29330 Federal Register / Vol. 71, No.

98 / Monday, May 22, 2006 / Notices

The existing dam is owned by the application no later than 30 days after 385.2001 (a)(1)(iii) and the instructions
applicant. the specified comment date for the on the Commission’s Web site under ‘‘e-
g. Filed Pursuant to: Federal Power particular application. A competing filing’’ link. The Commission strongly
Act, 16 U.S.C. 791(a)–825(r). preliminary permit application must encourages electronic filing.
h. Applicant Contact: Mr. Elias A. conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive
Felluss, 71 Centershore Road, o. Competing Development Documents: Any filings must bear in all
Centerport, NY 11721, (800) 335–5877. Application: Any qualified development capital letter the title ‘‘COMMENTS’’,
i. FERC Contact: Etta Foster, (202) applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS
502–8769. development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’,
j. Deadline for filing comments, the Commission, on or before a ‘‘MOTION TO INTERVENE’’, ‘‘NOTICE
protests, and motions to intervene: 60 specified comment date for the OF INTENT’’, or ‘‘COMPETING
days from the issuance date of this particular application, either a APPLICATION’’, as applicable, and the
notice. competing development application or a Project Number of the particular
All documents (original and eight notice of intent to file such an application to which the filing refers.
copies) should be filed with Magalie R. application. Submission of a timely Any of the above-named documents
Salas, Secretary, Federal Energy notice of intent to file a development must be filed by providing the original
Regulatory Commission, 888 First application allows an interested person and the number of copies provided by
Street, NE., Washington, DC 20426. to file the competing application no the Commission’s regulations to: The
Please include the project number (P– later than 120 days after the specified Secretary, Federal Energy Regulatory
12637–000) on any comments, protests, comment date for the particular Commission, 888 First Street, NE.,
or motions filed. application. A competing license Washington, DC 20426. A copy of any
k. Description of Project: The application must conform with 18 CFR motion to intervene must also be served
proposed project would consist of: (1) 4.30(b) and 4.36. upon each representative of the
An existing 10-foot-high, 180-foot-long p. Notice of Intent: A notice of intent Applicant specified in the particular
dam; (2) a 180-foot-wide reservoir; (3) a must specify the exact name, business application.
12-foot-wide, 70-foot-long penstock; (4) address, and telephone number of the t. Agency Comments: Federal, state,
a proposed powerhouse containing a prospective applicant, and must include and local agencies are invited to file
single generator with an installed an unequivocal statement of intent to comments on the described application.
capacity of approximately 1MW; (5) a submit, if such an application may be A copy of the application may be
tailrace; and (6) appurtenant facilities. filed, either a preliminary permit obtained by agencies directly from the
The project would have an estimated application or a development applicant. If an agency does not file
annual generation of approximately 2 application (specify which type of comments within the time specified for
MW. The applicant plans to sell the application). A notice of intent must be filing comments, it will be presumed to
generated energy. served on the applicant(s) named in this have no comments. One copy of an
l. Location of Application: A copy of public notice. agency’s comments must also be sent to
the application is available for q. Proposed Scope of Studies under the Applicant’s representatives.
inspection and reproduction at the Permit: A preliminary permit, if issued,
Commission in the Public Reference Magalie R. Salas,
does not authorize construction. The
Room, located at 888 First Street, NE., term of the proposed preliminary permit Secretary.
Room 2A, Washington, DC 20426, or by would be 36 months. The work [FR Doc. E6–7694 Filed 5–19–06; 8:45 am]
calling (202) 502–8371. This filing may proposed under the preliminary permit BILLING CODE 6717–01–P
also be viewed on the Commission’s would include economic analysis,
Web site at http://www.ferc.gov using preparation of preliminary engineering
the ‘‘eLibrary’’ link. Enter the docket plans, and a study of environmental DEPARTMENT OF ENERGY
number excluding the last three digits in impacts. Based on the results of these
Federal Energy Regulatory
the docket number field to access the studies, the Applicant would decide
Commission
document. For assistance, call toll-free whether to proceed with the preparation
1–866–208–3676 or e-mail of a development application to [Project No. 925–010]
FERCOnlineSupport@ferc.gov. For TTY, construct and operate the project.
call (202) 502–8659. A copy is also r. Comments, Protests, or Motions to City of Ottumwa, IA; Notice of
available for inspection and Intervene: Anyone may submit Application Tendered for Filing With
reproduction at the address in item h. comments, a protest, or a motion to the Commission, Soliciting Additional
above. intervene in accordance with the Study Requests, and Establishing
m. Individuals desiring to be included requirements of Rules of Practice and Procedural Schedule for Relicensing
on the Commission’s mailing list should Procedure, 18 CFR 385.210, 385.211, and a Deadline for Submission of Final
so indicate by writing to the Secretary 385.214. In determining the appropriate Amendments
of the Commission. action to take, the Commission will May 12, 2006.
n. Competing Preliminary Permit: consider all protests or other comments Take notice that the following
Anyone desiring to file a competing filed, but only those who file a motion hydroelectric application has been filed
application for preliminary permit for a to intervene in accordance with the with the Commission and is available
proposed project must submit the Commission’s Rules may become a for public inspection.
competing application itself, or a notice party to the proceeding. Any comments, a. Type of Application: New License.
of intent to file such an application, to protests, or motions to intervene must b. Project No.: 925–010.
the Commission on or before the be received on or before the specified c. Date Filed: April 26, 2006.
cchase on PROD1PC60 with NOTICES

