Documentation of the calculations to the article “Integrated scheduling and

distribution of production and shipment with stock-free material flows in a supply


chain network – a real-life problem”

Contents

A. Remarks 2

B. Notation 3

C. The MSPSDS-SF model (data from Section 2) 5

D. Computational results of the optimizations 22

E. Preliminary notes to the RF-heuristics S1S2 and S2S1 159

F. Computational results of the RF-heuristic S1S2 161

G. Computational results of the RF-heuristic S2S1 305

H. Preliminary notes to the three-stage RF-heuristics 327

I. Computational results of the RF-heuristic S3S4S5 329

J. Computational results of the RF-heuristic S4S3S5 462

K. Computational results of the RF-heuristic S3S5S4 496

L. Computational results of the RF-heuristic S5S3S4 519

M. Computational results of the RF-heuristic S4S5S3 553

N. Computational results of the RF-heuristic S5S4S3 576


Documentation of the calculations 2

A. Remarks

Remarks to LINGO 11.0: the objective function and constraints must be terminated with
a semicolon. All expressions between an exclamation mark and a semicolon are not
part of the model. Here, the objective function and the constraints are numbered as in
the article. By default, all variables are assumed as non-negative and continuous.
However, binary variables can be considered with the @bin function. The syntax is as
follows:
@bin(variable_name);

Calculations can be started by entering the MSPSDS-SF model formulated in Section C


into the so-called child window labeled LINGO Model – LINGO1 and pushing the solve-
button (for further information see LINGO – the modeling language and optimizer,
LINDO Systems Inc., 2007).

All calculations were executed using the optimization software package LINGO 11.0
(LINDO 2007) on an Intel Core 2 Quad Q9650 PC with a 3 GHz CPU, 1333 MHz Front-
Side-bus, 12 MB cache and 4 GB memory. During each execution, the aforementioned
PC was exclusively used for the calculation of only one scenario.

All solver status windows generated during the optimizations and the RF-heuristics are
documented by screenshots. The solution reports of the optimizations as well as the
final solution reports of the RF-heuristics are also documented. In contrast, the values
of the binary variables computed in the intermediate steps of the RF-heuristics are not
recorded. At any time, they can be handed in later.
Documentation of the calculations 3

B. Notation

The assignment between numbers and SC stages or sites, respectively, is as follows:

I Bauxite mining
II Aluminum oxide production
III Primary aluminum production
1 Jamaica (Bauxite mining)
2 West Africa (Bauxite mining)
3 Australia (Bauxite mining)
4 Spain (Aluminum oxide production)
5 Jamaica (Aluminum oxide production)
6 Ireland (Aluminum oxide production)
7 Italy (Aluminum oxide production)
8 Germany (Primary aluminum production)

Index sets and indices

- SC stages of the primary aluminum supply chain

IS : = {I, II, III}

- Sites at the SC stages


k
o
n
ΓI

ΓI
ΓI

: = {1,2,3}, = ,
kI
oI
n
ΓI

ΓI
Γ
I

: = {4,5,6,7}, = ,
kI
oI
n
Γ
ΓI

I
I
I

: = {8}, =∅.

- Released quantities at the sites 1 to 8


L
L

3
1

: = {1,2}, : = {1,2}, : = {1,2},


L

L
L

L
4

: = {1,2,3}, : = {1,2,3}, : = {1,2,3}, : = {1,2,3},


L
8

: = {1,2,3,4}.
Documentation of the calculations 4

Continuous decision variables

Li
p_i_k k-th released quantity, k ∈ , at site i = 1,…,8 (in units/production activity)

Li
t_i_k Production start time of the k-th released quantity, k ∈ , at site i = 1,…,8
(in days)

tr_i_j_k_m Quantity of intermediate products taken from the k-th released quantity,
Li

k∈ , at site i = 1,2,3 [i = 4,…,7], which is fed into the m-th released


Lj

quantity, m ∈ , at site j = 4,…,7 [j = 8] (in tons)

x_i Order quantity at site i, i = 1, …, 8 (in tons)

Binary decision variables


Li

ar_i_k 1, if the k-th released quantity, k ∈ , at site i = 1,…,8 is produced, 0


otherwise

Li L
b_i_j_k_m 1, if intermediate products of the k-th released quantity, k ∈ , at site i =

j
1,2,3 (i = 4,…,7) are fed into the m-th released quantity, m ∈ , at site j =

4,…,7 (j = 8), 0 otherwise

pr_i 1, if site 1 to 8 is occupied by the supply chain, 0 otherwise


L
6

s_6_k 1, if the k-th released quantity, k ∈ , at site 6 is scheduled before time

block interval (20; 40), 0 otherwise

Furthermore, it is defined C = 10,000.


Documentation of the calculations 5

C. The MSPSDS-SF model (data from Section 2)

!Objective function (1);


min=16.5*x_1+9.5*x_2+6.5*x_3+279*x_4+176*x_5+240*x_6+307*x_7+1560*x_8+4500
00*b_1_4_1_1+450000*b_1_4_1_2+450000*b_1_4_1_3+450000*b_1_4_2_1+450000*
b_1_4_2_2+450000*b_1_4_2_3+0.54*tr_1_5_1_1+0.54*tr_1_5_1_2+0.54*tr_1_5_1_3
+0.54*tr_1_5_2_1+0.54*tr_1_5_2_2+0.54*tr_1_5_2_3+390000*b_1_6_1_1+390000*b_
1_6_1_2+390000*b_1_6_1_3+390000*b_1_6_2_1+390000*b_1_6_2_2+390000*b_1_
6_2_3+540000*b_1_7_1_1+540000*b_1_7_1_2+540000*b_1_7_1_3+540000*b_1_7_
2_1+540000*b_1_7_2_2+540000*b_1_7_2_3+210000*b_2_4_1_1+210000*b_2_4_1_
2+210000*b_2_4_1_3+210000*b_2_4_2_1+210000*b_2_4_2_2+210000*b_2_4_2_3+
390000*b_2_5_1_1+390000*b_2_5_1_2+390000*b_2_5_1_3+390000*b_2_5_2_1+39
0000*b_2_5_2_2+390000*b_2_5_2_3+270000*b_2_6_1_1+270000*b_2_6_1_2+2700
00*b_2_6_1_3+270000*b_2_6_2_1+270000*b_2_6_2_2+270000*b_2_6_2_3+300000*
b_2_7_1_1+300000*b_2_7_1_2+300000*b_2_7_1_3+300000*b_2_7_2_1+300000*b_
2_7_2_2+300000*b_2_7_2_3+840000*b_3_4_1_1+840000*b_3_4_1_2+840000*b_3_
4_1_3+840000*b_3_4_2_1+840000*b_3_4_2_2+840000*b_3_4_2_3+1110000*b_3_5
_1_1+1110000*b_3_5_1_2+1110000*b_3_5_1_3+1110000*b_3_5_2_1+1110000*b_3
_5_2_2+1110000*b_3_5_2_3+930000*b_3_6_1_1+930000*b_3_6_1_2+930000*b_3_
6_1_3+930000*b_3_6_2_1+930000*b_3_6_2_2+930000*b_3_6_2_3+960000*b_3_7_
1_1+960000*b_3_7_1_2+960000*b_3_7_1_3+960000*b_3_7_2_1+960000*b_3_7_2_
2+960000*b_3_7_2_3+67700*b_4_8_1_1+67700*b_4_8_1_2+67700*b_4_8_1_3+677
00*b_4_8_1_4+67700*b_4_8_2_1+67700*b_4_8_2_2+67700*b_4_8_2_3+67700*b_4_
8_2_4+67700*b_4_8_3_1+67700*b_4_8_3_2+67700*b_4_8_3_3+67700*b_4_8_3_4+
427700*b_5_8_1_1+427700*b_5_8_1_2+427700*b_5_8_1_3+427700*b_5_8_1_4+42
7700*b_5_8_2_1+427700*b_5_8_2_2+427700*b_5_8_2_3+427700*b_5_8_2_4+4277
00*b_5_8_3_1+427700*b_5_8_3_2+427700*b_5_8_3_3+427700*b_5_8_3_4+52700*b
_6_8_1_1+52700*b_6_8_1_2+52700*b_6_8_1_3+52700*b_6_8_1_4+52700*b_6_8_2
_1+52700*b_6_8_2_2+52700*b_6_8_2_3+52700*b_6_8_2_4+52700*b_6_8_3_1+527
00*b_6_8_3_2+52700*b_6_8_3_3+52700*b_6_8_3_4+217700*b_7_8_1_1+217700*b_
7_8_1_2+217700*b_7_8_1_3+217700*b_7_8_1_4+217700*b_7_8_2_1+217700*b_7_
8_2_2+217700*b_7_8_2_3+217700*b_7_8_2_4+217700*b_7_8_3_1+217700*b_7_8_
3_2+217700*b_7_8_3_3+217700*b_7_8_3_4-bonus payments*(181-t_8_1-
p_8_1/440)- bonus payments*(181-t_8_2-p_8_2/440)- bonus payments*(181-t_8_3-
Documentation of the calculations 6

p_8_3/440)- bonus payments*(181-t_8_4-p_8_4/440);


!Note: The bonus payments were parametrically varied according to the values
assumed in the scenario analysis;
!Constraints (2);
x_8=96000;
!Constraints (3);
x_4+x_5+x_6+x_7=180000; x_1+x_2+x_3=360000;
!Constraints (4);
x_8=p_8_1+p_8_2+p_8_3+p_8_4; x_7=p_7_1+p_7_2+p_7_3;
x_6=p_6_1+p_6_2+p_6_3; x_5=p_5_1+p_5_2+p_5_3;
x_4=p_4_1+p_4_2+p_4_3; x_3=p_3_1+p_3_2; x_2=p_2_1+p_2_2;
x_1=p_1_1+p_1_2;
!Constraints (5);
p_1_1=tr_1_4_1_1+tr_1_4_1_2+tr_1_4_1_3+tr_1_5_1_1+tr_1_5_1_2+tr_1_5_1_3+
tr_1_6_1_1+tr_1_6_1_2+tr_1_6_1_3+tr_1_7_1_1+tr_1_7_1_2+tr_1_7_1_3;
p_1_2=tr_1_4_2_1+tr_1_4_2_2+tr_1_4_2_3+tr_1_5_2_1+tr_1_5_2_2+tr_1_5_2_3+
tr_1_6_2_1+tr_1_6_2_2+tr_1_6_2_3+tr_1_7_2_1+tr_1_7_2_2+tr_1_7_2_3;
p_2_1=tr_2_4_1_1+tr_2_4_1_2+tr_2_4_1_3+tr_2_5_1_1+tr_2_5_1_2+tr_2_5_1_3+
tr_2_6_1_1+tr_2_6_1_2+tr_2_6_1_3+tr_2_7_1_1+tr_2_7_1_2+tr_2_7_1_3;
p_2_2=tr_2_4_2_1+tr_2_4_2_2+tr_2_4_2_3+tr_2_5_2_1+tr_2_5_2_2+tr_2_5_2_3+
tr_2_6_2_1+tr_2_6_2_2+tr_2_6_2_3+tr_2_7_2_1+tr_2_7_2_2+tr_2_7_2_3;
p_3_1=tr_3_4_1_1+tr_3_4_1_2+tr_3_4_1_3+tr_3_5_1_1+tr_3_5_1_2+tr_3_5_1_3+
tr_3_6_1_1+tr_3_6_1_2+tr_3_6_1_3+tr_3_7_1_1+tr_3_7_1_2+tr_3_7_1_3;
p_3_2=tr_3_4_2_1+tr_3_4_2_2+tr_3_4_2_3+tr_3_5_2_1+tr_3_5_2_2+tr_3_5_2_3+
tr_3_6_2_1+tr_3_6_2_2+tr_3_6_2_3+tr_3_7_2_1+tr_3_7_2_2+tr_3_7_2_3;
p_4_1=tr_4_8_1_1+tr_4_8_1_2+tr_4_8_1_3+tr_4_8_1_4;
p_4_2=tr_4_8_2_1+tr_4_8_2_2+tr_4_8_2_3+tr_4_8_2_4;
p_4_3=tr_4_8_3_1+ tr_4_8_3_2+ tr_4_8_3_3+ tr_4_8_3_4;
p_5_1=tr_5_8_1_1+ tr_5_8_1_2+ tr_5_8_1_3+ tr_5_8_1_4;
p_5_2=tr_5_8_2_1+ tr_5_8_2_2+ tr_5_8_2_3+ tr_5_8_2_4;
p_5_3=tr_5_8_3_1+ tr_5_8_3_2+ tr_5_8_3_3+ tr_5_8_3_4;
p_6_1=tr_6_8_1_1+ tr_6_8_1_2+ tr_6_8_1_3+ tr_6_8_1_4;
p_6_2=tr_6_8_2_1+ tr_6_8_2_2+ tr_6_8_2_3+ tr_6_8_2_4;
p_6_3=tr_6_8_3_1+ tr_6_8_3_2+ tr_6_8_3_3+ tr_6_8_3_4;
Documentation of the calculations 7

p_7_1=tr_7_8_1_1+ tr_7_8_1_2+ tr_7_8_1_3+ tr_7_8_1_4;


p_7_2=tr_7_8_2_1+ tr_7_8_2_2+ tr_7_8_2_3+ tr_7_8_2_4;
p_7_3=tr_7_8_3_1+ tr_7_8_3_2+ tr_7_8_3_3+ tr_7_8_3_4;
!Constraints (6);
2*p_4_1=tr_1_4_1_1+tr_1_4_2_1+tr_2_4_1_1+tr_2_4_2_1+tr_3_4_1_1+tr_3_4_2_1;
2*p_4_2=tr_1_4_1_2+tr_1_4_2_2+tr_2_4_1_2+tr_2_4_2_2+tr_3_4_1_2+tr_3_4_2_2;
2*p_4_3=tr_1_4_1_3+tr_1_4_2_3+tr_2_4_1_3+tr_2_4_2_3+tr_3_4_1_3+tr_3_4_2_3;
2*p_5_1=tr_1_5_1_1+tr_1_5_2_1+tr_2_5_1_1+tr_2_5_2_1+tr_3_5_1_1+tr_3_5_2_1;
2*p_5_2=tr_1_5_1_2+tr_1_5_2_2+tr_2_5_1_2+tr_2_5_2_2+tr_3_5_1_2+tr_3_5_2_2;
2*p_5_3=tr_1_5_1_3+tr_1_5_2_3+tr_2_5_1_3+tr_2_5_2_3+tr_3_5_1_3+tr_3_5_2_3;
2*p_6_1=tr_1_6_1_1+tr_1_6_2_1+tr_2_6_1_1+tr_2_6_2_1+tr_3_6_1_1+tr_3_6_2_1;
2*p_6_2=tr_1_6_1_2+tr_1_6_2_2+tr_2_6_1_2+tr_2_6_2_2+tr_3_6_1_2+tr_3_6_2_2;
2*p_6_3=tr_1_6_1_3+tr_1_6_2_3+tr_2_6_1_3+tr_2_6_2_3+tr_3_6_1_3+tr_3_6_2_3;
2*p_7_1=tr_1_7_1_1+tr_1_7_2_1+tr_2_7_1_1+tr_2_7_2_1+tr_3_7_1_1+tr_3_7_2_1;
2*p_7_2=tr_1_7_1_2+tr_1_7_2_2+tr_2_7_1_2+tr_2_7_2_2+tr_3_7_1_2+tr_3_7_2_2;
2*p_7_3=tr_1_7_1_3+tr_1_7_2_3+tr_2_7_1_3+tr_2_7_2_3+tr_3_7_1_3+tr_3_7_2_3;
1.875*p_8_1=tr_4_8_1_1+tr_4_8_2_1+tr_4_8_3_1+tr_5_8_1_1+tr_5_8_2_1+tr_5_8_3
_1+tr_6_8_1_1+tr_6_8_2_1+tr_6_8_3_1+tr_7_8_1_1+tr_7_8_2_1+tr_7_8_3_1;
1.875*p_8_2=tr_4_8_1_2+tr_4_8_2_2+tr_4_8_3_2+tr_5_8_1_2+tr_5_8_2_2+tr_5_8_3
_2+tr_6_8_1_2+tr_6_8_2_2+tr_6_8_3_2+tr_7_8_1_2+tr_7_8_2_2+tr_7_8_3_2;
1.875*p_8_3=tr_4_8_1_3+tr_4_8_2_3+tr_4_8_3_3+tr_5_8_1_3+tr_5_8_2_3+tr_5_8_3
_3+tr_6_8_1_3+tr_6_8_2_3+tr_6_8_3_3+tr_7_8_1_3+tr_7_8_2_3+tr_7_8_3_3;
1.875*p_8_4=tr_4_8_1_4+tr_4_8_2_4+tr_4_8_3_4+tr_5_8_1_4+tr_5_8_2_4+tr_5_8_3
_4+tr_6_8_1_4+tr_6_8_2_4+tr_6_8_3_4+tr_7_8_1_4+tr_7_8_2_4+tr_7_8_3_4;
!Constraints (7);
25000*pr_1<=x_1; x_1<=360000*pr_1;
35000*pr_2<=x_2; x_2<=360000*pr_2;
60000*pr_3<=x_3; x_3<=360000*pr_3;
10000*pr_4<=x_4; x_4<=180000*pr_4;
30000*pr_5<=x_5; x_5<=180000*pr_5;
5000*pr_6<=x_6; x_6<=180000*pr_6;
15000*pr_7<=x_7; x_7<=180000*pr_7;
!Constraints (8);
8000*ar_8_1<=p_8_1; p_8_1<=96000*ar_8_1;
Documentation of the calculations 8

8000*ar_8_2<=p_8_2; p_8_2<=96000*ar_8_2;
8000*ar_8_3<=p_8_3; p_8_3<=96000*ar_8_3;
8000*ar_8_4<=p_8_4; p_8_4<=96000*ar_8_4;
5000*ar_4_1<= p_4_1; p_4_1<=180000*ar_4_1;
5000*ar_4_2<= p_4_2; p_4_2<=180000*ar_4_2;
5000*ar_4_3<= p_4_3; p_4_3<=180000*ar_4_3;
5000*ar_5_1<= p_5_1; p_5_1<=180000*ar_5_1;
5000*ar_5_2<= p_5_2; p_5_2<=180000*ar_5_2;
5000*ar_5_3<= p_5_3; p_5_3<=180000*ar_5_3;
5000*ar_6_1<= p_6_1; p_6_1<=180000*ar_6_1;
5000*ar_6_2<= p_6_2; p_6_2<=180000*ar_6_2;
5000*ar_6_3<= p_6_3; p_6_3<=180000*ar_6_3;
5000*ar_7_1<= p_7_1; p_7_1<=180000*ar_7_1;
5000*ar_7_2<= p_7_2; p_7_2<=180000*ar_7_2;
5000*ar_7_3<= p_7_3; p_7_3<=180000*ar_7_3;
20000*ar_1_1<= p_1_1; p_1_1<=360000*ar_1_1;
20000*ar_1_2<= p_1_2; p_1_2<=360000*ar_1_2;
20000*ar_2_1<= p_2_1; p_2_1<=360000*ar_2_1;
20000*ar_2_2<= p_2_2; p_2_2<=360000*ar_2_2;
20000*ar_3_1<= p_3_1; p_3_1<=360000*ar_3_1;
20000*ar_3_2<= p_3_2; p_3_2<=360000*ar_3_2;
!Constraints (9);
10000*b_1_4_1_1<=tr_1_4_1_1; tr_1_4_1_1<=70000*b_1_4_1_1;
10000*b_1_4_1_2<=tr_1_4_1_2; tr_1_4_1_2<=70000*b_1_4_1_2;
10000*b_1_4_1_3<=tr_1_4_1_3; tr_1_4_1_3<=70000*b_1_4_1_3;
10000*b_1_4_2_1<=tr_1_4_2_1; tr_1_4_2_1<=70000*b_1_4_2_1;
10000*b_1_4_2_2<=tr_1_4_2_2; tr_1_4_2_2<=70000*b_1_4_2_2;
10000*b_1_4_2_3<=tr_1_4_2_3; tr_1_4_2_3<=70000*b_1_4_2_3;
10000*b_1_5_1_1<=tr_1_5_1_1; tr_1_5_1_1<=70000*b_1_5_1_1;
10000*b_1_5_1_2<=tr_1_5_1_2; tr_1_5_1_2<=70000*b_1_5_1_2;
10000*b_1_5_1_3<=tr_1_5_1_3; tr_1_5_1_3<=70000*b_1_5_1_3;
10000*b_1_5_2_1<=tr_1_5_2_1; tr_1_5_2_1<=70000*b_1_5_2_1;
10000*b_1_5_2_2<=tr_1_5_2_2; tr_1_5_2_2<=70000*b_1_5_2_2;
10000*b_1_5_2_3<=tr_1_5_2_3; tr_1_5_2_3<=70000*b_1_5_2_3;
Documentation of the calculations 9

10000*b_1_6_1_1<=tr_1_6_1_1; tr_1_6_1_1<=70000*b_1_6_1_1;
10000*b_1_6_1_2<=tr_1_6_1_2; tr_1_6_1_2<=70000*b_1_6_1_2;
10000*b_1_6_1_3<=tr_1_6_1_3; tr_1_6_1_3<=70000*b_1_6_1_3;
10000*b_1_6_2_1<=tr_1_6_2_1; tr_1_6_2_1<=70000*b_1_6_2_1;
10000*b_1_6_2_2<=tr_1_6_2_2; tr_1_6_2_2<=70000*b_1_6_2_2;
10000*b_1_6_2_3<=tr_1_6_2_3; tr_1_6_2_3<=70000*b_1_6_2_3;
10000*b_1_7_1_1<=tr_1_7_1_1; tr_1_7_1_1<=70000*b_1_7_1_1;
10000*b_1_7_1_2<=tr_1_7_1_2; tr_1_7_1_2<=70000*b_1_7_1_2;
10000*b_1_7_1_3<=tr_1_7_1_3; tr_1_7_1_3<=70000*b_1_7_1_3;
10000*b_1_7_2_1<=tr_1_7_2_1; tr_1_7_2_1<=70000*b_1_7_2_1;
10000*b_1_7_2_2<=tr_1_7_2_2; tr_1_7_2_2<=70000*b_1_7_2_2;
10000*b_1_7_2_3<=tr_1_7_2_3; tr_1_7_2_3<=70000*b_1_7_2_3;
10000*b_2_4_1_1<=tr_2_4_1_1; tr_2_4_1_1<=70000*b_2_4_1_1;
10000*b_2_4_1_2<=tr_2_4_1_2; tr_2_4_1_2<=70000*b_2_4_1_2;
10000*b_2_4_1_3<=tr_2_4_1_3; tr_2_4_1_3<=70000*b_2_4_1_3;
10000*b_2_4_2_1<=tr_2_4_2_1; tr_2_4_2_1<=70000*b_2_4_2_1;
10000*b_2_4_2_2<=tr_2_4_2_2; tr_2_4_2_2<=70000*b_2_4_2_2;
10000*b_2_4_2_3<=tr_2_4_2_3; tr_2_4_2_3<=70000*b_2_4_2_3;
10000*b_2_5_1_1<=tr_2_5_1_1; tr_2_5_1_1<=70000*b_2_5_1_1;
10000*b_2_5_1_2<=tr_2_5_1_2; tr_2_5_1_2<=70000*b_2_5_1_2;
10000*b_2_5_1_3<=tr_2_5_1_3; tr_2_5_1_3<=70000*b_2_5_1_3;
10000*b_2_5_2_1<=tr_2_5_2_1; tr_2_5_2_1<=70000*b_2_5_2_1;
10000*b_2_5_2_2<=tr_2_5_2_2; tr_2_5_2_2<=70000*b_2_5_2_2;
10000*b_2_5_2_3<=tr_2_5_2_3; tr_2_5_2_3<=70000*b_2_5_2_3;
10000*b_2_6_1_1<=tr_2_6_1_1; tr_2_6_1_1<=70000*b_2_6_1_1;
10000*b_2_6_1_2<=tr_2_6_1_2; tr_2_6_1_2<=70000*b_2_6_1_2;
10000*b_2_6_1_3<=tr_2_6_1_3; tr_2_6_1_3<=70000*b_2_6_1_3;
10000*b_2_6_2_1<=tr_2_6_2_1; tr_2_6_2_1<=70000*b_2_6_2_1;
10000*b_2_6_2_2<=tr_2_6_2_2; tr_2_6_2_2<=70000*b_2_6_2_2;
10000*b_2_6_2_3<=tr_2_6_2_3; tr_2_6_2_3<=70000*b_2_6_2_3;
10000*b_2_7_1_1<=tr_2_7_1_1; tr_2_7_1_1<=70000*b_2_7_1_1;
10000*b_2_7_1_2<=tr_2_7_1_2; tr_2_7_1_2<=70000*b_2_7_1_2;
10000*b_2_7_1_3<=tr_2_7_1_3; tr_2_7_1_3<=70000*b_2_7_1_3;
10000*b_2_7_2_1<=tr_2_7_2_1; tr_2_7_2_1<=70000*b_2_7_2_1;
Documentation of the calculations 10

10000*b_2_7_2_2<=tr_2_7_2_2; tr_2_7_2_2<=70000*b_2_7_2_2;
10000*b_2_7_2_3<=tr_2_7_2_3; tr_2_7_2_3<=70000*b_2_7_2_3;
10000*b_3_4_1_1<=tr_3_4_1_1; tr_3_4_1_1<=70000*b_3_4_1_1;
10000*b_3_4_1_2<=tr_3_4_1_2; tr_3_4_1_2<=70000*b_3_4_1_2;
10000*b_3_4_1_3<=tr_3_4_1_3; tr_3_4_1_3<=70000*b_3_4_1_3;
10000*b_3_4_2_1<=tr_3_4_2_1; tr_3_4_2_1<=70000*b_3_4_2_1;
10000*b_3_4_2_2<=tr_3_4_2_2; tr_3_4_2_2<=70000*b_3_4_2_2;
10000*b_3_4_2_3<=tr_3_4_2_3; tr_3_4_2_3<=70000*b_3_4_2_3;
10000*b_3_5_1_1<=tr_3_5_1_1; tr_3_5_1_1<=70000*b_3_5_1_1;
10000*b_3_5_1_2<=tr_3_5_1_2; tr_3_5_1_2<=70000*b_3_5_1_2;
10000*b_3_5_1_3<=tr_3_5_1_3; tr_3_5_1_3<=70000*b_3_5_1_3;
10000*b_3_5_2_1<=tr_3_5_2_1; tr_3_5_2_1<=70000*b_3_5_2_1;
10000*b_3_5_2_2<=tr_3_5_2_2; tr_3_5_2_2<=70000*b_3_5_2_2;
10000*b_3_5_2_3<=tr_3_5_2_3; tr_3_5_2_3<=70000*b_3_5_2_3;
10000*b_3_6_1_1<=tr_3_6_1_1; tr_3_6_1_1<=70000*b_3_6_1_1;
10000*b_3_6_1_2<=tr_3_6_1_2; tr_3_6_1_2<=70000*b_3_6_1_2;
10000*b_3_6_1_3<=tr_3_6_1_3; tr_3_6_1_3<=70000*b_3_6_1_3;
10000*b_3_6_2_1<=tr_3_6_2_1; tr_3_6_2_1<=70000*b_3_6_2_1;
10000*b_3_6_2_2<=tr_3_6_2_2; tr_3_6_2_2<=70000*b_3_6_2_2;
10000*b_3_6_2_3<=tr_3_6_2_3; tr_3_6_2_3<=70000*b_3_6_2_3;
10000*b_3_7_1_1<=tr_3_7_1_1; tr_3_7_1_1<=70000*b_3_7_1_1;
10000*b_3_7_1_2<=tr_3_7_1_2; tr_3_7_1_2<=70000*b_3_7_1_2;
10000*b_3_7_1_3<=tr_3_7_1_3; tr_3_7_1_3<=70000*b_3_7_1_3;
10000*b_3_7_2_1<=tr_3_7_2_1; tr_3_7_2_1<=70000*b_3_7_2_1;
10000*b_3_7_2_2<=tr_3_7_2_2; tr_3_7_2_2<=70000*b_3_7_2_2;
10000*b_3_7_2_3<=tr_3_7_2_3; tr_3_7_2_3<=70000*b_3_7_2_3;
5000*b_4_8_1_1<=tr_4_8_1_1; tr_4_8_1_1<=25000*b_4_8_1_1;
5000*b_4_8_1_2<=tr_4_8_1_2; tr_4_8_1_2<=25000*b_4_8_1_2;
5000*b_4_8_1_3<=tr_4_8_1_3; tr_4_8_1_3<=25000*b_4_8_1_3;
5000*b_4_8_1_4<=tr_4_8_1_4; tr_4_8_1_4<=25000*b_4_8_1_4;
5000*b_4_8_2_1<=tr_4_8_2_1; tr_4_8_2_1<=25000*b_4_8_2_1;
5000*b_4_8_2_2<=tr_4_8_2_2; tr_4_8_2_2<=25000*b_4_8_2_2;
5000*b_4_8_2_3<=tr_4_8_2_3; tr_4_8_2_3<=25000*b_4_8_2_3;
5000*b_4_8_2_4<=tr_4_8_2_4; tr_4_8_2_4<=25000*b_4_8_2_4;
Documentation of the calculations 11

5000*b_4_8_3_1<=tr_4_8_3_1; tr_4_8_3_1<=25000*b_4_8_3_1;
5000*b_4_8_3_2<=tr_4_8_3_2; tr_4_8_3_2<=25000*b_4_8_3_2;
5000*b_4_8_3_3<=tr_4_8_3_3; tr_4_8_3_3<=25000*b_4_8_3_3;
5000*b_4_8_3_4<=tr_4_8_3_4; tr_4_8_3_4<=25000*b_4_8_3_4;
5000*b_5_8_1_1<=tr_5_8_1_1; tr_5_8_1_1<=25000*b_5_8_1_1;
5000*b_5_8_1_2<=tr_5_8_1_2; tr_5_8_1_2<=25000*b_5_8_1_2;
5000*b_5_8_1_3<=tr_5_8_1_3; tr_5_8_1_3<=25000*b_5_8_1_3;
5000*b_5_8_1_4<=tr_5_8_1_4; tr_5_8_1_4<=25000*b_5_8_1_4;
5000*b_5_8_2_1<=tr_5_8_2_1; tr_5_8_2_1<=25000*b_5_8_2_1;
5000*b_5_8_2_2<=tr_5_8_2_2; tr_5_8_2_2<=25000*b_5_8_2_2;
5000*b_5_8_2_3<=tr_5_8_2_3; tr_5_8_2_3<=25000*b_5_8_2_3;
5000*b_5_8_2_4<=tr_5_8_2_4; tr_5_8_2_4<=25000*b_5_8_2_4;
5000*b_5_8_3_1<=tr_5_8_3_1; tr_5_8_3_1<=25000*b_5_8_3_1;
5000*b_5_8_3_2<=tr_5_8_3_2; tr_5_8_3_2<=25000*b_5_8_3_2;
5000*b_5_8_3_3<=tr_5_8_3_3; tr_5_8_3_3<=25000*b_5_8_3_3;
5000*b_5_8_3_4<=tr_5_8_3_4; tr_5_8_3_4<=25000*b_5_8_3_4;
5000*b_6_8_1_1<=tr_6_8_1_1; tr_6_8_1_1<=25000*b_6_8_1_1;
5000*b_6_8_1_2<=tr_6_8_1_2; tr_6_8_1_2<=25000*b_6_8_1_2;
5000*b_6_8_1_3<=tr_6_8_1_3; tr_6_8_1_3<=25000*b_6_8_1_3;
5000*b_6_8_1_4<=tr_6_8_1_4; tr_6_8_1_4<=25000*b_6_8_1_4;
5000*b_6_8_2_1<=tr_6_8_2_1; tr_6_8_2_1<=25000*b_6_8_2_1;
5000*b_6_8_2_2<=tr_6_8_2_2; tr_6_8_2_2<=25000*b_6_8_2_2;
5000*b_6_8_2_3<=tr_6_8_2_3; tr_6_8_2_3<=25000*b_6_8_2_3;
5000*b_6_8_2_4<=tr_6_8_2_4; tr_6_8_2_4<=25000*b_6_8_2_4;
5000*b_6_8_3_1<=tr_6_8_3_1; tr_6_8_3_1<=25000*b_6_8_3_1;
5000*b_6_8_3_2<=tr_6_8_3_2; tr_6_8_3_2<=25000*b_6_8_3_2;
5000*b_6_8_3_3<=tr_6_8_3_3; tr_6_8_3_3<=25000*b_6_8_3_3;
5000*b_6_8_3_4<=tr_6_8_3_4; tr_6_8_3_4<=25000*b_6_8_3_4;
5000*b_7_8_1_1<=tr_7_8_1_1; tr_7_8_1_1<=25000*b_7_8_1_1;
5000*b_7_8_1_2<=tr_7_8_1_2; tr_7_8_1_2<=25000*b_7_8_1_2;
5000*b_7_8_1_3<=tr_7_8_1_3; tr_7_8_1_3<=25000*b_7_8_1_3;
5000*b_7_8_1_4<=tr_7_8_1_4; tr_7_8_1_4<=25000*b_7_8_1_4;
5000*b_7_8_2_1<=tr_7_8_2_1; tr_7_8_2_1<=25000*b_7_8_2_1;
5000*b_7_8_2_2<=tr_7_8_2_2; tr_7_8_2_2<=25000*b_7_8_2_2;
Documentation of the calculations 12

