TECHNICAL SPECIFICATION
FOR PIPES
ESSAR STEEL
INDIA LIMITED
TECHNICAL SPECIFICATION
FOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003
DETAILS OF REVISION:
DATE
DETAILS OF REVISION
REVISION NO.
FOR CONCURRENCE
17/05/2014
FOR APPROVAL
P0
Confidential
16/05/2014
Page 2 of 20
ESSAR STEEL
INDIA LIMITED
CONTENTS
CHAPTER
No.
1
2
3
4
5
6
7
8
9
10
DESCRIPTION
GENERAL INFORMATION
SCOPE OF WORK
TECHNICAL SPECIFICATION
INSPECTION & TESTING
HSE REQUIREMENT
DELIVERY
PAINTING
WORKMANSHIP & PERFORMANCE GUARANTEE
SPECIAL INSTRUCTIONS TO SELLER
DOCUMENTS TO BE SUPPLIED
16
17
18
19
20
Confidential
ANNEXURES
I
SITE CONDITIONS
FORMAT FOR DEVIATION FROM SELLER
II
DOCUMENT
QUESTIONNAIRE TO BE FILLED IN AND SUBMITTED
III
WITH OFFER
IV
OVERALL SUPPLY & IMPLEMENTATION SCHEDULE
V
QUALITY ASSURANCE PLAN
VI
BILL OF QUANTITY
PAGE No.
4
5
6
8
9
10
11
13
14
15
Page 3 of 20
ESSAR STEEL
INDIA LIMITED
1.
GENERAL INFORMATION
ESSAR Steel (INDIA) Ltd. (EST(I)L) is a fully integrated flat carbon steel
manufacturer from iron ore to ready-to-market products with a current capacity of
10 million tons per annum (MTPA) at Hazira. The complex has 6 HBI/DRI modules, 2
COREX modules and one blast furnace for making Iron, in six modules module 1 5
are HBI/HDRI product, and in module 6 is Cold DRI plant. From this Cold DRI plant
the cold DRI discharged from furnace and transferred to Steel Making Plant through
conveyor system.
M/s EST(I)L contracted to M/s. ESSAR PROJECT (INDIA) LIMITED - ENGINEERING
& PROJECT MANAGEMENT HAZIRA to provide engineering service for the
enhancement of VPSA Mod VI located at Hazira, Surat.
This document covers the minimum technical requirements for valves as mention
Confidential
below.
Page 4 of 20
ESSAR STEEL
INDIA LIMITED
2.
SCOPE OF WORK
The scope of work of supplier shall include Manufacture/fabrication, Inspection,
testing and supply of pipes as per attached Bill of Quantity and applicable codes
indicated with this specification.
The scope of supply / work shall comprise of following:
Manufacture, Testing, Inspection, Painting/Protective coating, Marking and Supply of
pipes as per attached BOQ.
Confidential
Page 5 of 20
ESSAR STEEL
INDIA LIMITED
3.
TECHNICAL SPECIFICATION
Supplied pipes shall meet the requirement of clauses indicated in the technical
requirement and shall be as per the attached bill of material.
3.1.
Confidential
3.2.
TECHNICAL REQUIREMENT
Test reports shall be furnished for all mandatory tests as per the applicable material
specifications.
Material test certificates (physical property, chemical composition and heat treatment
report) shall also be furnished for the pipes & pipe fittings.
ERW pipes shall not have any circumferential seam joint in a random length.
Weld repair shall be done on pipe welds upon prior approval from the Buyer
/Consultant. Specified heat treatment for carbon steel shall be carried out after
welding / weld repairs. Number of weld repairs at same spot shall be restricted to
maximum two by approved repair procedure.
All pipes shall be marked in accordance with the applicable codes, standards and
specifications in addition to the Purchase Order No.
Pipes shall be dry, clean and free from oil, moisture, dirt and loose foreign materials
of any kind.
Pipes shall be protected from rust, corrosion and mechanical damages during
Page 6 of 20
ESSAR STEEL
INDIA LIMITED
Both ends of the pipe shall be protected with the wood / metal.
End protectors to be used shall be securely and tightly attached with belt or wire.
Pipes shall conform to IS 1239 Part I & IS 3589 (Fe 330 ERW, Bevel end)
Confidential
3.3.
Page 7 of 20
ESSAR STEEL
INDIA LIMITED
Seller shall furnish a QAP which he proposes to follow at the factory and the tests he
proposes to conduct at site within 30 days of email order.
Buyer reserves the right to verify the quality program and entire product
characteristics during manufacturing to assure the intended and specified quality of
the product.
The successful bidder shall send the intimation to Buyer for inspection along-with his
internal inspection certificates at-least three weeks prior to the start of inspection.
The successful Seller shall include and provide for in his offer all facilities, which will
enable witnessing inspection by Buyer or his authorized representatives.
Confidential
4.
Page 8 of 20
ESSAR STEEL
INDIA LIMITED
HSE REQUIREMENT
Tenderer shall comply with the entire applicable statutory requirement as minimum
national standards (plant local governments standard).
In additional to the above Tenderer shall comply with the Clients internal Standards /
Procedures.
Confidential
5.
Page 9 of 20
ESSAR STEEL
INDIA LIMITED
6.
DELIVERY
The delivery of all the valves covered under this specification shall be at plant site on door
delivery freight pre paid basis within 03 months from the date of placement of order.
Confidential
All material shall be packed properly for prevention of damage during transit and
deterioration during storage.
Page 10 of 20
ESSAR STEEL
INDIA LIMITED
TECHNICAL SPECIFICATION
FOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003
7.
PAINTING
The following specification shall be applicable for all equipment covered under this
document unless separate painting specification is elaborated in the respective
attachments.
