Академический Документы
Профессиональный Документы
Культура Документы
PT PLN (Persero)
Sarawak Energy Berhad
Outlines
Introduction
The Interconnection
275kV HVAC Transmission Line
Sarawak
Serikin
Mambong
128km
Bengkayang
West Kalimantan
Bengkayang
Kalimantan-Sarawak
Border
150kV 275kV
Siluas
Serikin
82.6km
45.6km
201 Towers
144 Towers
We s t K a l i m a n t a n
Sarawak
Kalimantan-Sarawak
Border
Mambong
275kV 132kV
Initially
Power
Power transfer
Transfer up to
SEB to PLN
In due course
Background
Construction started
Expected to be completed by
Target operational by
Technical Specification
of the Project
Description
PLN
SEB
Line Conductor
Conductor
type/name
No. and diameter
of Al wire
No. and diameter
of St wire
ACSR/AS Zebra
ACSR Drake
54/3.18
26/4.44
7/3.18
7/3.45
Overall diameter
28.62 mm
28.11 mm
Cross-section
Resistance (DC at
20C)
428.9/55.6 mm
402/65 mm
0.065 /km
0.072 /km
137.8 kN
145 kN
1,621 kg/km
1,680 kg/km
Breaking load
Weight
Description
PLN
SEB
Tower Design Parameters
Tower height
50.4 m
10.5 m
Clearance open country
Clearance over
7m
plantations
Clearance to highway,
11 m
roads
5m
Clearance to other lines
35 to 37 m
7.5 m
4m
9m
4m
Basic span
400 m
350 m
Insulators
Communication link
OPGW
OPGW
Surge arresters
Class 3
Class 3
>7.4m
>6.8m
~6.9m
~6m
~15m
~10m
Right of way
Environment
Busbar configuration
Busbar rating, A
Circuit breaker rating, A
Circuit breaker short-circuit rating, kA
Mambong Substation
2 (extension)
Line
Bengkayang Substation
Heavy Pollution
Double
2000
2500
25 (3 sec.)
2
Line
Outdoor (1 circuit-breaker
scheme)
Heavy Pollution
Double
1600
2500*
25 (3 sec.)
25 (3 sec.)
25 (3 sec.)
300
300
460
460
850/1050
850/1050
4800
4800
3x5MVAr
3x5MVAr
TBA
Outdoor
Voltage/Capacity of
Capacitor Banks
Mambong
Substation
275kV
240MVAR
280MVAR
420MVAR
132kV
Mambong Substation
78%
98%
Activity
Extension Works at Mambong
275/132kV Substation
275kV Double Circuit
Transmission Lines
Bengkayang Substation
85.46%
Transmission Lines
89.33%
Activity
Expected Completion Date
Construction Works at Bengkayang
July 2015
275/150kV Substation
275kV Double Circuit Transmission
Lines
July 2015