5000*b_7_8_2_3<=tr_7_8_2_3; tr_7_8_2_3<=25000*b_7_8_2_3;
5000*b_7_8_2_4<=tr_7_8_2_4; tr_7_8_2_4<=25000*b_7_8_2_4;
5000*b_7_8_3_1<=tr_7_8_3_1; tr_7_8_3_1<=25000*b_7_8_3_1;
5000*b_7_8_3_2<=tr_7_8_3_2; tr_7_8_3_2<=25000*b_7_8_3_2;
5000*b_7_8_3_3<=tr_7_8_3_3; tr_7_8_3_3<=25000*b_7_8_3_3;
5000*b_7_8_3_4<=tr_7_8_3_4; tr_7_8_3_4<=25000*b_7_8_3_4;
!Constraints (10);
t_1_1+p_1_1/24438<=t_1_2;
t_2_1+p_2_1/36055<=t_2_2;
t_3_1+p_3_1/45205<=t_3_2;
t_4_1+p_4_1/4027<=t_4_2; t_4_2+p_4_2/4027<=t_4_3;
t_5_1+p_5_1/3562<=t_5_2; t_5_2+p_5_2/3562<=t_5_3;
t_6_1+p_6_1/4932<=t_6_2; t_6_2+p_6_2/4932<=t_6_3;
t_7_1+p_7_1/2740<=t_7_2; t_7_2+p_7_2/2740<=t_7_3;
!Constraints (11);
t_8_1+p_8_1/440<=181; t_8_2+p_8_2/440<=181; t_8_3+p_8_3/440<=181;
t_8_4+p_8_4/440<=181;
!Constraints (12);
t_1_1+p_1_1/24438+15<=t_4_1+10000*(1-b_1_4_1_1);
t_1_1+p_1_1/24438+15>=t_4_1-10000*(1-b_1_4_1_1);
t_1_1+p_1_1/24438+15<=t_4_2+10000*(1-b_1_4_1_2);
t_1_1+p_1_1/24438+15>=t_4_2-10000*(1-b_1_4_1_2);
t_1_1+p_1_1/24438+15<=t_4_3+10000*(1-b_1_4_1_3);
t_1_1+p_1_1/24438+15>=t_4_3-10000*(1-b_1_4_1_3);
t_1_2+p_1_2/24438+15<=t_4_1+10000*(1-b_1_4_2_1);
t_1_2+p_1_2/24438+15>=t_4_1-10000*(1-b_1_4_2_1);
t_1_2+p_1_2/24438+15<=t_4_2+10000*(1-b_1_4_2_2);
t_1_2+p_1_2/24438+15>=t_4_2-10000*(1-b_1_4_2_2);
t_1_2+p_1_2/24438+15<=t_4_3+10000*(1-b_1_4_2_3);
t_1_2+p_1_2/24438+15>=t_4_3-10000*(1-b_1_4_2_3);
t_1_1+p_1_1/24438+1<=t_5_1+10000*(1-b_1_5_1_1);
t_1_1+p_1_1/24438+1>=t_5_1-10000*(1-b_1_5_1_1);
t_1_1+p_1_1/24438+1<=t_5_2+10000*(1-b_1_5_1_2);
t_1_1+p_1_1/24438+1>=t_5_2-10000*(1-b_1_5_1_2);
Documentation of the calculations 13

t_1_1+p_1_1/24438+1<=t_5_3+10000*(1-b_1_5_1_3);
t_1_1+p_1_1/24438+1>=t_5_3-10000*(1-b_1_5_1_3);
t_1_2+p_1_2/24438+1<=t_5_1+10000*(1-b_1_5_2_1);
t_1_2+p_1_2/24438+1>=t_5_1-10000*(1-b_1_5_2_1);
t_1_2+p_1_2/24438+1<=t_5_2+10000*(1-b_1_5_2_2);
t_1_2+p_1_2/24438+1>=t_5_2-10000*(1-b_1_5_2_2);
t_1_2+p_1_2/24438+1<=t_5_3+10000*(1-b_1_5_2_3);
t_1_2+p_1_2/24438+1>=t_5_3-10000*(1-b_1_5_2_3);
t_1_1+p_1_1/24438+13<=t_6_1+10000*(1-b_1_6_1_1);
t_1_1+p_1_1/24438+13>=t_6_1-10000*(1-b_1_6_1_1);
t_1_1+p_1_1/24438+13<=t_6_2+10000*(1-b_1_6_1_2);
t_1_1+p_1_1/24438+13>=t_6_2-10000*(1-b_1_6_1_2);
t_1_1+p_1_1/24438+13<=t_6_3+10000*(1-b_1_6_1_3);
t_1_1+p_1_1/24438+13>=t_6_3-10000*(1-b_1_6_1_3);
t_1_2+p_1_2/24438+13<=t_6_1+10000*(1-b_1_6_2_1);
t_1_2+p_1_2/24438+13>=t_6_1-10000*(1-b_1_6_2_1);
t_1_2+p_1_2/24438+13<=t_6_2+10000*(1-b_1_6_2_2);
t_1_2+p_1_2/24438+13>=t_6_2-10000*(1-b_1_6_2_2);
t_1_2+p_1_2/24438+13<=t_6_3+10000*(1-b_1_6_2_3);
t_1_2+p_1_2/24438+13>=t_6_3-10000*(1-b_1_6_2_3);
t_1_1+p_1_1/24438+18<=t_7_1+10000*(1-b_1_7_1_1);
t_1_1+p_1_1/24438+18>=t_7_1-10000*(1-b_1_7_1_1);
t_1_1+p_1_1/24438+18<=t_7_2+10000*(1-b_1_7_1_2);
t_1_1+p_1_1/24438+18>=t_7_2-10000*(1-b_1_7_1_2);
t_1_1+p_1_1/24438+18<=t_7_3+10000*(1-b_1_7_1_3);
t_1_1+p_1_1/24438+18>=t_7_3-10000*(1-b_1_7_1_3);
t_1_2+p_1_2/24438+18<=t_7_1+10000*(1-b_1_7_2_1);
t_1_2+p_1_2/24438+18>=t_7_1-10000*(1-b_1_7_2_1);
t_1_2+p_1_2/24438+18<=t_7_2+10000*(1-b_1_7_2_2);
t_1_2+p_1_2/24438+18>=t_7_2-10000*(1-b_1_7_2_2);
t_1_2+p_1_2/24438+18<=t_7_3+10000*(1-b_1_7_2_3);
t_1_2+p_1_2/24438+18>=t_7_3-10000*(1-b_1_7_2_3);
t_2_1+p_2_1/36055+7<=t_4_1+10000*(1-b_2_4_1_1);
t_2_1+p_2_1/36055+7>=t_4_1-10000*(1-b_2_4_1_1);
Documentation of the calculations 14

t_2_1+p_2_1/36055+7<=t_4_2+10000*(1-b_2_4_1_2);
t_2_1+p_2_1/36055+7>=t_4_2-10000*(1-b_2_4_1_2);
t_2_1+p_2_1/36055+7<=t_4_3+10000*(1-b_2_4_1_3);
t_2_1+p_2_1/36055+7>=t_4_3-10000*(1-b_2_4_1_3);
t_2_2+p_2_2/36055+7<=t_4_1+10000*(1-b_2_4_2_1);
t_2_2+p_2_2/36055+7>=t_4_1-10000*(1-b_2_4_2_1);
t_2_2+p_2_2/36055+7<=t_4_2+10000*(1-b_2_4_2_2);
t_2_2+p_2_2/36055+7>=t_4_2-10000*(1-b_2_4_2_2);
t_2_2+p_2_2/36055+7<=t_4_3+10000*(1-b_2_4_2_3);
t_2_2+p_2_2/36055+7>=t_4_3-10000*(1-b_2_4_2_3);
t_2_1+p_2_1/36055+13<=t_5_1+10000*(1-b_2_5_1_1);
t_2_1+p_2_1/36055+13>=t_5_1-10000*(1-b_2_5_1_1);
t_2_1+p_2_1/36055+13<=t_5_2+10000*(1-b_2_5_1_2);
t_2_1+p_2_1/36055+13>=t_5_2-10000*(1-b_2_5_1_2);
t_2_1+p_2_1/36055+13<=t_5_3+10000*(1-b_2_5_1_3);
t_2_1+p_2_1/36055+13>=t_5_3-10000*(1-b_2_5_1_3);
t_2_2+p_2_2/36055+13<=t_5_1+10000*(1-b_2_5_2_1);
t_2_2+p_2_2/36055+13>=t_5_1-10000*(1-b_2_5_2_1);
t_2_2+p_2_2/36055+13<=t_5_2+10000*(1-b_2_5_2_2);
t_2_2+p_2_2/36055+13>=t_5_2-10000*(1-b_2_5_2_2);
t_2_2+p_2_2/36055+13<=t_5_3+10000*(1-b_2_5_2_3);
t_2_2+p_2_2/36055+13>=t_5_3-10000*(1-b_2_5_2_3);
t_2_1+p_2_1/36055+9<=t_6_1+10000*(1-b_2_6_1_1);
t_2_1+p_2_1/36055+9>=t_6_1-10000*(1-b_2_6_1_1);
t_2_1+p_2_1/36055+9<=t_6_2+10000*(1-b_2_6_1_2);
t_2_1+p_2_1/36055+9>=t_6_2-10000*(1-b_2_6_1_2);
t_2_1+p_2_1/36055+9<=t_6_3+10000*(1-b_2_6_1_3);
t_2_1+p_2_1/36055+9>=t_6_3-10000*(1-b_2_6_1_3);
t_2_2+p_2_2/36055+9<=t_6_1+10000*(1-b_2_6_2_1);
t_2_2+p_2_2/36055+9>=t_6_1-10000*(1-b_2_6_2_1);
t_2_2+p_2_2/36055+9<=t_6_2+10000*(1-b_2_6_2_2);
t_2_2+p_2_2/36055+9>=t_6_2-10000*(1-b_2_6_2_2);
t_2_2+p_2_2/36055+9<=t_6_3+10000*(1-b_2_6_2_3);
t_2_2+p_2_2/36055+9>=t_6_3-10000*(1-b_2_6_2_3);
Documentation of the calculations 15

t_2_1+p_2_1/36055+10<=t_7_1+10000*(1-b_2_7_1_1);
t_2_1+p_2_1/36055+10>=t_7_1-10000*(1-b_2_7_1_1);
t_2_1+p_2_1/36055+10<=t_7_2+10000*(1-b_2_7_1_2);
t_2_1+p_2_1/36055+10>=t_7_2-10000*(1-b_2_7_1_2);
t_2_1+p_2_1/36055+10<=t_7_3+10000*(1-b_2_7_1_3);
t_2_1+p_2_1/36055+10>=t_7_3-10000*(1-b_2_7_1_3);
t_2_2+p_2_2/36055+10<=t_7_1+10000*(1-b_2_7_2_1);
t_2_2+p_2_2/36055+10>=t_7_1-10000*(1-b_2_7_2_1);
t_2_2+p_2_2/36055+10<=t_7_2+10000*(1-b_2_7_2_2);
t_2_2+p_2_2/36055+10>=t_7_2-10000*(1-b_2_7_2_2);
t_2_2+p_2_2/36055+10<=t_7_3+10000*(1-b_2_7_2_3);
t_2_2+p_2_2/36055+10>=t_7_3-10000*(1-b_2_7_2_3);
t_3_1+p_3_1/45205+28<=t_4_1+10000*(1-b_3_4_1_1);
t_3_1+p_3_1/45205+28>=t_4_1-10000*(1-b_3_4_1_1);
t_3_1+p_3_1/45205+28<=t_4_2+10000*(1-b_3_4_1_2);
t_3_1+p_3_1/45205+28>=t_4_2-10000*(1-b_3_4_1_2);
t_3_1+p_3_1/45205+28<=t_4_3+10000*(1-b_3_4_1_3);
t_3_1+p_3_1/45205+28>=t_4_3-10000*(1-b_3_4_1_3);
t_3_2+p_3_2/45205+28<=t_4_1+10000*(1-b_3_4_2_1);
t_3_2+p_3_2/45205+28>=t_4_1-10000*(1-b_3_4_2_1);
t_3_2+p_3_2/45205+28<=t_4_2+10000*(1-b_3_4_2_2);
t_3_2+p_3_2/45205+28>=t_4_2-10000*(1-b_3_4_2_2);
t_3_2+p_3_2/45205+28<=t_4_3+10000*(1-b_3_4_2_3);
t_3_2+p_3_2/45205+28>=t_4_3-10000*(1-b_3_4_2_3);
t_3_1+p_3_1/45205+37<=t_5_1+10000*(1-b_3_5_1_1);
t_3_1+p_3_1/45205+37>=t_5_1-10000*(1-b_3_5_1_1);
t_3_1+p_3_1/45205+37<=t_5_2+10000*(1-b_3_5_1_2);
t_3_1+p_3_1/45205+37>=t_5_2-10000*(1-b_3_5_1_2);
t_3_1+p_3_1/45205+37<=t_5_3+10000*(1-b_3_5_1_3);
t_3_1+p_3_1/45205+37>=t_5_3-10000*(1-b_3_5_1_3);
t_3_2+p_3_2/45205+37<=t_5_1+10000*(1-b_3_5_2_1);
t_3_2+p_3_2/45205+37>=t_5_1-10000*(1-b_3_5_2_1);
t_3_2+p_3_2/45205+37<=t_5_2+10000*(1-b_3_5_2_2);
t_3_2+p_3_2/45205+37>=t_5_2-10000*(1-b_3_5_2_2);
Documentation of the calculations 16

t_3_2+p_3_2/45205+37<=t_5_3+10000*(1-b_3_5_2_3);
t_3_2+p_3_2/45205+37>=t_5_3-10000*(1-b_3_5_2_3);
t_3_1+p_3_1/45205+31<=t_6_1+10000*(1-b_3_6_1_1);
t_3_1+p_3_1/45205+31>=t_6_1-10000*(1-b_3_6_1_1);
t_3_1+p_3_1/45205+31<=t_6_2+10000*(1-b_3_6_1_2);
t_3_1+p_3_1/45205+31>=t_6_2-10000*(1-b_3_6_1_2);
t_3_1+p_3_1/45205+31<=t_6_3+10000*(1-b_3_6_1_3);
t_3_1+p_3_1/45205+31>=t_6_3-10000*(1-b_3_6_1_3);
t_3_2+p_3_2/45205+31<=t_6_1+10000*(1-b_3_6_2_1);
t_3_2+p_3_2/45205+31>=t_6_1-10000*(1-b_3_6_2_1);
t_3_2+p_3_2/45205+31<=t_6_2+10000*(1-b_3_6_2_2);
t_3_2+p_3_2/45205+31>=t_6_2-10000*(1-b_3_6_2_2);
t_3_2+p_3_2/45205+31<=t_6_3+10000*(1-b_3_6_2_3);
t_3_2+p_3_2/45205+31>=t_6_3-10000*(1-b_3_6_2_3);
t_3_1+p_3_1/45205+32<=t_7_1+10000*(1-b_3_7_1_1);
t_3_1+p_3_1/45205+32>=t_7_1-10000*(1-b_3_7_1_1);
t_3_1+p_3_1/45205+32<=t_7_2+10000*(1-b_3_7_1_2);
t_3_1+p_3_1/45205+32>=t_7_2-10000*(1-b_3_7_1_2);
t_3_1+p_3_1/45205+32<=t_7_3+10000*(1-b_3_7_1_3);
t_3_1+p_3_1/45205+32>=t_7_3-10000*(1-b_3_7_1_3);
t_3_2+p_3_2/45205+32<=t_7_1+10000*(1-b_3_7_2_1);
t_3_2+p_3_2/45205+32>=t_7_1-10000*(1-b_3_7_2_1);
t_3_2+p_3_2/45205+32<=t_7_2+10000*(1-b_3_7_2_2);
t_3_2+p_3_2/45205+32>=t_7_2-10000*(1-b_3_7_2_2);
t_3_2+p_3_2/45205+32<=t_7_3+10000*(1-b_3_7_2_3);
t_3_2+p_3_2/45205+32>=t_7_3-10000*(1-b_3_7_2_3);
t_4_1+p_4_1/4027+3<=t_8_1+10000*(1-b_4_8_1_1);
t_4_1+p_4_1/4027+3>=t_8_1-10000*(1-b_4_8_1_1);
t_4_1+p_4_1/4027+3<=t_8_2+10000*(1-b_4_8_1_2);
t_4_1+p_4_1/4027+3>=t_8_2-10000*(1-b_4_8_1_2);
t_4_1+p_4_1/4027+3<=t_8_3+10000*(1-b_4_8_1_3);
t_4_1+p_4_1/4027+3>=t_8_3-10000*(1-b_4_8_1_3);
t_4_1+p_4_1/4027+3<=t_8_4+10000*(1-b_4_8_1_4);
t_4_1+p_4_1/4027+3>=t_8_4-10000*(1-b_4_8_1_4);
Documentation of the calculations 17

t_4_2+p_4_2/4027+3<=t_8_1+10000*(1-b_4_8_2_1);
t_4_2+p_4_2/4027+3>=t_8_1-10000*(1-b_4_8_2_1);
t_4_2+p_4_2/4027+3<=t_8_2+10000*(1-b_4_8_2_2);
t_4_2+p_4_2/4027+3>=t_8_2-10000*(1-b_4_8_2_2);
t_4_2+p_4_2/4027+3<=t_8_3+10000*(1-b_4_8_2_3);
t_4_2+p_4_2/4027+3>=t_8_3-10000*(1-b_4_8_2_3);
t_4_2+p_4_2/4027+3<=t_8_4+10000*(1-b_4_8_2_4);
t_4_2+p_4_2/4027+3>=t_8_4-10000*(1-b_4_8_2_4);
t_4_3+p_4_3/4027+3<=t_8_1+10000*(1-b_4_8_3_1);
t_4_3+p_4_3/4027+3>=t_8_1-10000*(1-b_4_8_3_1);
t_4_3+p_4_3/4027+3<=t_8_2+10000*(1-b_4_8_3_2);
t_4_3+p_4_3/4027+3>=t_8_2-10000*(1-b_4_8_3_2);
t_4_3+p_4_3/4027+3<=t_8_3+10000*(1-b_4_8_3_3);
t_4_3+p_4_3/4027+3>=t_8_3-10000*(1-b_4_8_3_3);
t_4_3+p_4_3/4027+3<=t_8_4+10000*(1-b_4_8_3_4);
t_4_3+p_4_3/4027+3>=t_8_4-10000*(1-b_4_8_3_4);
t_5_1+p_5_1/3562+15<=t_8_1+10000*(1-b_5_8_1_1);
t_5_1+p_5_1/3562+15>=t_8_1-10000*(1-b_5_8_1_1);
t_5_1+p_5_1/3562+15<=t_8_2+10000*(1-b_5_8_1_2);
t_5_1+p_5_1/3562+15>=t_8_2-10000*(1-b_5_8_1_2);
t_5_1+p_5_1/3562+15<=t_8_3+10000*(1-b_5_8_1_3);
t_5_1+p_5_1/3562+15>=t_8_3-10000*(1-b_5_8_1_3);
t_5_1+p_5_1/3562+15<=t_8_4+10000*(1-b_5_8_1_4);
t_5_1+p_5_1/3562+15>=t_8_4-10000*(1-b_5_8_1_4);
t_5_2+p_5_2/3562+15<=t_8_1+10000*(1-b_5_8_2_1);
t_5_2+p_5_2/3562+15>=t_8_1-10000*(1-b_5_8_2_1);
t_5_2+p_5_2/3562+15<=t_8_2+10000*(1-b_5_8_2_2);
t_5_2+p_5_2/3562+15>=t_8_2-10000*(1-b_5_8_2_2);
t_5_2+p_5_2/3562+15<=t_8_3+10000*(1-b_5_8_2_3);
t_5_2+p_5_2/3562+15>=t_8_3-10000*(1-b_5_8_2_3);
t_5_2+p_5_2/3562+15<=t_8_4+10000*(1-b_5_8_2_4);
t_5_2+p_5_2/3562+15>=t_8_4-10000*(1-b_5_8_2_4);
t_5_3+p_5_3/3562+15<=t_8_1+10000*(1-b_5_8_3_1);
t_5_3+p_5_3/3562+15>=t_8_1-10000*(1-b_5_8_3_1);
Documentation of the calculations 18

t_5_3+p_5_3/3562+15<=t_8_2+10000*(1-b_5_8_3_2);
t_5_3+p_5_3/3562+15>=t_8_2-10000*(1-b_5_8_3_2);
t_5_3+p_5_3/3562+15<=t_8_3+10000*(1-b_5_8_3_3);
t_5_3+p_5_3/3562+15>=t_8_3-10000*(1-b_5_8_3_3);
t_5_3+p_5_3/3562+15<=t_8_4+10000*(1-b_5_8_3_4);
t_5_3+p_5_3/3562+15>=t_8_4-10000*(1-b_5_8_3_4);
t_6_1+p_6_1/4932+2.5<=t_8_1+10000*(1-b_6_8_1_1);
t_6_1+p_6_1/4932+2.5>=t_8_1-10000*(1-b_6_8_1_1);
t_6_1+p_6_1/4932+2.5<=t_8_2+10000*(1-b_6_8_1_2);
t_6_1+p_6_1/4932+2.5>=t_8_2-10000*(1-b_6_8_1_2);
t_6_1+p_6_1/4932+2.5<=t_8_3+10000*(1-b_6_8_1_3);
t_6_1+p_6_1/4932+2.5>=t_8_3-10000*(1-b_6_8_1_3);
t_6_1+p_6_1/4932+2.5<=t_8_4+10000*(1-b_6_8_1_4);
t_6_1+p_6_1/4932+2.5>=t_8_4-10000*(1-b_6_8_1_4);
t_6_2+p_6_2/4932+2.5<=t_8_1+10000*(1-b_6_8_2_1);
t_6_2+p_6_2/4932+2.5>=t_8_1-10000*(1-b_6_8_2_1);
t_6_2+p_6_2/4932+2.5<=t_8_2+10000*(1-b_6_8_2_2);
t_6_2+p_6_2/4932+2.5>=t_8_2-10000*(1-b_6_8_2_2);
t_6_2+p_6_2/4932+2.5<=t_8_3+10000*(1-b_6_8_2_3);
t_6_2+p_6_2/4932+2.5>=t_8_3-10000*(1-b_6_8_2_3);
t_6_2+p_6_2/4932+2.5<=t_8_4+10000*(1-b_6_8_2_4);
t_6_2+p_6_2/4932+2.5>=t_8_4-10000*(1-b_6_8_2_4);
t_6_3+p_6_3/4932+2.5<=t_8_1+10000*(1-b_6_8_3_1);
t_6_3+p_6_3/4932+2.5>=t_8_1-10000*(1-b_6_8_3_1);
t_6_3+p_6_3/4932+2.5<=t_8_2+10000*(1-b_6_8_3_2);
t_6_3+p_6_3/4932+2.5>=t_8_2-10000*(1-b_6_8_3_2);
t_6_3+p_6_3/4932+2.5<=t_8_3+10000*(1-b_6_8_3_3);
t_6_3+p_6_3/4932+2.5>=t_8_3-10000*(1-b_6_8_3_3);
t_6_3+p_6_3/4932+2.5<=t_8_4+10000*(1-b_6_8_3_4);
t_6_3+p_6_3/4932+2.5>=t_8_4-10000*(1-b_6_8_3_4);
t_7_1+p_7_1/2740+8<=t_8_1+10000*(1-b_7_8_1_1);
t_7_1+p_7_1/2740+8>=t_8_1-10000*(1-b_7_8_1_1);
t_7_1+p_7_1/2740+8<=t_8_2+10000*(1-b_7_8_1_2);
t_7_1+p_7_1/2740+8>=t_8_2-10000*(1-b_7_8_1_2);
Documentation of the calculations 19

t_7_1+p_7_1/2740+8<=t_8_3+10000*(1-b_7_8_1_3);
t_7_1+p_7_1/2740+8>=t_8_3-10000*(1-b_7_8_1_3);
t_7_1+p_7_1/2740+8<=t_8_4+10000*(1-b_7_8_1_4);
t_7_1+p_7_1/2740+8>=t_8_4-10000*(1-b_7_8_1_4);
t_7_2+p_7_2/2740+8<=t_8_1+10000*(1-b_7_8_2_1);
t_7_2+p_7_2/2740+8>=t_8_1-10000*(1-b_7_8_2_1);
t_7_2+p_7_2/2740+8<=t_8_2+10000*(1-b_7_8_2_2);
t_7_2+p_7_2/2740+8>=t_8_2-10000*(1-b_7_8_2_2);
t_7_2+p_7_2/2740+8<=t_8_3+10000*(1-b_7_8_2_3);
t_7_2+p_7_2/2740+8>=t_8_3-10000*(1-b_7_8_2_3);
t_7_2+p_7_2/2740+8<=t_8_4+10000*(1-b_7_8_2_4);
t_7_2+p_7_2/2740+8>=t_8_4-10000*(1-b_7_8_2_4);
t_7_3+p_7_3/2740+8<=t_8_1+10000*(1-b_7_8_3_1);
t_7_3+p_7_3/2740+8>=t_8_1-10000*(1-b_7_8_3_1);
t_7_3+p_7_3/2740+8<=t_8_2+10000*(1-b_7_8_3_2);
t_7_3+p_7_3/2740+8>=t_8_2-10000*(1-b_7_8_3_2);
t_7_3+p_7_3/2740+8<=t_8_3+10000*(1-b_7_8_3_3);
t_7_3+p_7_3/2740+8>=t_8_3-10000*(1-b_7_8_3_3);
t_7_3+p_7_3/2740+8<=t_8_4+10000*(1-b_7_8_3_4);
t_7_3+p_7_3/2740+8>=t_8_4-10000*(1-b_7_8_3_4);
!The time block constraints (13) need to be added only for the scenarios 12 to 22;
t_6_1+p_6_1/4932<=20+10000*(1-s_6_1);
t_6_1>=40-10000*s_6_1;
t_6_2+p_6_2/4932<=20+10000*(1-s_6_2);
t_6_2>=40-10000*s_6_2;
t_6_3+p_6_3/4932<=20+10000*(1-s_6_3);
t_6_3>=40-10000*s_6_3;
!Constraints (14);
t_8_1<=181+10000*ar_8_1; t_8_1>=181-10000*ar_8_1;
t_8_2<=181+10000*ar_8_2; t_8_2>=181-10000*ar_8_2;
t_8_3<=181+10000*ar_8_3; t_8_3>=181-10000*ar_8_3;
t_8_4<=181+10000*ar_8_4; t_8_4>=181-10000*ar_8_4;
!Binary constraints (15);
@bin(pr_1); @bin(pr_2); @bin(pr_3); @bin(pr_4); @bin(pr_5); @bin(pr_6); @bin(pr_7);
Documentation of the calculations 20

!Binary constraints (16);


@bin(ar_1_1); @bin(ar_1_2); @bin(ar_2_1); @bin(ar_2_2); @bin(ar_3_1);
@bin(ar_3_2); @bin(ar_4_1); @bin(ar_4_2); @bin(ar_4_3); @bin(ar_5_1);
@bin(ar_5_2); @bin(ar_5_3); @bin(ar_6_1); @bin(ar_6_2); @bin(ar_6_3);
@bin(ar_7_1); @bin(ar_7_2); @bin(ar_7_3); @bin(ar_8_1); @bin(ar_8_2);
@bin(ar_8_3); @bin(ar_8_4);
!Binary constraints (17);
@bin(b_1_4_1_1); @bin(b_1_4_1_2); @bin(b_1_4_1_3); @bin(b_1_4_2_1);
@bin(b_1_4_2_2); @bin(b_1_4_2_3); @bin(b_1_5_1_1); @bin(b_1_5_1_2);
@bin(b_1_5_1_3); @bin(b_1_5_2_1); @bin(b_1_5_2_2); @bin(b_1_5_2_3);
@bin(b_1_6_1_1); @bin(b_1_6_1_2); @bin(b_1_6_1_3); @bin(b_1_6_2_1);
@bin(b_1_6_2_2); @bin(b_1_6_2_3); @bin(b_1_7_1_1); @bin(b_1_7_1_2);
@bin(b_1_7_1_3); @bin(b_1_7_2_1); @bin(b_1_7_2_2); @bin(b_1_7_2_3);
@bin(b_2_4_1_1); @bin(b_2_4_1_2); @bin(b_2_4_1_3); @bin(b_2_4_2_1);
@bin(b_2_4_2_2); @bin(b_2_4_2_3); @bin(b_2_5_1_1); @bin(b_2_5_1_2);
@bin(b_2_5_1_3); @bin(b_2_5_2_1); @bin(b_2_5_2_2); @bin(b_2_5_2_3);
@bin(b_2_6_1_1); @bin(b_2_6_1_2); @bin(b_2_6_1_3); @bin(b_2_6_2_1);
@bin(b_2_6_2_2); @bin(b_2_6_2_3); @bin(b_2_7_1_1); @bin(b_2_7_1_2);
@bin(b_2_7_1_3); @bin(b_2_7_2_1); @bin(b_2_7_2_2); @bin(b_2_7_2_3);
@bin(b_3_4_1_1); @bin(b_3_4_1_2); @bin(b_3_4_1_3); @bin(b_3_4_2_1);
@bin(b_3_4_2_2); @bin(b_3_4_2_3); @bin(b_3_5_1_1); @bin(b_3_5_1_2);
@bin(b_3_5_1_3); @bin(b_3_5_2_1); @bin(b_3_5_2_2); @bin(b_3_5_2_3);
@bin(b_3_6_1_1); @bin(b_3_6_1_2); @bin(b_3_6_1_3); @bin(b_3_6_2_1);
@bin(b_3_6_2_2); @bin(b_3_6_2_3); @bin(b_3_7_1_1); @bin(b_3_7_1_2);
@bin(b_3_7_1_3); @bin(b_3_7_2_1); @bin(b_3_7_2_2); @bin(b_3_7_2_3);
@bin(b_4_8_1_1); @bin(b_4_8_1_2); @bin(b_4_8_1_3); @bin(b_4_8_1_4);
@bin(b_4_8_2_1); @bin(b_4_8_2_2); @bin(b_4_8_2_3); @bin(b_4_8_2_4);
@bin(b_4_8_3_1); @bin(b_4_8_3_2); @bin(b_4_8_3_3); @bin(b_4_8_3_4);
@bin(b_5_8_1_1); @bin(b_5_8_1_2); @bin(b_5_8_1_3); @bin(b_5_8_1_4);
@bin(b_5_8_2_1); @bin(b_5_8_2_2); @bin(b_5_8_2_3); @bin(b_5_8_2_4);
@bin(b_5_8_3_1); @bin(b_5_8_3_2); @bin(b_5_8_3_3); @bin(b_5_8_3_4);
@bin(b_6_8_1_1); @bin(b_6_8_1_2); @bin(b_6_8_1_3); @bin(b_6_8_1_4);
@bin(b_6_8_2_1); @bin(b_6_8_2_2); @bin(b_6_8_2_3); @bin(b_6_8_2_4);
@bin(b_6_8_3_1); @bin(b_6_8_3_2); @bin(b_6_8_3_3); @bin(b_6_8_3_4);
Documentation of the calculations 21

@bin(b_7_8_1_1); @bin(b_7_8_1_2); @bin(b_7_8_1_3); @bin(b_7_8_1_4);


@bin(b_7_8_2_1); @bin(b_7_8_2_2); @bin(b_7_8_2_3); @bin(b_7_8_2_4);
@bin(b_7_8_3_1); @bin(b_7_8_3_2); @bin(b_7_8_3_3); @bin(b_7_8_3_4);

!The binary constraints (18) need to be added only for the scenarios 12 to 22;
@bin(s_6_1); @bin(s_6_2); @bin(s_6_3);
Documentation of the calculations 22

D. Computational results of the optimizations

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1585783E+09
Objective bound: 0.1585783E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 16644637
Total solver iterations: 1045951058

Variable Value Reduced Cost


X_1 90004.51 0.000000
X_2 170000.0 0.000000
X_3 99995.49 0.000000
X_4 25000.00 0.000000
X_5 70002.26 0.000000
X_6 84997.74 0.000000
X_7 0.000000 45.62440
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 40004.51 0.000000
TR_1_5_1_2 0.000000 9.513369
TR_1_5_1_3 0.000000 17.05337
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
Documentation of the calculations 23

B_1_6_1_1 0.000000 390000.0


B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 120955.7
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -803735.8
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 1.000000 0.6755130E+09
B_2_5_2_1 0.000000 -803735.8
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.6746339E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 220607.0
B_2_6_2_1 0.000000 -489044.3
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 220607.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 399393.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 399393.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 1.000000 840000.0
B_3_4_2_3 0.000000 140000.0
B_3_5_1_1 0.000000 -34342.80
B_3_5_1_2 0.000000 631593.0
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 -293735.8
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 220348.7
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 1.000000 0.1676053E+10
B_3_6_2_1 0.000000 -39044.26
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 670607.0
B_3_7_1_1 0.000000 519393.0
B_3_7_1_2 0.000000 519393.0
B_3_7_1_3 0.000000 519393.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 67700.00
Documentation of the calculations 24

B_4_8_1_2 0.000000 67700.00


B_4_8_1_3 0.000000 67700.00
B_4_8_1_4 0.000000 67700.00
B_4_8_2_1 0.000000 8309.906
B_4_8_2_2 0.000000 8309.906
B_4_8_2_3 1.000000 8309.906
B_4_8_2_4 0.000000 8309.906
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 1.000000 0.1325305E+10
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 0.000000 -977837.2
B_5_8_2_2 0.000000 -977837.2
B_5_8_2_3 0.000000 -977837.2
B_5_8_2_4 1.000000 0.9990222E+09
B_5_8_3_1 0.000000 -2530527.
B_5_8_3_2 0.000000 -2530527.
B_5_8_3_3 1.000000 0.6725924E+09
B_5_8_3_4 0.000000 -2530527.
B_6_8_1_1 1.000000 0.3249297E+09
B_6_8_1_2 1.000000 0.1000053E+10
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 -831690.1
B_6_8_2_2 0.000000 -831690.1
B_6_8_2_3 0.000000 -831690.1
B_6_8_2_4 1.000000 -831690.1
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 0.000000 52700.00
B_6_8_3_3 1.000000 0.1675176E+10
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 23.25244 0.000000
P_8_1 16001.20 0.000000
T_8_2 23.25244 0.000000
P_8_2 13333.33 0.000000
T_8_3 39.67445 0.000000
P_8_3 39998.80 0.000000
T_8_4 30.27097 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
Documentation of the calculations 25

P_7_3 0.000000 0.000000


P_6_1 35000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 24997.74 0.000000
P_5_1 20002.26 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 17.62440
P_4_2 25000.00 0.000000
P_4_3 0.000000 17.62440
P_3_1 49995.49 0.000000
P_3_2 50000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 40004.51 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 9.513369
TR_1_4_1_2 0.000000 19.51337
TR_1_4_1_3 0.000000 9.513369
TR_1_6_1_1 0.000000 5.669879
TR_1_6_1_2 0.000000 16.51337
TR_1_6_1_3 0.000000 15.80775
TR_1_7_1_1 0.000000 9.513369
TR_1_7_1_2 0.000000 9.513369
TR_1_7_1_3 0.000000 9.513369
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 6.294386
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 3.705614
TR_3_4_1_3 0.000000 0.000000
Documentation of the calculations 26

TR_3_5_1_1 0.000000 0.000000


TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.7056144
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.7056144
TR_3_6_1_3 49995.49 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 50000.00 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 25000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 20002.26 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 10000.00 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 24997.74 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
Documentation of the calculations 27

TR_7_8_2_1 0.000000 0.000000


TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.2324877E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -665935.8
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 232487.7
T_1_2 5.206442 0.000000
T_2_1 1.327675 0.000000
T_2_2 12.31526 0.000000
T_3_1 0.000000 167512.3
T_3_2 1.360285 0.000000
T_4_1 0.000000 0.000000
T_4_2 30.46636 0.000000
T_4_3 36.67445 0.000000
T_5_1 2.636980 0.000000
T_5_2 8.252436 0.000000
T_5_3 17.65592 0.000000
T_6_1 13.65592 0.000000
T_6_2 22.70203 0.000000
T_6_3 32.10597 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 28

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

After a calculation time of 100 hours:

5 hours and 7 minutes after re-start with the additional constraint that the objective
function value is smaller or equal to the best objective function value found after 100
hours:
Documentation of the calculations 29

Global optimal solution found.