Preparation and painting of piping. The term painting referred herein covers rust
preventive and decorative coating along with surface protection.
Surfaces made of aluminum, brass; bronze, stainless steel, cast iron and other
corrosion resistant alloys are not required to be painted unless specified except for
aesthetic purposes or for identification bands.
All machined mating surfaces (e.g. flanges) shall be properly cleaned, greased and
protected before dispatch. General compatibility between primer and finishing paints
shall be certified by the paint manufacturer supplying the paints.
Areas which become inaccessible after assembly shall be painted before assembly
(after painting clearance has been given by the inspecting authority) after requisite
surface cleaning as specified.
The machine finished surfaces shall be coated with white lead and covered before
shipment or before being put out into the open air.
The complete paint system for any item includes the following activities
Confidential
The Color code to be followed for the final coat shall be intimated to the
successful tenderer.
Degreasing
Pickling in Acid.
Cold Rinsing and phosphating.
Final coat of painting.
Surfaces which cannot be painted but require protection shall be given a coat of rust
inhibitive grease according to standards. The general guideline followed for painting
is follows:
Page 11 of 20
ESSAR STEEL
INDIA LIMITED
Area or surface
Surface
preparation
Fabricated items
(surfaces
exposed to gas
stream)
SA 2.5
SA 2.5
Final Painting
Painting Scheme
DFT/COAT
40 microns
NIL
NIL
25 microns
1 coat of
aluminum
paint (Normal
temp)
25
microns
Confidential
Fabricated items
(surfaces
exposed to
atmosphere)
Initial Painting
Page 12 of 20
ESSAR STEEL
INDIA LIMITED
The material used shall be new and best of its kind available and shall conform to
relevant latest international standards.
The warrantee shall cover faulty design / material / workmanship. All replacement
under the warrantee shall be done by the supplier free of cost.
The Seller should study the specification and satisfy himself regarding the workability
of the proposed system and shall take full responsibility for the manufacture, quality
of the material, workmanship, etc. of the entire system
The supplier is solely responsible and accountable for any defects and subsequent
delays in supply due to manufacture/inspection.
Confidential
8.
Page 13 of 20
ESSAR STEEL
INDIA LIMITED
The supply items shall meet the requirements stipulated in the technical
specifications and standard method of manufacture.
The Buyer reserves the right to place order for only one or more items in part or full
quantity on a particular supplier. The Seller shall confirm his agreement to accept
part order.
The Seller shall furnish drawings / documents / catalogues as applicable along with
the tender to enable evaluation of his offer. These documents shall be furnished as
per clause no. 10
Manufacturing will be taken up only on the basis of material data duly approved and
signed.
Confidential
9.
Page 14 of 20
ESSAR STEEL
INDIA LIMITED
10.
DOCUMENTS TO BE FURNISHED
The following sets of document shall be submitted
6 sets of Test and Inspection certificates/ reports (Test Certificate / Report) shall
cover material test, destructive test for weld quality.
Confidential
Page 15 of 20
ESSAR STEEL
INDIA LIMITED
TECHNICAL SPECIFICATION
FOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003
Annexure-I
SITE CONDITION
Geographical Conditions
i)
Site Location
ii)
Seismic zone
Meteorological Conditions
i)
45.6 C
4.4 C
33.6 C
Design ambient
50 C
ii)
Relative humidity
Maximum (during
100%
monsoon)
Minimum
33%
71%
iii)
Rainfall
Annual average
1203 mm
Period
June to September
iv)
Climatic condition
Confidential
Tropical sea coast climate with petrochemical complexes within the radius of about 5 km.
Page 16 of 20
ESSAR STEEL
INDIA LIMITED
Annexure-II
FORMAT FOR DEVIATIONS FROM TECHNICAL SPECIFICATION
Sr. No.
Clause No.
Sellers Deviations
The Seller hereby certifies that the above mentioned are the only deviations from the
technical specification.
Signature
Name
Designation
Confidential
Company seal
Page 17 of 20
ESSAR STEEL
INDIA LIMITED
Annexure-III
TO BE SUBMITTED BY THE SELLER ALONG WITH OFFER
Seller's name and address.
Confidential
Page 18 of 20
ESSAR STEEL
INDIA LIMITED
Annexure-IV
OVERALL SUPPLY & IMPLEMENTATION SCHEDULE
Sl.No.
WORK DESCRIPTION
1.0
2.0
Equipment Manufacture
Mechanical
WEEKS FROM
Start
Finish
Confidential
3.0
Page 19 of 20
ESSAR STEEL
INDIA LIMITED
TECHNICAL SPECIFICATION
FOR PIPES
TS. No.: 2746-H000-F11340-0015-1518-0003
Annexure-V
QUALITY ASSURANCE PLAN (QAP)
Seller shall furnish Quality Assurance Plan (QAP) after completion of detailed
engineering and finalization of billing schedule and prior to start of manufacturing.
Inspection and test requirements shall be decided with due consideration of factors
like safety, duty cycle, operating conditions, equipment life, environment conditions,
place of installation and statutory regulations, as applicable for a particular
equipment.
QAP shall clearly indicate the followings through use of codes in the appropriate
columns:
Confidential
Range of inspection & tests to be carried out by Seller and cross checked
during manufacturing of equipment from raw materials to finishing stage.
Suggestive check/ hold points for Buyer inspection and witnessing of tests
during manufacturing and final product inspection.
Details of test certificates, internal inspection reports and calibration certificates
to be furnished by Seller to Buyer.
Inspection documents to be furnished by Seller to Buyer for reference during
inspection along with acceptable norms as per codes/ regulations.
Page 20 of 20