of an Electronic Fire Alarm in high rise building (October 2005)
Designed a fire/smoke alarm system using LED sensors.
Constructed the designed system along with a prototype building.
Employment
Mantrac CAT (Caterpillar) Ltd.
Power Systems Sales Engineer November 2007-September 2008
Key responsibilities:
Update and expand the existing customer base
Carry out load analysis for customer and determine the power requirement
Provide products related technical advice and assistance to customers and prospects
Installation and commissioning of power system units
Negotiate equipment sales into high value projects
Managing high value projects from the design stage up to commission stage
Ensure that full payments are received for all units sold
Aggressively promote the company’s product within the catchment area and win more
potential clients.
Computer Knowledge
Petro $
Eclipse 100
Petrel RE
Proficiency in the use of Microsoft Office
Hobbies
Basketball, driving, sound set up
Referees
Available on request
.