Objective value: 0.1626957E+09
Objective bound: 0.1626957E+09
Infeasibilities: 0.1912849E-07
Extended solver steps: 4366389
Total solver iterations: 195987995

Variable Value Reduced Cost


X_1 87295.32 0.000000
X_2 272704.7 0.000000
X_3 0.000000 0.000000
X_4 56702.69 0.000000
X_5 68647.66 0.000000
X_6 54649.65 0.000000
X_7 0.000000 50.13215
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 37295.32 0.000000
TR_1_5_1_2 0.000000 9.004636
TR_1_5_1_3 0.000000 12.66321
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 3.658577
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.6403016E+09
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 -8300.381
B_2_4_2_1 0.000000 -61699.62
B_2_4_2_2 1.000000 0.1522612E+10
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -496424.9
B_2_5_1_2 0.000000 133899.6
B_2_5_1_3 1.000000 0.9003900E+09
B_2_5_2_1 0.000000 -768124.5
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 118300.4
B_2_6_1_1 0.000000 51699.62
B_2_6_1_2 1.000000 0.1139809E+10
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -220000.0
B_2_6_2_2 0.000000 -1699.619
B_2_6_2_3 1.000000 0.1522672E+10
B_2_7_1_1 0.000000 81699.62
B_2_7_1_2 0.000000 81699.62
Documentation of the calculations 30

B_2_7_1_3 0.000000 81699.62


B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 441875.5
B_3_5_1_2 0.000000 1072200.
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 441875.5
B_3_5_2_2 0.000000 1072200.
B_3_5_2_3 0.000000 1110000.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 1.000000 0.2396064E+09
B_4_8_1_3 0.000000 67700.00
B_4_8_1_4 1.000000 0.4006206E+09
B_4_8_2_1 1.000000 0.1521728E+10
B_4_8_2_2 0.000000 -674118.0
B_4_8_2_3 0.000000 -674118.0
B_4_8_2_4 0.000000 -674118.0
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 1.000000 0.1300981E+10
B_5_8_2_1 1.000000 0.8990647E+09
B_5_8_2_2 0.000000 -935328.6
B_5_8_2_3 0.000000 -935328.6
B_5_8_2_4 0.000000 -935328.6
B_5_8_3_1 0.000000 -1118257.
B_5_8_3_2 0.000000 -1118257.
B_5_8_3_3 1.000000 0.8988817E+09
B_5_8_3_4 0.000000 -1118257.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 1.000000 0.1139591E+10
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 1.000000 52700.00
B_6_8_3_1 1.000000 0.1522455E+10
Documentation of the calculations 31

B_6_8_3_2 0.000000 52700.00


B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 29.77981 0.000000
P_8_1 39050.84 0.000000
T_8_2 22.76129 0.000000
P_8_2 26666.67 0.000000
T_8_3 39.90728 0.000000
P_8_3 13333.33 0.000000
T_8_4 22.76129 0.000000
P_8_4 16949.16 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 0.000000 0.000000
P_6_2 31429.33 0.000000
P_6_3 23220.33 0.000000
P_5_1 18647.66 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 31702.69 0.000000
P_4_2 25000.00 0.000000
P_4_3 0.000000 22.13215
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
P_2_1 176264.0 0.000000
P_2_2 96440.65 0.000000
P_1_1 37295.32 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 12.12321
TR_1_4_1_2 0.000000 16.00464
TR_1_4_1_3 0.000000 9.004636
TR_1_6_1_1 0.000000 9.004636
TR_1_6_1_2 0.000000 12.12321
TR_1_6_1_3 0.000000 16.00464
TR_1_7_1_1 0.000000 9.004636
TR_1_7_1_2 0.000000 9.004636
TR_1_7_1_3 0.000000 9.004636
TR_1_4_2_1 0.000000 3.118577
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 3.118577
TR_1_6_2_3 0.000000 7.000000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 32

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 63405.37 0.000000
TR_2_4_1_2 0.000000 3.881423
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 62858.65 0.000000
TR_2_6_1_3 0.000000 3.881423
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 46440.65 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 3.118577
TR_3_4_1_2 0.000000 7.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 3.118577
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 3.118577
TR_3_6_1_3 0.000000 7.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 3.118577
TR_3_4_2_2 0.000000 7.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 3.118577
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 3.118577
TR_3_6_2_3 0.000000 7.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 25000.00 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 6702.686 0.000000
TR_4_8_2_1 25000.00 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 33

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 18647.66 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 6429.327 0.000000
TR_6_8_3_1 23220.33 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -3600000.
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 0.000000 -3036213.
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
Documentation of the calculations 34

AR_3_2 0.000000 0.000000


B_1_5_1_1 1.000000 0.2200553E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -630324.5
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 220055.3
T_1_2 4.715292 0.000000
T_2_1 0.000000 139944.7
T_2_2 10.89690 0.000000
T_3_1 9965.526 0.000000
T_3_2 9965.526 0.000000
T_4_1 11.88875 0.000000
T_4_2 20.57172 0.000000
T_4_3 26.77981 0.000000
T_5_1 2.526120 0.000000
T_5_2 7.761286 0.000000
T_5_3 17.88875 0.000000
T_6_1 0.000000 0.000000
T_6_2 13.88875 0.000000
T_6_3 22.57172 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 35

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1663656E+09
Objective bound: 0.1663656E+09
Infeasibilities: 0.4351023E-08
Extended solver steps: 6751446
Total solver iterations: 406514344

Variable Value Reduced Cost


X_1 90007.59 0.000000
X_2 170000.0 0.000000
X_3 99992.41 0.000000
X_4 24996.21 0.000000
X_5 70003.79 0.000000
X_6 85000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 -1807831.
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 -1807831.
B_1_4_2_1 0.000000 -2455000.
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 -2455000.
TR_1_5_1_1 40007.59 0.000000
TR_1_5_1_2 0.000000 9.245265
TR_1_5_1_3 0.000000 16.78526
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 -175193.1
Documentation of the calculations 36

B_1_6_2_2 0.000000 390000.0


B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 -1717831.
B_1_7_1_2 0.000000 -1717831.
B_1_7_1_3 0.000000 -1717831.
B_1_7_2_1 0.000000 -2365000.
B_1_7_2_2 0.000000 -2365000.
B_1_7_2_3 0.000000 -2365000.
B_2_4_1_1 0.000000 -3185000.
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 -3185000.
B_2_4_2_1 0.000000 -3185000.
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 -3185000.
B_2_5_1_1 0.000000 -784968.5
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 1.000000 0.1410322E+09
B_2_5_2_1 0.000000 -784968.5
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.1398571E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -785193.1
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -3095000.
B_2_7_1_2 0.000000 -3095000.
B_2_7_1_3 0.000000 -3095000.
B_2_7_2_1 0.000000 -3095000.
B_2_7_2_2 0.000000 -3095000.
B_2_7_2_3 0.000000 -3095000.
B_3_4_1_1 0.000000 -2619341.
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 -2619341.
B_3_4_2_1 0.000000 -2765000.
B_3_4_2_2 1.000000 840000.0
B_3_4_2_3 0.000000 -2765000.
B_3_5_1_1 0.000000 -129309.9
B_3_5_1_2 0.000000 517858.6
B_3_5_1_3 0.000000 1045659.
B_3_5_2_1 0.000000 -274968.5
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 -189534.5
B_3_6_1_2 0.000000 865658.6
B_3_6_1_3 1.000000 0.9415722E+09
B_3_6_2_1 0.000000 -335193.1
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 784341.4
B_3_7_1_1 0.000000 -2499341.
B_3_7_1_2 0.000000 -2499341.
B_3_7_1_3 0.000000 -2499341.
B_3_7_2_1 0.000000 -2645000.
B_3_7_2_2 0.000000 -2645000.
B_3_7_2_3 0.000000 -2645000.
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 0.000000 67700.00
B_4_8_1_3 0.000000 67700.00
B_4_8_1_4 0.000000 67700.00
B_4_8_2_1 1.000000 67700.00
Documentation of the calculations 37

B_4_8_2_2 0.000000 67700.00


B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 1.000000 0.1459785E+10
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 0.000000 -1058818.
B_5_8_2_2 0.000000 -1058818.
B_5_8_2_3 1.000000 0.7989412E+09
B_5_8_2_4 0.000000 -1058818.
B_5_8_3_1 1.000000 0.1385462E+09
B_5_8_3_2 0.000000 -2096010.
B_5_8_3_3 0.000000 -2096010.
B_5_8_3_4 0.000000 -2096010.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 1.000000 0.6594105E+09
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 1.000000 0.8000527E+09
B_6_8_2_1 0.000000 -772300.0
B_6_8_2_2 0.000000 -772300.0
B_6_8_2_3 1.000000 -772300.0
B_6_8_2_4 0.000000 -772300.0
B_6_8_3_1 1.000000 0.9403008E+09
B_6_8_3_2 0.000000 -341452.5
B_6_8_3_3 0.000000 -341452.5
B_6_8_3_4 0.000000 -341452.5
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 39.67501 0.000000
P_8_1 39997.98 0.000000
T_8_2 23.25299 0.000000
P_8_2 21335.36 0.000000
T_8_3 30.27152 0.000000
P_8_3 26666.67 0.000000
T_8_4 23.25299 0.000000
P_8_4 8000.000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 35000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
Documentation of the calculations 38

P_5_1 20003.79 0.000000


P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 103.0000
P_4_2 24996.21 0.000000
P_4_3 0.000000 103.0000
P_3_1 50000.00 0.000000
P_3_2 49992.41 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 40007.59 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 19.24526
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 1.171078
TR_1_6_1_2 0.000000 16.24526
TR_1_6_1_3 0.000000 17.16443
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.919163
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.9191633
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.9191633
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 2.080837
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
Documentation of the calculations 39

TR_3_6_1_2 0.000000 0.000000


TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 49992.41 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 24996.21 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 20003.79 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 20000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 15000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
Documentation of the calculations 40

TR_7_8_3_1 0.000000 0.000000


TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.2259358E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -647168.5
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 225935.8
T_1_2 5.207000 0.000000
T_2_1 1.328232 0.000000
T_2_2 12.31581 0.000000
T_3_1 0.000000 94064.22
T_3_2 1.361952 0.000000
T_4_1 0.000000 0.000000
T_4_2 30.46786 0.000000
T_4_3 36.67501 0.000000
T_5_1 2.637106 0.000000
T_5_2 8.252994 0.000000
T_5_3 17.65648 0.000000
T_6_1 13.65648 0.000000
T_6_2 22.70258 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 41

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

After a calculation time of 100 hours:

17 hours and 8 minutes after re-start with the additional constraint that the objective
function value is smaller or equal to the best objective function value found after 100
hours:
Documentation of the calculations 42

Global optimal solution found.


Objective value: 0.1702592E+09
Objective bound: 0.1702592E+09
Infeasibilities: 0.1373453E-06
Extended solver steps: 13916436
Total solver iterations: 619636545

Variable Value Reduced Cost


X_1 90000.01 0.000000
X_2 170000.0 0.000000
X_3 99999.99 0.000000
X_4 25000.00 0.000000
X_5 70000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 8.448476
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 40000.01 0.000000
TR_1_5_1_2 0.000000 11.45180
TR_1_5_1_3 0.000000 18.99180
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 -653432.8
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 -1455058.
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -939425.7
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 1.000000 0.6989798E+09
B_2_5_2_1 0.000000 -939425.7
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.6965247E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -2065058.
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 43

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 1.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 -429207.3
B_3_5_1_2 0.000000 372418.4
B_3_5_1_3 0.000000 900218.4
B_3_5_2_1 0.000000 -429425.7
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 -1614840.
B_3_6_1_2 0.000000 720218.4
B_3_6_1_3 1.000000 2340217.
B_3_6_2_1 0.000000 -1615058.
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 929781.6
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -421088.1
B_4_8_1_2 1.000000 -421088.1
B_4_8_1_3 0.000000 -421088.1
B_4_8_1_4 0.000000 -421088.1
B_4_8_2_1 0.000000 67700.00
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 1.000000 0.2099017E+10
B_5_8_2_1 0.000000 -1617791.
B_5_8_2_2 0.000000 -1617791.
B_5_8_2_3 1.000000 0.6983822E+09
B_5_8_2_4 0.000000 -1617791.
B_5_8_3_1 0.000000 -1995781.
B_5_8_3_2 1.000000 0.6965940E+09
B_5_8_3_3 0.000000 -1995781.
B_5_8_3_4 0.000000 -1995781.
B_6_8_1_1 1.000000 0.7000527E+09
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 1.000000 0.1398642E+10
B_6_8_2_1 0.000000 -1261088.
B_6_8_2_2 0.000000 -1261088.
B_6_8_2_3 1.000000 -1261088.
B_6_8_2_4 0.000000 -1261088.
B_6_8_3_1 0.000000 -1410217.
Documentation of the calculations 44

B_6_8_3_2 0.9999999 0.000000


B_6_8_3_3 0.000000 -1410217.
B_6_8_3_4 0.000000 -1410217.
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 23.25162 0.000000
P_8_1 13333.33 0.000000
T_8_2 39.67364 0.000000
P_8_2 40000.00 0.000000
T_8_3 30.27015 0.000000
P_8_3 26666.67 0.000000
T_8_4 23.25162 0.000000
P_8_4 16000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 35000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 20000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 25000.00 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 49999.99 0.000000
P_3_2 50000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 40000.01 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 21.45180
TR_1_4_1_2 0.000000 21.45180
TR_1_4_1_3 0.000000 21.45180
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 18.45180
TR_1_6_1_3 0.000000 21.44868
TR_1_7_1_1 0.000000 21.45180
TR_1_7_1_2 0.000000 21.45180
TR_1_7_1_3 0.000000 21.45180
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 9.996880
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 45

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 2.996880
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 2.996880
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.3119605E-02
TR_3_4_1_2 0.000000 0.3119605E-02
TR_3_4_1_3 0.000000 0.3119605E-02
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 49999.99 0.000000
TR_3_7_1_1 0.000000 0.3119605E-02
TR_3_7_1_2 0.000000 0.3119605E-02
TR_3_7_1_3 0.000000 0.3119605E-02
TR_3_4_2_1 50000.00 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 25000.00 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 46

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 20000.00 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 10000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 -3519274.
AR_4_3 0.000000 -3519274.
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 47

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.2798590E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -801625.7
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 279859.0
T_1_2 5.205626 0.000000
T_2_1 1.326858 0.000000
T_2_2 12.31444 0.000000
T_3_1 0.000000 141.0217
T_3_2 1.359468 0.000000
T_4_1 30.46554 0.000000
T_4_2 10011.66 0.000000
T_4_3 10011.66 0.000000
T_5_1 2.636795 0.000000
T_5_2 8.251620 0.000000
T_5_3 17.65511 0.000000
T_6_1 13.65511 0.000000
T_6_2 22.70121 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 48

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1741529E+09
Objective bound: 0.1741529E+09
Infeasibilities: 0.6871764E-07
Extended solver steps: 26187181
Total solver iterations: 351974483

Variable Value Reduced Cost


X_1 90000.00 0.000000
X_2 170000.0 0.000000
X_3 100000.0 0.000000
X_4 25000.00 0.000000
X_5 70000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 40000.00 0.000000
TR_1_5_1_2 0.000000 9.245265
TR_1_5_1_3 0.000000 16.78526
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 46184.71
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 49

B_1_6_2_1 0.000000 -600983.8


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -784968.5
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 1.000000 0.4597478E+09
B_2_5_2_1 0.000000 -784968.5
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.4581468E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -1210984.
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 161778.5
B_3_4_1_2 0.000000 161778.5
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 -253190.0
B_3_5_1_2 0.000000 393978.5
B_3_5_1_3 0.000000 921778.5
B_3_5_2_1 0.000000 -274968.5
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 -739205.3
B_3_6_1_2 0.000000 741778.5
B_3_6_1_3 0.9999999 0.1415722E+09
B_3_6_2_1 0.000000 -760983.8
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 908221.5
B_3_7_1_1 0.000000 281778.5
B_3_7_1_2 0.000000 281778.5
B_3_7_1_3 0.000000 281778.5
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 -407300.0
B_4_8_1_2 0.000000 -407300.0
B_4_8_1_3 0.000000 -407300.0
B_4_8_1_4 0.000000 -407300.0
Documentation of the calculations 50

B_4_8_2_1 0.000000 -407300.0


B_4_8_2_2 0.000000 -407300.0
B_4_8_2_3 0.000000 -407300.0
B_4_8_2_4 0.000000 -407300.0
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 1.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 1.000000 0.1659785E+10
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 0.000000 -1199188.
B_5_8_2_2 1.000000 0.5988008E+09
B_5_8_2_3 0.000000 -1199188.
B_5_8_2_4 0.000000 -1199188.
B_5_8_3_1 0.000000 -1674898.
B_5_8_3_2 0.000000 -1674898.
B_5_8_3_3 0.000000 -1674898.
B_5_8_3_4 1.000000 0.4576829E+09
B_6_8_1_1 1.000000 0.6000527E+09
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 0.1059410E+10
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 -772300.0
B_6_8_2_2 1.000000 -772300.0
B_6_8_2_3 0.000000 -772300.0
B_6_8_2_4 0.000000 -772300.0
B_6_8_3_1 0.000000 -835453.3
B_6_8_3_2 0.000000 -835453.3
B_6_8_3_3 0.000000 -835453.3
B_6_8_3_4 0.9999999 0.1398068E+09
B_7_8_1_1 0.000000 -257300.0
B_7_8_1_2 0.000000 -257300.0
B_7_8_1_3 0.000000 -257300.0
B_7_8_1_4 0.000000 -257300.0
B_7_8_2_1 0.000000 -257300.0
B_7_8_2_2 0.000000 -257300.0
B_7_8_2_3 0.000000 -257300.0
B_7_8_2_4 0.000000 -257300.0
B_7_8_3_1 0.000000 -257300.0
B_7_8_3_2 0.000000 -257300.0
B_7_8_3_3 0.000000 -257300.0
B_7_8_3_4 0.000000 -257300.0
T_8_1 23.25162 0.000000
P_8_1 13333.33 0.000000
T_8_2 30.27015 0.000000
P_8_2 26666.67 0.000000
T_8_3 23.25162 0.000000
P_8_3 16000.00 0.000000
T_8_4 39.67364 0.000000
P_8_4 40000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 35000.00 0.000000
P_6_2 25000.00 0.000000
Documentation of the calculations 51

P_6_3 25000.00 0.000000


P_5_1 20000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 39.00000
P_4_2 0.000000 39.00000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 40000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 9.245265
TR_1_4_1_2 0.000000 9.245265
TR_1_4_1_3 0.000000 19.24526
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 16.24526
TR_1_6_1_3 0.000000 18.93414
TR_1_7_1_1 0.000000 9.245265
TR_1_7_1_2 0.000000 9.245265
TR_1_7_1_3 0.000000 9.245265
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 9.688879
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 2.688879
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 2.688879
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.3111210
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 52

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 25000.00 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 20000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 10000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 53

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.9999999 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.9999999 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.2259358E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -647168.5
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 225935.8
T_1_2 5.205625 0.000000
T_2_1 1.326858 0.000000
T_2_2 12.31444 0.000000
T_3_1 0.000000 14064.22
T_3_2 1.359468 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 30.46554 0.000000
T_5_1 2.636795 0.000000
T_5_2 8.251619 0.000000
T_5_3 17.65511 0.000000
T_6_1 13.65511 0.000000
T_6_2 22.70121 0.000000
T_6_3 32.10539 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 54

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1779996E+09
Objective bound: 0.1779996E+09
Infeasibilities: 0.4272138E-10
Extended solver steps: 24100738
Total solver iterations: 1202793322

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 170000.0 0.000000
X_3 90000.00 0.000000
X_4 20000.00 0.000000
X_5 75000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 8.183976
Documentation of the calculations 55

TR_1_5_1_3 0.000000 15.72398


TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 -56947.32
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 -629825.6
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -710678.3
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 1.000000 0.5003900E+09
B_2_5_2_1 0.000000 -710678.3
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.2487602E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -1239826.
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 1.000000 840000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 140000.0
B_3_5_1_1 0.000000 -200678.3
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 900000.0
B_3_5_2_1 0.000000 -200678.3
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 -789825.6
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 930000.0
B_3_6_2_1 0.000000 -789825.6
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
Documentation of the calculations 56

B_3_7_2_1 0.000000 260000.0


B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 1.000000 67700.00
B_4_8_1_3 0.000000 67700.00
B_4_8_1_4 0.000000 67700.00
B_4_8_2_1 0.000000 -2007300.
B_4_8_2_2 0.000000 -2007300.
B_4_8_2_3 0.000000 -2007300.
B_4_8_2_4 0.000000 -2007300.
B_4_8_3_1 0.000000 -2007300.
B_4_8_3_2 0.000000 -2007300.
B_4_8_3_3 0.000000 -2007300.
B_4_8_3_4 0.000000 -2007300.
B_5_8_1_1 1.000000 0.1500193E+10
B_5_8_1_2 0.000000 192604.6
B_5_8_1_3 0.000000 192604.6
B_5_8_1_4 0.000000 192604.6
B_5_8_2_1 0.000000 -1269374.
B_5_8_2_2 0.000000 -1269374.
B_5_8_2_3 1.000000 0.4987306E+09
B_5_8_2_4 0.000000 -1269374.
B_5_8_3_1 0.000000 -1646374.
B_5_8_3_2 1.000000 0.4983536E+09
B_5_8_3_3 0.000000 -1646374.
B_5_8_3_4 0.000000 -1646374.
B_6_8_1_1 1.000000 0.5000527E+09
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 1.000000 0.5000527E+09
B_6_8_2_1 0.000000 -772300.0
B_6_8_2_2 0.000000 -772300.0
B_6_8_2_3 1.000000 -772300.0
B_6_8_2_4 0.000000 -772300.0
B_6_8_3_1 0.000000 -922300.0
B_6_8_3_2 1.000000 -922300.0
B_6_8_3_3 0.000000 -922300.0
B_6_8_3_4 0.000000 -922300.0
B_7_8_1_1 0.000000 -1857300.
B_7_8_1_2 0.000000 -1857300.
B_7_8_1_3 0.000000 -1857300.
B_7_8_1_4 0.000000 -1857300.
B_7_8_2_1 0.000000 -1857300.
B_7_8_2_2 0.000000 -1857300.
B_7_8_2_3 0.000000 -1857300.
B_7_8_2_4 0.000000 -1857300.
B_7_8_3_1 0.000000 -1857300.
B_7_8_3_2 0.000000 -1857300.
B_7_8_3_3 0.000000 -1857300.
B_7_8_3_4 0.000000 -1857300.
T_8_1 25.06452 0.000000
P_8_1 18666.67 0.000000
T_8_2 41.48654 0.000000
P_8_2 37333.33 0.000000
T_8_3 32.08305 0.000000
P_8_3 26666.67 0.000000
T_8_4 25.06452 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
Documentation of the calculations 57

AR_8_3 1.000000 0.000000


AR_8_4 1.000000 0.000000
P_4_1 20000.00 0.000000
P_4_2 0.000000 103.0000
P_4_3 0.000000 103.0000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_6_1 35000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 40000.00 0.000000
TR_1_4_1_1 0.000000 18.18398
TR_1_4_1_2 0.000000 8.183976
TR_1_4_1_3 0.000000 8.183976
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 15.18398
TR_1_6_1_3 0.000000 18.18398
TR_1_7_1_1 0.000000 8.183976
TR_1_7_1_2 0.000000 8.183976
TR_1_7_1_3 0.000000 8.183976
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 50000.00 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
Documentation of the calculations 58

TR_2_7_2_3 0.000000 0.000000


TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 40000.00 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 20000.00 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 10000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
Documentation of the calculations 59

TR_7_8_1_1 0.000000 0.000000


TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.2000000E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -572878.3
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 200000.0
T_1_2 7.018529 0.000000
T_2_1 3.139762 0.000000
T_2_2 14.12734 0.000000
T_3_1 1.811529 0.000000
T_3_2 4.635205 0.000000
T_4_1 33.52006 0.000000
T_4_2 5013.468 0.000000
T_4_3 5013.468 0.000000
T_5_1 3.045994 0.000000
T_5_2 10.06452 0.000000
T_5_3 19.46801 0.000000
T_6_1 15.46801 0.000000
T_6_2 24.51411 0.000000
T_6_3 33.91760 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 60

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1816682E+09
Objective bound: 0.1816682E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 22134482
Total solver iterations: 1211488024

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 59.46071
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 87.46071
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 61

B_1_6_1_3 0.000000 -293202.2


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -293202.2
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.3998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 232239.8
B_2_6_1_3 0.000000 -903202.2
B_2_6_2_1 1.000000 0.4002700E+09
B_2_6_2_2 0.000000 232239.8
B_2_6_2_3 0.000000 -903202.2
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 619960.2
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 619960.2
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 1.000000 0.1600930E+10
B_3_6_1_3 0.000000 -205442.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 682239.8
B_3_6_2_3 1.000000 -453202.2
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -1431819.
B_4_8_1_2 0.000000 -1431819.
B_4_8_1_3 0.000000 -1431819.
Documentation of the calculations 62

B_4_8_1_4 0.000000 -1431819.


B_4_8_2_1 0.000000 -1431819.
B_4_8_2_2 0.000000 -1431819.
B_4_8_2_3 0.000000 -1431819.
B_4_8_2_4 0.000000 -1431819.
B_4_8_3_1 0.000000 -1431819.
B_4_8_3_2 0.000000 -1431819.
B_4_8_3_3 0.000000 -1431819.
B_4_8_3_4 0.000000 -1431819.
B_5_8_1_1 0.000000 -1633302.
B_5_8_1_2 0.000000 -1633302.
B_5_8_1_3 1.000000 -1633302.
B_5_8_1_4 0.000000 -1633302.
B_5_8_2_1 0.000000 -2010302.
B_5_8_2_2 0.000000 -2010302.
B_5_8_2_3 0.000000 -2010302.
B_5_8_2_4 1.000000 0.1197990E+10
B_5_8_3_1 1.000000 0.3989282E+09
B_5_8_3_2 1.000000 0.3989282E+09
B_5_8_3_3 0.000000 -1071819.
B_5_8_3_4 0.000000 -1071819.
B_6_8_1_1 0.000000 -582544.1
B_6_8_1_2 0.000000 -582544.1
B_6_8_1_3 1.000000 0.3994175E+09
B_6_8_1_4 0.000000 -582544.1
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 1.000000 0.1600053E+10
B_6_8_3_1 1.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 -1281819.
B_7_8_1_2 0.000000 -1281819.
B_7_8_1_3 0.000000 -1281819.
B_7_8_1_4 0.000000 -1281819.
B_7_8_2_1 0.000000 -1281819.
B_7_8_2_2 0.000000 -1281819.
B_7_8_2_3 0.000000 -1281819.
B_7_8_2_4 0.000000 -1281819.
B_7_8_3_1 0.000000 -1281819.
B_7_8_3_2 0.000000 -1281819.
B_7_8_3_3 0.000000 -1281819.
B_7_8_3_4 0.000000 -1281819.
T_8_1 52.47707 0.000000
P_8_1 18666.67 0.000000
T_8_2 52.47707 0.000000
P_8_2 26666.67 0.000000
T_8_3 27.00895 0.000000
P_8_3 26666.67 0.000000
T_8_4 38.44001 0.000000
P_8_4 24000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
Documentation of the calculations 63

P_6_2 20000.00 0.000000


P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 6.460569
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 6.460569
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 3.539431
TR_3_4_1_2 0.000000 3.539431
TR_3_4_1_3 0.000000 3.539431
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.5394315
Documentation of the calculations 64

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.5394315
TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 3.539431
TR_3_7_1_2 0.000000 3.539431
TR_3_7_1_3 0.000000 3.539431
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 20000.00 0.000000
TR_6_8_3_1 10000.00 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 65

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 160000.0
T_3_2 10.33205 0.000000
T_4_1 10010.42 0.000000
T_4_2 10010.42 0.000000
T_4_3 10010.42 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 66

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1850223E+09
Objective bound: 0.1850223E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 7928266
Total solver iterations: 378727718

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 103.0000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 67

B_1_6_1_3 0.000000 52598.34


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 52598.34
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.2998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -557401.7
B_2_6_2_1 1.000000 0.3002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -557401.7
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 325820.2
B_3_4_1_2 0.000000 325820.2
B_3_4_1_3 0.000000 325820.2
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 140000.0
B_3_5_1_1 0.000000 558020.2
B_3_5_1_2 0.000000 1085820.
B_3_5_1_3 0.000000 558020.2
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 905820.2
B_3_6_1_2 1.000000 0.1200930E+10
B_3_6_1_3 0.000000 78418.49
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 744179.8
B_3_6_2_3 1.000000 -107401.7
B_3_7_1_1 0.000000 445820.2
B_3_7_1_2 0.000000 445820.2
B_3_7_1_3 0.000000 445820.2
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 -1773301.
B_4_8_1_2 0.000000 -1773301.
B_4_8_1_3 0.000000 -1773301.
Documentation of the calculations 68

B_4_8_1_4 0.000000 -1773301.


B_4_8_2_1 0.000000 -1773301.
B_4_8_2_2 0.000000 -1773301.
B_4_8_2_3 0.000000 -1773301.
B_4_8_2_4 0.000000 -1773301.
B_4_8_3_1 0.000000 -1773301.
B_4_8_3_2 0.000000 -1773301.
B_4_8_3_3 0.000000 -1773301.
B_4_8_3_4 0.000000 -1773301.
B_5_8_1_1 0.000000 -1386301.
B_5_8_1_2 1.000000 -1386301.
B_5_8_1_3 0.000000 -1386301.
B_5_8_1_4 0.000000 -1386301.
B_5_8_2_1 1.000000 0.8982367E+09
B_5_8_2_2 0.000000 -1763301.
B_5_8_2_3 0.000000 -1763301.
B_5_8_2_4 0.000000 -1763301.
B_5_8_3_1 0.000000 -965189.5
B_5_8_3_2 0.000000 -965189.5
B_5_8_3_3 1.000000 0.5990348E+09
B_5_8_3_4 1.000000 -965189.5
B_6_8_1_1 0.000000 -386233.1
B_6_8_1_2 1.000000 0.2996138E+09
B_6_8_1_3 0.000000 -386233.1
B_6_8_1_4 0.000000 -386233.1
B_6_8_2_1 1.000000 0.1200053E+10
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 0.000000 52700.00
B_6_8_3_3 1.000000 0.3000527E+09
B_6_8_3_4 1.000000 0.3000527E+09
B_7_8_1_1 0.000000 -1623301.
B_7_8_1_2 0.000000 -1623301.
B_7_8_1_3 0.000000 -1623301.
B_7_8_1_4 0.000000 -1623301.
B_7_8_2_1 0.000000 -1623301.
B_7_8_2_2 0.000000 -1623301.
B_7_8_2_3 0.000000 -1623301.
B_7_8_2_4 0.000000 -1623301.
B_7_8_3_1 0.000000 -1623301.
B_7_8_3_2 0.000000 -1623301.
B_7_8_3_3 0.000000 -1623301.
B_7_8_3_4 0.000000 -1623301.
T_8_1 38.44001 0.000000
P_8_1 24000.00 0.000000
T_8_2 27.00895 0.000000
P_8_2 26666.67 0.000000
T_8_3 52.47707 0.000000
P_8_3 26666.67 0.000000
T_8_4 52.47707 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
Documentation of the calculations 69

P_6_2 20000.00 0.000000


P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.345426
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.345426
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.3454264
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 0.3454264
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 70

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 25000.00 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 20000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 10000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 71

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 120000.0
T_3_2 10.33205 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 72

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1883765E+09
Objective bound: 0.1883765E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 3695161
Total solver iterations: 150238907

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 81.92000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 109.9200
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 73

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.1998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -211601.1
B_2_6_2_1 1.000000 0.2002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -211601.1
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 496080.1
B_3_5_1_2 0.000000 1023880.
B_3_5_1_3 0.000000 496080.1
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 843880.1
B_3_6_1_2 1.000000 0.8009300E+09
B_3_6_1_3 0.000000 362279.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 806119.9
B_3_6_2_3 1.000000 238398.9
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -1499301.
B_4_8_1_2 0.000000 -1499301.
B_4_8_1_3 0.000000 -1499301.
Documentation of the calculations 74

B_4_8_1_4 0.000000 -1499301.


B_4_8_2_1 0.000000 -1499301.
B_4_8_2_2 0.000000 -1499301.
B_4_8_2_3 0.000000 -1499301.
B_4_8_2_4 0.000000 -1499301.
B_4_8_3_1 0.000000 -1499301.
B_4_8_3_2 0.000000 -1499301.
B_4_8_3_3 0.000000 -1499301.
B_4_8_3_4 0.000000 -1499301.
B_5_8_1_1 0.000000 -1139301.
B_5_8_1_2 0.000000 -1139301.
B_5_8_1_3 0.000000 -1139301.
B_5_8_1_4 1.000000 -1139301.
B_5_8_2_1 1.000000 0.5984837E+09
B_5_8_2_2 0.000000 -1516301.
B_5_8_2_3 0.000000 -1516301.
B_5_8_2_4 0.000000 -1516301.
B_5_8_3_1 0.000000 -858559.6
B_5_8_3_2 1.000000 0.1991414E+09
B_5_8_3_3 1.000000 0.1991414E+09
B_5_8_3_4 0.000000 -858559.6
B_6_8_1_1 0.000000 -189922.0
B_6_8_1_2 0.000000 -189922.0
B_6_8_1_3 0.000000 -189922.0
B_6_8_1_4 1.000000 0.1998101E+09
B_6_8_2_1 1.000000 0.8000527E+09
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 1.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 -1349301.
B_7_8_1_2 0.000000 -1349301.
B_7_8_1_3 0.000000 -1349301.
B_7_8_1_4 0.000000 -1349301.
B_7_8_2_1 0.000000 -1349301.
B_7_8_2_2 0.000000 -1349301.
B_7_8_2_3 0.000000 -1349301.
B_7_8_2_4 0.000000 -1349301.
B_7_8_3_1 0.000000 -1349301.
B_7_8_3_2 0.000000 -1349301.
B_7_8_3_3 0.000000 -1349301.
B_7_8_3_4 0.000000 -1349301.
T_8_1 38.44001 0.000000
P_8_1 24000.00 0.000000
T_8_2 52.47707 0.000000
P_8_2 26666.67 0.000000
T_8_3 52.47707 0.000000
P_8_3 18666.67 0.000000
T_8_4 27.00895 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
Documentation of the calculations 75

P_6_2 20000.00 0.000000


P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 8.230284
TR_1_6_1_3 0.000000 0.1199842
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 8.230284
TR_1_6_2_3 0.000000 0.1199842
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 1.230284
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 1.230284
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 1.769716
TR_3_4_1_2 0.000000 1.769716
TR_3_4_1_3 0.000000 1.769716
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 76

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 1.769716
TR_3_7_1_2 0.000000 1.769716
TR_3_7_1_3 0.000000 1.769716
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 20000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 77

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 80000.00
T_3_2 10.33205 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 78

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Global optimal solution found.


Objective value: 0.1915723E+09
Objective bound: 0.1915723E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 1929342
Total solver iterations: 66376742

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 0.000000 103.0000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 9.176795
TR_1_5_1_3 0.000000 1.636795
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 79

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -252375.7
B_2_5_1_2 1.000000 0.3003900E+09
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -252375.7
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.1998622E+09
B_2_6_1_1 1.000000 0.3002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 1.000000 0.2002700E+09
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 257624.3
B_3_5_1_2 0.000000 900000.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 957624.3
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 861930.3
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -1080921.
B_4_8_1_2 0.000000 -1080921.
B_4_8_1_3 0.000000 -1080921.
Documentation of the calculations 80

B_4_8_1_4 0.000000 -1080921.


B_4_8_2_1 0.000000 -1080921.
B_4_8_2_2 0.000000 -1080921.
B_4_8_2_3 0.000000 -1080921.
B_4_8_2_4 0.000000 -1080921.
B_4_8_3_1 0.000000 -1080921.
B_4_8_3_2 0.000000 -1080921.
B_4_8_3_3 0.000000 -1080921.
B_4_8_3_4 0.000000 -1080921.
B_5_8_1_1 0.000000 -331340.3
B_5_8_1_2 0.000000 -331340.3
B_5_8_1_3 0.000000 -331340.3
B_5_8_1_4 1.000000 0.3996687E+09
B_5_8_2_1 1.000000 0.2991396E+09
B_5_8_2_2 0.000000 -860365.4
B_5_8_2_3 0.000000 -860365.4
B_5_8_2_4 0.000000 -860365.4
B_5_8_3_1 0.000000 -553550.7
B_5_8_3_2 1.000000 0.9944645E+08
B_5_8_3_3 1.000000 0.9944645E+08
B_5_8_3_4 0.000000 -553550.7
B_6_8_1_1 0.000000 2010.624
B_6_8_1_2 0.000000 2010.624
B_6_8_1_3 0.000000 2010.624
B_6_8_1_4 1.000000 0.3000020E+09
B_6_8_2_1 1.000000 0.2000527E+09
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 1.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 -930921.2
B_7_8_1_2 0.000000 -930921.2
B_7_8_1_3 0.000000 -930921.2
B_7_8_1_4 0.000000 -930921.2
B_7_8_2_1 0.000000 -930921.2
B_7_8_2_2 0.000000 -930921.2
B_7_8_2_3 0.000000 -930921.2
B_7_8_2_4 0.000000 -930921.2
B_7_8_3_1 0.000000 -930921.2
B_7_8_3_2 0.000000 -930921.2
B_7_8_3_3 0.000000 -930921.2
B_7_8_3_4 0.000000 -930921.2
T_8_1 43.51411 0.000000
P_8_1 24000.00 0.000000
T_8_2 69.99602 0.000000
P_8_2 26666.67 0.000000
T_8_3 69.99602 0.000000
P_8_3 18666.67 0.000000
T_8_4 25.06452 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
Documentation of the calculations 81

P_6_2 20000.00 0.000000


P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 100000.0 0.000000
P_2_2 110000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 1.636795
TR_1_4_1_2 0.000000 1.636795
TR_1_4_1_3 0.000000 1.636795
TR_1_6_1_1 0.000000 8.636795
TR_1_6_1_2 0.000000 8.636795
TR_1_6_1_3 0.000000 10.66437
TR_1_7_1_1 0.000000 1.636795
TR_1_7_1_2 0.000000 1.636795
TR_1_7_1_3 0.000000 1.636795
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 9.027575
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 2.027575
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 40000.00 0.000000
TR_2_6_2_3 0.000000 2.027575
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 82

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 7.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 7.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 9.027575
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 20000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 83

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -3600000.
B_1_5_1_1 1.000000 0.4000000E+09
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -114575.7
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 40000.00
T_1_2 38.73137 0.000000
T_2_1 5.722045 0.000000
T_2_2 24.90807 0.000000
T_3_1 27.85101 0.000000
T_3_2 29.39951 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 3.045994 0.000000
T_5_2 21.49559 0.000000
T_5_3 40.95896 0.000000
T_6_1 17.49559 0.000000
T_6_2 36.95896 0.000000
T_6_3 60.39951 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 84

Scenario No. 11 [No bonus payments, no time block interval]

Global optimal solution found.


Objective value: 0.1945448E+09
Objective bound: 0.1945448E+09
Infeasibilities: 0.4365575E-10
Extended solver steps: 771741
Total solver iterations: 29773572

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 0.000000 103.0000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
Documentation of the calculations 85

B_1_6_2_3 0.000000 390000.0


B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 -137800.0
B_2_6_1_1 1.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 900000.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1072200.
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 720000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -1182300.
B_4_8_1_2 0.000000 -1182300.
B_4_8_1_3 0.000000 -1182300.
B_4_8_1_4 0.000000 -1182300.
B_4_8_2_1 0.000000 -1182300.
B_4_8_2_2 0.000000 -1182300.
Documentation of the calculations 86

B_4_8_2_3 0.000000 -1182300.


