Вы находитесь на странице: 1из 2

26952 Federal Register / Vol. 71, No.

89 / Tuesday, May 9, 2006 / Notices

and 214 of the Commission’s Rules of DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY


Practice and Procedure (18 CFR 385.211
and 385.214) on or before 5 p.m. Eastern Federal Energy Regulatory Federal Energy Regulatory
time on the specified comment date. It Commission Commission
is not necessary to separately intervene
Notice of Application Accepted for
again in a subdocket related to a [Project No. 11433–016]
Filing and Soliciting Motions To
compliance filing if you have previously
Madison Electric Works; Notice of Intervene, Protests, and Comments
intervened in the same docket. Protests
will be considered by the Commission Availability of Environmental May 2, 2006.
in determining the appropriate action to Assessment Take notice that the following
be taken, but will not serve to make hydroelectric application has been filed
May 2, 2006.
protestants parties to the proceeding. with the Commission and is available
Anyone filing a motion to intervene or In accordance with the National for public inspection:
protest must serve a copy of that Environmental Policy Act of 1969 and a. Type of Application: Preliminary
document on the Applicant. In reference the Federal Energy Regulatory Permit.
to filings initiating a new proceeding, Commission’s (Commission) b. Project No.: 12655–000
interventions or protests submitted on regulations, 18 CFR Part 380 (Order No. c. Date filed: February 20, 2006.
or before the comment deadline need 486, 52 F.R. 47897), the Office of Energy d. Applicant: Fall Line Hydro
not be served on persons other than the Projects has prepared an Environmental Company, Incorporated.
Assessment (EA) for an application e. Name of Project: Carters
Applicant.
requesting Commission approval for Reregulation Dam Hydroelectric Project.
The Commission encourages f. Location: The project would be
electronic submission of protests and surrender of minor project license and
located at the existing U.S. Army Corps
interventions in lieu of paper, using the dam removal of the 547 kilowatt Sandy
of Engineers’ Carters Reregulation Dam
FERC Online links at http:// River Project (FERC No. 11433). The
on the Coosawattee River in Murray
www.ferc.gov. To facilitate electronic project is located on the Sandy River in
County, Georgia.
service, persons with Internet access the Towns of Norridgewock and Starks, g. Filed Pursuant to: Federal Power
who will eFile a document and/or be Somerset County, Maine. Act, 16 U.S.C. 791(a)–825(r).
listed as a contact for an intervenor The EA contains the staff’s analysis of h. Applicant Contacts: Robert A.
must create and validate an the potential environmental impacts of Davis, 390 Timber Laurel Lane,
eRegistration account using the the project and concludes that the Lawrenceville, GA 30043, and Michael
eRegistration link. Select the eFiling surrender of license and dam removal P. O’Brien, 302 North Spring Blvd.,
link to log on and submit the would not constitute a major federal Tarpon Springs, FL 34689.
intervention or protests. action that would significantly affect the i. FERC Contact: Chris Yeakel, (202)
quality of the human environment. 502–8132.
Persons unable to file electronically j. Deadline for filing comments,
should submit an original and 14 copies A copy of the EA is attached to the
protests, and motions to intervene: 60
of the intervention or protest to the May 1, 2006 Commission Order titled days from the issuance date of this
Federal Energy Regulatory Commission, ‘‘Order Approving Surrender of License notice.
888 First St., NE., Washington, DC with Dam Removal,’’ which is available The Commission’s Rules of Practice
20426. for review and reproduction at the and Procedure require all intervenors
The filings in the above proceedings Commission’s Public Reference Room, filing documents with the Commission
are accessible in the Commission’s located at 888 First Street, NE., Room to serve a copy of that document on
eLibrary system by clicking on the 2A, Washington, DC 20426. The EA may each person in the official service list
appropriate link in the above list. They also be viewed on the Commission’s for the project. Further, if an intervenor
are also available for review in the Web site at http://www.ferc.gov using files comments or documents with the
Commission’s Public Reference Room in the ‘‘eLibrary’’ link. Enter the docket Commission relating to the merits of an
Washington, DC. There is an number (prefaced by P-) in the docket issue that may affect the responsibilities
number field to access the document. of a particular resource agency, they
eSubscription link on the Web site that
For assistance, contact FERC On Line must also serve a copy of the document
enables subscribers to receive e-mail
Support at on that resource agency.
notification when a document is added k. Description of Project: The
to a subscribed docket(s). For assistance FERCOnlineSupport@ferc.gov or call
toll free at (866) 208–3676, or for TTY proposed project would use the existing
with any FERC Online service, please e- Army Corps of Engineers’ Carters
mail FERCOnlineSupport@ferc.gov. or contact (202) 502–8659.
Reregulation Dam and consist of: (1)
call (866) 208–3676 (toll free). For TTY, For further information, please Three proposed eight-foot-diameter steel
call (202) 502–8659. contact Andrea Shriver at (202) 502– penstocks 85 feet in length, (2) a
8171. proposed powerhouse containing two
Magalie R. Salas,
Magalie R. Salas, generating units with an installed
Secretary.
Secretary.
capacity of 4.5 megawatts, (3) a
[FR Doc. E6–7005 Filed 5–8–06; 8:45 am] proposed tailrace, (4) a proposed intake
[FR Doc. E6–6944 Filed 5–8–06; 8:45 am]
BILLING CODE 6717–01–P structure, (5) a proposed transmission
mstockstill on PROD1PC68 with NOTICES

