Академический Документы
Профессиональный Документы
Культура Документы
CCC
(Certificate of Completion and Compliance)
CCC FRAMEWORK
CFO by local authorities replaced by CCC to be
issued by the Principal Submitting Person (PSP)
on 12 April 2007
Aim of CCC to cut short the delays caused by
Local Authorities and towards self regulations
by the professionals
CCC can only be issued by PSP after: All certifications by the respective parties
(professionals, contractors, licensed tradesmen)
based on prescribed forms (Form Gs) under the
Matrix of Responsibility and Accountability are
secured.
Master
Flowchart
Submission to
Technical depts
R&D
Street Lighting
Planning Approved
Pre-Comp Plan Approved
Earthworks
Submission by
AR/IR on Bldg Plan
Planning Dept
Passive Fire
Structural Plan
Int Water
Sub-struct/Foundation
Active Fire
Int Sanitary
Lift Etc
Landscape
Submission by IR
for Infra Works
Issue CCC
Liaise with
Authorities to
take over
Duties of PSP
To prepare and present planning and building
plans to PBT for approval.
Inform PBT of the commencement of
construction works on site.
Supervise construction works at site and
ensure that laws and technical conditions of
the PBT are followed.
Report building breaches, explain reasons of
breach and ensure breach is rectified during
construction.
Duties of PSP
Present work resumption notice to the PBT.
Ensure Form Gs are duly certified by bona fide
Professionals practising through ACPs/ECPs
registered with BAM/BEM, at various stages of the
works and when all the essential services have been
provided.
Issue CCC upon satisfactory completion of the works
and after all conditions have been complied with,
confirming the building is safe and fit for occupation.
Deposit a copy of the CCC to the PBT and BAM/BEM
within 14 days of issue.
2. Copy to:
(a) Local Authority : .
(Name of Local Authority)
(b) **Board of Architects Malaysia(BAM)/Board of Engineers Malaysia (BEM)
FORM F FAQ
Q1 Can a Form F once issued be cancelled or have a
date change?
Case 1: Ar. A requested BAM for guidance where the
PBT had instructed him to cancel Form F issued on
24.9.2012 due to no support letter from PBT for
Form G17. The PBT later conducted a site inspection
and subsequently issued a Letter of Support on
24.3.2013. The PBT refused to accept Form F dated
24.9.2012 and requested for a fresh Form F to be
submitted with a later date. On the other hand, Ar.
A was threatened by the developer for losses and
damages if Form F is issued with a later date.
Can Conditional CCC be issued?
Project Title:
*1. We certify that we have supervised and/or carried out the construction and
completion of the earthworks and that to the best of our knowledge and belief
such works are in accordance with the Approved Earthwork Plans Ref. No. :
.. and that we accept full responsibility for the same.
(a) Contractor
Name (Individual)
#Registration No.
............................
...........................
(CIDB)
...........................
(BEM)
Signature
....................
(Date:
.....................
(Date:
OR
*2. I certify that this form is not applicable.
.....................................................
( Principal Submitting Person )
# I.C. No., if there is no relevant body in respect of registration
* Delete whichever is not applicable
Form G1 - Earthworks
Q3 For a project with multiple phases, can the
SP submit only ONE (1) Form G1 for all the
phases?
Need to submit Form G1 only once under
Phase 1 development. For subsequent phases,
insert Phase 1 EW approval reference no. and
PSP to certify Not Applicable on the
respective Form G1. The project title shall be
the approved BP title for each phase.
Form G3 -Foundations
Q4 How is Form G3 submitted if there are
different Contractors for structural elements
such as piling, raft foundation, pile cap, etc?
Submit separate Form G3s in accordance with
the Contractors scope of work.
(a) Contractor
Name (Individual)
#Registration No.
Signature
............................
...........................
....................
(CIDB)
(Date:
........................... .....................
(Date:
)
(BEM)
...................................................................
*1. We certify that we have supervised and/or carried out the erection and
completion of the internal water plumbing works and that to the best of our
knowledge and belief such works are in accordance with the *approved
plans/Deposited Plans Ref. No. : ........................................... and that we
accept full responsibility for the same.
Name (Individual)
(a) Trade contractor ............................
(Licensed plumber)
#Registration No.
Signature
...........................
.....................
+(
(Date:
................................ .........................