B_4_8_2_4 0.000000 -1182300.
B_4_8_3_1 0.000000 -1182300.
B_4_8_3_2 0.000000 -1182300.
B_4_8_3_3 0.000000 -1182300.
B_4_8_3_4 0.000000 -1182300.
B_5_8_1_1 0.000000 -795300.0
B_5_8_1_2 0.000000 -795300.0
B_5_8_1_3 1.000000 -795300.0
B_5_8_1_4 0.000000 -795300.0
B_5_8_2_1 0.000000 -1172300.
B_5_8_2_2 0.000000 -1172300.
B_5_8_2_3 0.000000 -1172300.
B_5_8_2_4 1.000000 -1172300.
B_5_8_3_1 1.000000 -795300.0
B_5_8_3_2 1.000000 -795300.0
B_5_8_3_3 0.000000 -795300.0
B_5_8_3_4 0.000000 -795300.0
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 1.000000 52700.00
B_6_8_3_1 1.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 -1032300.
B_7_8_1_2 0.000000 -1032300.
B_7_8_1_3 0.000000 -1032300.
B_7_8_1_4 0.000000 -1032300.
B_7_8_2_1 0.000000 -1032300.
B_7_8_2_2 0.000000 -1032300.
B_7_8_2_3 0.000000 -1032300.
B_7_8_2_4 0.000000 -1032300.
B_7_8_3_1 0.000000 -1032300.
B_7_8_3_2 0.000000 -1032300.
B_7_8_3_3 0.000000 -1032300.
B_7_8_3_4 0.000000 -1032300.
P_8_1 18666.67 0.000000
P_8_2 26666.67 0.000000
P_8_3 24000.00 0.000000
P_8_4 26666.67 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 90000.00 0.000000
Documentation of the calculations 87

P_2_2 120000.0 0.000000


P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 7.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 40000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
Documentation of the calculations 88

TR_3_5_2_2 0.000000 7.000000


TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 7.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 7.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 10000.00 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
Documentation of the calculations 89

PR_6 1.000000 0.000000


PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -3600000.
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 50.39792 0.000000
T_1_2 89.12929 0.000000
T_2_1 57.41110 0.000000
T_2_2 75.02863 0.000000
T_3_1 78.24893 0.000000
T_3_2 79.79743 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 53.44391 0.000000
T_5_2 72.90729 0.000000
T_5_3 91.35688 0.000000
T_6_1 68.90729 0.000000
T_6_2 87.35688 0.000000
T_6_3 110.7974 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 120.3939 0.000000
T_8_2 120.3939 0.000000
T_8_3 75.46244 0.000000
T_8_4 94.92582 0.000000
Documentation of the calculations 90

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1612782E+09
Objective bound: 0.1612782E+09
Infeasibilities: 0.7275958E-11
Extended solver steps: 10921540
Total solver iterations: 964896623

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 50000.00 0.000000
X_5 50000.00 0.000000
X_6 65000.00 0.000000
X_7 15000.00 0.000000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 412200.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 412200.0
TR_1_5_1_1 0.000000 0.000000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 297556.5
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 91

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 297556.5
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 447556.5
B_1_7_1_2 0.000000 502200.0
B_1_7_1_3 0.000000 502200.0
B_1_7_2_1 0.000000 447556.5
B_1_7_2_2 0.000000 502200.0
B_1_7_2_3 0.000000 502200.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 1.000000 0.1820956E+10
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 -317800.0
B_2_5_1_1 0.000000 390000.0
B_2_5_1_2 0.000000 390000.0
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.2000270E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -312443.5
B_2_6_2_2 1.000000 0.1821016E+10
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 1.000000 0.1000300E+10
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 -282443.5
B_2_7_2_2 0.000000 -227800.0
B_2_7_2_3 0.000000 -227800.0
B_3_4_1_1 0.000000 630000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 102200.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 1.000000 840000.0
B_3_4_2_3 0.000000 102200.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 137556.5
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 930000.0
B_3_6_2_1 0.000000 137556.5
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 167556.5
B_3_7_1_2 0.000000 222200.0
B_3_7_1_3 0.000000 222200.0
B_3_7_2_1 0.000000 167556.5
B_3_7_2_2 0.000000 222200.0
B_3_7_2_3 0.000000 222200.0
B_4_8_1_1 0.000000 -1517455.
B_4_8_1_2 0.000000 -1517455.
B_4_8_1_3 0.000000 -1517455.
Documentation of the calculations 92

B_4_8_1_4 1.000000 0.1819229E+10


B_4_8_2_1 0.000000 -537118.6
B_4_8_2_2 0.000000 -537118.6
B_4_8_2_3 1.000000 -537118.6
B_4_8_2_4 0.000000 -537118.6
B_4_8_3_1 0.000000 -2585119.
B_4_8_3_2 0.000000 -2585119.
B_4_8_3_3 0.000000 -2585119.
B_4_8_3_4 0.000000 -2585119.
B_5_8_1_1 0.000000 -2225119.
B_5_8_1_2 0.000000 -2225119.
B_5_8_1_3 0.000000 -2225119.
B_5_8_1_4 0.000000 -2225119.
B_5_8_2_1 1.000000 -2225119.
B_5_8_2_2 0.000000 -2225119.
B_5_8_2_3 0.000000 -2225119.
B_5_8_2_4 0.000000 -2225119.
B_5_8_3_1 0.000000 -2225119.
B_5_8_3_2 0.000000 -2225119.
B_5_8_3_3 1.000000 -2225119.
B_5_8_3_4 0.000000 -2225119.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 1.000000 0.1000053E+10
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 1.000000 0.2820799E+10
B_6_8_3_1 0.000000 -1020225.
B_6_8_3_2 0.000000 -1020225.
B_6_8_3_3 1.000000 0.9989798E+09
B_6_8_3_4 0.000000 -1020225.
B_7_8_1_1 1.000000 0.1000218E+10
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 -2435119.
B_7_8_2_2 0.000000 -2435119.
B_7_8_2_3 0.000000 -2435119.
B_7_8_2_4 0.000000 -2435119.
B_7_8_3_1 0.000000 -2435119.
B_7_8_3_2 0.000000 -2435119.
B_7_8_3_3 0.000000 -2435119.
B_7_8_3_4 0.000000 -2435119.
T_8_1 25.23730 0.000000
P_8_1 21333.33 0.000000
T_8_2 16.66505 0.000000
P_8_2 8949.159 0.000000
T_8_3 47.56894 0.000000
P_8_3 40000.00 0.000000
T_8_4 21.37314 0.000000
P_8_4 25717.51 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 15000.00 0.000000
P_7_2 0.000000 68.05515
P_7_3 0.000000 68.05515
P_6_1 16779.67 0.000000
Documentation of the calculations 93

P_6_2 23220.33 0.000000


P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 25000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 0.000000 103.0000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 63559.35 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 7.000000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 8.320621
TR_2_4_1_2 0.000000 11.32062
TR_2_4_1_3 0.000000 0.7806213
TR_2_5_1_1 0.000000 0.7806213
TR_2_5_1_2 0.000000 0.7806213
TR_2_5_1_3 0.000000 0.7806213
TR_2_6_1_1 33559.35 0.000000
TR_2_6_1_2 0.000000 8.320621
TR_2_6_1_3 0.000000 11.32062
TR_2_7_1_1 30000.00 0.000000
TR_2_7_1_2 0.000000 0.7806213
TR_2_7_1_3 0.000000 0.7806213
TR_2_4_2_1 50000.00 0.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 94

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 50000.00 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 25000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 25000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 16779.67 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 23220.33 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 15000.00 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 95

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 1.000000 944172.7
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 1.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.1727739 0.000000
T_1_2 22.50441 0.000000
T_2_1 0.000000 300000.0
T_2_2 2.490228 0.000000
T_3_1 7.893928 0.000000
T_3_2 9.254770 0.000000
T_4_1 12.16505 0.000000
T_4_2 38.36084 0.000000
T_4_3 44.56894 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.218768 0.000000
T_5_3 25.55041 0.000000
T_6_1 10.76284 0.000000
T_6_2 14.16505 0.000000
T_6_3 40.00000 0.000000
T_7_1 11.76284 0.000000
T_7_2 17.23730 0.000000
T_7_3 17.23730 0.000000
S_6_1 1.000000 0.000000
S_6_2 1.000000 0.000000
S_6_3 0.000000 -0.1000000E+10
Documentation of the calculations 96

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1654539E+09
Objective bound: 0.1654539E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 4160384
Total solver iterations: 335184266

Variable Value Reduced Cost


X_1 175233.4 0.000000
X_2 184766.6 0.000000
X_3 0.000000 0.000000
X_4 70209.62 0.000000
X_5 50000.00 0.000000
X_6 40627.40 0.000000
X_7 19162.98 0.000000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 1.000000 0.1886967E+10
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 17.59069
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 0.000000
B_1_6_1_1 0.000000 -18286.43
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 97

B_1_6_1_3 1.000000 0.2499204E+10


B_1_6_2_1 0.000000 -1249635.
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -841348.6
B_1_7_1_1 0.000000 131713.6
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 131713.6
B_1_7_2_1 0.000000 -1099635.
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 -1099635.
B_2_4_1_1 1.000000 0.3778426E+10
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 -105267.0
B_2_4_2_1 0.000000 35266.95
B_2_4_2_2 1.000000 0.9002100E+09
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -1194416.
B_2_5_1_2 0.000000 36933.05
B_2_5_1_3 0.000000 -1564902.
B_2_5_2_1 0.000000 -1369149.
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -1739635.
B_2_6_1_1 0.000000 -1684902.
B_2_6_1_2 1.000000 0.4678486E+10
B_2_6_1_3 0.000000 -1276616.
B_2_6_2_1 0.000000 -1859635.
B_2_6_2_2 0.000000 95266.95
B_2_6_2_3 0.000000 -1451349.
B_2_7_1_1 0.000000 -1654902.
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 -1654902.
B_2_7_2_1 0.000000 -1829635.
B_2_7_2_2 1.000000 0.9003000E+09
B_2_7_2_3 0.000000 -1829635.
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 1110000.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 1.000000 0.3774542E+10
B_4_8_1_2 0.000000 -3674211.
B_4_8_1_3 0.000000 -3674211.
Documentation of the calculations 98

B_4_8_1_4 0.000000 -3674211.


B_4_8_2_1 0.000000 -2012196.
B_4_8_2_2 0.000000 -2012196.
B_4_8_2_3 1.000000 0.8979878E+09
B_4_8_2_4 0.000000 -2012196.
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 1.000000 0.1886585E+10
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 -1148598.
B_5_8_1_2 0.000000 -1148598.
B_5_8_1_3 1.000000 0.1798851E+10
B_5_8_1_4 0.000000 -1148598.
B_5_8_2_1 0.000000 -4615525.
B_5_8_2_2 1.000000 0.1881902E+10
B_5_8_2_3 0.000000 -4615525.
B_5_8_2_4 0.000000 -4615525.
B_5_8_3_1 0.000000 427700.0
B_5_8_3_2 0.000000 427700.0
B_5_8_3_3 0.000000 427700.0
B_5_8_3_4 0.000000 427700.0
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 1.000000 0.4678269E+10
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 0.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 1.000000 0.9000527E+09
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 1.000000 0.9002177E+09
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 18.88292 0.000000
P_8_1 25717.51 0.000000
T_8_2 35.27481 0.000000
P_8_2 34332.05 0.000000
T_8_3 26.48911 0.000000
P_8_3 26666.67 0.000000
T_8_4 22.50000 0.000000
P_8_4 9283.774 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 28.00000
P_7_2 19162.98 0.000000
P_7_3 0.000000 28.00000
P_6_1 0.000000 0.000000
Documentation of the calculations 99

P_6_2 23220.33 0.000000


P_6_3 17407.08 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 25000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 20209.62 0.000000
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
P_2_1 96440.65 0.000000
P_2_2 88325.96 0.000000
P_1_1 84814.15 0.000000
P_1_2 90419.23 0.000000
TR_1_4_1_1 0.000000 22.09451
TR_1_4_1_2 0.000000 24.59069
TR_1_4_1_3 0.000000 17.59069
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 22.09451
TR_1_6_1_3 34814.15 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 24.59069
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 4.503814
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 40419.23 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 4.503814
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 7.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 50000.00 0.000000
TR_2_4_1_2 0.000000 2.496186
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 46440.65 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 2.496186
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 38325.96 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 27.92717
TR_3_4_1_2 0.000000 30.42336
TR_3_4_1_3 0.000000 23.42336
TR_3_5_1_1 0.000000 5.292663
TR_3_5_1_2 0.000000 22.88336
Documentation of the calculations 100

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 27.92717
TR_3_6_1_3 0.000000 5.832663
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 30.42336
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 27.92717
TR_3_4_2_2 0.000000 30.42336
TR_3_4_2_3 0.000000 23.42336
TR_3_5_2_1 0.000000 5.292663
TR_3_5_2_2 0.000000 22.88336
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 27.92717
TR_3_6_2_3 0.000000 5.832663
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 30.42336
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 25000.00 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 25000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 20209.62 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 23220.33 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 17407.08 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 19162.98 0.000000
Documentation of the calculations 101

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -0.1203241E+08
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 1.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 -0.1854000E+08
AR_6_1 0.000000 -7020000.
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 1.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
AR_3_2 0.000000 0.000000
B_1_5_1_1 1.000000 0.1800000E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 -370486.4
B_1_5_2_1 0.000000 -1231349.
B_1_5_2_2 1.000000 0.1886517E+10
B_1_5_2_3 0.000000 -1601835.
T_1_1 0.000000 429881.4
T_1_2 8.556334 0.000000
T_2_1 0.000000 90000.00
T_2_2 7.831262 0.000000
T_3_1 0.000000 0.000000
T_3_2 0.000000 0.000000
T_4_1 9.674820 0.000000
T_4_2 17.28102 0.000000
T_4_3 27.25628 0.000000
T_5_1 4.470585 0.000000
T_5_2 13.25628 0.000000
T_5_3 20.27481 0.000000
T_6_1 0.000000 0.000000
T_6_2 11.67482 0.000000
T_6_3 16.47058 0.000000
T_7_1 0.000000 0.000000
T_7_2 20.28102 0.000000
T_7_3 27.27481 0.000000
S_6_1 1.000000 0.000000
S_6_2 1.000000 0.000000
S_6_3 1.000000 0.1598814E+10
Documentation of the calculations 102

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1687103E+09
Objective bound: 0.1687103E+09
Infeasibilities: 0.4365575E-10
Extended solver steps: 8698934
Total solver iterations: 776374080

Variable Value Reduced Cost


X_1 140419.2 0.000000
X_2 219580.8 0.000000
X_3 0.000000 0.000000
X_4 76210.22 0.000000
X_5 50000.00 0.000000
X_6 53789.78 0.000000
X_7 0.000000 36.73534
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 1.000000 0.6158772E+09
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 220848.7
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 3.813590
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 3.273590
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 103

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.1456117E+09
B_2_4_1_2 0.000000 -198514.8
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -100636.5
B_2_4_2_2 0.000000 -509151.3
B_2_4_2_3 1.000000 0.1383343E+10
B_2_5_1_1 0.000000 210636.5
B_2_5_1_2 0.000000 -56314.79
B_2_5_1_3 0.000000 172836.5
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -366951.3
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1745672E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 90636.53
B_2_6_2_1 0.000000 -40636.53
B_2_6_2_2 1.000000 0.1383403E+10
B_2_6_2_3 0.000000 -220000.0
B_2_7_1_1 0.000000 120636.5
B_2_7_1_2 0.000000 120636.5
B_2_7_1_3 0.000000 120636.5
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 610848.7
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 610848.7
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 843048.7
B_3_5_1_3 0.000000 1072200.
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 843048.7
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 0.000000 67700.00
B_4_8_1_3 1.000000 67700.00
Documentation of the calculations 104

B_4_8_1_4 1.000000 0.1454694E+09


B_4_8_2_1 1.000000 0.6154949E+09
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 0.000000 -922578.6
B_4_8_3_2 1.000000 0.1382210E+10
B_4_8_3_3 0.000000 -922578.6
B_4_8_3_4 0.000000 -922578.6
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 1.000000 0.1414682E+10
B_5_8_2_2 0.000000 -744815.3
B_5_8_2_3 0.000000 -744815.3
B_5_8_2_4 0.000000 -744815.3
B_5_8_3_1 0.000000 -1901916.
B_5_8_3_2 1.000000 -1901916.
B_5_8_3_3 0.000000 -1901916.
B_5_8_3_4 0.000000 -1901916.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 0.8000527E+09
B_6_8_1_4 1.000000 0.9454544E+09
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 1.000000 0.2183186E+10
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 0.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 26.71847 0.000000
P_8_1 24111.80 0.000000
T_8_2 47.20810 0.000000
P_8_2 39050.84 0.000000
T_8_3 21.11353 0.000000
P_8_3 8000.000 0.000000
T_8_4 21.11353 0.000000
P_8_4 24837.36 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 30569.46 0.000000
Documentation of the calculations 105

P_6_2 23220.33 0.000000


P_6_3 0.000000 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 31000.60 0.000000
P_4_2 20209.62 0.000000
P_4_3 25000.00 0.000000
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
P_2_1 123140.1 0.000000
P_2_2 96440.65 0.000000
P_1_1 90419.23 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.835926
TR_1_4_1_2 40419.23 0.000000
TR_1_4_1_3 0.000000 10.27359
TR_1_6_1_1 0.000000 5.835926
TR_1_6_1_2 0.000000 10.27359
TR_1_6_1_3 0.000000 3.273590
TR_1_7_1_1 0.000000 3.273590
TR_1_7_1_2 0.000000 3.273590
TR_1_7_1_3 0.000000 3.273590
TR_1_4_2_1 0.000000 2.562335
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 2.562335
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 62001.20 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 4.437665
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 61138.92 0.000000
TR_2_6_1_2 0.000000 4.437665
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 50000.00 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 2.562335
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 7.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 106

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 2.562335
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 2.562335
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 7.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 2.562335
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 6000.599 0.000000
TR_4_8_1_4 25000.00 0.000000
TR_4_8_2_1 20209.62 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 25000.00 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 8999.401 0.000000
TR_6_8_1_4 21570.06 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 23220.33 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 107

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -3600000.
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1696764E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.000000 -5447639.
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
AR_3_2 0.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.1415427E+10
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 -229151.3
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 80000.00
T_1_2 22.14357 0.000000
T_2_1 0.000000 160000.0
T_2_2 28.32518 0.000000
T_3_1 9963.000 0.000000
T_3_2 9963.000 0.000000
T_4_1 10.41534 0.000000
T_4_2 18.69994 0.000000
T_4_3 38.00000 0.000000
T_5_1 0.000000 0.000000
T_5_2 4.699944 0.000000
T_5_3 25.18957 0.000000
T_6_1 12.41534 0.000000
T_6_2 40.00000 0.000000
T_6_3 44.70810 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.8000000E+09
S_6_3 0.000000 0.000000
Documentation of the calculations 108

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

After a calculation time of 100 hours:

22 hours and 48 minutes after re-start with the additional constraint that the objective
function value is smaller or equal to the best objective function value found after 100
hours:
Documentation of the calculations 109

Global optimal solution found.


Objective value: 0.1718793E+09
Objective bound: 0.1718793E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 34446006
Total solver iterations: 863695293

Variable Value Reduced Cost


X_1 85854.07 0.000000
X_2 189236.3 0.000000
X_3 84909.62 0.000000
X_4 52072.97 0.000000
X_5 67927.03 0.000000
X_6 60000.00 0.000000
X_7 0.000000 28.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 35854.07 0.000000
TR_1_5_1_2 0.000000 9.245265
TR_1_5_1_3 0.000000 16.78526
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 -103534.1
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.2418300E+09
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -784968.5
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -784968.5
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 390000.0
B_2_6_1_1 1.000000 0.2409065E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -713534.1
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 110

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 630000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 -274968.5
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 900000.0
B_3_5_2_1 0.000000 -274968.5
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 -263534.1
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 1.000000 930000.0
B_3_6_2_1 0.000000 -263534.1
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 0.000000 67700.00
B_4_8_1_3 1.000000 0.8594255E+09
B_4_8_1_4 1.000000 0.6178055E+09
B_4_8_2_1 0.000000 67700.00
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 1.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 1.000000 0.1559785E+10
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 0.000000 -1129003.
B_5_8_2_2 1.000000 0.6988710E+09
B_5_8_2_3 0.000000 -1129003.
B_5_8_2_4 0.000000 -1129003.
B_5_8_3_1 1.000000 -1997300.
B_5_8_3_2 0.000000 -1997300.
B_5_8_3_3 0.000000 -1997300.
B_5_8_3_4 0.000000 -1997300.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 52700.00
B_6_8_1_4 1.000000 0.8231495E+08
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 1.000000 0.6994325E+09
Documentation of the calculations 111

B_6_8_3_2 0.000000 -567474.4


B_6_8_3_3 0.000000 -567474.4
B_6_8_3_4 0.000000 -567474.4
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 47.56894 0.000000
P_8_1 35975.90 0.000000
T_8_2 29.51853 0.000000
P_8_2 13333.33 0.000000
T_8_3 22.50000 0.000000
P_8_3 20024.10 0.000000
T_8_4 22.50000 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 35000.00 0.000000
P_6_2 0.000000 0.000000
P_6_3 25000.00 0.000000
P_5_1 17927.03 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 34618.16 0.000000
P_4_2 0.000000 0.000000
P_4_3 17454.81 0.000000
P_3_1 50000.00 0.000000
P_3_2 34909.62 0.000000
P_2_1 139236.3 0.000000
P_2_2 50000.00 0.000000
P_1_1 35854.07 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 16.24526
TR_1_4_1_2 0.000000 19.24526
TR_1_4_1_3 0.000000 19.24526
TR_1_6_1_1 0.000000 2.194778
TR_1_6_1_2 0.000000 19.24526
TR_1_6_1_3 0.000000 19.24526
TR_1_7_1_1 0.000000 19.24526
TR_1_7_1_2 0.000000 19.24526
TR_1_7_1_3 0.000000 19.24526
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 112

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 69236.31 0.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 50000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 34909.62 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 9618.156 0.000000
TR_4_8_1_4 25000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 17454.81 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 113

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 17927.03 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 10000.00 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 0.000000 -4465255.
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 114

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.2259358E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -647168.5
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 225935.8
T_1_2 4.454006 0.000000
T_2_1 0.4171202E-01 0.000000
T_2_2 11.16364 0.000000
T_3_1 7.893928 0.000000
T_3_2 11.46224 0.000000
T_4_1 10.90349 0.000000
T_4_2 19.50000 0.000000
T_4_3 40.23449 0.000000
T_5_1 2.467144 0.000000
T_5_2 7.500000 0.000000
T_5_3 25.55041 0.000000
T_6_1 12.90349 0.000000
T_6_2 40.00000 0.000000
T_6_3 40.00000 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.1593578E+09
S_6_2 0.000000 -0.7000000E+09
S_6_3 0.000000 0.000000
Documentation of the calculations 115

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

After a calculation time of 100 hours:

63 hours and 59 minutes after re-start with the additional constraint that the objective
function value is smaller or equal to the best objective function value found after 100
hours:
Documentation of the calculations 116

Global optimal solution found.


Objective value: 0.1755520E+09
Objective bound: 0.1755520E+09
Infeasibilities: 0.1455192E-09
Extended solver steps: 50046092
Total solver iterations: 1380255608

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 280000.0 0.000000
X_3 0.000000 0.000000
X_4 53847.36 0.000000
X_5 75000.00 0.000000
X_6 51152.64 0.000000
X_7 0.000000 43.37828
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 2.995193
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 2.455193
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.1255713E+10
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 1.000000 0.5571329E+08
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -100000.0
B_2_5_1_2 0.000000 -309663.5
B_2_5_1_3 1.000000 0.5998622E+09
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -309663.5
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1855773E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -220000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 1.000000 0.5577329E+08
B_2_6_2_3 0.000000 -220000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
Documentation of the calculations 117

B_2_7_1_3 0.000000 -190000.0


B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 900336.5
B_3_5_1_3 0.000000 1072200.
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 900336.5
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -677271.4
B_4_8_1_2 1.000000 0.1254826E+10
B_4_8_1_3 0.000000 -677271.4
B_4_8_1_4 0.000000 -677271.4
B_4_8_2_1 0.000000 67700.00
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 1.000000 0.5557099E+08
B_4_8_2_4 1.000000 67700.00
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 1.000000 0.5988080E+09
B_5_8_2_2 0.000000 -1191972.
B_5_8_2_3 0.000000 -1191972.
B_5_8_2_4 0.000000 -1191972.
B_5_8_3_1 0.000000 -2156955.
B_5_8_3_2 0.000000 -2156955.
B_5_8_3_3 1.000000 0.6533463E+09
B_5_8_3_4 1.000000 0.1253346E+10
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 1.000000 0.1855556E+10
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 1.000000 52700.00
B_6_8_2_4 1.000000 0.1855556E+10
B_6_8_3_1 0.000000 52700.00
Documentation of the calculations 118

B_6_8_3_2 0.000000 52700.00


B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 25.06452 0.000000
P_8_1 13333.33 0.000000
T_8_2 22.33452 0.000000
P_8_2 25717.51 0.000000
T_8_3 48.16349 0.000000
P_8_3 38282.49 0.000000
T_8_4 48.16349 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 23220.33 0.000000
P_6_2 27932.31 0.000000
P_6_3 0.000000 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 25000.00 0.000000
P_4_2 28847.36 0.000000
P_4_3 0.000000 15.37828
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
P_2_1 166440.7 0.000000
P_2_2 113559.3 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 9.455193
TR_1_4_1_2 0.000000 9.455193
TR_1_4_1_3 0.000000 2.455193
TR_1_6_1_1 0.000000 9.455193
TR_1_6_1_2 0.000000 9.455193
TR_1_6_1_3 0.000000 2.455193
TR_1_7_1_1 0.000000 2.455193
TR_1_7_1_2 0.000000 2.455193
TR_1_7_1_3 0.000000 2.455193
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 119

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 50000.00 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 46440.65 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 57694.72 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 55864.63 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 7.000000
TR_3_4_1_2 0.000000 7.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 7.000000
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 7.000000
TR_3_4_2_2 0.000000 7.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 7.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 25000.00 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 23847.36 0.000000
TR_4_8_2_4 5000.000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 120

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 23220.33 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 22932.31 0.000000
TR_6_8_2_4 5000.000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -3600000.
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 -0.1577191E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.000000 -4251910.
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
Documentation of the calculations 121

AR_3_2 0.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.6000000E+09
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 -171863.5
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 60000.00
T_1_2 16.89883 0.000000
T_2_1 1.510130 0.000000
T_2_2 27.85039 0.000000
T_3_1 9963.000 0.000000
T_3_2 9963.000 0.000000
T_4_1 13.12643 0.000000
T_4_2 38.00000 0.000000
T_4_3 45.16349 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.045994 0.000000
T_5_3 19.12643 0.000000
T_6_1 15.12643 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.66349 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1800000E+10
S_6_3 0.000000 0.000000
Documentation of the calculations 122

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

After a calculation time of 100 hours:

36 hours after re-start with the additional constraint that the objective function value is
smaller or equal to the best objective function value found after 100 hours:
Documentation of the calculations 123

Global optimal solution found.


Objective value: 0.1791729E+09
Objective bound: 0.1791729E+09
Infeasibilities: 0.2370507E-07
Extended solver steps: 23657571
Total solver iterations: 1453436577

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 280000.0 0.000000
X_3 0.000000 0.000000
X_4 53847.36 0.000000
X_5 75000.00 0.000000
X_6 51152.64 0.000000
X_7 0.000000 32.72687
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 2.045994
TR_1_5_1_3 0.000000 9.585994
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 30000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.5953855E+09
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 1.000000 0.9538546E+08
B_2_5_1_1 0.000000 -281019.6
B_2_5_1_2 1.000000 0.2498622E+09
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -281019.6
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 1.000000 0.1690621E+10
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 1.000000 0.1906209E+09
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 124

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 438980.4
B_3_5_1_2 0.000000 582200.0
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 438980.4
B_3_5_2_2 0.000000 582200.0
B_3_5_2_3 0.000000 1110000.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -553109.5
B_4_8_1_2 0.000000 -553109.5
B_4_8_1_3 1.000000 0.5946224E+09
B_4_8_1_4 0.000000 -553109.5
B_4_8_2_1 0.000000 67700.00
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 1.000000 0.9524316E+08
B_4_8_3_2 1.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 -1198902.
B_5_8_1_2 0.000000 -1198902.
B_5_8_1_3 0.000000 -1198902.
B_5_8_1_4 1.000000 0.4988011E+09
B_5_8_2_1 1.000000 0.4979969E+09
B_5_8_2_2 1.000000 0.4979969E+09
B_5_8_2_3 0.000000 -2003055.
B_5_8_2_4 0.000000 -2003055.
B_5_8_3_1 0.000000 427700.0
B_5_8_3_2 0.000000 427700.0
B_5_8_3_3 0.000000 427700.0
B_5_8_3_4 0.000000 427700.0
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 1.000000 0.1690404E+10
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 1.000000 0.1690404E+10
Documentation of the calculations 125

B_6_8_3_2 1.000000 52700.00


B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 48.16349 0.000000
P_8_1 18666.67 0.000000
T_8_2 48.16349 0.000000
P_8_2 38282.49 0.000000
T_8_3 22.33452 0.000000
P_8_3 25717.51 0.000000
T_8_4 25.06452 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
T_6_1 15.12643 0.000000
P_6_1 0.000000 0.000000
S_6_1 1.000000 0.000000
T_6_2 15.12643 0.000000
P_6_2 23220.33 0.000000
S_6_2 1.000000 0.000000
T_6_3 40.00000 0.000000
P_6_3 27932.31 0.000000
S_6_3 0.000000 -0.7500000E+09
P_4_1 25000.00 0.000000
P_4_2 0.000000 4.726867
P_4_3 28847.36 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 0.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
P_2_1 166440.7 0.000000
P_2_2 113559.3 0.000000
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
TR_1_4_1_1 0.000000 9.045994
TR_1_4_1_2 0.000000 9.045994
TR_1_4_1_3 0.000000 9.045994
TR_1_6_1_1 0.000000 9.045994
TR_1_6_1_2 0.000000 9.045994
TR_1_6_1_3 0.000000 9.045994
TR_1_7_1_1 0.000000 9.045994
TR_1_7_1_2 0.000000 9.045994
TR_1_7_1_3 0.000000 9.045994
TR_1_4_2_1 0.000000 7.000000
Documentation of the calculations 126

TR_1_4_2_2 0.000000 7.000000


TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.000000
TR_1_7_2_1 0.000000 7.000000
TR_1_7_2_2 0.000000 7.000000
TR_1_7_2_3 0.000000 7.000000
TR_2_4_1_1 50000.00 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 46440.65 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 57694.72 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 55864.63 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.2369052E-07 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 25000.00 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
Documentation of the calculations 127

TR_4_8_2_2 0.000000 0.000000


TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 5000.000 0.000000
TR_4_8_3_2 23847.36 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 23220.33 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 5000.000 0.000000
TR_6_8_3_2 22932.31 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -1080000.
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 -0.1768916E+08
AR_6_1 0.000000 -6169164.
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
Documentation of the calculations 128

AR_7_3 0.000000 0.000000


AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
AR_3_2 0.000000 0.000000
B_1_5_1_1 1.000000 0.5000000E+09
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -143219.6
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 50000.00
T_1_2 16.89883 0.000000
T_2_1 1.510130 0.000000
T_2_2 27.85039 0.000000
T_3_1 9966.046 0.000000
T_3_2 9966.046 0.000000
T_4_1 13.12643 0.000000
T_4_2 19.33452 0.000000
T_4_3 38.00000 0.000000
T_5_1 3.045994 0.000000
T_5_2 19.12643 0.000000
T_5_3 33.16349 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 129

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1827939E+09
Objective bound: 0.1827939E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 55940600
Total solver iterations: 730432874

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 280000.0 0.000000
X_3 0.000000 0.000000
X_4 53847.36 0.000000
X_5 75000.00 0.000000
X_6 51152.64 0.000000
X_7 0.000000 50.07545
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 2.176795
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 1.636795
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 130

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 1.000000 0.1125409E+10
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 1.000000 0.3254086E+09
B_2_5_1_1 0.000000 -100000.0
B_2_5_1_2 0.000000 -252375.7
B_2_5_1_3 1.000000 0.3998622E+09
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -252375.7
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 0.000000 -220000.0
B_2_6_1_2 1.000000 0.1525469E+10
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -220000.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 1.000000 0.3254686E+09
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 957624.3
B_3_5_1_3 0.000000 1072200.
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 957624.3
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 0.000000 67700.00
B_4_8_1_3 0.000000 67700.00
Documentation of the calculations 131

B_4_8_1_4 0.000000 67700.00


B_4_8_2_1 0.000000 -428947.6
B_4_8_2_2 1.000000 0.1124770E+10
B_4_8_2_3 0.000000 -428947.6
B_4_8_2_4 0.000000 -428947.6
B_4_8_3_1 1.000000 0.3252663E+09
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 1.000000 67700.00
B_5_8_1_1 0.000000 427700.0
B_5_8_1_2 0.000000 427700.0
B_5_8_1_3 0.000000 427700.0
B_5_8_1_4 0.000000 427700.0
B_5_8_2_1 0.000000 -1205833.
B_5_8_2_2 0.000000 -1205833.
B_5_8_2_3 1.000000 0.3987942E+09
B_5_8_2_4 0.000000 -1205833.
B_5_8_3_1 1.000000 0.7981508E+09
B_5_8_3_2 0.000000 -1849155.
B_5_8_3_3 0.000000 -1849155.
B_5_8_3_4 1.000000 0.3981508E+09
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 1.000000 0.1525251E+10
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 1.000000 0.1525251E+10
B_6_8_3_2 0.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 1.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 48.16349 0.000000
P_8_1 18666.67 0.000000
T_8_2 22.33452 0.000000
P_8_2 25717.51 0.000000
T_8_3 25.06452 0.000000
P_8_3 13333.33 0.000000
T_8_4 48.16349 0.000000
P_8_4 38282.49 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 0.000000 0.000000
Documentation of the calculations 132

P_6_2 23220.33 0.000000


P_6_3 27932.31 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 22.07545
P_4_2 25000.00 0.000000
P_4_3 28847.36 0.000000
P_3_1 0.000000 0.000000
P_3_2 0.000000 0.000000
P_2_1 166440.7 0.000000
P_2_2 113559.3 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 1.636795
TR_1_4_1_2 0.000000 8.636795
TR_1_4_1_3 0.000000 8.636795
TR_1_6_1_1 0.000000 1.636795
TR_1_6_1_2 0.000000 8.636795
TR_1_6_1_3 0.000000 8.636795
TR_1_7_1_1 0.000000 1.636795
TR_1_7_1_2 0.000000 1.636795
TR_1_7_1_3 0.000000 1.636795
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 50000.00 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 46440.65 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 57694.72 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 55864.63 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 7.000000
TR_3_4_1_3 0.000000 7.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 133

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 7.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 7.000000
TR_3_4_2_3 0.000000 7.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 7.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 25000.00 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 5000.000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 23847.36 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 23220.33 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 5000.000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 22932.31 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 134

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 0.000000 -3600000.
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1456642E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 0.000000 -3046418.
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 0.000000
AR_3_2 0.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.4000000E+09
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 -114575.7
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 40000.00
T_1_2 16.89883 0.000000
T_2_1 1.510130 0.000000
T_2_2 27.85039 0.000000
T_3_1 0.000000 0.000000
T_3_2 0.000000 0.000000
T_4_1 0.000000 0.000000
T_4_2 13.12643 0.000000
T_4_3 38.00000 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.045994 0.000000
T_5_3 19.12643 0.000000
T_6_1 15.12643 0.000000
T_6_2 15.12643 0.000000
T_6_3 40.00000 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 1.000000 0.000000
S_6_3 0.000000 -0.1200000E+10
Documentation of the calculations 135

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1862030E+09
Objective bound: 0.1862030E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 30983047
Total solver iterations: 333551263

Variable Value Reduced Cost


X_1 120000.0 0.000000
X_2 170000.0 0.000000
X_3 70000.00 0.000000
X_4 15000.00 0.000000
X_5 95000.00 0.000000
X_6 70000.00 0.000000
X_7 0.000000 86.41029
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 5.450385
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
TR_1_5_2_3 70000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 136

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 297220.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 1.000000 0.9002100E+09
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -481527.0
B_2_5_1_2 0.000000 -100000.0
B_2_5_1_3 1.000000 0.8984516E+09
B_2_5_2_1 0.000000 -481527.0
B_2_5_2_2 0.000000 -100000.0
B_2_5_2_3 0.000000 -1548445.
B_2_6_1_1 0.000000 -220000.0
B_2_6_1_2 0.000000 -220000.0
B_2_6_1_3 0.000000 -312780.0
B_2_6_2_1 0.000000 -220000.0
B_2_6_2_2 0.000000 -220000.0
B_2_6_2_3 1.000000 -312780.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 630000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 28473.02
B_3_5_1_2 0.000000 410000.0
B_3_5_1_3 0.000000 -1038445.
B_3_5_2_1 0.000000 728473.0
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 -338445.3
B_3_6_1_1 0.000000 230000.0
B_3_6_1_2 0.000000 230000.0
B_3_6_1_3 1.000000 137220.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 837220.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -483828.7
B_4_8_1_2 0.000000 -483828.7
B_4_8_1_3 0.000000 -483828.7
Documentation of the calculations 137

B_4_8_1_4 0.000000 -483828.7


B_4_8_2_1 1.000000 0.9000677E+09
B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 0.000000 67700.00
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 0.000000 -483828.7
B_4_8_3_2 0.000000 -483828.7
B_4_8_3_3 0.000000 -483828.7
B_4_8_3_4 0.000000 -483828.7
B_5_8_1_1 1.000000 0.1199876E+10
B_5_8_1_2 0.000000 -123828.7
B_5_8_1_3 0.000000 -123828.7
B_5_8_1_4 0.000000 -123828.7
B_5_8_2_1 0.000000 -123828.7
B_5_8_2_2 0.000000 -123828.7
B_5_8_2_3 0.000000 -123828.7
B_5_8_2_4 0.000000 -123828.7
B_5_8_3_1 0.000000 427700.0
B_5_8_3_2 1.000000 427700.0
B_5_8_3_3 1.000000 0.9004277E+09
B_5_8_3_4 1.000000 427700.0
B_6_8_1_1 0.000000 -498828.7
B_6_8_1_2 0.000000 -498828.7
B_6_8_1_3 0.000000 -498828.7
B_6_8_1_4 0.000000 -498828.7
B_6_8_2_1 0.000000 -498828.7
B_6_8_2_2 0.000000 -498828.7
B_6_8_2_3 0.000000 -498828.7
B_6_8_2_4 0.000000 -498828.7
B_6_8_3_1 0.000000 52700.00
B_6_8_3_2 1.000000 0.3000527E+09
B_6_8_3_3 1.000000 0.6000527E+09
B_6_8_3_4 1.000000 0.3000527E+09
B_7_8_1_1 0.000000 -333828.7
B_7_8_1_2 0.000000 -333828.7
B_7_8_1_3 0.000000 -333828.7
B_7_8_1_4 0.000000 -333828.7
B_7_8_2_1 0.000000 -333828.7
B_7_8_2_2 0.000000 -333828.7
B_7_8_2_3 0.000000 -333828.7
B_7_8_2_4 0.000000 -333828.7
B_7_8_3_1 0.000000 -333828.7
B_7_8_3_2 0.000000 -333828.7
B_7_8_3_3 0.000000 -333828.7
B_7_8_3_4 0.000000 -333828.7
T_8_1 25.06452 0.000000
P_8_1 21333.33 0.000000
T_8_2 58.99155 0.000000
P_8_2 21333.33 0.000000
T_8_3 58.99155 0.000000
P_8_3 26666.67 0.000000
T_8_4 58.99155 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 0.000000 19.41029
Documentation of the calculations 138