BILLING CODE 6717–01–P


line one-half mile in length of a voltage
yet to be determined; and (7)
appurtenant facilities. The project
would have an annual generation of
16.5 gigawatt-hours, which would be
sold to a local utility.

VerDate Aug<31>2005 15:42 May 08, 2006 Jkt 208001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1
Federal Register / Vol. 71, No. 89 / Tuesday, May 9, 2006 / Notices 26953

l. Locations of Applications: A copy of served on the applicant(s) named in this agency’s comments must also be sent to
the application is available for public notice. the Applicant’s representatives.
inspection and reproduction at the q. Proposed Scope of Studies under
Permit: A preliminary permit, if issued, Magalie R. Salas,
Commission in the Public Reference
Room, located at 888 First Street NE., does not authorize construction. The Secretary.
Room 2A, Washington, DC 20426, or by term of the proposed preliminary permit [FR Doc. E6–6945 Filed 5–8–06; 8:45 am]
calling (202) 502–8371. This filing may would be 36 months. The work BILLING CODE 6717–01–P
also be viewed on the Commission’s proposed under the preliminary permit
Web site at http://www.ferc.gov using would include economic analysis,
the ‘‘eLibrary’’ link. Enter the docket preparation of preliminary engineering DEPARTMENT OF ENERGY
number excluding the last three digits in plans, and a study of environmental
impacts. Based on the results of these Federal Energy Regulatory
the docket number field to access the Commission
document. For assistance, call toll-free studies, the Applicant would decide
1–866–208–3676 or e-mail whether to proceed with the preparation Notice of Application Accepted for
FERCOnlineSupport@ferc.gov. For TTY, of a development application to Filing and Soliciting Motions To
call (202) 502–8659. A copy is also construct and operate the project.
Intervene, Protests, and Comments
available for inspection and r. Comments, Protests, or Motions To
reproduction at the address in item h Intervene: Anyone may submit May 2, 2006.
above. comments, a protest, or a motion to Take notice that the following
m. Individuals desiring to be included intervene in accordance with the hydroelectric application has been filed
on the Commission’s mailing list should requirements of Rules of Practice and with the Commission and is available
so indicate by writing to the Secretary Procedure, 18 CFR 385.210, 385.211, for public inspection:
of the Commission. 385.214. In determining the appropriate a. Type of Application: Preliminary
action to take, the Commission will Permit.
n. Competing Preliminary Permit:
consider all protests or other comments b. Project No.: 12663–000.
Anyone desiring to file a competing
filed, but only those who file a motion c. Date filed: March 31, 2006.
application for preliminary permit for a
to intervene in accordance with the d. Applicant: Washington Tidal
proposed project must submit the
Commission’s Rules may become a Energy Company.
competing application itself, or a notice
party to the proceeding. Any comments, e. Name of Project: Deception Pass
of intent to file such an application, to
protests, or motions to intervene must Tidal Energy Hydroelectric Project.
the Commission on or before the f. Location: The project would be
be received on or before the specified
specified comment date for the comment date for the particular located in Deception Pass, between
particular application (see 18 CFR 4.36). application. Whidbey Island and Fidalgo Island, in
Submission of a timely notice of intent Comments, protests and interventions the Puget Sound in Skagit and Island
allows an interested person to file the may be filed electronically via the Counties, Washington.