(*BAM/BEM)
(Date:
FORM F
CERTIFICATE OF COMPLETION AND COMPLIANCE
FORM F1
PARTIAL CERTIFICATE OF COMPLETION AND
COMPLIANCE
FORM G 1 (Approved Plans)
STAGE CERTIFICATION : EARTHWORKS
FORM G 2 (Approved Plans)
STAGE CERTIFICATION : SETTING OUT
FORM G 3 (Deposited Plans)
STAGE CERTIFICATION : FOUNDATIONS
FORM G 4 (Deposited Plans)
STAGE CERTIFICATION : STRUCTURAL
Date
Address To *
Insert
date of
CCC
F1
Insert
date of
CCC
1. PSP
2. Local
Authority
Insert Name
of Local
Authority
Insert Name
of Local
Authority
Notes:
1) PSP shall notify the local authority through OSC (in writing or using prescribed form) after
Forms G1-G3 are certified (i.e. after completion of Earthwork, Setting Out and Foundations)
2) Form F/F1 and Form G-1 to G-21 shall be forwarded to the Local Authority and BAM/BEM
within 14 days of the issuance of Form F/F1
2/13/2015
Project Title
Item *1
Item *1 (a)
Item *1 (b)
G-1
Earthwork
Insert
description
of project as
per BP
approval
If this item is
applicable, insert
LA's Approval Ref
No. If not
applicable, strike
out Item*1
G-2
Setting Out
Insert
description
of project as
per BP
approval
If this item is
applicable, insert
LA's Approval Ref
No. If not
applicable, strike
out Item*1
G-3
Foundation
Insert
description
of project as
per BP
approval
If this item is
applicable, insert
SP's Deposited
Plans Ref No. to
LA. If not
applicable, strike
out Item*1
2/13/2015
Item *1(c)
Item *2
If Item *1 is
applicable, strike
out Item *2. If
item *1 is not
applicable, PSP to
sign declaration
1) Fill in PSP's
name 2) Fill in
BAM/BEM
registration no.
3) Sign and
date
If Item *1 is
applicable, strike
out Item *2. If
item *1 is not
applicable, PSP to
sign declaration
If Item *1 is
applicable, strike
out Item *2. If
item *1 is not
applicable, PSP to
sign declaration
FORM
Project Title
Item *1
Item *1 (a)
Item *1 (b)
G-8
Passive
Fire
Insert
description
of project as
per BP
approval
If this item is
applicable,
insert
Bomba's
Approval Ref
No. or PSP's
Deposited
Plans Ref No.
If not
applicable,
strike out
Item*1
If Item *1 is
applicable,
strike out
Item *2. If
item *1 is
not
applicable,
PSP to sign
declaration
G-9
Active
Fire
Insert
description
of project as
per BP
approval
If this item is
applicable,
insert
Bomba's
Approval Ref
No. or PSP's
Deposited
Plans Ref No.
If not
applicable,
strike out
Item*1
If Item *1 is
applicable,
strike out
Item *2. If
item *1 is
not
applicable,
PSP to sign
declaration
2/13/2015
Item
*1(c)
Item *2
FAQs
2/13/2015
www.acem.com.my
www.bem.org.my
www.iem.org.my
www.lam.gov.my
www.pam.org.my
CCC SUBMISSIONS
As of 31.8.2014
BEM have received 2,741 CCC submissions
Late Submissions: 197
Wrong Endorsements: 167
Submission not through an ECP: 134
Submission without Form G: 79
Cases investigated under IC: 13
Engineers deregistered: 1
Engineers suspended: Engineers fined: 2
Engineers reprimanded: 3
FORM
SERVICE
DISCIPLINE OF SIGNING SP
G1
Earthwork
Civil Engineer
G2
Setting Out
G3
Foundation
Civil Engineer
G4
Structure
Civil Engineer
G5
G6
G7
Internal Electrical
Electrical Engineer
G8
Passive Fire
G9
Active Fire
Mechanical Engineer
G 10
Mechanical Ventilation
Mechanical Engineer
G 11
Lift/Escalator
G 12
Building
2/13/2015
FORM
SERVICE
DISCIPLINE OF SIGNING SP
G 13
Civil Engineer
G 14
Sewerage Reticulation
Civil Engineer
G 15
Civil Engineer
G 16
External Electrical
Electrical Engineer
G 17
Civil Engineer
G 18
Street Lighting
Electrical Engineer
G 19
Civil Engineer
G 20
Telecommunication
Electrical Engineer
G 21
Landscape
NOTES;
1)Signing SP must be a Professional Engineer registered with BEM in the
correct discipline
2)SP must be attached to an ECP registered with BEM to practise in the
correct discipline/s
2/13/2015
End of Presentation
THANK YOU