P_6_2 0.000000 19.41029


P_6_3 70000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 70000.00 0.000000
P_4_1 0.000000 58.41029
P_4_2 15000.00 0.000000
P_4_3 0.000000 58.41029
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 100000.0 0.000000
P_2_2 70000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 70000.00 0.000000
TR_1_4_1_1 0.000000 4.910385
TR_1_4_1_2 0.000000 11.91039
TR_1_4_1_3 0.000000 4.910385
TR_1_6_1_1 0.000000 4.910385
TR_1_6_1_2 0.000000 4.910385
TR_1_6_1_3 0.000000 3.584957
TR_1_7_1_1 0.000000 4.910385
TR_1_7_1_2 0.000000 4.910385
TR_1_7_1_3 0.000000 4.910385
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 0.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 30000.00 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 70000.00 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 139

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 7.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 15000.00 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 20000.00 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 20000.00 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 140

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -8026148.
AR_5_3 1.000000 0.000000
AR_6_1 0.000000 0.000000
AR_6_2 0.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -3600000.
B_1_5_1_1 1.000000 0.1200000E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 -1066918.
B_1_5_2_1 0.000000 -343727.0
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 -1410645.
T_1_1 0.000000 120000.0
T_1_2 20.47527 0.000000
T_2_1 8.566125 0.000000
T_2_2 31.35704 0.000000
T_3_1 9.750020 0.000000
T_3_2 11.29852 0.000000
T_4_1 0.000000 0.000000
T_4_2 18.33967 0.000000
T_4_3 22.06452 0.000000
T_5_1 3.045994 0.000000
T_5_2 10.06452 0.000000
T_5_3 24.33967 0.000000
T_6_1 0.000000 0.000000
T_6_2 20.00000 0.000000
T_6_3 42.29852 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 1.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 141

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1892408E+09
Objective bound: 0.1892408E+09
Infeasibilities: 0.1242734E-07
Extended solver steps: 15319517
Total solver iterations: 893805019

Variable Value Reduced Cost


X_1 120000.0 0.000000
X_2 170000.0 0.000000
X_3 70000.00 0.000000
X_4 15000.00 0.000000
X_5 95000.00 0.000000
X_6 70000.00 0.000000
X_7 0.000000 56.89943
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 3.813590
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
TR_1_5_2_3 70000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 265631.3
Documentation of the calculations 142

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 36480.01
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 1.000000 0.6002100E+09
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -366951.3
B_2_5_1_2 0.000000 -100000.0
B_2_5_1_3 1.000000 0.5978960E+09
B_2_5_2_1 0.000000 -366951.3
B_2_5_2_2 0.000000 -100000.0
B_2_5_2_3 0.000000 -2103964.
B_2_6_1_1 0.000000 -220000.0
B_2_6_1_2 0.000000 -220000.0
B_2_6_1_3 0.000000 -573520.0
B_2_6_2_1 0.000000 -220000.0
B_2_6_2_2 0.000000 -220000.0
B_2_6_2_3 1.000000 -573520.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 630000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 143048.7
B_3_5_1_2 0.000000 410000.0
B_3_5_1_3 0.000000 -1593964.
B_3_5_2_1 0.000000 843048.7
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 -893963.6
B_3_6_1_1 0.000000 230000.0
B_3_6_1_2 0.000000 230000.0
B_3_6_1_3 1.000000 -123520.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 576480.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 67700.00
B_4_8_1_2 0.000000 67700.00
B_4_8_1_3 0.000000 67700.00
B_4_8_1_4 0.000000 67700.00
Documentation of the calculations 143

B_4_8_2_1 0.000000 67700.00


B_4_8_2_2 0.000000 67700.00
B_4_8_2_3 1.000000 0.6000677E+09
B_4_8_2_4 0.000000 67700.00
B_4_8_3_1 0.000000 67700.00
B_4_8_3_2 0.000000 67700.00
B_4_8_3_3 0.000000 67700.00
B_4_8_3_4 0.000000 67700.00
B_5_8_1_1 0.000000 -672652.4
B_5_8_1_2 0.000000 -672652.4
B_5_8_1_3 1.000000 0.7993273E+09
B_5_8_1_4 0.000000 -672652.4
B_5_8_2_1 0.000000 427700.0
B_5_8_2_2 0.000000 427700.0
B_5_8_2_3 0.000000 427700.0
B_5_8_2_4 0.000000 427700.0
B_5_8_3_1 1.000000 0.2004277E+09
B_5_8_3_2 1.000000 0.2004277E+09
B_5_8_3_3 0.000000 427700.0
B_5_8_3_4 1.000000 0.2004277E+09
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 0.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 0.000000 52700.00
B_6_8_3_1 1.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 1.000000 52700.00
B_7_8_1_1 0.000000 217700.0
B_7_8_1_2 0.000000 217700.0
B_7_8_1_3 0.000000 217700.0
B_7_8_1_4 0.000000 217700.0
B_7_8_2_1 0.000000 217700.0
B_7_8_2_2 0.000000 217700.0
B_7_8_2_3 0.000000 217700.0
B_7_8_2_4 0.000000 217700.0
B_7_8_3_1 0.000000 217700.0
B_7_8_3_2 0.000000 217700.0
B_7_8_3_3 0.000000 217700.0
B_7_8_3_4 0.000000 217700.0
T_8_1 58.99155 0.000000
P_8_1 21333.33 0.000000
T_8_2 58.99155 0.000000
P_8_2 26666.67 0.000000
T_8_3 25.06452 0.000000
P_8_3 21333.33 0.000000
T_8_4 58.99155 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 0.000000 0.000000
P_6_2 0.000000 0.000000
Documentation of the calculations 144

P_6_3 70000.00 0.000000


P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 70000.00 0.000000
P_4_1 0.000000 28.89943
P_4_2 15000.00 0.000000
P_4_3 0.000000 28.89943
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 100000.0 0.000000
P_2_2 70000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 70000.00 0.000000
TR_1_4_1_1 0.000000 3.273590
TR_1_4_1_2 0.000000 10.27359
TR_1_4_1_3 0.000000 3.273590
TR_1_6_1_1 0.000000 3.273590
TR_1_6_1_2 0.000000 3.273590
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 3.273590
TR_1_7_1_2 0.000000 3.273590
TR_1_7_1_3 0.000000 3.273590
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 0.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 30000.00 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 70000.00 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 145

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 7.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 15000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 20000.00 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 20000.00 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 146

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1333810E+08
AR_5_3 1.000000 0.000000
AR_6_1 0.000000 -1818103.
AR_6_2 0.000000 -1818103.
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -3600000.
B_1_5_1_1 1.000000 0.8000000E+09
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 -1737012.
B_1_5_2_1 0.000000 -229151.3
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 -1966164.
T_1_1 0.000000 80000.00
T_1_2 20.47527 0.000000
T_2_1 8.566125 0.000000
T_2_2 31.35704 0.000000
T_3_1 9.750020 0.000000
T_3_2 11.29852 0.000000
T_4_1 0.000000 0.000000
T_4_2 18.33967 0.000000
T_4_3 22.06452 0.000000
T_5_1 3.045994 0.000000
T_5_2 24.33967 0.000000
T_5_3 24.33967 0.000000
T_6_1 42.29852 0.000000
T_6_2 42.29852 0.000000
T_6_3 42.29852 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 0.000000
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 147

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1922445E+09
Objective bound: 0.1922445E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 5268032
Total solver iterations: 191512250

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 180000.0 0.000000
X_3 100000.0 0.000000
X_4 0.000000 39.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 30000.00 0.000000
TR_1_5_1_2 0.000000 0.000000
TR_1_5_1_3 0.000000 7.540000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
Documentation of the calculations 148

B_1_6_1_3 0.000000 390000.0


B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 1.000000 -137800.0
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 0.1003900E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 1.000000 0.1002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 630000.0
B_3_4_1_2 0.000000 630000.0
B_3_4_1_3 0.000000 630000.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 0.000000 630000.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 900000.0
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 750000.0
B_3_7_1_2 0.000000 750000.0
B_3_7_1_3 0.000000 750000.0
B_3_7_2_1 0.000000 750000.0
B_3_7_2_2 0.000000 750000.0
B_3_7_2_3 0.000000 750000.0
B_4_8_1_1 0.000000 -84368.13
B_4_8_1_2 0.000000 -84368.13
B_4_8_1_3 0.000000 -84368.13
Documentation of the calculations 149

B_4_8_1_4 0.000000 -84368.13


B_4_8_2_1 0.000000 -84368.13
B_4_8_2_2 0.000000 -84368.13
B_4_8_2_3 0.000000 -84368.13
B_4_8_2_4 0.000000 -84368.13
B_4_8_3_1 0.000000 -84368.13
B_4_8_3_2 0.000000 -84368.13
B_4_8_3_3 0.000000 -84368.13
B_4_8_3_4 0.000000 -84368.13
B_5_8_1_1 0.000000 -947368.1
B_5_8_1_2 0.000000 -947368.1
B_5_8_1_3 1.000000 0.9905263E+08
B_5_8_1_4 1.000000 -947368.1
B_5_8_2_1 1.000000 0.9912282E+08
B_5_8_2_2 0.000000 -877182.8
B_5_8_2_3 0.000000 -877182.8
B_5_8_2_4 0.000000 -877182.8
B_5_8_3_1 0.000000 -1254183.
B_5_8_3_2 1.000000 0.9874582E+08
B_5_8_3_3 0.000000 -1254183.
B_5_8_3_4 0.000000 -1254183.
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 0.2000527E+09
B_6_8_1_4 1.000000 0.1000527E+09
B_6_8_2_1 1.000000 -249368.1
B_6_8_2_2 0.000000 -249368.1
B_6_8_2_3 0.000000 -249368.1
B_6_8_2_4 0.000000 -249368.1
B_6_8_3_1 0.000000 -249368.1
B_6_8_3_2 1.000000 -249368.1
B_6_8_3_3 0.000000 -249368.1
B_6_8_3_4 0.000000 -249368.1
B_7_8_1_1 0.000000 65631.87
B_7_8_1_2 0.000000 65631.87
B_7_8_1_3 0.000000 65631.87
B_7_8_1_4 0.000000 65631.87
B_7_8_2_1 0.000000 65631.87
B_7_8_2_2 0.000000 65631.87
B_7_8_2_3 0.000000 65631.87
B_7_8_2_4 0.000000 65631.87
B_7_8_3_1 0.000000 65631.87
B_7_8_3_2 0.000000 65631.87
B_7_8_3_3 0.000000 65631.87
B_7_8_3_4 0.000000 65631.87
T_8_1 55.60125 0.000000
P_8_1 26666.67 0.000000
T_8_2 66.01853 0.000000
P_8_2 26666.67 0.000000
T_8_3 48.58273 0.000000
P_8_3 16000.00 0.000000
T_8_4 48.58273 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 30000.00 0.000000
Documentation of the calculations 150

P_6_2 25000.00 0.000000


P_6_3 25000.00 0.000000
P_5_1 50000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 30000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 7.000000
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 7.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 7.000000
TR_1_7_1_2 0.000000 7.000000
TR_1_7_1_3 0.000000 7.000000
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 7.000000
TR_1_7_2_2 0.000000 7.000000
TR_1_7_2_3 0.000000 7.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 70000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 50000.00 0.000000
TR_2_6_2_1 60000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
Documentation of the calculations 151

TR_3_5_1_3 0.000000 0.000000


TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 5000.000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
Documentation of the calculations 152

TR_7_8_2_3 0.000000 0.000000


TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 17.31807 0.000000
T_1_2 30.53673 0.000000
T_2_1 4.604189 0.000000
T_2_2 27.94911 0.000000
T_3_1 15.92624 0.000000
T_3_2 26.34352 0.000000
T_4_1 10013.55 0.000000
T_4_2 10013.55 0.000000
T_4_3 10013.55 0.000000
T_5_1 19.54567 0.000000
T_5_2 33.58273 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 48.03232 0.000000
T_6_3 58.44959 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.4000000E+09
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 153

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Global optimal solution found.


Objective value: 0.1945448E+09
Objective bound: 0.1945448E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 1317309
Total solver iterations: 53211692

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 0.000000 101.9200
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 129.9200
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
Documentation of the calculations 154

B_1_6_2_3 0.000000 390000.0


B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 -137800.0
B_2_6_1_1 1.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 140000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 900000.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1072200.
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 1072200.
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 720000.0
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 -1155300.
B_4_8_1_2 0.000000 -1155300.
B_4_8_1_3 0.000000 -1155300.
B_4_8_1_4 0.000000 -1155300.
B_4_8_2_1 0.000000 -1155300.
B_4_8_2_2 0.000000 -1155300.
Documentation of the calculations 155

B_4_8_2_3 0.000000 -1155300.


B_4_8_2_4 0.000000 -1155300.
B_4_8_3_1 0.000000 -1155300.
B_4_8_3_2 0.000000 -1155300.
B_4_8_3_3 0.000000 -1155300.
B_4_8_3_4 0.000000 -1155300.
B_5_8_1_1 0.000000 -795300.0
B_5_8_1_2 0.000000 -795300.0
B_5_8_1_3 1.000000 -795300.0
B_5_8_1_4 0.000000 -795300.0
B_5_8_2_1 0.000000 -1172300.
B_5_8_2_2 0.000000 -1172300.
B_5_8_2_3 0.000000 -1172300.
B_5_8_2_4 1.000000 -1172300.
B_5_8_3_1 1.000000 -795300.0
B_5_8_3_2 1.000000 -795300.0
B_5_8_3_3 0.000000 -795300.0
B_5_8_3_4 0.000000 -795300.0
B_6_8_1_1 0.000000 52700.00
B_6_8_1_2 0.000000 52700.00
B_6_8_1_3 1.000000 52700.00
B_6_8_1_4 0.000000 52700.00
B_6_8_2_1 0.000000 52700.00
B_6_8_2_2 0.000000 52700.00
B_6_8_2_3 0.000000 52700.00
B_6_8_2_4 1.000000 52700.00
B_6_8_3_1 1.000000 52700.00
B_6_8_3_2 1.000000 52700.00
B_6_8_3_3 0.000000 52700.00
B_6_8_3_4 0.000000 52700.00
B_7_8_1_1 0.000000 -1005300.
B_7_8_1_2 0.000000 -1005300.
B_7_8_1_3 0.000000 -1005300.
B_7_8_1_4 0.000000 -1005300.
B_7_8_2_1 0.000000 -1005300.
B_7_8_2_2 0.000000 -1005300.
B_7_8_2_3 0.000000 -1005300.
B_7_8_2_4 0.000000 -1005300.
B_7_8_3_1 0.000000 -1005300.
B_7_8_3_2 0.000000 -1005300.
B_7_8_3_3 0.000000 -1005300.
B_7_8_3_4 0.000000 -1005300.
P_8_1 26666.67 0.000000
P_8_2 18666.67 0.000000
P_8_3 24000.00 0.000000
P_8_4 26666.67 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 90000.00 0.000000
Documentation of the calculations 156

P_2_2 120000.0 0.000000


P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 7.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 40000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
Documentation of the calculations 157

TR_3_5_2_2 0.000000 7.000000


TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 7.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 7.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
Documentation of the calculations 158

PR_6 1.000000 0.000000


PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -3600000.
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 50.39792 0.000000
T_1_2 89.12929 0.000000
T_2_1 57.41110 0.000000
T_2_2 75.02863 0.000000
T_3_1 78.24893 0.000000
T_3_2 79.79743 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 53.44391 0.000000
T_5_2 72.90729 0.000000
T_5_3 91.35688 0.000000
T_6_1 68.90729 0.000000
T_6_2 87.35688 0.000000
T_6_3 110.7974 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 120.3939 0.000000
T_8_2 120.3939 0.000000
T_8_3 75.46244 0.000000
T_8_4 94.92582 0.000000
S_6_1 0.000000 0.000000
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 159

E. Preliminary notes to the RF-heuristics S1S2 and S2S1

Corresponding to the subsets S1 and S2, the binary constraints (15) to (18) in the
MSPSDS-SF model (see pp. 5 – 21) are grouped into the constraints (19) and (20).
The RF-heuristics differ in the sequence of relaxing binary constraints and fixing binary
variables.

!Subset S1 ⇒ Binary constraints (19);


@bin(pr_1); @bin(pr_2); @bin(pr_3); @bin(ar_1_1); @bin(ar_1_2); @bin(ar_2_1);
@bin(ar_2_2); @bin(ar_3_1); @bin(ar_3_2); @bin(s_6_1); @bin(s_6_2); @bin(s_6_3);
@bin(b_1_4_1_1); @bin(b_1_4_1_2); @bin(b_1_4_1_3); @bin(b_1_4_2_1);
@bin(b_1_4_2_2); @bin(b_1_4_2_3); @bin(b_1_5_1_1); @bin(b_1_5_1_2);
@bin(b_1_5_1_3); @bin(b_1_5_2_1); @bin(b_1_5_2_2); @bin(b_1_5_2_3);
@bin(b_1_6_1_1); @bin(b_1_6_1_2); @bin(b_1_6_1_3); @bin(b_1_6_2_1);
@bin(b_1_6_2_2); @bin(b_1_6_2_3); @bin(b_1_7_1_1); @bin(b_1_7_1_2);
@bin(b_1_7_1_3); @bin(b_1_7_2_1); @bin(b_1_7_2_2); @bin(b_1_7_2_3);
@bin(b_2_4_1_1); @bin(b_2_4_1_2); @bin(b_2_4_1_3); @bin(b_2_4_2_1);
@bin(b_2_4_2_2); @bin(b_2_4_2_3); @bin(b_2_5_1_1); @bin(b_2_5_1_2);
@bin(b_2_5_1_3); @bin(b_2_5_2_1); @bin(b_2_5_2_2); @bin(b_2_5_2_3);
@bin(b_2_6_1_1); @bin(b_2_6_1_2); @bin(b_2_6_1_3); @bin(b_2_6_2_1);
@bin(b_2_6_2_2); @bin(b_2_6_2_3); @bin(b_2_7_1_1); @bin(b_2_7_1_2);
@bin(b_2_7_1_3); @bin(b_2_7_2_1); @bin(b_2_7_2_2); @bin(b_2_7_2_3);
@bin(b_3_4_1_1); @bin(b_3_4_1_2); @bin(b_3_4_1_3); @bin(b_3_4_2_1);
@bin(b_3_4_2_2); @bin(b_3_4_2_3); @bin(b_3_5_1_1); @bin(b_3_5_1_2);
@bin(b_3_5_1_3); @bin(b_3_5_2_1); @bin(b_3_5_2_2); @bin(b_3_5_2_3);
@bin(b_3_6_1_1); @bin(b_3_6_1_2); @bin(b_3_6_1_3); @bin(b_3_6_2_1);
@bin(b_3_6_2_2); @bin(b_3_6_2_3); @bin(b_3_7_1_1); @bin(b_3_7_1_2);
@bin(b_3_7_1_3); @bin(b_3_7_2_1); @bin(b_3_7_2_2); @bin(b_3_7_2_3);

!Subset S2 ⇒ Binary constraints (20);


@bin(pr_4); @bin(pr_5); @bin(pr_6); @bin(pr_7); @bin(ar_4_1); @bin(ar_4_2);
@bin(ar_4_3); @bin(ar_5_1); @bin(ar_5_2); @bin(ar_5_3); @bin(ar_6_1);
@bin(ar_6_2); @bin(ar_6_3); @bin(ar_7_1); @bin(ar_7_2); @bin(ar_7_3);
@bin(ar_8_1); @bin(ar_8_2); @bin(ar_8_3); @bin(ar_8_4); @bin(b_4_8_1_1);
@bin(b_4_8_1_2); @bin(b_4_8_1_3); @bin(b_4_8_1_4); @bin(b_4_8_2_1);
Documentation of the calculations 160

@bin(b_4_8_2_2); @bin(b_4_8_2_3); @bin(b_4_8_2_4); @bin(b_4_8_3_1);


@bin(b_4_8_3_2); @bin(b_4_8_3_3); @bin(b_4_8_3_4); @bin(b_5_8_1_1);
@bin(b_5_8_1_2); @bin(b_5_8_1_3); @bin(b_5_8_1_4); @bin(b_5_8_2_1);
@bin(b_5_8_2_2); @bin(b_5_8_2_3); @bin(b_5_8_2_4); @bin(b_5_8_3_1);
@bin(b_5_8_3_2); @bin(b_5_8_3_3); @bin(b_5_8_3_4); @bin(b_6_8_1_1);
@bin(b_6_8_1_2); @bin(b_6_8_1_3); @bin(b_6_8_1_4); @bin(b_6_8_2_1);
@bin(b_6_8_2_2); @bin(b_6_8_2_3); @bin(b_6_8_2_4); @bin(b_6_8_3_1);
@bin(b_6_8_3_2); @bin(b_6_8_3_3); @bin(b_6_8_3_4); @bin(b_7_8_1_1);
@bin(b_7_8_1_2); @bin(b_7_8_1_3); @bin(b_7_8_1_4); @bin(b_7_8_2_1);
@bin(b_7_8_2_2); @bin(b_7_8_2_3); @bin(b_7_8_2_4); @bin(b_7_8_3_1);
@bin(b_7_8_3_2); @bin(b_7_8_3_3); @bin(b_7_8_3_4);

Note: the binary variables s_6_1, s_6_2 and s_6_3 in subset S1 are only required in
the scenarios 12 to 22.
Documentation of the calculations 161

F. Computational results of the RF-heuristic S1S2

The sequence of relaxing and fixing is as follows:

Step 1: The binary constraints (19) are relaxed.

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1.

Both steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 162

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1592096E+09
Objective bound: 0.1592096E+09
Infeasibilities: 0.1818989E-10
Extended solver steps: 2781
Total solver iterations: 118153

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 176440.7 0.000000
X_3 83559.35 0.000000
X_4 56779.67 0.000000
X_5 50000.00 0.000000
X_6 73220.33 0.000000
X_7 0.000000 28.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 14.63199
TR_1_5_1_3 0.000000 4.091988
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 10.54000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
Documentation of the calculations 163

B_1_6_2_2 0.000000 390000.0


B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.1000210E+10
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -178295.7
B_2_4_2_2 1.000000 0.1627770E+10
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -35943.49
B_2_5_1_2 0.000000 390000.0
B_2_5_1_3 0.000000 250495.7
B_2_5_2_1 0.000000 -424239.2
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1000270E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -118295.7
B_2_6_2_2 1.000000 0.1627830E+10
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 396554.5
B_3_4_1_2 0.000000 784850.1
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 241704.3
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 240611.0
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 527050.1
B_3_5_2_1 0.000000 85760.85
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 486554.5
B_3_6_1_2 0.000000 874850.1
B_3_6_1_3 1.000000 0.1000930E+10
B_3_6_2_1 0.000000 331704.3
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 775149.9
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 1.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 1.000000 0.000000
Documentation of the calculations 164

B_4_8_2_2 0.000000 0.000000


B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 1.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 25.06452 0.000000
P_8_1 39050.84 0.000000
T_8_2 15.94369 0.000000
P_8_2 8000.000 0.000000
T_8_3 39.67501 0.000000
P_8_3 35615.83 0.000000
T_8_4 18.78777 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 23220.33 0.000000
P_6_3 25000.00 0.000000
Documentation of the calculations 165

P_5_1 25000.00 0.000000


P_5_2 0.000000 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 16779.67 0.000000
P_3_1 50000.00 0.000000
P_3_2 33559.35 0.000000
P_2_1 80000.00 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.544907
TR_1_4_1_2 0.000000 11.09199
TR_1_4_1_3 0.000000 14.09199
TR_1_6_1_1 0.000000 5.544907
TR_1_6_1_2 0.000000 11.09199
TR_1_6_1_3 0.000000 11.87984
TR_1_7_1_1 0.000000 14.09199
TR_1_7_1_2 0.000000 14.09199
TR_1_7_1_3 0.000000 14.09199
TR_1_4_2_1 0.000000 1.452919
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 1.452919
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.787855
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 5.547081
TR_2_4_1_3 0.000000 8.547081
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 8.547081
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 5.547081
TR_2_6_1_3 0.000000 6.334936
TR_2_7_1_1 0.000000 8.547081
TR_2_7_1_2 0.000000 8.547081
TR_2_7_1_3 0.000000 8.547081
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 3.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 0.7878553
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 2.212145
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 2.212145
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
Documentation of the calculations 166

TR_3_6_1_2 0.000000 0.000000


TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 2.212145
TR_3_7_1_2 0.000000 2.212145
TR_3_7_1_3 0.000000 2.212145
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 33559.35 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 41.92654
TR_4_8_1_2 15000.00 0.000000
TR_4_8_1_3 0.000000 41.92654
TR_4_8_1_4 0.000000 41.92654
TR_4_8_2_1 25000.00 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 16779.67 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 23220.33 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
Documentation of the calculations 167

TR_7_8_3_1 0.000000 0.000000


TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.1000000E+10
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -286439.2
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 100000.0
T_1_2 14.61049 0.000000
T_2_1 0.000000 200000.0
T_2_2 6.181607 0.000000
T_3_1 0.000000 100000.0
T_3_2 3.765836 0.000000
T_4_1 9.218832 0.000000
T_4_2 15.85643 0.000000
T_4_3 32.50822 0.000000
T_5_1 3.045994 0.000000
T_5_2 17.65648 0.000000
T_5_3 17.65648 0.000000
T_6_1 11.21883 0.000000
T_6_2 17.85643 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 168

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 169

Global optimal solution found.


Objective value: 0.1632731E+09
Objective bound: 0.1632731E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 3086
Total solver iterations: 108600

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 176440.7 0.000000
X_3 83559.35 0.000000
X_4 56779.67 0.000000
X_5 50000.00 0.000000
X_6 73220.33 0.000000
X_7 0.000000 28.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 3.682789
TR_1_5_1_3 0.000000 14.22279
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 10.54000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.9002100E+09
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -139466.1
B_2_4_2_2 1.000000 0.1627770E+10
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -46129.14
B_2_5_1_2 0.000000 211666.1
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -395595.2
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.9002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -79466.09
B_2_6_2_2 1.000000 0.1627830E+10
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 170

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 419899.0
B_3_4_1_2 0.000000 769365.1
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 280533.9
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 253769.9
B_3_5_1_2 0.000000 511565.1
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 114404.8
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 1110000.
B_3_6_1_1 0.000000 509899.0
B_3_6_1_2 0.000000 859365.1
B_3_6_1_3 1.000000 0.9009300E+09
B_3_6_2_1 0.000000 370533.9
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 790634.9
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 1.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 1.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 171

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 15.94369 0.000000
P_8_1 8000.000 0.000000
T_8_2 39.67501 0.000000
P_8_2 35615.83 0.000000
T_8_3 25.06452 0.000000
P_8_3 39050.84 0.000000
T_8_4 18.78777 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 23220.33 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 15000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 16779.67 0.000000
P_3_1 50000.00 0.000000
P_3_2 33559.35 0.000000
P_2_1 80000.00 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.690416
TR_1_4_1_2 0.000000 10.68279
TR_1_4_1_3 0.000000 13.68279
TR_1_6_1_1 0.000000 5.690416
TR_1_6_1_2 0.000000 10.68279
TR_1_6_1_3 0.000000 11.69186
TR_1_7_1_1 0.000000 13.68279
TR_1_7_1_2 0.000000 13.68279
TR_1_7_1_3 0.000000 13.68279
TR_1_4_2_1 0.000000 2.007627
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.007627
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 8.009070
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 172

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.992373
TR_2_4_1_3 0.000000 7.992373
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 7.992373
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.992373
TR_2_6_1_3 0.000000 6.001443
TR_2_7_1_1 0.000000 7.992373
TR_2_7_1_2 0.000000 7.992373
TR_2_7_1_3 0.000000 7.992373
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 3.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 1.009070
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 1.990930
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 1.990930
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 1.990930
TR_3_7_1_2 0.000000 1.990930
TR_3_7_1_3 0.000000 1.990930
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 33559.35 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 15000.00 0.000000
TR_4_8_1_2 0.000000 38.33389
TR_4_8_1_3 0.000000 38.33389
TR_4_8_1_4 0.000000 38.33389
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 25000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 16779.67 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 173

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 23220.33 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 174

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.9000000E+09
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -257795.2
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 90000.00
T_1_2 14.61049 0.000000
T_2_1 0.000000 180000.0
T_2_2 6.181607 0.000000
T_3_1 0.000000 90000.00
T_3_2 3.765836 0.000000
T_4_1 9.218832 0.000000
T_4_2 15.85643 0.000000
T_4_3 32.50822 0.000000
T_5_1 3.045994 0.000000
T_5_2 17.65648 0.000000
T_5_3 104.9482 0.000000
T_6_1 11.21883 0.000000
T_6_2 17.85643 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 175

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1702250E+09
Objective bound: 0.1702250E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 1156
Total solver iterations: 110261

Variable Value Reduced Cost


X_1 75509.78 0.000000
X_2 184490.2 0.000000
X_3 100000.0 0.000000
X_4 32245.11 0.000000
X_5 50000.00 0.000000
X_6 97754.89 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 23.63436
TR_1_5_1_2 0.000000 14.84130
TR_1_5_1_3 0.000000 13.09436
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 1.746939
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 1.000000 0.3200390E+10
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 -526605.3
Documentation of the calculations 176

B_1_6_2_2 0.000000 390000.0


B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 -195514.2
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 1.000000 0.4888980E+09
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 390000.0
B_2_5_1_2 0.000000 -15514.24
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 1.000000 0.1600390E+10
B_2_5_2_3 0.000000 267714.2
B_2_6_1_1 1.000000 0.2087551E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -731091.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 224485.8
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 224485.8
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 494485.8
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 494485.8
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 -686605.3
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 -686605.3
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
Documentation of the calculations 177

B_4_8_2_2 0.000000 0.000000


B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 1.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 43.23782 0.000000
P_8_1 26666.67 0.000000
T_8_2 50.25635 0.000000
P_8_2 26666.67 0.000000
T_8_3 26.22652 0.000000
P_8_3 16000.00 0.000000
T_8_4 26.22652 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 47754.89 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
Documentation of the calculations 178

P_5_1 0.000000 0.000000


P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 39.00000
P_4_2 32245.11 0.000000
P_4_3 0.000000 39.00000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 114490.2 0.000000
P_1_1 25509.78 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 23.09436
TR_1_4_1_2 0.000000 14.30130
TR_1_4_1_3 0.000000 23.09436
TR_1_6_1_1 25509.78 0.000000
TR_1_6_1_2 0.000000 23.09436
TR_1_6_1_3 0.000000 23.09436
TR_1_7_1_1 0.000000 23.09436
TR_1_7_1_2 0.000000 23.09436
TR_1_7_1_3 0.000000 23.09436
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 1.206939
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 3.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 70000.00 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 8.793061
TR_2_4_2_2 64490.22 0.000000
TR_2_4_2_3 0.000000 8.793061
TR_2_5_2_1 0.000000 8.793061
TR_2_5_2_2 50000.00 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 8.793061
TR_2_6_2_3 0.000000 8.793061
TR_2_7_2_1 0.000000 8.793061
TR_2_7_2_2 0.000000 8.793061
TR_2_7_2_3 0.000000 8.793061
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
Documentation of the calculations 179

TR_3_6_1_2 50000.00 0.000000


TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 7245.112 0.000000
TR_4_8_2_4 25000.00 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 22754.89 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
Documentation of the calculations 180

TR_7_8_3_1 0.000000 0.000000


TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 320000.0
T_1_2 25.19182 0.000000
T_2_1 3.102379 0.000000
T_2_2 5.043857 0.000000
T_3_1 3.562809 0.000000
T_3_2 10.58134 0.000000
T_4_1 0.000000 0.000000
T_4_2 15.21929 0.000000
T_4_3 146.6028 0.000000
T_5_1 0.000000 0.000000
T_5_2 21.21929 0.000000
T_5_3 28.23782 0.000000
T_6_1 14.04386 0.000000
T_6_2 35.66888 0.000000
T_6_3 42.68741 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 181

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 182

Global optimal solution found.


Objective value: 0.1709860E+09
Objective bound: 0.1709860E+09
Infeasibilities: 0.1818989E-10
Extended solver steps: 950
Total solver iterations: 61729

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 20000.00 0.000000
X_5 75000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 61.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 13.40439
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 2.864392
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 -74492.59
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -275000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 390000.0
B_2_5_1_2 0.000000 69403.04
B_2_5_1_3 1.000000 0.1400270E+10
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 0.000000 -338307.4
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.7002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -477289.6
B_2_6_2_1 0.000000 -137710.4
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 -885000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 183

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 1.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 171692.6
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 171692.6
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 312289.6
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 -435000.0
B_3_6_2_1 0.000000 312289.6
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 -435000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 1.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 184

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 25.06452 0.000000
P_8_1 26666.67 0.000000
T_8_2 45.36531 0.000000
P_8_2 18666.67 0.000000
T_8_3 19.89719 0.000000
P_8_3 13333.33 0.000000
T_8_4 45.36531 0.000000
P_8_4 37333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 20000.00 0.000000
P_4_2 0.000000 33.00000
P_4_3 0.000000 33.00000
P_3_1 70000.00 0.000000
P_3_2 40000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 12.86439
TR_1_4_1_2 0.000000 12.86439
TR_1_4_1_3 0.000000 12.86439
TR_1_6_1_1 0.000000 4.039957
TR_1_6_1_2 0.000000 9.864392
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 12.86439
TR_1_7_1_2 0.000000 12.86439
TR_1_7_1_3 0.000000 12.86439
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 1.175565
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 185

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 8.824435
TR_2_4_1_2 0.000000 8.824435
TR_2_4_1_3 0.000000 8.824435
TR_2_5_1_1 0.000000 8.824435
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 5.824435
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 8.824435
TR_2_7_1_2 0.000000 8.824435
TR_2_7_1_3 0.000000 8.824435
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 3.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 40000.00 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 20000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 186

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 187

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.7000000E+09
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 -200507.4
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 70000.00
T_1_2 14.10065 0.000000
T_2_1 0.000000 210000.0
T_2_2 7.108815 0.000000
T_3_1 3.220292 0.000000
T_3_2 8.513972 0.000000
T_4_1 37.39883 0.000000
T_4_2 115.0582 0.000000
T_4_3 115.0582 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.045994 0.000000
T_5_3 16.32825 0.000000
T_6_1 12.32825 0.000000
T_6_2 17.49559 0.000000
T_6_3 35.76879 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 188

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1744897E+09
Objective bound: 0.1744897E+09
Infeasibilities: 0.1455214E-10
Extended solver steps: 478
Total solver iterations: 52578

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 -766912.9
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 -766912.9
B_1_4_2_1 0.000000 -766912.9
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 -766912.9
TR_1_5_1_1 0.000000 0.000000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 -668313.9
Documentation of the calculations 189

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -668313.9
B_1_7_1_1 0.000000 -676912.9
B_1_7_1_2 0.000000 -676912.9
B_1_7_1_3 0.000000 -676912.9
B_1_7_2_1 0.000000 -676912.9
B_1_7_2_2 0.000000 -676912.9
B_1_7_2_3 0.000000 -676912.9
B_2_4_1_1 0.000000 -1030958.
B_2_4_1_2 1.000000 0.3254086E+09
B_2_4_1_3 0.000000 -1030958.
B_2_4_2_1 0.000000 -1496913.
B_2_4_2_2 0.000000 -255954.8
B_2_4_2_3 0.000000 -1496913.
B_2_5_1_1 0.000000 -850958.1
B_2_5_1_2 0.000000 328154.8
B_2_5_1_3 1.000000 0.1200328E+10
B_2_5_2_1 0.000000 -1316913.
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1525469E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -812359.1
B_2_6_2_1 0.000000 -195954.8
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 -1278314.
B_2_7_1_1 0.000000 -940958.1
B_2_7_1_2 0.000000 -940958.1
B_2_7_1_3 0.000000 -940958.1
B_2_7_2_1 0.000000 -1406913.
B_2_7_2_2 0.000000 -1406913.
B_2_7_2_3 0.000000 -1406913.
B_3_4_1_1 0.000000 -1076913.
B_3_4_1_2 0.000000 164045.2
B_3_4_1_3 0.000000 -1076913.
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 -806912.9
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 1110000.
B_3_6_1_1 0.000000 254045.2
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 -828313.9
B_3_6_2_1 0.000000 930000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 -956912.9
B_3_7_1_2 0.000000 -956912.9
B_3_7_1_3 0.000000 -956912.9
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 190

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 1.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 25.35525 0.000000
P_8_1 26666.67 0.000000
T_8_2 20.28631 0.000000
P_8_2 24000.00 0.000000
T_8_3 46.47472 0.000000
P_8_3 26666.67 0.000000
T_8_4 46.47472 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 21447.51 0.000000
P_6_2 25000.00 0.000000
Documentation of the calculations 191

P_6_3 35000.00 0.000000


P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 103.0000
P_4_2 23552.49 0.000000
P_4_3 0.000000 103.0000
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 160000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.3435030
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 0.3435030
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.3435030
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.3435030
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 47104.98 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 6.656497
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 192

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 17.72797
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 16.84447
TR_3_5_2_3 0.000000 16.84447
TR_3_6_2_1 0.000000 17.72797
TR_3_6_2_2 0.000000 24.38447
TR_3_6_2_3 0.000000 2.265700
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 23552.49 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 21447.51 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 10000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 193

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 0.000000 -9858409.
B_1_5_1_1 0.000000 -1179113.
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -1179113.
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.2907232 0.000000
T_1_2 15.21007 0.000000
T_2_1 0.000000 240000.0
T_2_2 7.399538 0.000000
T_3_1 4.329709 0.000000
T_3_2 5.878210 0.000000
T_4_1 0.000000 0.000000
T_4_2 11.43766 0.000000
T_4_3 142.3199 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.336717 0.000000
T_5_3 17.43766 0.000000
T_6_1 13.43766 0.000000
T_6_2 17.78631 0.000000
T_6_3 36.87821 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 194

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 195

Global optimal solution found.