competing preliminary permit Internet in lieu of paper; See 18 CFR g. Filed Pursuant to: Federal Power
application no later than 30 days after 385.2001(a)(1)(iii) and the instructions Act, 16 U.S.C. 791(a)–825(r).
the specified comment date for the on the Commission’s Web site under h. Applicant Contacts: Joseph A.
particular application. A competing ‘‘e-filing’’ link. The Commission Cannon, Pillsbury Winthrop Shaw
preliminary permit application must strongly encourages electronic filing. Pittman LLP, 2300 N Street, NW.,
conform with 18 CFR 4.30(b) and 4.36. s. Filing and Service of Responsive Washington, DC 20037, phone: (202)–
o. Competing Development Documents: Any filings must bear in all 663–8000, and Charles B. Cooper, TRC
Application: Any qualified development capital letters the title ‘‘COMMENTS’’, Environmental, Boott Mills South, 116
applicant desiring to file a competing ‘‘RECOMMENDATIONS FOR TERMS John St., Lowell, MA 01852, phone:
development application must submit to AND CONDITIONS’’, ‘‘PROTEST’’, (978)–656–3567.
the Commission, on or before a ‘‘COMPETING APPLICATION’’ or i. FERC Contact: Chris Yeakel, (202)
specified comment date for the ‘‘MOTION TO INTERVENE’’, as 502–8132.
particular application, either a applicable, and the Project Number of j. Deadline for filing comments,
competing development application or a the particular application to which the protests, and motions to intervene: 60
notice of intent to file such an filing refers. Any of the above-named days from the issuance date of this
application. Submission of a timely documents must be filed by providing notice.
notice of intent to file a development the original and the number of copies The Commission’s Rules of Practice
application allows an interested person provided by the Commission’s and Procedure require all intervenors
to file the competing application no regulations to: The Secretary, Federal filing documents with the Commission
later than 120 days after the specified Energy Regulatory Commission, 888 to serve a copy of that document on
comment date for the particular First Street, NE., Washington, DC 20426. each person in the official service list
application. A competing license A copy of any motion to intervene must for the project. Further, if an intervenor
application must conform with 18 CFR also be served upon each representative files comments or documents with the
4.30(b) and 4.36. of the Applicant specified in the Commission relating to the merits of an
p. Notice of Intent: A notice of intent particular application. issue that may affect the responsibilities
must specify the exact name, business t. Agency Comments: Federal, state, of a particular resource agency, they
address, and telephone number of the and local agencies are invited to file must also serve a copy of the document
prospective applicant, and must include comments on the described application. on that resource agency.
mstockstill on PROD1PC68 with NOTICES

an unequivocal statement of intent to A copy of the application may be k. Description of Project: The
submit, if such an application may be obtained by agencies directly from the proposed project would consist of: (1)
filed, either a preliminary permit Applicant. If an agency does not file 100 to 300 Tidal In Stream Energy
application or a development comments within the time specified for Conversion (TISEC) devices consisting
application (specify which type of filing comments, it will be presumed to of, (2) rotating propeller blades, (3)
application). A notice of intent must be have no comments. One copy of an integrated generators with a capacity of

VerDate Aug<31>2005 15:42 May 08, 2006 Jkt 208001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\09MYN1.SGM 09MYN1

Вам также может понравиться