Form 27 Running Account Bill C.

Cash Book Voucher No.


Dated
Name of contractor :
Name of work : Const. and upgradation of Roads under PMGSY Package No. MP
Name of Consultant :
Serial No. of this bill :
No. & Date of this work order :
Agreement No.
Date of Start
Date of Complition : as per Agreement
as per actual

Unit

1
Hact.

Amount

Quanitity
executed
up-to-date per
measurement
book

Item of work
under subhead's & sub-work's of
Estimate

Rate
Rs. P.

Up-to-date
Rs.
P.
5

Since previous Remark


bill (Total) for
each sub-head
Rs.
P.
6

1. Clearing & grubbing road land 14760.00


including uprooting rank vegetation,
grass, brush, shrubs, spalings and trees
of girth upto 300 mm, removal of stumps,
disposal of unserviceable material and
stacking of serviceable material upto 100
M. from road boundary as per clause 201
in (a) Area of light jungle.

Cum.

2. Excavation of embankment, subgrade

43.00

and drain consisting of excavation,


removal and satisfactory disposal of all
excavated materials i/c handling and
stacking of or hauling to sides of
embankment and subgrade construction,
spoil banks or stacking of suitable cut
materials in specified manner and the
trimming and finishing of the road to the
specified dimensions or as directed by
the Engineer-in-charge i/c all lifts, lead up
to 250 meter sand dewatering complete,
shaping nad excavation in marsh and
complete disposal of all muck as per
clause 301 (excluding preparation of the
cut formation vide clause 301.6) and
excluding dressing of bed and sides of
drains vide clause 309.4
(i) Ordinary / Hard soil

3.
Cum.

Construction
of
embankments
/subgrade / earthen shoulders, inclusive
of cost of land as a source of supply of
material, cost of watering and drying of
material in borrow areas, spreading in
layers bringing to appropiate moisture
content and compacting to specification

43.20

1. The work full name of the as given in the estimate should be entered here except in the cash of bill for stock materials
2. The purpose of applicable to the case should be filled in and the rest recoded out.
3. If the oplay on the work is recorded by sub-head the total for each sub-head should be shown in column 6 and againstthe total theres
should be on entry in column 6 also in on other case should and entirse be made in column 6.

-2-

Unit

Quanitity
executed
up-to-date per
measurement
book

Amount
Item of work
under subhead's & sub-work's of
Estimate

Rate
Rs. P.

requirements (As per clause 305.1.1)


inclusive of the operations necessary as
per clause 306 & its sub clauses, where
required but with approved materials
obtained from excavation for road
construction(vide clause 301.3.11) i/c
consolidating the original ground by
rolling as directed by the Engineer-in
-charge but with maximum of six passes
of 8 to 10 tonne roller & i/c compecting
and maintenance of surface during
construction to ensure shedding and
preventing ponding of water(clause
305.3.7) finishing i/c all lifts but excluding
scarifying
adjusting
grannular
/
bitumenous road surface Clause 305.6

Cum

4. Excavation of embankment, subgrade


for widening consisting of excavation of
existing embankment, removal, trimming
and finishing of road to the specified
dimensions as per clause 301 and its sub
clauses i/c consolidating the original
ground with maximum 6 passes of 8-10
tonne roller including spreding, dressing
of excavated material watering and
compaction in specified grade and
camber as per clause 305 and its sub
clauses i/c maintenance of surface during
construction to ensure shedding and
preventing ponding of water and dressing
of excavated material i/c all lifts and lead
up to 15 m.

65.10

Sqm.

5.Dressing the bed and sides of

0.70

Cum.

6. Construction of embankment /
subgrade / earthan sohulder i/c clearing
and grubbing and transportation of
materials to embankment and sub grade
site( as per clause 305 and its sub
clauses) where required , but with
approved materials having CBR not less
than 7, i/c all lead and lift i/c cost of land
as a source of supply of material i/c
excavation ,cost of watering , compaction
and maintenance
of surface during
construction to ensure shedding and
preventing ponding of water ( clause
305.3.6) shaping and dressing ( clause
305.3.7) finishing etc. comlete but
excluding scarifying existing granular /
bituminous road surface vide clause
305.6.and includind all royalty charges.
Note : (1) If matarial is available with in a
lead of 250 m. Rate of Rs. 86.0/Cum. will
payble.

133.00

Cum.

7. Construction of hard shoulder as per

167.20

excavated drains as per clause 309

clause 407 with selected soil having CBR


value not less than 12 inclusive of all
leads and lifts providing 4% camber i/c
operations like watering, rolling and
compaction, royalty charges etc. as per
clause 305.3.

Up-to-date
Rs.
P.

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

-3-

Unit

Quanitity
executed
up-to-date per
measurement
book

Cum.