Objective value: 0.1781620E+09
Objective bound: 0.1781620E+09
Infeasibilities: 0.5820766E-10
Extended solver steps: 240
Total solver iterations: 26373

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 41.21369
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 0.000000
TR_1_5_1_3 0.000000 0.5400000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 30000.00 0.000000
TR_1_5_2_3 0.000000 0.5400000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 -512521.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -512521.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 108295.7
B_2_4_1_2 0.000000 108295.7
B_2_4_1_3 1.000000 0.4153070E+09
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -178295.7
B_2_5_1_1 0.000000 250495.7
B_2_5_1_2 1.000000 0.1000250E+10
B_2_5_1_3 0.000000 288295.7
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -100000.0
B_2_6_1_1 1.000000 0.1415367E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -734225.4
B_2_6_2_1 0.000000 -118295.7
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 -1122521.
B_2_7_1_1 0.000000 198295.7
B_2_7_1_2 0.000000 198295.7
Documentation of the calculations 196

B_2_7_1_3 0.000000 198295.7


B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 241704.3
B_3_5_1_1 0.000000 1072200.
B_3_5_1_2 0.000000 1072200.
B_3_5_1_3 0.000000 1110000.
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 410000.0
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 27478.98
B_3_6_2_1 0.000000 331704.3
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 1.000000 -672521.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 1.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 1.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 197

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.47472 0.000000
P_8_1 26666.67 0.000000
T_8_2 25.35525 0.000000
P_8_2 26666.67 0.000000
T_8_3 20.28631 0.000000
P_8_3 24000.00 0.000000
T_8_4 46.47472 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 21447.51 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 0.000000 13.21369
P_4_2 0.000000 13.21369
P_4_3 23552.49 0.000000
P_3_1 0.000000 0.000000
P_3_2 70000.00 0.000000
P_2_1 160000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 1.452919
TR_1_6_1_1 0.000000 1.452919
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 1.452919
TR_1_6_2_1 0.000000 1.452919
TR_1_6_2_2 0.000000 7.000000

TR_1_6_2_3 0.000000 0.000000


Documentation of the calculations 198

TR_1_7_2_1 0.000000 0.000000


TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 47104.98 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 5.547081
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 1.452919
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 1.452919
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
Documentation of the calculations 199

TR_4_8_3_3 23552.49 0.000000


TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 25000.00 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 21447.51 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 10000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 200

AR_3_1 0.000000 -3600000.


AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.2907232 0.000000
T_1_2 15.21007 0.000000
T_2_1 0.000000 200000.0
T_2_2 7.399538 0.000000
T_3_1 0.000000 0.000000
T_3_2 4.329709 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 11.43766 0.000000
T_5_1 3.336717 0.000000
T_5_2 17.43766 0.000000
T_5_3 135.2512 0.000000
T_6_1 13.43766 0.000000
T_6_2 17.78631 0.000000
T_6_3 36.87821 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 201

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1816682E+09
Objective bound: 0.1816682E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 1540
Total solver iterations: 81949

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 103.0000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 -293202.2
Documentation of the calculations 202

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 -293202.2
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.3998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 232239.8
B_2_6_1_3 0.000000 -903202.2
B_2_6_2_1 1.000000 0.4002700E+09
B_2_6_2_2 0.000000 232239.8
B_2_6_2_3 0.000000 -903202.2
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 0.000000 630000.0
B_3_5_1_1 0.000000 619960.2
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 619960.2
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 1.000000 0.1600930E+10
B_3_6_1_3 0.000000 -205442.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 682239.8
B_3_6_2_3 1.000000 -453202.2
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 750000.0
B_3_7_2_2 0.000000 750000.0
B_3_7_2_3 0.000000 750000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 203

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 27.00895 0.000000
P_8_1 26666.67 0.000000
T_8_2 38.44001 0.000000
P_8_2 24000.00 0.000000
T_8_3 52.47707 0.000000
P_8_3 18666.67 0.000000
T_8_4 52.47707 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 20000.00 0.000000
Documentation of the calculations 204

P_6_3 35000.00 0.000000


P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 7.000000
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 7.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 6.460569
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 7.000000
TR_1_7_1_2 0.000000 7.000000
TR_1_7_1_3 0.000000 7.000000
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 6.460569
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 7.000000
TR_1_7_2_2 0.000000 7.000000
TR_1_7_2_3 0.000000 7.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.5394315
TR_3_4_1_2 0.000000 0.5394315
TR_3_4_1_3 0.000000 0.5394315
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.5394315
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 205

TR_3_6_1_1 0.000000 0.5394315


TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.5394315
TR_3_7_1_2 0.000000 0.5394315
TR_3_7_1_3 0.000000 0.5394315
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 20000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 206

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 160000.0
T_3_2 10.33205 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 207

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 208

Global optimal solution found.


Objective value: 0.1850223E+09
Objective bound: 0.1850223E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 2392
Total solver iterations: 102749

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 65.07553
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 93.07553
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 52598.34
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 52598.34
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.2998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -557401.7
B_2_6_2_1 1.000000 0.3002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -557401.7
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 209

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 558020.2
B_3_5_1_2 0.000000 1085820.
B_3_5_1_3 0.000000 558020.2
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 905820.2
B_3_6_1_2 1.000000 0.1200930E+10
B_3_6_1_3 0.000000 78418.49
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 744179.8
B_3_6_2_3 1.000000 -107401.7
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 210

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 52.47707 0.000000
P_8_1 26666.67 0.000000
T_8_2 52.47707 0.000000
P_8_2 18666.67 0.000000
T_8_3 27.00895 0.000000
P_8_3 26666.67 0.000000
T_8_4 38.44001 0.000000
P_8_4 24000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 20000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.345426
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.345426

TR_1_6_2_3 0.000000 0.000000


Documentation of the calculations 211

TR_1_7_2_1 0.000000 10.00000


TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.3454264
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 0.3454264
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 2.654574
TR_3_4_1_2 0.000000 2.654574
TR_3_4_1_3 0.000000 2.654574
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 2.654574
TR_3_7_1_2 0.000000 2.654574
TR_3_7_1_3 0.000000 2.654574
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
Documentation of the calculations 212

TR_4_8_3_3 0.000000 0.000000


TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 20000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 213

AR_3_1 1.000000 0.000000


AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 120000.0
T_3_2 10.33205 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 214

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1890058E+09
Objective bound: 0.1890058E+09
Infeasibilities: 0.1091394E-10
Extended solver steps: 2476
Total solver iterations: 83527

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 180000.0 0.000000
X_3 100000.0 0.000000
X_4 0.000000 39.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 30000.00 0.000000
TR_1_5_1_2 0.000000 0.000000
TR_1_5_1_3 0.000000 7.540000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 215

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 54681.74
B_2_4_2_2 0.000000 54681.74
B_2_4_2_3 0.000000 54681.74
B_2_5_1_1 1.000000 0.8000175E+09
B_2_5_1_2 0.000000 17518.26
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 0.2003900E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 1.000000 0.2002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 144681.7
B_2_7_2_2 0.000000 144681.7
B_2_7_2_3 0.000000 144681.7
B_3_4_1_1 0.000000 474681.7
B_3_4_1_2 0.000000 474681.7
B_3_4_1_3 0.000000 474681.7
B_3_4_2_1 0.000000 474681.7
B_3_4_2_2 0.000000 474681.7
B_3_4_2_3 0.000000 474681.7
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 900000.0
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 594681.7
B_3_7_1_2 0.000000 594681.7
B_3_7_1_3 0.000000 594681.7
B_3_7_2_1 0.000000 594681.7
B_3_7_2_2 0.000000 594681.7
B_3_7_2_3 0.000000 594681.7
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 216

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 50.99707 0.000000
P_8_1 26666.67 0.000000
T_8_2 61.41434 0.000000
P_8_2 26666.67 0.000000
T_8_3 43.97854 0.000000
P_8_3 26666.67 0.000000
T_8_4 43.97854 0.000000
P_8_4 16000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 30000.00 0.000000
P_6_2 25000.00 0.000000
Documentation of the calculations 217

P_6_3 25000.00 0.000000


P_5_1 50000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 30000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 4.781168
TR_1_4_1_2 0.000000 4.781168
TR_1_4_1_3 0.000000 4.781168
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 4.781168
TR_1_7_1_2 0.000000 4.781168
TR_1_7_1_3 0.000000 4.781168
TR_1_4_2_1 0.000000 4.781168
TR_1_4_2_2 0.000000 4.781168
TR_1_4_2_3 0.000000 4.781168
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 4.781168
TR_1_7_2_2 0.000000 4.781168
TR_1_7_2_3 0.000000 4.781168
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 70000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 2.218832
TR_2_6_1_1 0.000000 2.218832
TR_2_6_1_2 0.000000 5.218832
TR_2_6_1_3 0.000000 5.218832
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 50000.00 0.000000
TR_2_6_2_1 60000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 218

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 8.492815
TR_4_8_1_2 0.000000 8.492815
TR_4_8_1_3 0.000000 8.492815
TR_4_8_1_4 0.000000 8.492815
TR_4_8_2_1 0.000000 8.492815
TR_4_8_2_2 0.000000 8.492815
TR_4_8_2_3 0.000000 8.492815
TR_4_8_2_4 0.000000 8.492815
TR_4_8_3_1 0.000000 8.492815
TR_4_8_3_2 0.000000 8.492815
TR_4_8_3_3 0.000000 8.492815
TR_4_8_3_4 0.000000 8.492815
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 5000.000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 8.492815
TR_7_8_1_2 0.000000 8.492815
TR_7_8_1_3 0.000000 8.492815
TR_7_8_1_4 0.000000 8.492815
TR_7_8_2_1 0.000000 8.492815
TR_7_8_2_2 0.000000 8.492815
TR_7_8_2_3 0.000000 8.492815
Documentation of the calculations 219

TR_7_8_2_4 0.000000 8.492815


TR_7_8_3_1 0.000000 8.492815
TR_7_8_3_2 0.000000 8.492815
TR_7_8_3_3 0.000000 8.492815
TR_7_8_3_4 0.000000 8.492815
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 12.71388 0.000000
T_1_2 25.93254 0.000000
T_2_1 0.000000 80000.00
T_2_2 23.34492 0.000000
T_3_1 11.32206 0.000000
T_3_2 21.73933 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 14.94148 0.000000
T_5_2 28.97854 0.000000
T_5_3 39.39581 0.000000
T_6_1 35.39581 0.000000
T_6_2 43.42813 0.000000
T_6_3 53.84540 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 220

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;

no time block interval]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 221

Global optimal solution found.


Objective value: 0.1919192E+09
Objective bound: 0.1919192E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 812
Total solver iterations: 55180

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 53.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 81.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 1.227596
TR_1_5_1_3 0.000000 11.54638
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 30000.00 0.000000
TR_1_5_2_3 0.000000 10.31879
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -223731.7
B_2_5_1_2 1.000000 0.1998622E+09
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 -223731.7
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 390000.0
B_2_6_1_1 1.000000 0.2002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 1.000000 270000.0
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
Documentation of the calculations 222

B_2_7_1_3 0.000000 -190000.0


B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 155485.0
B_3_4_1_2 0.000000 155485.0
B_3_4_1_3 0.000000 155485.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 140000.0
B_3_5_1_1 0.000000 301753.3
B_3_5_1_2 0.000000 387685.0
B_3_5_1_3 1.000000 0.1011100E+09
B_3_5_2_1 0.000000 286268.3
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 1094515.
B_3_6_1_1 0.000000 735485.0
B_3_6_1_2 0.000000 735485.0
B_3_6_1_3 0.000000 735485.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 1.000000 720000.0
B_3_6_2_3 0.000000 720000.0
B_3_7_1_1 0.000000 275485.0
B_3_7_1_2 0.000000 275485.0
B_3_7_1_3 0.000000 275485.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 223

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 25.06452 0.000000
P_8_1 26666.67 0.000000
T_8_2 60.12460 0.000000
P_8_2 24000.00 0.000000
T_8_3 50.53264 0.000000
P_8_3 26666.67 0.000000
T_8_4 50.53264 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 35000.00 0.000000
P_6_3 20000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 40000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 1.227596
TR_1_4_1_2 0.000000 1.227596
TR_1_4_1_3 0.000000 1.227596
TR_1_6_1_1 0.000000 8.227596
TR_1_6_1_2 0.000000 8.227596
TR_1_6_1_3 0.000000 8.227596
TR_1_7_1_1 0.000000 1.227596
TR_1_7_1_2 0.000000 1.227596
TR_1_7_1_3 0.000000 1.227596
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000

TR_1_6_2_3 0.000000 7.000000


Documentation of the calculations 224

TR_1_7_2_1 0.000000 0.000000


TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 2.778786
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 2.778786
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 40000.00 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 50000.00 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 70000.00 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
Documentation of the calculations 225

TR_4_8_3_3 0.000000 0.000000


TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 10000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 20000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 226

AR_3_1 1.000000 0.000000


AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.3000000E+09
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 -85931.75
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 30000.00
T_1_2 19.26799 0.000000
T_2_1 5.167337 0.000000
T_2_2 43.46004 0.000000
T_3_1 0.000000 10000.00
T_3_2 8.387629 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 3.045994 0.000000
T_5_2 21.49559 0.000000
T_5_3 38.10607 0.000000
T_6_1 17.49559 0.000000
T_6_2 40.93613 0.000000
T_6_3 53.56945 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 227

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1948440E+09
Objective bound: 0.1948440E+09
Infeasibilities: 0.1746230E-09
Extended solver steps: 1187
Total solver iterations: 297692

Variable Value Reduced Cost


X_1 60000.00 0.000000
X_2 160000.0 0.000000
X_3 140000.0 0.000000
X_4 0.000000 33.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 61.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 10.54000
TR_1_5_1_2 30000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
Documentation of the calculations 228

B_1_6_2_2 0.000000 390000.0


B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 390000.0
B_2_5_1_2 1.000000 -137800.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 -137800.0
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 1.000000 270000.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 1110000.
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 1110000.
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 1.000000 720000.0
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 1.000000 720000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
Documentation of the calculations 229

B_4_8_2_2 0.000000 0.000000


B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
P_8_1 24000.00 0.000000
P_8_2 26666.67 0.000000
P_8_3 26666.67 0.000000
P_8_4 18666.67 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 45000.00 0.000000
P_6_2 35000.00 0.000000
P_6_3 0.000000 0.000000
P_5_1 0.000000 0.000000
P_5_2 50000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 70000.00 0.000000
Documentation of the calculations 230

P_2_1 70000.00 0.000000


P_2_2 90000.00 0.000000
P_1_1 30000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 3.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 3.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 20000.00 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 70000.00 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
Documentation of the calculations 231

TR_3_5_2_1 0.000000 0.000000


TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 70000.00 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 20000.00 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 10000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
Documentation of the calculations 232

PR_5 1.000000 0.000000


PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 12.90793 0.000000
T_1_2 34.32090 0.000000
T_2_1 0.1940527 0.000000
T_2_2 21.05231 0.000000
T_3_1 0.000000 0.000000
T_3_2 23.44055 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 0.000000 0.000000
T_5_2 15.13553 0.000000
T_5_3 36.54850 0.000000
T_6_1 32.54850 0.000000
T_6_2 55.98905 0.000000
T_6_3 146.1915 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 44.17259 0.000000
T_8_2 44.17259 0.000000
T_8_3 65.58556 0.000000
T_8_4 65.58556 0.000000
Documentation of the calculations 233

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 234

Global optimal solution found.


Objective value: 0.1628228E+09
Objective bound: 0.1628228E+09
Infeasibilities: 0.1110267E-10
Extended solver steps: 8603
Total solver iterations: 524254

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 61305.03 0.000000
X_5 50000.00 0.000000
X_6 68694.97 0.000000
X_7 0.000000 41.14589
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.1000210E+10
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -178295.7
B_2_4_2_2 1.000000 0.3460514E+08
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 288295.7
B_2_5_1_2 0.000000 250495.7
B_2_5_1_3 0.000000 250495.7
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1000270E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -118295.7
B_2_6_2_2 1.000000 0.3466514E+08
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 198295.7
B_2_7_1_2 0.000000 198295.7
Documentation of the calculations 235

B_2_7_1_3 0.000000 198295.7


B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 241704.3
B_3_4_1_2 0.000000 630000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 241704.3
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 410000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 410000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 331704.3
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 930000.0
B_3_6_2_1 0.000000 331704.3
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 1.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 1.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 236

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 18.78777 0.000000
P_8_1 13333.33 0.000000
T_8_2 53.30907 0.000000
P_8_2 40000.00 0.000000
T_8_3 46.29055 0.000000
P_8_3 34666.67 0.000000
T_8_4 15.94369 0.000000
P_8_4 8000.000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 18694.97 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 21305.03 0.000000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 80000.00 0.000000
P_2_2 80000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 1.452919
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 1.452919
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 1.452919
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 1.452919
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 237

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 5.547081
TR_2_4_1_3 0.000000 8.547081
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 5.547081
TR_2_6_1_3 0.000000 8.547081
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 42610.06 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 37389.94 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 35.07243
TR_4_8_1_2 0.000000 35.07243
TR_4_8_1_3 0.000000 35.07243
TR_4_8_1_4 15000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 21305.03 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 25000.00 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 238

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 18694.97 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 239

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.22602 0.000000
T_1_2 28.24455 0.000000
T_2_1 0.000000 200000.0
T_2_2 28.78117 0.000000
T_3_1 13.63406 0.000000
T_3_2 14.99491 0.000000
T_4_1 9.218832 0.000000
T_4_2 38.00000 0.000000
T_4_3 44.10098 0.000000
T_5_1 0.000000 0.000000
T_5_2 24.27202 0.000000
T_5_3 31.29055 0.000000
T_6_1 11.21883 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.74014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.2000000E+10
S_6_3 0.000000 0.000000

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 240

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1665377E+09
Objective bound: 0.1665377E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 6864
Total solver iterations: 477379

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 61305.03 0.000000
X_5 50000.00 0.000000
X_6 68694.97 0.000000
X_7 0.000000 87.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 241

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 1.000000 0.9002100E+09
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -139466.1
B_2_4_2_2 1.000000 0.5571329E+08
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 249466.1
B_2_5_1_2 0.000000 211666.1
B_2_5_1_3 0.000000 211666.1
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.9002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -79466.09
B_2_6_2_2 1.000000 0.5577329E+08
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 159466.1
B_2_7_1_2 0.000000 159466.1
B_2_7_1_3 0.000000 159466.1
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 280533.9
B_3_4_1_2 0.000000 630000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 280533.9
B_3_4_2_2 0.000000 630000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 410000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 410000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 370533.9
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 930000.0
B_3_6_2_1 0.000000 370533.9
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 930000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 1.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 242

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 1.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 15.94369 0.000000
P_8_1 8000.000 0.000000
T_8_2 53.30907 0.000000
P_8_2 40000.00 0.000000
T_8_3 46.29055 0.000000
P_8_3 34666.67 0.000000
T_8_4 18.78777 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 18694.97 0.000000
Documentation of the calculations 243

P_6_3 25000.00 0.000000


P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 21305.03 0.000000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 80000.00 0.000000
P_2_2 80000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 2.007627
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 2.007627
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 2.007627
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.007627
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.992373
TR_2_4_1_3 0.000000 7.992373
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.992373
TR_2_6_1_3 0.000000 7.992373
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 42610.06 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 37389.94 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 244

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 15000.00 0.000000
TR_4_8_1_2 0.000000 33.71217
TR_4_8_1_3 0.000000 33.71217
TR_4_8_1_4 0.000000 33.71217
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 21305.03 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 25000.00 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 18694.97 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 245

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.22602 0.000000
T_1_2 28.24455 0.000000
T_2_1 0.000000 180000.0
T_2_2 28.78117 0.000000
T_3_1 13.63406 0.000000
T_3_2 14.99491 0.000000
T_4_1 9.218832 0.000000
T_4_2 38.00000 0.000000
T_4_3 44.10098 0.000000
T_5_1 0.000000 0.000000
T_5_2 24.27202 0.000000
T_5_3 31.29055 0.000000
T_6_1 11.21883 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.74014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1800000E+10
S_6_3 0.000000 0.000000
Documentation of the calculations 246

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 247

Global optimal solution found.


Objective value: 0.1706562E+09
Objective bound: 0.1706562E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 3582
Total solver iterations: 211429

Variable Value Reduced Cost


X_1 140419.2 0.000000
X_2 119580.8 0.000000
X_3 100000.0 0.000000
X_4 45209.62 0.000000
X_5 50000.00 0.000000
X_6 84790.38 0.000000
X_7 0.000000 22.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 1.000000 0.4709433E+09
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 10.54000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 10.54000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 30636.53
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 1.000000 210000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 172836.5
B_2_5_1_2 0.000000 390000.0
B_2_5_1_3 0.000000 172836.5
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.1600270E+10
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -40636.53
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 248

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 630000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 1110000.
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 409363.5
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 409363.5
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 1.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 1.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 249

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 47.56894 0.000000
P_8_1 26666.67 0.000000
T_8_2 54.58747 0.000000
P_8_2 37445.13 0.000000
T_8_3 20.48386 0.000000
P_8_3 8000.000 0.000000
T_8_4 20.48386 0.000000
P_8_4 23888.20 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 34790.38 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 25000.00 0.000000
P_4_1 25000.00 0.000000
P_4_2 20209.62 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 69580.77 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 90419.23 0.000000
TR_1_4_1_1 0.000000 7.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 2.562335
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 40419.23 0.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.562335
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 250

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 4.437665
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 7.437665
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 7.437665
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 69580.77 0.000000
TR_2_6_1_2 0.000000 7.437665
TR_2_6_1_3 0.000000 7.437665
TR_2_7_1_1 0.000000 7.437665
TR_2_7_1_2 0.000000 7.437665
TR_2_7_1_3 0.000000 7.437665
TR_2_4_2_1 50000.00 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 3.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 25000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 20209.62 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 251

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 15000.00 0.000000
TR_6_8_1_4 19790.38 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 252

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.4704933E+09
T_1_1 22.50441 0.000000
T_1_2 27.86899 0.000000
T_2_1 0.000000 160000.0
T_2_2 2.888997 0.000000
T_3_1 7.893928 0.000000
T_3_2 14.91246 0.000000
T_4_1 11.27577 0.000000
T_4_2 46.56894 0.000000
T_4_3 116.2998 0.000000
T_5_1 25.55041 0.000000
T_5_2 32.56894 0.000000
T_5_3 32.56894 0.000000
T_6_1 10.92985 0.000000
T_6_2 40.00000 0.000000
T_6_3 47.01853 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1600000E+10
S_6_3 0.000000 0.000000

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 253

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1756382E+09
Objective bound: 0.1756382E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 4050
Total solver iterations: 188251

Variable Value Reduced Cost


X_1 148660.2 0.000000
X_2 91339.78 0.000000
X_3 120000.0 0.000000
X_4 25000.00 0.000000
X_5 59330.11 0.000000
X_6 95669.89 0.000000
X_7 0.000000 62.92402
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 68660.22 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 254

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 1.000000 0.3259587E+10
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -144096.5
B_2_4_1_2 0.000000 -144096.5
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 35903.48
B_2_5_1_2 0.000000 -1896.519
B_2_5_1_3 0.000000 -1896.519
B_2_5_2_1 0.000000 -100000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 1.000000 0.7002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -84096.52
B_2_6_2_1 0.000000 134096.5
B_2_6_2_2 1.000000 270000.0
B_2_6_2_3 0.000000 -220000.0
B_2_7_1_1 0.000000 -54096.52
B_2_7_1_2 0.000000 -54096.52
B_2_7_1_3 0.000000 -54096.52
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 140000.0
B_3_4_1_2 0.000000 140000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 1.000000 840000.0
B_3_5_1_1 0.000000 410000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 410000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 584096.5
B_3_6_1_2 0.000000 720000.0
B_3_6_1_3 1.000000 230000.0
B_3_6_2_1 0.000000 584096.5
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 0.000000 230000.0
B_3_7_1_1 0.000000 260000.0
B_3_7_1_2 0.000000 260000.0
B_3_7_1_3 0.000000 260000.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 255

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 1.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.69098 0.000000
P_8_1 24357.27 0.000000
T_8_2 56.82885 0.000000
P_8_2 31642.73 0.000000
T_8_3 17.95571 0.000000
P_8_3 13333.33 0.000000
T_8_4 56.82885 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 20669.89 0.000000
Documentation of the calculations 256

P_6_3 50000.00 0.000000


P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 34330.11 0.000000
P_4_1 0.000000 34.92402
P_4_2 0.000000 34.92402
P_4_3 25000.00 0.000000
P_3_1 70000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 41339.78 0.000000
P_1_1 50000.00 0.000000
P_1_2 98660.22 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 5.058522
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 5.058522
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 30000.00 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 4.941478
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 1.941478
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 41339.78 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 257

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 25000.00 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 9330.111 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 20669.89 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 258

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.3259197E+10
T_1_1 21.62645 0.000000
T_1_2 27.15381 0.000000
T_2_1 0.000000 70000.00
T_2_2 29.85342 0.000000
T_3_1 11.64247 0.000000
T_3_2 18.51468 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 47.62075 0.000000
T_5_1 0.000000 0.000000
T_5_2 24.67245 0.000000
T_5_3 32.19098 0.000000
T_6_1 10.38677 0.000000
T_6_2 40.00000 0.000000
T_6_3 44.19098 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.2100000E+10
S_6_3 0.000000 0.000000
Documentation of the calculations 259

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 260

Global optimal solution found.


Objective value: 0.1783591E+09
Objective bound: 0.1783591E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 1798
Total solver iterations: 106627

Variable Value Reduced Cost


X_1 79192.32 0.000000
X_2 190000.0 0.000000
X_3 90807.68 0.000000
X_4 20403.84 0.000000
X_5 75000.00 0.000000
X_6 84596.16 0.000000
X_7 0.000000 34.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 10.27185
TR_1_5_1_2 0.000000 2.731852
TR_1_5_1_3 0.000000 10.27185
TR_1_5_2_1 0.000000 7.540000
TR_1_5_2_2 30000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 1.000000 0.6680001E+09
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 198770.3
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 390000.0
B_2_5_1_2 1.000000 -137800.0
B_2_5_1_3 0.000000 390000.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 0.6003900E+09
B_2_6_1_1 0.000000 -411229.7
B_2_6_1_2 0.000000 -33418.49
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 0.000000 -411229.7
B_2_6_2_2 1.000000 0.5999666E+09
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 261

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 630000.0
B_3_4_1_2 1.000000 840000.0
B_3_4_1_3 0.000000 630000.0
B_3_4_2_1 0.000000 630000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 630000.0
B_3_5_1_1 0.000000 900000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 900000.0
B_3_5_2_1 0.000000 900000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 900000.0
B_3_6_1_1 0.000000 38770.33
B_3_6_1_2 0.000000 416581.5
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 38770.33
B_3_6_2_2 0.000000 416581.5
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 750000.0
B_3_7_1_2 0.000000 750000.0
B_3_7_1_3 0.000000 750000.0
B_3_7_2_1 0.000000 750000.0
B_3_7_2_2 0.000000 750000.0
B_3_7_2_3 0.000000 750000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 1.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 262

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 49.59651 0.000000
P_8_1 37548.71 0.000000
T_8_2 22.50000 0.000000
P_8_2 13117.95 0.000000
T_8_3 66.01853 0.000000
P_8_3 26666.67 0.000000
T_8_4 49.59651 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 24596.16 0.000000
P_6_2 35000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 50000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 6.000000
P_4_2 20403.84 0.000000
P_4_3 0.000000 6.000000
P_3_1 40807.68 0.000000
P_3_2 50000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 49192.32 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 9.731852
TR_1_4_1_2 0.000000 12.73185
TR_1_4_1_3 0.000000 9.731852
TR_1_6_1_1 49192.32 0.000000
TR_1_6_1_2 0.000000 5.397302
TR_1_6_1_3 0.000000 12.73185
TR_1_7_1_1 0.000000 9.731852
TR_1_7_1_2 0.000000 9.731852
TR_1_7_1_3 0.000000 9.731852
TR_1_4_2_1 0.000000 7.000000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 7.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 2.665450

TR_1_6_2_3 0.000000 10.00000


Documentation of the calculations 263

TR_1_7_2_1 0.000000 7.000000


TR_1_7_2_2 0.000000 7.000000
TR_1_7_2_3 0.000000 7.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 50000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 70000.00 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 40807.68 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 20403.84 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
Documentation of the calculations 264

TR_4_8_3_3 0.000000 0.000000


TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 24596.16 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 10000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 265

AR_3_1 1.000000 0.000000


AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 66761.01
T_1_2 18.33186 0.000000
T_2_1 5.617976 0.000000
T_2_2 27.67175 0.000000
T_3_1 12.62703 0.000000
T_3_2 26.34352 0.000000
T_4_1 0.000000 0.000000
T_4_2 41.52975 0.000000
T_4_3 115.0582 0.000000
T_5_1 0.000000 0.000000
T_5_2 20.55945 0.000000
T_5_3 44.00000 0.000000
T_6_1 15.01294 0.000000
T_6_2 40.00000 0.000000
T_6_3 58.44959 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.6761008E+08
S_6_2 0.000000 -0.1800000E+10
S_6_3 0.000000 0.000000

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 266

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1811686E+09
Objective bound: 0.1811686E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 1638
Total solver iterations: 83320

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 30000.00 0.000000
TR_1_5_1_2 0.000000 9.433928
TR_1_5_1_3 0.000000 0.5400000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 9.433928
TR_1_5_2_3 0.000000 0.5400000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 267

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 1.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -182926.1
B_2_4_1_2 0.000000 -182926.1
B_2_4_1_3 1.000000 0.6400531E+09
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 112926.1
B_2_5_1_1 0.000000 -40726.09
B_2_5_1_2 0.000000 390000.0
B_2_5_1_3 0.000000 -2926.085
B_2_5_2_1 1.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 0.000000 -100000.0
B_2_6_1_1 1.000000 0.1140113E+10
B_2_6_1_2 0.000000 170760.2
B_2_6_1_3 0.000000 -122926.1
B_2_6_2_1 0.000000 172926.1
B_2_6_2_2 0.000000 73686.28
B_2_6_2_3 0.000000 -220000.0
B_2_7_1_1 0.000000 -92926.09
B_2_7_1_2 0.000000 -92926.09
B_2_7_1_3 0.000000 -92926.09
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 217425.1
B_3_4_1_2 0.000000 217425.1
B_3_4_1_3 0.000000 610351.1
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 532926.1
B_3_5_1_1 0.000000 449625.1
B_3_5_1_2 1.000000 0.5011100E+09
B_3_5_1_3 0.000000 487425.1
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 1032575.
B_3_5_2_3 0.000000 410000.0
B_3_6_1_1 0.000000 700351.1
B_3_6_1_2 0.000000 601111.3
B_3_6_1_3 0.000000 307425.1
B_3_6_2_1 0.000000 622926.1
B_3_6_2_2 1.000000 523686.3
B_3_6_2_3 0.000000 230000.0
B_3_7_1_1 0.000000 337425.1
B_3_7_1_2 0.000000 337425.1
B_3_7_1_3 0.000000 337425.1
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 268

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 1.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 49.59651 0.000000
P_8_1 26666.67 0.000000
T_8_2 18.34483 0.000000
P_8_2 24000.00 0.000000
T_8_3 49.59651 0.000000
P_8_3 18666.67 0.000000
T_8_4 60.12460 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 21447.51 0.000000
P_6_2 35000.00 0.000000
Documentation of the calculations 269

P_6_3 25000.00 0.000000


P_5_1 50000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 0.000000 39.00000
P_4_2 0.000000 39.00000
P_4_3 23552.49 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 90000.00 0.000000
P_2_2 70000.00 0.000000
P_1_1 30000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 5.613230
TR_1_6_1_1 0.000000 5.613230
TR_1_6_1_2 0.000000 4.195518
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 5.613230
TR_1_6_2_1 0.000000 5.613230
TR_1_6_2_2 0.000000 4.195518
TR_1_6_2_3 50000.00 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 47104.98 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 3.280698
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 70000.00 0.000000
TR_2_5_2_2 0.000000 1.893928
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 50000.00 0.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 270

TR_3_6_1_1 0.000000 0.000000


TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 70000.00 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 23552.49 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 21447.51 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 10000.00 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 271

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 18.33186 0.000000
T_1_2 37.50967 0.000000
T_2_1 0.000000 50000.00
T_2_2 5.617976 0.000000
T_3_1 0.000000 50000.00
T_3_2 7.451499 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 9.496186 0.000000
T_5_1 20.55945 0.000000
T_5_2 38.10607 0.000000
T_5_3 135.2512 0.000000
T_6_1 11.49619 0.000000
T_6_2 40.00000 0.000000
T_6_3 52.55566 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1000000E+10
S_6_3 0.000000 0.000000
Documentation of the calculations 272

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 273

Global optimal solution found.


Objective value: 0.1846702E+09
Objective bound: 0.1846702E+09
Infeasibilities: 0.2182860E-10
Extended solver steps: 6322
Total solver iterations: 368649

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 81.92000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 109.9200
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 312279.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 312279.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 390000.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.7998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -297721.0
B_2_6_2_1 1.000000 0.8002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -297721.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 274

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 372200.0
B_3_5_1_2 0.000000 900000.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 152279.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 152279.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 275

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 53.57368 0.000000
P_8_1 26666.67 0.000000
T_8_2 73.03706 0.000000
P_8_2 18666.67 0.000000
T_8_3 73.03706 0.000000
P_8_3 26666.67 0.000000
T_8_4 46.55515 0.000000
P_8_4 24000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 276

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 40000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 277

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 20000.00 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 278

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.49063 0.000000
T_1_2 41.77240 0.000000
T_2_1 17.16838 0.000000
T_2_2 27.94911 0.000000
T_3_1 13.89867 0.000000
T_3_2 30.89204 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 31.55515 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 46.00474 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.1600000E+10
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 279

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1872663E+09
Objective bound: 0.1872663E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 5484
Total solver iterations: 315852

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 73.49777
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 101.4978
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 7.540000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 7.540000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
Documentation of the calculations 280

B_1_6_2_2 0.000000 390000.0


B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 1.000000 390000.0
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 0.5998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -155790.8
B_2_6_2_1 1.000000 0.6002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -155790.8
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
B_2_7_1_3 0.000000 300000.0
B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 900000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 900000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 294209.2
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 294209.2
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
Documentation of the calculations 281

B_4_8_2_2 0.000000 0.000000


B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 53.57368 0.000000
P_8_1 26666.67 0.000000
T_8_2 73.03706 0.000000
P_8_2 18666.67 0.000000
T_8_3 46.55515 0.000000
P_8_3 24000.00 0.000000
T_8_4 73.03706 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
Documentation of the calculations 282

P_5_1 25000.00 0.000000


P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 0.9172749
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 0.9172749
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 50000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 40000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
Documentation of the calculations 283

TR_3_6_1_2 50000.00 0.000000


TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 25000.00 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
Documentation of the calculations 284

TR_7_8_3_1 0.000000 0.000000


TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 28.50916 0.000000
T_1_2 41.77240 0.000000
T_2_1 10.14985 0.000000
T_2_2 27.94911 0.000000
T_3_1 13.89867 0.000000
T_3_2 30.89204 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 31.55515 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 46.00474 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.1200000E+10
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 285

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 286

Global optimal solution found.


Objective value: 0.1898625E+09
Objective bound: 0.1898625E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 2400
Total solver iterations: 158234

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 76.30518
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 104.3052
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 7.540000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 7.540000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 1.000000 390000.0
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 0.000000 -137800.0
B_2_5_2_3 1.000000 0.3998622E+09
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 -13860.50
B_2_6_2_1 1.000000 0.4002700E+09
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 -13860.50
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 287

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 900000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 900000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 930000.0
B_3_6_1_3 0.000000 436139.5
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 930000.0
B_3_6_2_3 1.000000 436139.5
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 288

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 73.03706 0.000000
P_8_1 26666.67 0.000000
T_8_2 53.57368 0.000000
P_8_2 26666.67 0.000000
T_8_3 46.55515 0.000000
P_8_3 24000.00 0.000000
T_8_4 73.03706 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 2.944850
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 2.944850
TR_1_7_2_1 0.000000 10.00000
Documentation of the calculations 289

TR_1_7_2_2 0.000000 10.00000


TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 50000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 40000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 290

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 10000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 291

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 28.50916 0.000000
T_1_2 41.77240 0.000000
T_2_1 10.14985 0.000000
T_2_2 27.94911 0.000000
T_3_1 13.89867 0.000000
T_3_2 30.89204 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 31.55515 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 46.00474 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.8000000E+09
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed


Documentation of the calculations 292

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1

Global optimal solution found.