specified comment date for the comment date for the particular d. Applicant: City of Ottumwa, Iowa.
particular application (see 18 CFR 4.36). application. e. Name of Project: Ottumwa
Submission of a timely notice of intent Comments, protests and interventions Hydroelectric Project.
allows an interested person to file the may be filed electronically via the f. Location: On the Des Moines River
competing preliminary permit Internet in lieu of paper; See 18 CFR in the City of Ottumwa, Wapello

VerDate Aug<31>2005 20:16 May 19, 2006 Jkt 208001 PO 00000 Frm 00044 Fmt 4703 Sfmt 4703 E:\FR\FM\22MYN1.SGM 22MYN1
Federal Register / Vol. 71, No. 98 / Monday, May 22, 2006 / Notices 29331

County, Iowa. The project does not one bascule gate; (2) a 125-acre reservoir Final amendments to the application
occupy Federal lands. with a normal water surface elevation of must be filed with the Commission no
g. Filed Pursuant to: Federal Power 638.5 feet msl; (3) a powerhouse integral later than 30 days from the issuance
Act 16 U.S.C. 791 (a)–825(r). to the dam containing three generating date of the notice of ready for
h. Applicant Contact: Richard Wilcox, units, unit 1 and unit 3 each rated at environmental analysis.
Ottumwa Water and Hydro, 230 Turner 1,000 kW and unit 2 rated at 1,250 kW;
Drive, Ottumwa, Iowa 52501, (641) 684– Magalie R. Salas,
and (4) appurtenant facilities. The
4606. applicant estimates that the average Secretary.
i. FERC Contact: Timothy Konnert, annual generation would be 10,261,920 [FR Doc. E6–7700 Filed 5–19–06; 8:45 am]
(202) 502–6359 or kilowatt hours using the three BILLING CODE 6717–01–P
timothy.konnert@ferc.gov. generating units with a combined
j. Cooperating agencies: We are asking capacity of 3,250 kW.
Federal, state, local, and tribal agencies o. A copy of the application is DEPARTMENT OF ENERGY
with jurisdiction and/or special available for review at the Commission
expertise with respect to environmental Federal Energy Regulatory
in the Public Reference Room or may be Commission
issues to cooperate with us in the viewed on the Commission’s Web site at
preparation of the environmental http://www.ferc.gov using the [Project No. 2602–007—North Carolina]
document. Agencies who would like to ‘‘eLibrary’’ link. Enter the docket
request cooperating status should follow number excluding the last three digits in Duke Power Company LLC; Dillsboro
the instructions for filing comments the docket number field to access the Hydroelectric Project; Notice of
described in item l below. document. For assistance, contact FERC Proposed Restricted Service List for a
k. Pursuant to § 4.32(b)(7) of 18 CFR Online Support at Memorandum of Agreement for
of the Commission’s regulations, if any FERCOnlineSupport@ferc.gov or toll- Managing Properties Included in or
resource agency, Indian Tribe, or person free at 1–866–208–3676, or for TTY, Eligible for Inclusion in the National
believes that an additional scientific (202) 502–8659. A copy is also available Register of Historic Places
study should be conducted in order to for inspection and reproduction at the
form an adequate factual basis for a May 12, 2006.
address in item h above. Rule 2010 of the Federal Energy
complete analysis of the application on You may also register online at
its merit, the resource agency, Indian Regulatory Commission’s (Commission)
http://www.ferc.gov/docs-filing/ Rules of Practice and Procedure
Tribe, or person must file a request for esubscription.asp to be notified via e-
a study with the Commission not later provides that, to eliminate unnecessary
mail of new filings and issuances expense or improve administrative
than 60 days from the date of filing of related to this or other pending projects.
the application, and serve a copy of the efficiency, the Secretary may establish a