Amount
Item of work
under subhead's & sub-work's of
Estimate
3
8. Providing and laying of well graded
granular material for sub base consisting
of sand, gravel, crushed stone, crushed
slag, brick metal, laterite, kanker etc. as
per grading given in table 400-1 of the
specifications and compacting to the
required density as per I.S. 2720 (Part-8)
with 8-10 tonne roller in 150 mm thick
layers in all seasons, maintaining the
required slope & grade during the
operation, as
approved
by
the
Engineer-in-Charge i/c watering to the
proper moisture content in accordance
with IS 2720 (Part-2) and suitably
sprinkled with the help of truck mounted
or trailer mounted water tank fitted with
suitable sprinkling arrangement as per
clause 401 but excluding scarifying
existing bituminous surface.
(i) River sand, shingle, stone crusher dust
(fully saturated having CBR value not
less than 20)

Cum.

(ii) Gravel, crushed slag, brick metal


laterite, kankar, disintigreted rock i.e.
moorum having value of CBR not less
than 20 and of PI & LL not more than 6
and 20 respectively or combination
thereof depending upon grading required.
( This item may be used with specific
approvel of the engineer.)

Cum.

9. Providing laying and compacting of

Cum.

WBM sub-base / base course including


preparation and compaction of subase
and spreading of clean and crushed
aggregate to proper grade and camber
including application of screening for
interlocking, sprinkings of water and
rolling with power roller as per clause 404
(excluding inverted choke and scarifying
of existing bitumenous surfaces) for: a) Grading No.2 Material. (63 to 45 mm
size) with (i) Stone screening and
binding materials.

Rate
Rs. P.

Up-to-date
Rs.
P.
5

269.50
236.50

456.50

Cum.

b) Grading No.3 Material. (53 to 22.4 mm


size) with (i) Stone screening and
binding materials.

489.50

Sqm.

10. Providing primer coat with bitumen


emulsion @ 9.00 kg /10 sqm over
grannula baseas per clause 502.

12.43

Sqm.

11.Providing tack coat with catonic


emulsion as per clause 503 over existing
surface. (iii) Granular surface (Primed) @
3kg./10 sqm. area.

5.72

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

-4-

Unit

Quanitity
executed
up-to-date per
measurement
book

Amount
Item of work
under subhead's & sub-work's of
Estimate
3

Rate
Rs. P.

4
48.40

Sqm.

12. Providing 20 mm open graded premix


carprt consist of laying and compacting
open graded carpet composed of
premixed aggregate 13.2 mm size @
0.18 cum per 10 sqm and 11.2 mmsize
@ 0.09 cum per 10 sqm with bitumen
binder @ 14.6 kg/per 10 sqm as [per
clause 511 excluding primer/ tack coat
and but i/c preparation of surface mixed
in hot mix plant and hot laid with paver
finishaer and rolled with smooth wheeled
tendum type roller(minimum thickness
shall not be less than 20 mm at any
place)

Sqm.

13. Providing premix seal coat type B


(using bitumen) immediately after laying
of bituminous course consist of laying
premixed agreegate size passing through
2.36 mm sieve and retained on 180
micron sieve @ 0.06 kg / per 10 sqm.
mixed with binder 6.8 kg /10 sqm. in
mechanical mixer and rolling with smooth
wheeled tendam type roller as per clause
513

16.28

Cum.

14. Excavation for foundation in sandy


gravel soft soils and moorums and other
similar soft strata including stepping as
necessary and disposing of the
excavated stuff as directed etc. complete.

60.00

B -1 (d) Add extra in the rate of


excavation drived vide item B-1 (A) to
above for excavation below water level.

Cum.

B-1 (A) including divertion of water


course 50 % extra.
15. Excavation in large Boulders ( each
more than .03 Cum. Volume) and soft
rock by wedging as necessary without
blasting including stepping as necessary
and disposing of the excavated stuff as
directed etc. complete.
B -3 (A) Above water level up to 3 m.
depth below avarage GL.

325.00

B -3 (D) Below water level add extra in


the rate of B -3 (A) including divertion of
water course 25 % extra
Cum.

16. Excavation in hard rock by dry and


wet blasting and chislling I/c prepairing
foundation base by proper benching and
stepping, disposing of the excavated stuff
as directed by etc. complete.

Cum.

17. Providing and filling in foundation or


top plug of wells or stinng with plain
cement concrete and providing needed
vertical pin headers including laying,
raiming curing etc. complete with graded
metal (40 mm and down) including cost
of cement.
B-6 (a) M-10 Nominal mix concrete
B-6 (b) M-15 Nominal mix concrete
B-6 (b) M-20 Nominal mix concrete

280.00

1615.00
2010.00
2220.00

Up-to-date
Rs.
P.
5

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

-5-

Amount

Unit

Quanitity
executed
up-to-date per
measurement
book

Item of work
under subhead's & sub-work's of
Estimate

Rate
Rs. P.

Cum

18. Earth work for filling the back of


abutment and between the returns and
wings including watering, ramming
rooling connsolidation etc complete
including all leads and lifts, with granular
soil ( other than B.C. or clayee soils)
approved by Engineering-incharge

165.00

Sqm.