Objective value: 0.1924421E+09
Objective bound: 0.1924421E+09
Infeasibilities: 0.2546674E-10
Extended solver steps: 5213
Total solver iterations: 272043

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 0.000000 50.97242
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 78.97242
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
Documentation of the calculations 293

B_1_6_2_1 0.000000 390000.0


B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 -280000.0
B_2_4_1_2 0.000000 -280000.0
B_2_4_1_3 0.000000 -280000.0
B_2_4_2_1 0.000000 -280000.0
B_2_4_2_2 0.000000 -280000.0
B_2_4_2_3 0.000000 -280000.0
B_2_5_1_1 0.000000 -137800.0
B_2_5_1_2 1.000000 0.3003900E+09
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 -137800.0
B_2_5_2_2 0.000000 390000.0
B_2_5_2_3 1.000000 0.1998622E+09
B_2_6_1_1 1.000000 0.3002700E+09
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 199034.9
B_2_6_2_1 0.000000 270000.0
B_2_6_2_2 1.000000 0.2002700E+09
B_2_6_2_3 0.000000 199034.9
B_2_7_1_1 0.000000 -190000.0
B_2_7_1_2 0.000000 -190000.0
B_2_7_1_3 0.000000 -190000.0
B_2_7_2_1 0.000000 -190000.0
B_2_7_2_2 0.000000 -190000.0
B_2_7_2_3 0.000000 -190000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 140000.0
B_3_4_2_2 0.000000 140000.0
B_3_4_2_3 0.000000 140000.0
B_3_5_1_1 0.000000 1072200.
B_3_5_1_2 0.000000 1110000.
B_3_5_1_3 0.000000 1072200.
B_3_5_2_1 0.000000 372200.0
B_3_5_2_2 0.000000 900000.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 930000.0
B_3_6_1_2 0.000000 930000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 1.000000 649034.9
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 260000.0
B_3_7_2_2 0.000000 260000.0
B_3_7_2_3 0.000000 260000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
Documentation of the calculations 294

B_4_8_2_1 0.000000 0.000000


B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 91.48665 0.000000
P_8_1 18666.67 0.000000
T_8_2 66.01853 0.000000
P_8_2 26666.67 0.000000
T_8_3 46.55515 0.000000
P_8_3 24000.00 0.000000
T_8_4 91.48665 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
Documentation of the calculations 295

P_6_3 35000.00 0.000000


P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 0.000000 0.000000
P_3_2 70000.00 0.000000
P_2_1 90000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 5.986212
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 5.986212
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 40000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 7.000000
TR_3_5_1_3 0.000000 0.000000
Documentation of the calculations 296

TR_3_6_1_1 0.000000 7.000000


TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 5.986212
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 10000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
Documentation of the calculations 297

TR_7_8_2_4 0.000000 0.000000


TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 -3600000.
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.49063 0.000000
T_1_2 60.22199 0.000000
T_2_1 28.50381 0.000000
T_2_2 46.12134 0.000000
T_3_1 49.34164 0.000000
T_3_2 49.34164 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 44.00000 0.000000
T_5_3 62.44959 0.000000
T_6_1 40.00000 0.000000
T_6_2 58.44959 0.000000
T_6_3 81.89014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.4000000E+09
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 298

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (19) are relaxed

Step 2: The variables from subset S2 are fixed on the binary values calculated in Step 1
Documentation of the calculations 299

Global optimal solution found.


Objective value: 0.1950548E+09
Objective bound: 0.1950548E+09
Infeasibilities: 0.2664573E-10
Extended solver steps: 1363
Total solver iterations: 88719

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 81.92000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 109.9200
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 450000.0
B_1_4_1_2 0.000000 450000.0
B_1_4_1_3 0.000000 450000.0
B_1_4_2_1 0.000000 450000.0
B_1_4_2_2 0.000000 450000.0
B_1_4_2_3 0.000000 450000.0
TR_1_5_1_1 0.000000 7.540000
TR_1_5_1_2 30000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 7.540000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 390000.0
B_1_6_1_2 0.000000 390000.0
B_1_6_1_3 0.000000 390000.0
B_1_6_2_1 0.000000 390000.0
B_1_6_2_2 0.000000 390000.0
B_1_6_2_3 0.000000 390000.0
B_1_7_1_1 0.000000 540000.0
B_1_7_1_2 0.000000 540000.0
B_1_7_1_3 0.000000 540000.0
B_1_7_2_1 0.000000 540000.0
B_1_7_2_2 0.000000 540000.0
B_1_7_2_3 0.000000 540000.0
B_2_4_1_1 0.000000 210000.0
B_2_4_1_2 0.000000 210000.0
B_2_4_1_3 0.000000 210000.0
B_2_4_2_1 0.000000 210000.0
B_2_4_2_2 0.000000 210000.0
B_2_4_2_3 0.000000 210000.0
B_2_5_1_1 1.000000 390000.0
B_2_5_1_2 0.000000 -137800.0
B_2_5_1_3 0.000000 -137800.0
B_2_5_2_1 0.000000 390000.0
B_2_5_2_2 1.000000 -137800.0
B_2_5_2_3 0.000000 -137800.0
B_2_6_1_1 0.000000 270000.0
B_2_6_1_2 0.000000 270000.0
B_2_6_1_3 0.000000 270000.0
B_2_6_2_1 1.000000 270000.0
B_2_6_2_2 0.000000 270000.0
B_2_6_2_3 0.000000 270000.0
B_2_7_1_1 0.000000 300000.0
B_2_7_1_2 0.000000 300000.0
Documentation of the calculations 300

B_2_7_1_3 0.000000 300000.0


B_2_7_2_1 0.000000 300000.0
B_2_7_2_2 0.000000 300000.0
B_2_7_2_3 0.000000 300000.0
B_3_4_1_1 0.000000 840000.0
B_3_4_1_2 0.000000 840000.0
B_3_4_1_3 0.000000 840000.0
B_3_4_2_1 0.000000 840000.0
B_3_4_2_2 0.000000 840000.0
B_3_4_2_3 0.000000 840000.0
B_3_5_1_1 0.000000 900000.0
B_3_5_1_2 0.000000 372200.0
B_3_5_1_3 0.000000 372200.0
B_3_5_2_1 0.000000 900000.0
B_3_5_2_2 0.000000 372200.0
B_3_5_2_3 0.000000 372200.0
B_3_6_1_1 0.000000 720000.0
B_3_6_1_2 1.000000 720000.0
B_3_6_1_3 0.000000 930000.0
B_3_6_2_1 0.000000 720000.0
B_3_6_2_2 0.000000 720000.0
B_3_6_2_3 1.000000 930000.0
B_3_7_1_1 0.000000 960000.0
B_3_7_1_2 0.000000 960000.0
B_3_7_1_3 0.000000 960000.0
B_3_7_2_1 0.000000 960000.0
B_3_7_2_2 0.000000 960000.0
B_3_7_2_3 0.000000 960000.0
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 301

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
P_8_1 26666.67 0.000000
P_8_2 26666.67 0.000000
P_8_3 24000.00 0.000000
P_8_4 18666.67 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 20000.00 0.000000
P_6_2 35000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 30000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 50000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
Documentation of the calculations 302

TR_2_6_1_1 0.000000 0.000000


TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 70000.00 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 40000.00 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 70000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
Documentation of the calculations 303

TR_5_8_2_4 25000.00 0.000000


TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 20000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 10000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
Documentation of the calculations 304

B_1_5_2_1 0.000000 0.000000


B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 82.11076 0.000000
T_1_2 95.32942 0.000000
T_2_1 50.48820 0.000000
T_2_2 68.28746 0.000000
T_3_1 71.23040 0.000000
T_3_2 80.71893 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 64.87497 0.000000
T_5_2 84.33835 0.000000
T_5_3 98.37541 0.000000
T_6_1 80.33835 0.000000
T_6_2 103.7789 0.000000
T_6_3 112.8250 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 120.3939 0.000000
T_8_2 113.3754 0.000000
T_8_3 86.89350 0.000000
T_8_4 113.3754 0.000000
S_6_1 0.000000 0.000000
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 305

G. Computational results of the RF-heuristic S2S1

The sequence of relaxing and fixing is as follows:

Step 1: The binary constraints (20) are relaxed.

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1.

Both steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 306

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 307

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 308

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 309

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 310

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 311

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 312

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 313

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 314

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 315

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 316

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;

(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 317

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 318

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 319

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 320

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 321

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 322

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 323

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 324

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 325

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 326

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (20) are relaxed

Step 2: The variables from subset S1 are fixed on the binary values calculated in Step 1
Documentation of the calculations 327

H. Preliminary notes to the three-step RF-heuristics

Corresponding to the subsets S3, S4 and S5, the binary constraints (15) to (18) in the
MSPSDS-SF model (see pp. 5 – 21) are grouped into the constraints (21) to (23). The
RF-heuristics differ in the sequence of relaxing binary constraints and fixing binary
variables.

!Subset S3 ⇒ Binary constraints (21);


@bin(pr_1); @bin(pr_2); @bin(pr_3); @bin(pr_4); @bin(pr_5); @bin(pr_6); @bin(pr_7);
@bin(ar_1_1); @bin(ar_1_2); @bin(ar_2_1); @bin(ar_2_2); @bin(ar_3_1);
@bin(ar_3_2); @bin(ar_4_1); @bin(ar_4_2); @bin(ar_4_3); @bin(ar_5_1);
@bin(ar_5_2); @bin(ar_5_3); @bin(ar_6_1); @bin(ar_6_2); @bin(ar_6_3);
@bin(ar_7_1); @bin(ar_7_2); @bin(ar_7_3); @bin(ar_8_1); @bin(ar_8_2);
@bin(ar_8_3); @bin(ar_8_4); @bin(s_6_1); @bin(s_6_2); @bin(s_6_3);

!Subset S4 ⇒ Binary constraints (22);


@bin(b_1_4_1_1); @bin(b_1_4_1_2); @bin(b_1_4_1_3); @bin(b_1_4_2_1);
@bin(b_1_4_2_2); @bin(b_1_4_2_3); @bin(b_1_5_1_1); @bin(b_1_5_1_2);
@bin(b_1_5_1_3); @bin(b_1_5_2_1); @bin(b_1_5_2_2); @bin(b_1_5_2_3);
@bin(b_1_6_1_1); @bin(b_1_6_1_2); @bin(b_1_6_1_3); @bin(b_1_6_2_1);
@bin(b_1_6_2_2); @bin(b_1_6_2_3); @bin(b_1_7_1_1); @bin(b_1_7_1_2);
@bin(b_1_7_1_3); @bin(b_1_7_2_1); @bin(b_1_7_2_2); @bin(b_1_7_2_3);
@bin(b_2_4_1_1); @bin(b_2_4_1_2); @bin(b_2_4_1_3); @bin(b_2_4_2_1);
@bin(b_2_4_2_2); @bin(b_2_4_2_3); @bin(b_2_5_1_1); @bin(b_2_5_1_2);
@bin(b_2_5_1_3); @bin(b_2_5_2_1); @bin(b_2_5_2_2); @bin(b_2_5_2_3);
@bin(b_2_6_1_1); @bin(b_2_6_1_2); @bin(b_2_6_1_3); @bin(b_2_6_2_1);
@bin(b_2_6_2_2); @bin(b_2_6_2_3); @bin(b_2_7_1_1); @bin(b_2_7_1_2);
@bin(b_2_7_1_3); @bin(b_2_7_2_1); @bin(b_2_7_2_2); @bin(b_2_7_2_3);
@bin(b_3_4_1_1); @bin(b_3_4_1_2); @bin(b_3_4_1_3); @bin(b_3_4_2_1);
@bin(b_3_4_2_2); @bin(b_3_4_2_3); @bin(b_3_5_1_1); @bin(b_3_5_1_2);
@bin(b_3_5_1_3); @bin(b_3_5_2_1); @bin(b_3_5_2_2); @bin(b_3_5_2_3);
@bin(b_3_6_1_1); @bin(b_3_6_1_2); @bin(b_3_6_1_3); @bin(b_3_6_2_1);
@bin(b_3_6_2_2); @bin(b_3_6_2_3); @bin(b_3_7_1_1); @bin(b_3_7_1_2);
@bin(b_3_7_1_3); @bin(b_3_7_2_1); @bin(b_3_7_2_2); @bin(b_3_7_2_3);
Documentation of the calculations 328

!Subset S5 ⇒ Binary constraints (23);


@bin(b_4_8_1_1); @bin(b_4_8_1_2); @bin(b_4_8_1_3); @bin(b_4_8_1_4);
@bin(b_4_8_2_1); @bin(b_4_8_2_2); @bin(b_4_8_2_3); @bin(b_4_8_2_4);
@bin(b_4_8_3_1); @bin(b_4_8_3_2); @bin(b_4_8_3_3); @bin(b_4_8_3_4);
@bin(b_5_8_1_1); @bin(b_5_8_1_2); @bin(b_5_8_1_3); @bin(b_5_8_1_4);
@bin(b_5_8_2_1); @bin(b_5_8_2_2); @bin(b_5_8_2_3); @bin(b_5_8_2_4);
@bin(b_5_8_3_1); @bin(b_5_8_3_2); @bin(b_5_8_3_3); @bin(b_5_8_3_4);
@bin(b_6_8_1_1); @bin(b_6_8_1_2); @bin(b_6_8_1_3); @bin(b_6_8_1_4);
@bin(b_6_8_2_1); @bin(b_6_8_2_2); @bin(b_6_8_2_3); @bin(b_6_8_2_4);
@bin(b_6_8_3_1); @bin(b_6_8_3_2); @bin(b_6_8_3_3); @bin(b_6_8_3_4);
@bin(b_7_8_1_1); @bin(b_7_8_1_2); @bin(b_7_8_1_3); @bin(b_7_8_1_4);
@bin(b_7_8_2_1); @bin(b_7_8_2_2); @bin(b_7_8_2_3); @bin(b_7_8_2_4);
@bin(b_7_8_3_1); @bin(b_7_8_3_2); @bin(b_7_8_3_3); @bin(b_7_8_3_4);

Note: the binary variables s_6_1, s_6_2 and s_6_3 in subset S3 are only required in
the scenarios 12 to 22.
Documentation of the calculations 329

I. Computational results of the RF-heuristic S3S4S5

Step 1: The binary constraints (21) and (22) are relaxed.

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed.

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 330

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 331

Global optimal solution found.


Objective value: 0.1592096E+09
Objective bound: 0.1592096E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 0
Total solver iterations: 13

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 176440.7 0.000000
X_3 83559.35 0.000000
X_4 56779.67 0.000000
X_5 50000.00 0.000000
X_6 73220.33 0.000000
X_7 0.000000 48.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 4.631988
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 4.091988
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 332

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 1.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 1.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 333

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 39.67501 0.000000
P_8_1 35615.83 0.000000
T_8_2 18.78777 0.000000
P_8_2 13333.33 0.000000
T_8_3 25.06452 0.000000
P_8_3 39050.84 0.000000
T_8_4 15.94369 0.000000
P_8_4 8000.000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 628898.1
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 23220.33 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 16779.67 0.000000
P_3_1 50000.00 0.000000
P_3_2 33559.35 0.000000
P_2_1 80000.00 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.544907
TR_1_4_1_2 0.000000 11.09199
TR_1_4_1_3 0.000000 14.09199
TR_1_6_1_1 0.000000 5.544907
TR_1_6_1_2 0.000000 11.09199
TR_1_6_1_3 0.000000 11.87984
TR_1_7_1_1 0.000000 4.091988
TR_1_7_1_2 0.000000 4.091988
TR_1_7_1_3 0.000000 4.091988
TR_1_4_2_1 0.000000 1.452919
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 1.452919
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 7.787855
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 334

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 5.547081
TR_2_4_1_3 0.000000 8.547081
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 5.547081
TR_2_6_1_3 0.000000 6.334936
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 0.7878553
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 2.212145
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 33559.35 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 41.92654
TR_4_8_1_2 0.000000 41.92654
TR_4_8_1_3 0.000000 41.92654
TR_4_8_1_4 15000.00 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 25000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 16779.67 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 335

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 23220.33 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1494000E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 336

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 100000.0
T_1_2 14.61049 0.000000
T_2_1 0.000000 200000.0
T_2_2 6.181607 0.000000
T_3_1 0.000000 100000.0
T_3_2 3.765836 0.000000
T_4_1 9.218832 0.000000
T_4_2 15.85643 0.000000
T_4_3 32.50822 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.045994 0.000000
T_5_3 17.65648 0.000000
T_6_1 11.21883 0.000000
T_6_2 17.85643 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 337

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 338

Global optimal solution found.


Objective value: 0.1632731E+09
Objective bound: 0.1632731E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 0
Total solver iterations: 12

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 176440.7 0.000000
X_3 83559.35 0.000000
X_4 56779.67 0.000000
X_5 50000.00 0.000000
X_6 73220.33 0.000000
X_7 0.000000 48.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 4.222789
TR_1_5_1_3 0.000000 3.682789
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 339

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 1.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 1.000000 0.000000
B_4_8_3_1 1.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 340

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 39.67501 0.000000
P_8_1 35615.83 0.000000
T_8_2 18.78777 0.000000
P_8_2 13333.33 0.000000
T_8_3 15.94369 0.000000
P_8_3 8000.000 0.000000
T_8_4 25.06452 0.000000
P_8_4 39050.84 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 575008.3
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 23220.33 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 16779.67 0.000000
P_3_1 50000.00 0.000000
P_3_2 33559.35 0.000000
P_2_1 80000.00 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.690416
TR_1_4_1_2 0.000000 10.68279
TR_1_4_1_3 0.000000 13.68279
TR_1_6_1_1 0.000000 5.690416
TR_1_6_1_2 0.000000 10.68279
TR_1_6_1_3 0.000000 11.69186
TR_1_7_1_1 0.000000 3.682789
TR_1_7_1_2 0.000000 3.682789
TR_1_7_1_3 0.000000 3.682789
TR_1_4_2_1 0.000000 2.007627
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.007627
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 8.009070
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 341

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.992373
TR_2_4_1_3 0.000000 7.992373
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.992373
TR_2_6_1_3 0.000000 6.001443
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 1.009070
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 1.990930
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 33559.35 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 38.33389
TR_4_8_1_2 0.000000 38.33389
TR_4_8_1_3 15000.00 0.000000
TR_4_8_1_4 0.000000 38.33389
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 25000.00 0.000000
TR_4_8_3_1 16779.67 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 342

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 23220.33 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1494000E+08
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 343

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 90000.00
T_1_2 14.61049 0.000000
T_2_1 0.000000 180000.0
T_2_2 6.181607 0.000000
T_3_1 0.000000 90000.00
T_3_2 3.765836 0.000000
T_4_1 9.218832 0.000000
T_4_2 15.85643 0.000000
T_4_3 32.50822 0.000000
T_5_1 3.045994 0.000000
T_5_2 13.95148 0.000000
T_5_3 17.65648 0.000000
T_6_1 11.21883 0.000000
T_6_2 17.85643 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 344

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 345

Global optimal solution found.


Objective value: 0.1673366E+09
Objective bound: 0.1673366E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 0
Total solver iterations: 11

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 176440.7 0.000000
X_3 83559.35 0.000000
X_4 56779.67 0.000000
X_5 50000.00 0.000000
X_6 73220.33 0.000000
X_7 0.000000 48.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 3.813590
TR_1_5_1_3 0.000000 3.273590
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 346

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 1.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 1.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 1.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 1.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 347

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 39.67501 0.000000
P_8_1 35615.83 0.000000
T_8_2 25.06452 0.000000
P_8_2 39050.84 0.000000
T_8_3 15.94369 0.000000
P_8_3 8000.000 0.000000
T_8_4 18.78777 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 521118.5
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 23220.33 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 25000.00 0.000000
P_4_3 16779.67 0.000000
P_3_1 50000.00 0.000000
P_3_2 33559.35 0.000000
P_2_1 80000.00 0.000000
P_2_2 96440.65 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.835926
TR_1_4_1_2 0.000000 10.27359
TR_1_4_1_3 0.000000 13.27359
TR_1_6_1_1 0.000000 5.835926
TR_1_6_1_2 0.000000 10.27359
TR_1_6_1_3 0.000000 11.50387
TR_1_7_1_1 0.000000 3.273590
TR_1_7_1_2 0.000000 3.273590
TR_1_7_1_3 0.000000 3.273590
TR_1_4_2_1 0.000000 2.562335
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.562335
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 8.230284
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 348

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.437665
TR_2_4_1_3 0.000000 7.437665
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.437665
TR_2_6_1_3 0.000000 5.667949
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 50000.00 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 46440.65 0.000000
TR_2_6_2_3 0.000000 1.230284
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 1.769716
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 33559.35 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 34.74123
TR_4_8_1_2 0.000000 34.74123
TR_4_8_1_3 15000.00 0.000000
TR_4_8_1_4 0.000000 34.74123
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 25000.00 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 16779.67 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 349

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 25000.00 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 23220.33 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1494000E+08
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 350

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.000000 80000.00
T_1_2 14.61049 0.000000
T_2_1 0.000000 160000.0
T_2_2 6.181607 0.000000
T_3_1 0.000000 80000.00
T_3_2 3.765836 0.000000
T_4_1 9.218832 0.000000
T_4_2 15.85643 0.000000
T_4_3 32.50822 0.000000
T_5_1 3.045994 0.000000
T_5_2 13.95148 0.000000
T_5_3 17.65648 0.000000
T_6_1 11.21883 0.000000
T_6_2 17.85643 0.000000
T_6_3 32.10607 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 351

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 352

Global optimal solution found.


Objective value: 0.1708151E+09
Objective bound: 0.1708151E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 0
Total solver iterations: 14

Variable Value Reduced Cost


X_1 90482.02 0.000000
X_2 199518.0 0.000000
X_3 70000.00 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 68.45850
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 0.3333047
TR_1_5_1_3 0.000000 0.8733047
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 40482.02 0.000000
TR_1_5_2_3 0.000000 0.5400000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 1.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 1.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 353

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 1.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 354

B_6_8_3_2 1.000000 0.000000


B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 19.99559 0.000000
P_8_1 24000.00 0.000000
T_8_2 46.18400 0.000000
P_8_2 26666.67 0.000000
T_8_3 46.18400 0.000000
P_8_3 18666.67 0.000000
T_8_4 25.06452 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 21447.51 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 0.000000 40.45850
P_4_2 23552.49 0.000000
P_4_3 0.000000 40.45850
P_3_1 70000.00 0.000000
P_3_2 0.000000 0.000000
P_2_1 149518.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 40482.02 0.000000
TR_1_4_1_1 0.000000 0.3333047
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.3333047
TR_1_6_1_1 0.000000 0.000000
TR_1_6_1_2 0.000000 7.333305
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.3333047
TR_1_7_1_2 0.000000 0.3333047
TR_1_7_1_3 0.000000 0.3333047
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 355

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.5400000
TR_2_4_1_2 47104.98 0.000000
TR_2_4_1_3 0.000000 0.5400000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 59517.98 0.000000
TR_2_5_1_3 0.000000 0.5400000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 7.540000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.5400000
TR_2_7_1_2 0.000000 0.5400000
TR_2_7_1_3 0.000000 0.5400000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 7.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 23552.49 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 356

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 21447.51 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 -0.1125747E+08
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 357

AR_3_2 0.000000 -3600000.


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.000000 8145.300
T_1_2 14.49042 0.000000
T_2_1 0.000000 271854.7
T_2_2 7.108815 0.000000
T_3_1 4.038985 0.000000
T_3_2 105.2749 0.000000
T_4_1 0.000000 0.000000
T_4_2 11.14694 0.000000
T_4_3 118.5979 0.000000
T_5_1 3.045994 0.000000
T_5_2 17.14694 0.000000
T_5_3 131.0401 0.000000
T_6_1 13.14694 0.000000
T_6_2 17.49559 0.000000
T_6_3 36.58749 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 358

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 359

Global optimal solution found.


Objective value: 0.1744897E+09
Objective bound: 0.1744897E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 0
Total solver iterations: 14

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 1.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 360

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 1.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
Documentation of the calculations 361

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.47472 0.000000
P_8_1 26666.67 0.000000
T_8_2 20.28631 0.000000
P_8_2 24000.00 0.000000
T_8_3 46.47472 0.000000
P_8_3 18666.67 0.000000
T_8_4 25.35525 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 21447.51 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 23552.49 0.000000
P_4_2 0.000000 39.00000
P_4_3 0.000000 39.00000
P_3_1 0.000000 0.000000
P_3_2 70000.00 0.000000
P_2_1 160000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.3435030
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 0.3435030
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.3435030
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 0.3435030
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 362

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 47104.98 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 6.656497
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.3435030
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.3435030
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 23552.49 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 363

TR_4_8_3_4 0.000000 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 21447.51 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 -0.1152000E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 -3600000.
Documentation of the calculations 364

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 0.2907232 0.000000
T_1_2 15.21007 0.000000
T_2_1 0.000000 240000.0
T_2_2 7.399538 0.000000
T_3_1 1.816587 0.000000
T_3_2 4.329709 0.000000
T_4_1 11.43766 0.000000
T_4_2 118.5979 0.000000
T_4_3 118.5979 0.000000
T_5_1 0.000000 0.000000
T_5_2 3.336717 0.000000
T_5_3 17.43766 0.000000
T_6_1 13.43766 0.000000
T_6_2 17.78631 0.000000
T_6_3 36.87821 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 365

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 366

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 367

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1818343E+09
Objective bound: 0.1818343E+09
Infeasibilities: 0.1818989E-10
Extended solver steps: 0
Total solver iterations: 14

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 23552.49 0.000000
X_5 75000.00 0.000000
X_6 81447.51 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 0.000000
TR_1_5_1_3 0.000000 0.5400000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 30000.00 0.000000
TR_1_5_2_3 0.000000 0.5400000
B_1_6_1_1 0.000000 0.000000
Documentation of the calculations 368

B_1_6_1_2 0.000000 0.000000


B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 1.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 1.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
Documentation of the calculations 369

B_4_8_1_3 0.000000 0.000000


B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 1.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.47472 0.000000
P_8_1 26666.67 0.000000
T_8_2 46.47472 0.000000
P_8_2 18666.67 0.000000
T_8_3 20.28631 0.000000
P_8_3 24000.00 0.000000
T_8_4 25.35525 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
Documentation of the calculations 370

P_6_1 21447.51 0.000000


P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 50000.00 0.000000
P_5_3 0.000000 0.000000
P_4_1 0.000000 39.00000
P_4_2 0.000000 39.00000
P_4_3 23552.49 0.000000
P_3_1 0.000000 0.000000
P_3_2 70000.00 0.000000
P_2_1 160000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 2.562335
TR_1_6_1_1 0.000000 2.562335
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 2.562335
TR_1_6_2_1 0.000000 2.562335
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 47104.98 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 70000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 42895.02 0.000000
TR_2_6_1_2 0.000000 4.437665
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 2.562335
TR_3_5_1_1 0.000000 0.000000
Documentation of the calculations 371

TR_3_5_1_2 0.000000 0.000000


TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 2.562335
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 23552.49 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 21447.51 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 10000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
Documentation of the calculations 372

TR_7_8_2_2 0.000000 0.000000


TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 0.000000 -0.1152000E+08
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 -3600000.
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 0.2907232 0.000000
T_1_2 15.21007 0.000000
T_2_1 0.000000 160000.0
T_2_2 7.399538 0.000000
T_3_1 1.816587 0.000000
T_3_2 4.329709 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 11.43766 0.000000
T_5_1 3.336717 0.000000
T_5_2 17.43766 0.000000
T_5_3 131.0401 0.000000
T_6_1 13.43766 0.000000
T_6_2 17.78631 0.000000
T_6_3 36.87821 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 373

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 374

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1850223E+09
Objective bound: 0.1850223E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 0
Total solver iterations: 17

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 0.000000 103.0000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 131.0000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 0.000000
Documentation of the calculations 375

B_1_6_1_2 0.000000 0.000000


B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 1.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 1.000000 0.000000
B_2_6_1_1 0.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 1.000000 0.000000
B_2_6_2_2 0.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 1.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
Documentation of the calculations 376

B_4_8_1_3 0.000000 0.000000


B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 27.00895 0.000000
P_8_1 26666.67 0.000000
T_8_2 38.44001 0.000000
P_8_2 24000.00 0.000000
T_8_3 52.47707 0.000000
P_8_3 26666.67 0.000000
T_8_4 52.47707 0.000000
P_8_4 18666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
Documentation of the calculations 377

P_6_1 25000.00 0.000000


P_6_2 20000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 40000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.345426
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.345426
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 0.3454264
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 50000.00 0.000000
TR_2_6_2_2 0.000000 0.3454264
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
Documentation of the calculations 378

TR_3_5_1_2 0.000000 0.000000


TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 40000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 20000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 25000.00 0.000000
TR_6_8_3_4 10000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
Documentation of the calculations 379

TR_7_8_2_2 0.000000 0.000000


TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 1.944423 0.000000
T_1_2 21.21241 0.000000
T_2_1 2.034709 0.000000
T_2_2 7.111759 0.000000
T_3_1 0.000000 120000.0
T_3_2 10.33205 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 4.990417 0.000000
T_5_2 16.42148 0.000000
T_5_3 23.44001 0.000000
T_6_1 19.44001 0.000000
T_6_2 31.88486 0.000000
T_6_3 42.88055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
Documentation of the calculations 380

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 381

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 382

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 383

Global optimal solution found.


Objective value: 0.1920603E+09
Objective bound: 0.1920603E+09
Infeasibilities: 0.1091394E-10
Extended solver steps: 0
Total solver iterations: 18

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 180000.0 0.000000
X_3 100000.0 0.000000
X_4 0.000000 39.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 30000.00 0.000000
TR_1_5_1_2 0.000000 0.000000
TR_1_5_1_3 0.000000 7.540000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 50000.00 0.000000
TR_1_5_2_3 0.000000 7.540000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 1.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 1.000000 0.000000
B_2_6_1_1 0.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 1.000000 0.000000
B_2_6_2_2 0.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
Documentation of the calculations 384

B_2_7_1_2 0.000000 0.000000


B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 1.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 1.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 1.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
Documentation of the calculations 385

B_6_8_3_1 0.000000 0.000000


B_6_8_3_2 1.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 43.97854 0.000000
P_8_1 26666.67 0.000000
T_8_2 61.41434 0.000000
P_8_2 26666.67 0.000000
T_8_3 43.97854 0.000000
P_8_3 16000.00 0.000000
T_8_4 50.99707 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 30000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 50000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 30000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 5.890584
TR_1_4_1_2 0.000000 5.890584
TR_1_4_1_3 0.000000 5.890584
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 5.890584
TR_1_7_1_2 0.000000 5.890584
TR_1_7_1_3 0.000000 5.890584
TR_1_4_2_1 0.000000 5.890584
TR_1_4_2_2 0.000000 5.890584
TR_1_4_2_3 0.000000 5.890584
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 10.00000
Documentation of the calculations 386

TR_1_7_2_1 0.000000 5.890584


TR_1_7_2_2 0.000000 5.890584
TR_1_7_2_3 0.000000 5.890584
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 70000.00 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 1.109416
TR_2_6_1_1 0.000000 1.109416
TR_2_6_1_2 0.000000 4.109416
TR_2_6_1_3 0.000000 4.109416
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 50000.00 0.000000
TR_2_6_2_1 60000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 50000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 4.246407
TR_4_8_1_2 0.000000 4.246407
TR_4_8_1_3 0.000000 4.246407
TR_4_8_1_4 0.000000 4.246407
TR_4_8_2_1 0.000000 4.246407
TR_4_8_2_2 0.000000 4.246407
TR_4_8_2_3 0.000000 4.246407
TR_4_8_2_4 0.000000 4.246407
TR_4_8_3_1 0.000000 4.246407
TR_4_8_3_2 0.000000 4.246407
Documentation of the calculations 387

TR_4_8_3_3 0.000000 4.246407


TR_4_8_3_4 0.000000 4.246407
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 25000.00 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 25000.00 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 5000.000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 25000.00 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 4.246407
TR_7_8_1_2 0.000000 4.246407
TR_7_8_1_3 0.000000 4.246407
TR_7_8_1_4 0.000000 4.246407
TR_7_8_2_1 0.000000 4.246407
TR_7_8_2_2 0.000000 4.246407
TR_7_8_2_3 0.000000 4.246407
TR_7_8_2_4 0.000000 4.246407
TR_7_8_3_1 0.000000 4.246407
TR_7_8_3_2 0.000000 4.246407
TR_7_8_3_3 0.000000 4.246407
TR_7_8_3_4 0.000000 4.246407
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 388

AR_3_1 1.000000 0.000000


AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 1.000000 0.000000
B_1_5_2_3 0.000000 0.000000
T_1_1 12.71388 0.000000
T_1_2 25.93254 0.000000
T_2_1 0.000000 40000.00
T_2_2 23.34492 0.000000
T_3_1 11.32206 0.000000
T_3_2 21.73933 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 14.94148 0.000000
T_5_2 28.97854 0.000000
T_5_3 39.39581 0.000000
T_6_1 35.39581 0.000000
T_6_2 43.42813 0.000000
T_6_3 53.84540 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 389

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 390

Global optimal solution found.


Objective value: 0.1948440E+09
Objective bound: 0.1948440E+09
Infeasibilities: 0.1091394E-10
Extended solver steps: 0
Total solver iterations: 19

Variable Value Reduced Cost


X_1 60000.00 0.000000
X_2 160000.0 0.000000
X_3 140000.0 0.000000
X_4 0.000000 33.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 61.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 30000.00 0.000000
TR_1_5_1_2 0.000000 10.54000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 10.54000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 1.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 1.000000 0.000000
B_2_6_1_1 0.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 1.000000 0.000000
B_2_6_2_2 0.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 391

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 1.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 1.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 1.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 392

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
P_8_1 26666.67 0.000000
P_8_2 24000.00 0.000000
P_8_3 26666.67 0.000000
P_8_4 18666.67 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 45000.00 0.000000
P_6_2 35000.00 0.000000
P_6_3 0.000000 0.000000
P_5_1 50000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 70000.00 0.000000
P_2_2 90000.00 0.000000
P_1_1 30000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 70000.00 0.000000
TR_2_5_1_2 0.000000 3.000000
TR_2_5_1_3 0.000000 0.000000
Documentation of the calculations 393

TR_2_6_1_1 0.000000 0.000000


TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 3.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 20000.00 0.000000
TR_2_6_2_2 0.000000 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 70000.00 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 70000.00 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 25000.00 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
Documentation of the calculations 394

TR_5_8_2_4 0.000000 0.000000


TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 20000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 10000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1260000E+08
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.000000 -1080000.
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
Documentation of the calculations 395

B_1_5_2_1 0.000000 0.000000


B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 12.90793 0.000000
T_1_2 34.32090 0.000000
T_2_1 0.1940527 0.000000
T_2_2 21.05231 0.000000
T_3_1 0.000000 0.000000
T_3_2 23.44055 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 15.13553 0.000000
T_5_2 32.66889 0.000000
T_5_3 36.54850 0.000000
T_6_1 32.54850 0.000000
T_6_2 55.98905 0.000000
T_6_3 143.1502 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 44.17259 0.000000
T_8_2 44.17259 0.000000
T_8_3 65.58556 0.000000
T_8_4 65.58556 0.000000

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 396

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 397

Global optimal solution found.


Objective value: 0.1628228E+09
Objective bound: 0.1628228E+09
Infeasibilities: 0.3637979E-11
Extended solver steps: 2
Total solver iterations: 26

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 61305.03 0.000000
X_5 50000.00 0.000000
X_6 68694.97 0.000000
X_7 0.000000 41.14589
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 398

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 1.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 1.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 1.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 1.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 399

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.29055 0.000000
P_8_1 34666.67 0.000000
T_8_2 15.94369 0.000000
P_8_2 8000.000 0.000000
T_8_3 18.78777 0.000000
P_8_3 13333.33 0.000000
T_8_4 53.30907 0.000000
P_8_4 40000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 526086.4
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 18694.97 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 21305.03 0.000000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 80000.00 0.000000
P_2_2 80000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 1.452919
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 1.452919
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 1.452919
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 1.452919
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 400

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 5.547081
TR_2_4_1_3 0.000000 8.547081
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 5.547081
TR_2_6_1_3 0.000000 8.547081
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 42610.06 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 37389.94 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 35.07243
TR_4_8_1_2 15000.00 0.000000
TR_4_8_1_3 0.000000 35.07243
TR_4_8_1_4 0.000000 35.07243
TR_4_8_2_1 21305.03 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 401

TR_4_8_3_4 25000.00 0.000000


TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 25000.00 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 18694.97 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1617374E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 402

AR_3_2 1.000000 0.000000


B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.22602 0.000000
T_1_2 28.24455 0.000000
T_2_1 0.000000 200000.0
T_2_2 28.78117 0.000000
T_3_1 13.63406 0.000000
T_3_2 14.99491 0.000000
T_4_1 9.218832 0.000000
T_4_2 38.00000 0.000000
T_4_3 44.10098 0.000000
T_5_1 0.000000 0.000000
T_5_2 24.27202 0.000000
T_5_3 31.29055 0.000000
T_6_1 11.21883 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.74014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.2000000E+10
S_6_3 0.000000 0.000000

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 403

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 404

Global optimal solution found.