For assistance, contact FERC Online restricted service list for a particular
request on the applicant. Support.
l. Deadline for filing additional study phase or issue in a proceeding.1 The
p. With this notice, we are initiating restricted service list should contain the
requests and requests for cooperating
consultation with the Iowa State names of persons on the service list
agency status: June 26, 2006.
All documents (original and eight Historic Preservation Officer (SHPO), as who, in the judgment of the decisional
copies) should be filed with: Magalie R. required by section 106, National authority establishing the list, are active
Salas, Secretary, Federal Energy Historic Preservation Act, and the participants with respect to the phase or
Regulatory Commission, 888 First regulations of the Advisory Council on issue in the proceeding for which the
Street, NE., Washington, DC 20426. Historic Preservation, 36 CFR 800.4. list is established.
The Commission’s Rules of Practice q. Procedural schedule and final The Commission staff is consulting
require all intervenors filing documents amendments: The application will be with the North Carolina State Historic
with the Commission to serve a copy of processed according to the following Preservation Officer (hereinafter, SHPO)
that document on each person on the Hydro Licensing Schedule. Revisions to and the Advisory Council on Historic
official service list for the project. the schedule will be made as Preservation (hereinafter, Council)
Further, if an intervenor files comments appropriate. The Commission staff pursuant to the Council’s regulations, 36
or documents with the Commission proposes to issue one environmental CFR part 800, implementing section 106
relating to the merits of an issue that assessment rather than issue a draft and of the National Historic Preservation
may affect the responsibilities of a final EA. Comments, terms and Act, as amended, (16 U.S.C. 470 f), to
particular resource agency, they must conditions, recommendations, prepare and execute a memorandum of
also serve a copy of the document on prescriptions, and reply comments, if agreement for managing properties
that resource agency. any, will be addressed in an EA. Staff included in, or eligible for inclusion in,
Additional study requests and intents to give at least 30 days for the National Register of Historic Places
requests for cooperating agency status entities to comment on the EA, and will at the Dillsboro Hydroelectric Project
may be filed electronically via the take into consideration all comments No. 2602–007 (SHPO Reference Number
Internet in lieu of paper. The received on the EA before final action is ER03–0341).
Commission strongly encourages taken on the license application. The memorandum of agreement,
electronic filings. See 18 CFR Issue Acceptance or Deficiency Letter: when executed by the Commission and
385.2001(a)(1)(iii) and the instructions June 2006. the SHPO would satisfy the
on the Commission’s Web site (http:// Issue Scoping Document: July 2006. Commission’s section 106
www.ferc.gov) under the ‘‘eFiling’’ link. Notice of application is ready for responsibilities for all individual
m. This application is not ready for environmental analysis: September undertakings carried out in accordance
cchase on PROD1PC60 with NOTICES

environmental analysis at this time. 2006. with the surrender of a license. The
n. The existing Ottumwa Project Notice of the availability of the EA: Commission’s responsibilities pursuant
consists of: (1) An 18-foot-high dam March 2007. to section 106 for the Dillsboro Project
with a 641-foot-long spillway section Ready for Commission’s decision on
equipped with eight Taintor gates and the application: May 2007. 1 18 CFR 385.2010.

VerDate Aug<31>2005 20:16 May 19, 2006 Jkt 208001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:\FR\FM\22MYN1.SGM 22MYN1