19. Providing form work shuttering with


steel plate including supports in the form
of soldiers 1 for foundation concrete, well
steining, kerbs, Piles caps etc. and
removing form work etc., complete for all
works of foundation.

80.00

RM

20. Providing and fixing in position R.C.C.


hume pipes of NP3 standard BIS-4581971 for culverts on highways including
transportation all handling filling the joint
with filler materials and cement mortor
1:3 including the cost of pipes and
collars, complete for the following internal
diameter of pipes.
1000 mm - NP3 Pipe
1200 mm - NP3 Pipe
600 mm - NP3 Pipe

Cum.

21.GSB 1st Class bedding Below

2955.00
3318.00
1037.00
165.00

Pipe/Face wall
Rm.

22. Providing and fixing weep holes in


abutment and return wall with 100 mm
dia A.C. Pipe.

70.00

KG.

23. Laying in position MS bar/ Deformed


bar reinforcement for well kerb piles
caps, pile caps and steining including
cutting beniding, tying, hooking etc.
complete as per detailed drawing
including cost of steel and including
transportation
B-10 (b) Deformed bars

22.14

24 providing & fixing ordinary km .stone


made of cut stone or R.C.C. M-15 (with
20 mm crushed aggregate ) and mild
steel reinforcement conforming to IRC
publication no 8 I/c excavation ,fix in plain
cc M10 painting lattering and figuring
complete.
No.
No.
No.

I - 00.2 Kilo metre Stone


2 -1.00 Kilo metre Stone
3 - 5.00 Kilo metre Stone

159.00
690.00
1105.00

Up-to-date
Rs.
P.
5

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

-6-

Unit

Quanitity
executed
up-to-date per
measurement
book

Sqm.

Amount
Item of work
under subhead's & sub-work's of
Estimate

Rate
Rs. P.

25. Construction of 200 mm thick


unreinforced dowel jointed, plain cement
concrete pavement mechanically vibrated
as par clause 602 of MORTH
specifications for road and bridge
concrete, constructioon by hand guided
method complete and inconformity with
the lines, grads and cross section shown
on the dawings and including form work
shuttering with steel plates, separation
membrane, with set of 15 nos. 25 mm
dia, 5000 mm long mild steel dowl bars in
each expansion joint @ 32 m C/C and 75
mm PVC pipe in 3.75 m width @ 50
metre centre to centre below bottom of
the concrte and contraction joints @ 4.57
metre centre to centre. As shown in
drawing including all materials, labour
and curing etc. as provided in the
specifications and as approved by the
Engineer-in-charge.

504.90

Up-to-date
Rs.
P.
5

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

- 4-

Amount

Unit

Quanitity
executed
up-to-date per
measurement
book

Item of work
under subhead's & sub-work's of
Estimate

Rate
Rs. P.

Up-to-date
Rs.
P.
5

Since previous
Remark
bill (Total) for
each sub-head
Rs.
P.
6

Total
Tender percentage

%
G. Total

Total value of work done up to date


Deduction value of work shown in previous bill A
Net value of work since previous bill (F)
Figure (F) in words Rs. :

II-CERTIFICATE AND SIGNATURE


The measurement were made by Mr . .
....on dated...and are recorded on page Nos..
.Of Measurement Book No . No.advance payment
has been made previously and not proposed in this bill.

Signature
Name ...
Designation (Asstt.Resident Engineer)

Dated signature of
Contractor
Dated signature of
Team leader
DPDC Consultant

-8-

III-MEMORANDUM OF PAYMENTS
To
figures 1. Total value of work done as per account 1, Co. 5 entry (A)
for Rs.
Abstract 2. Deduct amount with held.
.
(a) From previous bill as per last runing bill

Rs.

Rs.

Rs.

P.

(b) From this bill


(c)Net amount
3. Balance i.e. up-to-date payment (Item 1-2)
4. Total amount of payment already made as per (K) of
last runing bill No.................
5. Payment new to be made as detailed belowBy recovery amount creditable to this work
(a) Security deposit %
(b) Income Tax
%
(c) Commercial Tax
%
(d) Cost of Bill Form
(e) BOCWW CA Tax 1 %
(f) Extra deposit for E/W
(g)Extra deposit for PIU Checking
(h)Extra deposit for Time extention
(I) Extra deposit for
Total (a) to (I)
payable amount for
this Bill
Pay Rs.

(in words)

by Cheque

Accounts Officer
MPRRDA
PIU Bhopal

General Manager
MPRRDA
PIU Bhopal

Dated initials of disbursing officer


Received Rs.

(in words)

As per above
memorandum
on account of work

Date the

......... 200
full signature of contractor

Paid by me vide Cheque No..................... Date ..............................2002

Accounts Officer
MPRRDA
PIU

IV REMARKS

The Space reserved for remaks of the Disbursing officer

General Manager
MPRRDA
PIU