Objective value: 0.1665377E+09
Objective bound: 0.1665377E+09
Infeasibilities: 0.3637979E-11
Extended solver steps: 2
Total solver iterations: 27

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 61305.03 0.000000
X_5 50000.00 0.000000
X_6 68694.97 0.000000
X_7 0.000000 43.37828
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 0.5400000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 405

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 1.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 1.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 1.000000 0.000000
B_5_8_1_1 1.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 1.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 406

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 1.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 46.29055 0.000000
P_8_1 34666.67 0.000000
T_8_2 18.78777 0.000000
P_8_2 13333.33 0.000000
T_8_3 15.94369 0.000000
P_8_3 8000.000 0.000000
T_8_4 53.30907 0.000000
P_8_4 40000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 505682.5
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 18694.97 0.000000
P_6_3 25000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 21305.03 0.000000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 80000.00 0.000000
P_2_2 80000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 2.007627
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 2.007627
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 2.007627
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.007627
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 0.000000
Documentation of the calculations 407

TR_1_7_2_2 0.000000 0.000000


TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.992373
TR_2_4_1_3 0.000000 7.992373
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.992373
TR_2_6_1_3 0.000000 7.992373
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 42610.06 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 37389.94 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 33.71217
TR_4_8_1_2 0.000000 33.71217
TR_4_8_1_3 15000.00 0.000000
TR_4_8_1_4 0.000000 33.71217
TR_4_8_2_1 21305.03 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
Documentation of the calculations 408

TR_4_8_3_4 25000.00 0.000000


TR_5_8_1_1 25000.00 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 18694.97 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 25000.00 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1122390E+08
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
Documentation of the calculations 409

AR_3_2 1.000000 0.000000


B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.22602 0.000000
T_1_2 28.24455 0.000000
T_2_1 0.000000 180000.0
T_2_2 28.78117 0.000000
T_3_1 13.63406 0.000000
T_3_2 14.99491 0.000000
T_4_1 9.218832 0.000000
T_4_2 38.00000 0.000000
T_4_3 44.10098 0.000000
T_5_1 24.27202 0.000000
T_5_2 31.29055 0.000000
T_5_3 31.29055 0.000000
T_6_1 11.21883 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.74014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1800000E+10
S_6_3 0.000000 0.000000

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 410

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 411

Global optimal solution found.


Objective value: 0.1702525E+09
Objective bound: 0.1702525E+09
Infeasibilities: 0.3637979E-11
Extended solver steps: 2
Total solver iterations: 40

Variable Value Reduced Cost


X_1 100000.0 0.000000
X_2 160000.0 0.000000
X_3 100000.0 0.000000
X_4 61305.03 0.000000
X_5 50000.00 0.000000
X_6 68694.97 0.000000
X_7 0.000000 45.61067
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 0.5400000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.5400000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 1.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 1.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
Documentation of the calculations 412

B_2_7_1_2 0.000000 0.000000


B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 1.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 1.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
Documentation of the calculations 413

B_6_8_3_1 1.000000 0.000000


B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 53.30907 0.000000
P_8_1 40000.00 0.000000
T_8_2 15.94369 0.000000
P_8_2 8000.000 0.000000
T_8_3 46.29055 0.000000
P_8_3 34666.67 0.000000
T_8_4 18.78777 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 485278.6
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 18694.97 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 25000.00 0.000000
P_4_1 15000.00 0.000000
P_4_2 21305.03 0.000000
P_4_3 25000.00 0.000000
P_3_1 50000.00 0.000000
P_3_2 50000.00 0.000000
P_2_1 80000.00 0.000000
P_2_2 80000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 2.562335
TR_1_4_1_2 0.000000 7.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 2.562335
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 2.562335
TR_1_4_2_2 0.000000 7.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 2.562335
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
Documentation of the calculations 414

TR_1_7_2_1 0.000000 0.000000


TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 30000.00 0.000000
TR_2_4_1_2 0.000000 4.437665
TR_2_4_1_3 0.000000 7.437665
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 4.437665
TR_2_6_1_3 0.000000 7.437665
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 42610.06 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 37389.94 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 50000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 32.35191
TR_4_8_1_2 15000.00 0.000000
TR_4_8_1_3 0.000000 32.35191
TR_4_8_1_4 0.000000 32.35191
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 21305.03 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 25000.00 0.000000
TR_4_8_3_2 0.000000 0.000000
Documentation of the calculations 415

TR_4_8_3_3 0.000000 0.000000


TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 25000.00 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 18694.97 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 1.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1537008E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
Documentation of the calculations 416

AR_3_1 1.000000 0.000000


AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.22602 0.000000
T_1_2 28.24455 0.000000
T_2_1 0.000000 160000.0
T_2_2 28.78117 0.000000
T_3_1 13.63406 0.000000
T_3_2 14.99491 0.000000
T_4_1 9.218832 0.000000
T_4_2 38.00000 0.000000
T_4_3 44.10098 0.000000
T_5_1 0.000000 0.000000
T_5_2 24.27202 0.000000
T_5_3 31.29055 0.000000
T_6_1 11.21883 0.000000
T_6_2 40.00000 0.000000
T_6_3 45.74014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1600000E+10
S_6_3 0.000000 0.000000

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 417

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 418

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 419

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1791055E+09
Objective bound: 0.1791055E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 0
Total solver iterations: 21

Variable Value Reduced Cost


X_1 148660.2 0.000000
X_2 120000.0 0.000000
X_3 91339.78 0.000000
X_4 20669.89 0.000000
X_5 59330.11 0.000000
X_6 100000.0 0.000000
X_7 0.000000 69.66809
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 10.54000
TR_1_5_1_2 68660.22 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 50000.00 0.000000
Documentation of the calculations 420

B_1_6_1_1 0.000000 0.000000


B_1_6_1_2 1.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
Documentation of the calculations 421

B_4_8_1_2 0.000000 0.000000


B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 1.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 1.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 0.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 59.65640 0.000000
P_8_1 37690.61 0.000000
T_8_2 52.63788 0.000000
P_8_2 26666.67 0.000000
T_8_3 52.63788 0.000000
P_8_3 18309.39 0.000000
T_8_4 17.95571 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
Documentation of the calculations 422

P_7_3 0.000000 0.000000


P_6_1 25000.00 0.000000
P_6_2 50000.00 0.000000
P_6_3 25000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 34330.11 0.000000
P_5_3 25000.00 0.000000
P_4_1 0.000000 41.66809
P_4_2 0.000000 41.66809
P_4_3 20669.89 0.000000
P_3_1 50000.00 0.000000
P_3_2 41339.78 0.000000
P_2_1 50000.00 0.000000
P_2_2 70000.00 0.000000
P_1_1 98660.22 0.000000
P_1_2 50000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 5.335876
TR_1_6_1_2 30000.00 0.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 5.335876
TR_1_6_2_2 0.000000 0.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 4.664124
TR_2_4_1_2 0.000000 4.664124
TR_2_4_1_3 0.000000 4.664124
TR_2_5_1_1 0.000000 4.664124
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 4.664124
TR_2_7_1_1 0.000000 4.664124
TR_2_7_1_2 0.000000 4.664124
TR_2_7_1_3 0.000000 4.664124
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 3.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 70000.00 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
Documentation of the calculations 423

TR_3_5_1_1 0.000000 0.000000


TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 50000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 41339.78 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 20669.89 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 9330.111 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 0.000000 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
Documentation of the calculations 424

TR_7_8_2_1 0.000000 0.000000


TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 0.000000 -0.1103974E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 22.96284 0.000000
T_1_2 34.59188 0.000000
T_2_1 0.000000 60000.00
T_2_2 29.05852 0.000000
T_3_1 19.98139 0.000000
T_3_2 22.60908 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 51.52358 0.000000
T_5_1 0.000000 0.000000
T_5_2 28.00000 0.000000
T_5_3 37.63788 0.000000
T_6_1 10.38677 0.000000
T_6_2 40.00000 0.000000
T_6_3 52.08747 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 1.000000 0.000000
S_6_2 0.000000 -0.1800000E+10
S_6_3 0.000000 0.000000
Documentation of the calculations 425

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 426

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1839179E+09
Objective bound: 0.1839179E+09
Infeasibilities: 0.2182787E-10
Extended solver steps: 0
Total solver iterations: 18

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 20000.00 0.000000
X_5 75000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 67.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 10.54000
TR_1_5_1_2 50000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
Documentation of the calculations 427

B_1_6_1_1 0.000000 0.000000


B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 1.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 1.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
Documentation of the calculations 428

B_4_8_1_2 0.000000 0.000000


B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 1.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 1.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 73.03706 0.000000
P_8_1 26666.67 0.000000
T_8_2 47.56894 0.000000
P_8_2 13333.33 0.000000
T_8_3 73.03706 0.000000
P_8_3 29333.33 0.000000
T_8_4 52.63788 0.000000
P_8_4 26666.67 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
Documentation of the calculations 429

P_7_3 0.000000 0.000000


P_6_1 25000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 0.000000 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 39.00000
P_4_2 20000.00 0.000000
P_4_3 0.000000 39.00000
P_3_1 70000.00 0.000000
P_3_2 40000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 3.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 3.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
Documentation of the calculations 430

TR_3_5_1_1 0.000000 0.000000


TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 40000.00 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 20000.00 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 25000.00 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 25000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 25000.00 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
Documentation of the calculations 431

TR_7_8_2_1 0.000000 0.000000


TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 1.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 -0.1152000E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 27.57335 0.000000
T_1_2 41.77240 0.000000
T_2_1 27.67175 0.000000
T_2_2 34.68217 0.000000
T_3_1 30.89204 0.000000
T_3_2 36.18572 0.000000
T_4_1 0.000000 0.000000
T_4_2 65.07058 0.000000
T_4_3 112.5750 0.000000
T_5_1 0.000000 0.000000
T_5_2 30.61935 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 45.06894 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.2000000E+10
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 432

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 433

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1865133E+09
Objective bound: 0.1865133E+09
Infeasibilities: 0.9094947E-11
Extended solver steps: 0
Total solver iterations: 13

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 170000.0 0.000000
X_3 110000.0 0.000000
X_4 20000.00 0.000000
X_5 75000.00 0.000000
X_6 85000.00 0.000000
X_7 0.000000 48.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 0.5400000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 0.5400000
Documentation of the calculations 434

TR_1_5_2_3 30000.00 0.000000


B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 1.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 1.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 1.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
Documentation of the calculations 435

B_4_8_1_1 0.000000 0.000000


B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 1.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 1.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 0.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 73.03706 0.000000
P_8_1 26666.67 0.000000
T_8_2 52.63788 0.000000
P_8_2 26666.67 0.000000
T_8_3 73.03706 0.000000
P_8_3 29333.33 0.000000
T_8_4 47.56894 0.000000
P_8_4 13333.33 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
Documentation of the calculations 436

P_7_2 0.000000 0.000000


P_7_3 0.000000 0.000000
P_6_1 25000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 0.000000 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 20.00000
P_4_2 0.000000 20.00000
P_4_3 20000.00 0.000000
P_3_1 70000.00 0.000000
P_3_2 40000.00 0.000000
P_2_1 120000.0 0.000000
P_2_2 50000.00 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 0.000000
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 0.000000
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
TR_2_6_1_1 50000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
Documentation of the calculations 437

TR_3_4_1_3 0.000000 0.000000


TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 70000.00 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 40000.00 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 20000.00 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 25000.00 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 0.000000 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 25000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
Documentation of the calculations 438

TR_7_8_1_4 0.000000 0.000000


TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 1.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 1.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 0.000000 -0.1494000E+08
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 27.57335 0.000000
T_1_2 41.77240 0.000000
T_2_1 27.67175 0.000000
T_2_2 34.68217 0.000000
T_3_1 30.89204 0.000000
T_3_2 36.18572 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 65.07058 0.000000
T_5_1 30.61935 0.000000
T_5_2 42.61323 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 45.06894 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.1600000E+10
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 439

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]
Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 440

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1872663E+09
Objective bound: 0.1872663E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 0
Total solver iterations: 17

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 160000.0 0.000000
X_3 120000.0 0.000000
X_4 0.000000 81.92000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 109.9200
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
Documentation of the calculations 441

B_1_6_1_1 0.000000 0.000000


B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 1.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 1.000000 0.000000
B_2_6_1_1 0.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 1.000000 0.000000
B_2_6_2_2 0.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 1.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
Documentation of the calculations 442

B_4_8_1_2 0.000000 0.000000


B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 73.03706 0.000000
P_8_1 26666.67 0.000000
T_8_2 53.57368 0.000000
P_8_2 26666.67 0.000000
T_8_3 73.03706 0.000000
P_8_3 18666.67 0.000000
T_8_4 46.55515 0.000000
P_8_4 24000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
Documentation of the calculations 443

P_7_3 0.000000 0.000000


P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 50000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 50000.00 0.000000
P_2_2 110000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 10.00000
TR_1_6_1_3 0.000000 0.9172749
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 10.00000
TR_1_6_2_3 0.000000 0.9172749
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 0.000000 0.000000
TR_2_6_1_2 0.000000 3.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 40000.00 0.000000
TR_2_6_2_2 0.000000 3.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
Documentation of the calculations 444

TR_3_5_1_1 0.000000 0.000000


TR_3_5_1_2 0.000000 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 50000.00 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 20000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
Documentation of the calculations 445

TR_7_8_2_1 0.000000 0.000000


TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.49063 0.000000
T_1_2 41.77240 0.000000
T_2_1 17.16838 0.000000
T_2_2 27.94911 0.000000
T_3_1 13.89867 0.000000
T_3_2 30.89204 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 31.55515 0.000000
T_5_3 44.00000 0.000000
T_6_1 40.00000 0.000000
T_6_2 46.00474 0.000000
T_6_3 63.44055 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.1200000E+10
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 446

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 447

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Global optimal solution found.


Objective value: 0.1903394E+09
Objective bound: 0.1903394E+09
Infeasibilities: 0.2910383E-10
Extended solver steps: 0
Total solver iterations: 15

Variable Value Reduced Cost


X_1 80000.00 0.000000
X_2 210000.0 0.000000
X_3 70000.00 0.000000
X_4 0.000000 48.94485
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 76.94485
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 50000.00 0.000000
TR_1_5_1_2 0.000000 7.540000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 0.000000
TR_1_5_2_2 0.000000 7.540000
TR_1_5_2_3 30000.00 0.000000
Documentation of the calculations 448

B_1_6_1_1 0.000000 0.000000


B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 1.000000 0.000000
B_2_5_1_3 0.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 1.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
B_2_7_1_3 0.000000 0.000000
B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 0.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 0.000000 0.000000
B_3_6_2_3 1.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
Documentation of the calculations 449

B_4_8_1_2 0.000000 0.000000


B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 1.000000 0.000000
B_5_8_2_1 0.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 1.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 0.000000 0.000000
B_6_8_1_1 0.000000 0.000000
B_6_8_1_2 0.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 1.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 1.000000 0.000000
B_6_8_2_3 0.000000 0.000000
B_6_8_2_4 0.000000 0.000000
B_6_8_3_1 1.000000 0.000000
B_6_8_3_2 0.000000 0.000000
B_6_8_3_3 1.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
T_8_1 91.48665 0.000000
P_8_1 26666.67 0.000000
T_8_2 66.01853 0.000000
P_8_2 26666.67 0.000000
T_8_3 91.48665 0.000000
P_8_3 18666.67 0.000000
T_8_4 46.55515 0.000000
P_8_4 24000.00 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
Documentation of the calculations 450

P_7_3 0.000000 0.000000


P_6_1 20000.00 0.000000
P_6_2 25000.00 0.000000
P_6_3 35000.00 0.000000
P_5_1 25000.00 0.000000
P_5_2 25000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 0.000000 0.000000
P_3_2 70000.00 0.000000
P_2_1 90000.00 0.000000
P_2_2 120000.0 0.000000
P_1_1 50000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 0.000000
TR_1_4_1_2 0.000000 0.000000
TR_1_4_1_3 0.000000 0.000000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 4.972425
TR_1_7_1_1 0.000000 0.000000
TR_1_7_1_2 0.000000 0.000000
TR_1_7_1_3 0.000000 0.000000
TR_1_4_2_1 0.000000 0.000000
TR_1_4_2_2 0.000000 0.000000
TR_1_4_2_3 0.000000 0.000000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 4.972425
TR_1_7_2_1 0.000000 0.000000
TR_1_7_2_2 0.000000 0.000000
TR_1_7_2_3 0.000000 0.000000
TR_2_4_1_1 0.000000 0.000000
TR_2_4_1_2 0.000000 0.000000
TR_2_4_1_3 0.000000 0.000000
TR_2_5_1_1 0.000000 0.000000
TR_2_5_1_2 50000.00 0.000000
TR_2_5_1_3 0.000000 0.000000
TR_2_6_1_1 40000.00 0.000000
TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 0.000000
TR_2_7_1_1 0.000000 0.000000
TR_2_7_1_2 0.000000 0.000000
TR_2_7_1_3 0.000000 0.000000
TR_2_4_2_1 0.000000 0.000000
TR_2_4_2_2 0.000000 0.000000
TR_2_4_2_3 0.000000 0.000000
TR_2_5_2_1 0.000000 0.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 70000.00 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 50000.00 0.000000
TR_2_6_2_3 0.000000 0.000000
TR_2_7_2_1 0.000000 0.000000
TR_2_7_2_2 0.000000 0.000000
TR_2_7_2_3 0.000000 0.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
Documentation of the calculations 451

TR_3_5_1_1 0.000000 0.000000


TR_3_5_1_2 0.000000 7.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 7.000000
TR_3_6_1_2 0.000000 7.000000
TR_3_6_1_3 0.000000 4.972425
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 0.000000 0.000000
TR_3_6_2_3 70000.00 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 25000.00 0.000000
TR_5_8_2_1 0.000000 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
TR_5_8_2_4 0.000000 0.000000
TR_5_8_3_1 25000.00 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 0.000000 0.000000
TR_6_8_1_1 0.000000 0.000000
TR_6_8_1_2 0.000000 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 20000.00 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 25000.00 0.000000
TR_6_8_2_3 0.000000 0.000000
TR_6_8_2_4 0.000000 0.000000
TR_6_8_3_1 25000.00 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 10000.00 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
Documentation of the calculations 452

TR_7_8_2_1 0.000000 0.000000


TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 1.000000 0.000000
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 1.000000 0.000000
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 0.000000 -3600000.
AR_3_2 1.000000 0.000000
B_1_5_1_1 1.000000 0.000000
B_1_5_1_2 0.000000 0.000000
B_1_5_1_3 0.000000 0.000000
B_1_5_2_1 0.000000 0.000000
B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 21.49063 0.000000
T_1_2 60.22199 0.000000
T_2_1 28.50381 0.000000
T_2_2 46.12134 0.000000
T_3_1 44.59275 0.000000
T_3_2 49.34164 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 24.53662 0.000000
T_5_2 44.00000 0.000000
T_5_3 62.44959 0.000000
T_6_1 40.00000 0.000000
T_6_2 58.44959 0.000000
T_6_3 81.89014 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
S_6_1 0.000000 -0.8000000E+09
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 453

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed
Documentation of the calculations 454

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 455

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 456

Global optimal solution found.


Objective value: 0.1949040E+09
Objective bound: 0.1949040E+09
Infeasibilities: 0.1455192E-10
Extended solver steps: 0
Total solver iterations: 19

Variable Value Reduced Cost


X_1 60000.00 0.000000
X_2 160000.0 0.000000
X_3 140000.0 0.000000
X_4 0.000000 33.00000
X_5 100000.0 0.000000
X_6 80000.00 0.000000
X_7 0.000000 61.00000
X_8 96000.00 0.000000
B_1_4_1_1 0.000000 0.000000
B_1_4_1_2 0.000000 0.000000
B_1_4_1_3 0.000000 0.000000
B_1_4_2_1 0.000000 0.000000
B_1_4_2_2 0.000000 0.000000
B_1_4_2_3 0.000000 0.000000
TR_1_5_1_1 0.000000 10.54000
TR_1_5_1_2 30000.00 0.000000
TR_1_5_1_3 0.000000 0.000000
TR_1_5_2_1 0.000000 10.54000
TR_1_5_2_2 0.000000 0.000000
TR_1_5_2_3 30000.00 0.000000
B_1_6_1_1 0.000000 0.000000
B_1_6_1_2 0.000000 0.000000
B_1_6_1_3 0.000000 0.000000
B_1_6_2_1 0.000000 0.000000
B_1_6_2_2 0.000000 0.000000
B_1_6_2_3 0.000000 0.000000
B_1_7_1_1 0.000000 0.000000
B_1_7_1_2 0.000000 0.000000
B_1_7_1_3 0.000000 0.000000
B_1_7_2_1 0.000000 0.000000
B_1_7_2_2 0.000000 0.000000
B_1_7_2_3 0.000000 0.000000
B_2_4_1_1 0.000000 0.000000
B_2_4_1_2 0.000000 0.000000
B_2_4_1_3 0.000000 0.000000
B_2_4_2_1 0.000000 0.000000
B_2_4_2_2 0.000000 0.000000
B_2_4_2_3 0.000000 0.000000
B_2_5_1_1 0.000000 0.000000
B_2_5_1_2 0.000000 0.000000
B_2_5_1_3 1.000000 0.000000
B_2_5_2_1 0.000000 0.000000
B_2_5_2_2 0.000000 0.000000
B_2_5_2_3 0.000000 0.000000
B_2_6_1_1 1.000000 0.000000
B_2_6_1_2 0.000000 0.000000
B_2_6_1_3 0.000000 0.000000
B_2_6_2_1 0.000000 0.000000
B_2_6_2_2 1.000000 0.000000
B_2_6_2_3 0.000000 0.000000
B_2_7_1_1 0.000000 0.000000
B_2_7_1_2 0.000000 0.000000
Documentation of the calculations 457

B_2_7_1_3 0.000000 0.000000


B_2_7_2_1 0.000000 0.000000
B_2_7_2_2 0.000000 0.000000
B_2_7_2_3 0.000000 0.000000
B_3_4_1_1 0.000000 0.000000
B_3_4_1_2 0.000000 0.000000
B_3_4_1_3 0.000000 0.000000
B_3_4_2_1 0.000000 0.000000
B_3_4_2_2 0.000000 0.000000
B_3_4_2_3 0.000000 0.000000
B_3_5_1_1 0.000000 0.000000
B_3_5_1_2 1.000000 0.000000
B_3_5_1_3 0.000000 0.000000
B_3_5_2_1 0.000000 0.000000
B_3_5_2_2 0.000000 0.000000
B_3_5_2_3 0.000000 0.000000
B_3_6_1_1 0.000000 0.000000
B_3_6_1_2 0.000000 0.000000
B_3_6_1_3 0.000000 0.000000
B_3_6_2_1 0.000000 0.000000
B_3_6_2_2 1.000000 0.000000
B_3_6_2_3 0.000000 0.000000
B_3_7_1_1 0.000000 0.000000
B_3_7_1_2 0.000000 0.000000
B_3_7_1_3 0.000000 0.000000
B_3_7_2_1 0.000000 0.000000
B_3_7_2_2 0.000000 0.000000
B_3_7_2_3 0.000000 0.000000
B_4_8_1_1 0.000000 0.000000
B_4_8_1_2 0.000000 0.000000
B_4_8_1_3 0.000000 0.000000
B_4_8_1_4 0.000000 0.000000
B_4_8_2_1 0.000000 0.000000
B_4_8_2_2 0.000000 0.000000
B_4_8_2_3 0.000000 0.000000
B_4_8_2_4 0.000000 0.000000
B_4_8_3_1 0.000000 0.000000
B_4_8_3_2 0.000000 0.000000
B_4_8_3_3 0.000000 0.000000
B_4_8_3_4 0.000000 0.000000
B_5_8_1_1 0.000000 0.000000
B_5_8_1_2 0.000000 0.000000
B_5_8_1_3 0.000000 0.000000
B_5_8_1_4 0.000000 0.000000
B_5_8_2_1 1.000000 0.000000
B_5_8_2_2 1.000000 0.000000
B_5_8_2_3 0.000000 0.000000
B_5_8_2_4 0.000000 0.000000
B_5_8_3_1 0.000000 0.000000
B_5_8_3_2 0.000000 0.000000
B_5_8_3_3 1.000000 0.000000
B_5_8_3_4 1.000000 0.000000
B_6_8_1_1 1.000000 0.000000
B_6_8_1_2 1.000000 0.000000
B_6_8_1_3 0.000000 0.000000
B_6_8_1_4 0.000000 0.000000
B_6_8_2_1 0.000000 0.000000
B_6_8_2_2 0.000000 0.000000
B_6_8_2_3 1.000000 0.000000
B_6_8_2_4 1.000000 0.000000
B_6_8_3_1 0.000000 0.000000
Documentation of the calculations 458

B_6_8_3_2 0.000000 0.000000


B_6_8_3_3 0.000000 0.000000
B_6_8_3_4 0.000000 0.000000
B_7_8_1_1 0.000000 0.000000
B_7_8_1_2 0.000000 0.000000
B_7_8_1_3 0.000000 0.000000
B_7_8_1_4 0.000000 0.000000
B_7_8_2_1 0.000000 0.000000
B_7_8_2_2 0.000000 0.000000
B_7_8_2_3 0.000000 0.000000
B_7_8_2_4 0.000000 0.000000
B_7_8_3_1 0.000000 0.000000
B_7_8_3_2 0.000000 0.000000
B_7_8_3_3 0.000000 0.000000
B_7_8_3_4 0.000000 0.000000
P_8_1 26666.67 0.000000
P_8_2 18666.67 0.000000
P_8_3 26666.67 0.000000
P_8_4 24000.00 0.000000
P_7_1 0.000000 0.000000
P_7_2 0.000000 0.000000
P_7_3 0.000000 0.000000
P_6_1 35000.00 0.000000
P_6_2 45000.00 0.000000
P_6_3 0.000000 0.000000
P_5_1 0.000000 0.000000
P_5_2 50000.00 0.000000
P_5_3 50000.00 0.000000
P_4_1 0.000000 0.000000
P_4_2 0.000000 0.000000
P_4_3 0.000000 0.000000
P_3_1 70000.00 0.000000
P_3_2 70000.00 0.000000
P_2_1 140000.0 0.000000
P_2_2 20000.00 0.000000
P_1_1 30000.00 0.000000
P_1_2 30000.00 0.000000
TR_1_4_1_1 0.000000 10.00000
TR_1_4_1_2 0.000000 10.00000
TR_1_4_1_3 0.000000 10.00000
TR_1_6_1_1 0.000000 7.000000
TR_1_6_1_2 0.000000 7.000000
TR_1_6_1_3 0.000000 10.00000
TR_1_7_1_1 0.000000 10.00000
TR_1_7_1_2 0.000000 10.00000
TR_1_7_1_3 0.000000 10.00000
TR_1_4_2_1 0.000000 10.00000
TR_1_4_2_2 0.000000 10.00000
TR_1_4_2_3 0.000000 10.00000
TR_1_6_2_1 0.000000 7.000000
TR_1_6_2_2 0.000000 7.000000
TR_1_6_2_3 0.000000 10.00000
TR_1_7_2_1 0.000000 10.00000
TR_1_7_2_2 0.000000 10.00000
TR_1_7_2_3 0.000000 10.00000
TR_2_4_1_1 0.000000 3.000000
TR_2_4_1_2 0.000000 3.000000
TR_2_4_1_3 0.000000 3.000000
TR_2_5_1_1 0.000000 3.000000
TR_2_5_1_2 0.000000 0.000000
TR_2_5_1_3 70000.00 0.000000
Documentation of the calculations 459

TR_2_6_1_1 70000.00 0.000000


TR_2_6_1_2 0.000000 0.000000
TR_2_6_1_3 0.000000 3.000000
TR_2_7_1_1 0.000000 3.000000
TR_2_7_1_2 0.000000 3.000000
TR_2_7_1_3 0.000000 3.000000
TR_2_4_2_1 0.000000 3.000000
TR_2_4_2_2 0.000000 3.000000
TR_2_4_2_3 0.000000 3.000000
TR_2_5_2_1 0.000000 3.000000
TR_2_5_2_2 0.000000 0.000000
TR_2_5_2_3 0.000000 0.000000
TR_2_6_2_1 0.000000 0.000000
TR_2_6_2_2 20000.00 0.000000
TR_2_6_2_3 0.000000 3.000000
TR_2_7_2_1 0.000000 3.000000
TR_2_7_2_2 0.000000 3.000000
TR_2_7_2_3 0.000000 3.000000
TR_3_4_1_1 0.000000 0.000000
TR_3_4_1_2 0.000000 0.000000
TR_3_4_1_3 0.000000 0.000000
TR_3_5_1_1 0.000000 0.000000
TR_3_5_1_2 70000.00 0.000000
TR_3_5_1_3 0.000000 0.000000
TR_3_6_1_1 0.000000 0.000000
TR_3_6_1_2 0.000000 0.000000
TR_3_6_1_3 0.000000 0.000000
TR_3_7_1_1 0.000000 0.000000
TR_3_7_1_2 0.000000 0.000000
TR_3_7_1_3 0.000000 0.000000
TR_3_4_2_1 0.000000 0.000000
TR_3_4_2_2 0.000000 0.000000
TR_3_4_2_3 0.000000 0.000000
TR_3_5_2_1 0.000000 0.000000
TR_3_5_2_2 0.000000 0.000000
TR_3_5_2_3 0.000000 0.000000
TR_3_6_2_1 0.000000 0.000000
TR_3_6_2_2 70000.00 0.000000
TR_3_6_2_3 0.000000 0.000000
TR_3_7_2_1 0.000000 0.000000
TR_3_7_2_2 0.000000 0.000000
TR_3_7_2_3 0.000000 0.000000
TR_4_8_1_1 0.000000 0.000000
TR_4_8_1_2 0.000000 0.000000
TR_4_8_1_3 0.000000 0.000000
TR_4_8_1_4 0.000000 0.000000
TR_4_8_2_1 0.000000 0.000000
TR_4_8_2_2 0.000000 0.000000
TR_4_8_2_3 0.000000 0.000000
TR_4_8_2_4 0.000000 0.000000
TR_4_8_3_1 0.000000 0.000000
TR_4_8_3_2 0.000000 0.000000
TR_4_8_3_3 0.000000 0.000000
TR_4_8_3_4 0.000000 0.000000
TR_5_8_1_1 0.000000 0.000000
TR_5_8_1_2 0.000000 0.000000
TR_5_8_1_3 0.000000 0.000000
TR_5_8_1_4 0.000000 0.000000
TR_5_8_2_1 25000.00 0.000000
TR_5_8_2_2 25000.00 0.000000
TR_5_8_2_3 0.000000 0.000000
Documentation of the calculations 460

TR_5_8_2_4 0.000000 0.000000


TR_5_8_3_1 0.000000 0.000000
TR_5_8_3_2 0.000000 0.000000
TR_5_8_3_3 25000.00 0.000000
TR_5_8_3_4 25000.00 0.000000
TR_6_8_1_1 25000.00 0.000000
TR_6_8_1_2 10000.00 0.000000
TR_6_8_1_3 0.000000 0.000000
TR_6_8_1_4 0.000000 0.000000
TR_6_8_2_1 0.000000 0.000000
TR_6_8_2_2 0.000000 0.000000
TR_6_8_2_3 25000.00 0.000000
TR_6_8_2_4 20000.00 0.000000
TR_6_8_3_1 0.000000 0.000000
TR_6_8_3_2 0.000000 0.000000
TR_6_8_3_3 0.000000 0.000000
TR_6_8_3_4 0.000000 0.000000
TR_7_8_1_1 0.000000 0.000000
TR_7_8_1_2 0.000000 0.000000
TR_7_8_1_3 0.000000 0.000000
TR_7_8_1_4 0.000000 0.000000
TR_7_8_2_1 0.000000 0.000000
TR_7_8_2_2 0.000000 0.000000
TR_7_8_2_3 0.000000 0.000000
TR_7_8_2_4 0.000000 0.000000
TR_7_8_3_1 0.000000 0.000000
TR_7_8_3_2 0.000000 0.000000
TR_7_8_3_3 0.000000 0.000000
TR_7_8_3_4 0.000000 0.000000
PR_1 1.000000 0.000000
PR_2 1.000000 0.000000
PR_3 1.000000 0.000000
PR_4 0.000000 0.000000
PR_5 1.000000 0.000000
PR_6 1.000000 0.000000
PR_7 0.000000 0.000000
AR_8_1 1.000000 0.000000
AR_8_2 1.000000 0.000000
AR_8_3 1.000000 0.000000
AR_8_4 1.000000 0.000000
AR_4_1 0.000000 0.000000
AR_4_2 0.000000 0.000000
AR_4_3 0.000000 0.000000
AR_5_1 0.000000 -0.1260000E+08
AR_5_2 1.000000 0.000000
AR_5_3 1.000000 0.000000
AR_6_1 1.000000 0.000000
AR_6_2 1.000000 0.000000
AR_6_3 0.000000 -1080000.
AR_7_1 0.000000 0.000000
AR_7_2 0.000000 0.000000
AR_7_3 0.000000 0.000000
AR_1_1 1.000000 0.000000
AR_1_2 1.000000 0.000000
AR_2_1 1.000000 0.000000
AR_2_2 1.000000 0.000000
AR_3_1 1.000000 0.000000
AR_3_2 1.000000 0.000000
B_1_5_1_1 0.000000 0.000000
B_1_5_1_2 1.000000 0.000000
B_1_5_1_3 0.000000 0.000000
Documentation of the calculations 461

B_1_5_2_1 0.000000 0.000000


B_1_5_2_2 0.000000 0.000000
B_1_5_2_3 1.000000 0.000000
T_1_1 36.32090 0.000000
T_1_2 59.76145 0.000000
T_2_1 45.10609 0.000000
T_2_2 69.84731 0.000000
T_3_1 0.000000 0.000000
T_3_2 46.85352 0.000000
T_4_1 0.000000 0.000000
T_4_2 0.000000 0.000000
T_4_3 0.000000 0.000000
T_5_1 0.000000 0.000000
T_5_2 38.54850 0.000000
T_5_3 61.98905 0.000000
T_6_1 57.98905 0.000000
T_6_2 79.40202 0.000000
T_6_3 131.0289 0.000000
T_7_1 0.000000 0.000000
T_7_2 0.000000 0.000000
T_7_3 0.000000 0.000000
T_8_1 67.58556 0.000000
T_8_2 67.58556 0.000000
T_8_3 91.02610 0.000000
T_8_4 91.02610 0.000000
S_6_1 0.000000 0.000000
S_6_2 0.000000 0.000000
S_6_3 0.000000 0.000000
Documentation of the calculations 462

J. Computational results of the RF-heuristic S4S3S5

Step 1: The binary constraints (21) and (22) are relaxed.

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed.

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 463

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 464

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]
Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 465

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 466

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 467

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 468

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 469

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 470

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 471

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 472

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 473

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 474

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 475

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 476

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 477

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 478

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 479

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 480

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 481

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 482

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 483

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 484

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 485

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]
Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 486

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 487

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 488

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 489

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 490

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 491

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 492

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed


Documentation of the calculations 493

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 494

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (22) are relaxed

Step 2: The variables from subset S5 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed
Documentation of the calculations 495

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S3 are calculated
Documentation of the calculations 496

K. Computational results of the RF-heuristic S3S5S4

Step 1: The binary constraints (21) and (23) are relaxed.

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed.

Step 3: The variables from S4 and S5 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 497

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 498

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 499

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 500

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 501

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 502

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 503

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 504

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 505

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 506

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 507

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 508

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 509

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 510

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 511

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 512

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 513

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 514

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 515

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 516

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 517

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 518

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (21) are relaxed

STOP
Documentation of the calculations 519

L. Computational results of the RF-heuristic S5S3S4

Step 1: The binary constraints (21) and (23) are relaxed.

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed.

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 520

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 521

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 522

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 523

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 524

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 525

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 526

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 527

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 528

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 529

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 530

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 531

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 532

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 533

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 534

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 535

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 536

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 537

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 538

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 539

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]
Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 540

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 541

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 542

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]
Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 543

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 544

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 545

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 546

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 547

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 548

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 549

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed


Documentation of the calculations 550

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 551

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (21) and (23) are relaxed

Step 2: The variables from subset S4 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed
Documentation of the calculations 552

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2 and
the binary values for the variables from S5 are calculated
Documentation of the calculations 553

M. Computational results of the RF-heuristic S4S5S3

Step 1: The binary constraints (22) and (23) are relaxed.

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed.

Step 3: The variables from S3 and S5 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 554

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 555

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 556

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 557

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 558

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 559

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 560

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 561

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 562

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 563

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 564

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 565

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 566

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 567

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 568

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 569

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 570

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 571

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 572

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 573

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 574

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 575

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (22) are relaxed

STOP
Documentation of the calculations 576

N. Computational results of the RF-heuristic S5S4S3

Step 1: The binary constraints (22) and (23) are relaxed.

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed.

Step 3: The variables from S3 and S4 are fixed to the binary values generated in Step 2.

All steps are calculated ceteris paribus.

Scenario No. 1 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 577

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 2 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 578

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 3 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 579

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 4 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 580

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 5 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 581

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 6 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 582

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 7 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 583

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 8 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 584

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 9 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 585

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 10 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 586

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 11 [No bonus payments, no time block interval]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 587

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 12 [Bonus payments: 100,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 588

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 13 [Bonus payments: 90,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 589

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 14 [Bonus payments: 80,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 590

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 15 [Bonus payments: 70,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 591

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 16 [Bonus payments: 60,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 592

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 17 [Bonus payments: 50,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 593

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 18 [Bonus payments: 40,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 594

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 19 [Bonus payments: 30,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 595

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 20 [Bonus payments: 20,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 596

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 21 [Bonus payments: 10,000 US$ for each day of delivery before T=181;
(20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 597

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP

Scenario No. 22 [No bonus payments, (20; 40) time block interval at the site in Ireland]

Step 1: The binary constraints (22) and (23) are relaxed


Documentation of the calculations 598

Step 2: The variables from subset S3 are fixed to the binary values calculated in Step 1 and the
binary constraints (23) are relaxed

STOP