Вы находитесь на странице: 1из 35

Sharklet Entry Into Service

Presented by

Jean-Paul POURTAU
A320neo & Sharklets projects manager
Customer Services - A320 Family Programme - SBS

A320 Family Regional Seminar

Content
1

Sharklet benefits

Technical & project highlights

Entry Into Service

Sharklet retrofit solutions

Summary

Page 2
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Firm orders for Sharklets so far

Orders from 28 customers worldwide


Page 3
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets reduce fuel burn


A320 Block fuel improvement
vs. current Wingtip fences

4%

$150k
fuel savings per
year per aircraft

3%

Fuel burn
reduction

$275k
fuel savings per
year per aircraft

Attractive
savings

2%

1%
0

1000

2000

3000
Sector length (nm)

3.5% fuel burn savings on long sectors

Page 4
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets improve take-off performance


If facing obstacles or climb limitations, Sharklets will increase takeoff weight by:

Improving second segment performance


Clearing more obstacles

Washington

Better
take-off
capability

Corfu
Madeira

Kathmandu

Lanzarote

Quito

Canberra

Improved operational efficiency around the world

Page 5
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets reduce engine maintenance costs


Reduce take-off thrust for
same take-off weight

Up to 4% additional take-off
derate
Longer Time on Wing
Engine DMC per FH - $

Reduced engine
maintenance cost

up to 4%
reduced thrust up to
2%
lower
cost
Derate - %

Up to 2% reduction in engine maintenance costs


thanks to improved take-off performance
Page 6
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Lower
engine
DMC

A320 Family Regional Seminar

Improved climb performance with Sharklets


Altitude (ft)
40000

600nm

530nm

38000
36000
34000
32000
30000
Sector profile

Higher initial cruise altitude

Page 7
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Higher
optimum
altitude

A320 Family Regional Seminar

Sharklets benefits summary


Fuel burn
reduction

Attractive
savings

More
efficient
family

Lower CO2
emissions

More
payload &
range

Better
take-off
capability

Lower
engine
DMC

Higher
optimum
altitude

Sharklets increase A320 Family value


Page 8
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content
1

Sharklet

Technical & project highlights

Entry Into Service

Sharklet retrofit solutions

Summary

Page 9
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets design
Single piece design
Multi-lug and tension bolt
Innovative materials
Lightning strikes protection
New LED nav & strobe lights

Airbus design with state-of-the-art materials


Page 10
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets design: new wing-sharklet join


Rib 27 (wing-side)
z
y
x

z
y
x

Rib 27A (sharklet-side)

Simple connection: tension bolts and barrel nuts; multi-lugs and pins
Page 11
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Centre wing box changes


Changes
No changes
Changes without assembly jigs modification

Minor design changes for adapted centre wing box reinforcement (A319/A320)

Page 12
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Wing changes (A320)


Covers:
Skin thickness increase
outboard of Rib 11.
Topskin material 7449
Bottomskin material 2024HDT.
Strip milling introduced in
change area.

Stringers:
Increased
height
outboard of
Rib 11.
New btm
material
2026.

Mid and Outer Rear Spars:


Front spar Web thickness increase ~ 1mm
outboard of Rib 9
Flange changes outboard of Rib 25
New crack stopper outboard rib 24

Fixed Trailing Edge:


Aileron Hinge bracket
changes

y
Rib 11

Fixed Leading Edge:


Bolting and rivet changes outboard of
Slat 4

Rib 27:
New large
machined rib
concept
Introduction of
support straps to
stringers

Ribs 12 to 26:
System penetrations maintained.
Thicker web features and taller stringer cut outs.
Larger cleats used to fit larger fasteners.

Front Spar:
Front spar Web thickness increase ~1mm outboard of
Rib 9
Flange changes outboard of Rib 23

Page 13
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Systems Installation:
New looms for Sharklet, routed outside rib 27.
Centre Tank Vent Pipe Modified.

A320 Family Regional Seminar

Computers updated for Sharklet


No sharklets capability - Std & P/N

Sharklets capability - Std & P/N

MOD

Certif

ELAC

B L94

3945128210 or
3945129104

B L96

3945128212 or
3945129106

160015/P121
27

Nov 2012

SEC

B 122

B372BBM0103

B 121

B372BBM0104

160014/P121
25

Nov 2012

FCDC

58

15370-1520

59

160051/P129
77

Oct 2012

FAC

B 620

B397BAM0620

B 622

B397BAM0622

160011/P121
26

Nov 2012

FWF

H2 F6

350E053021111

H2 F7

350E053021212

153741/P130
23

Dec2012

PDB
TAV

G2831AAB03

G2831AAC01

160016/P121
28

Oct 2012

PDB
HWL

PS4087592-902 or
HNP53AD06-2002

PS4087592-903 or
HNP53AD06-2003

160017/P121
29

Oct 2012

Software upgrade via software upload or OBRM


Page 14
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet introduction certification


The Sharklet is certified through a significant major change
(classification according to EASA Part 21). The target date for the
official approval is end of November 2012 for A320.
The sharklet doesnt create any new model. For that reason, it
remains as part of the existing EASA TC.

Schedule

2011
1Q

2Q

3Q

4Q

2012
1Q

Page 15
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

2Q

3Q

4Q

2013
1Q

2Q

3Q

4Q

2014
1Q

2Q

3Q

4Q

A320 Family Regional Seminar

Sharklets and provisions ramp-up

Q2 2012

Q4 2012

Provisioned wings EIS


Start of ramp-up

1st Sharklets certification,


EIS and start of ramp-up

Q4 2013

Q1 2014

Provisioned Aircraft
Sharklets available
reach full production rate
for all deliveries

2012

2013
Provisions ramp-up
Sharklets ramp-up

From 2014, every A320 Family delivery can benefit from Sharklets
Page 16
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

2014

A320 Family Regional Seminar

Content
1

Sharklet benefits

Technical & project highlights

Entry Into Service

Sharklet retrofit solutions

Summary

Page 17
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

EIS preparation with Airlines


Dedicated communication to every Operator delivered with
Sharklet

Maintenance

Technical Publications
Ground Support Equipments
Scheduled maintenance
Structure Repair Manual (SRM)

Flight Ops & Training

Aircraft Flight Manual (AFM) & Flight Crew manuals (FCOM)


Perfo databases
Configuration Deviation List (CDL)
Master Minimum Equipment List (MMEL)
Weight & Balance Manual (WBM)
Training

Others

Spares support
Transportation
Supplier contract

Provides detailed information


Allows tailored support to sharklet Operators
Very useful feedback gathered

EIS plan under deployment, reviewed with every sharklet Operator


Page 18
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Tech Pubs
Minor adaptations for reinforced Aircraft and sharklet Aircraft
AMM
Removal / Installation tasks (sharklet, nav and strobe lights)
Trial performed on Aircraft (see dedicated slide) : AMM validated with minor adaptations

needed.
Sharklet removal / installation duration: around 6 h (excluding sealant curing time)

Inspections for Schedule maintenance


No or minor update identified on Aircraft structure
New tasks for Rib 27 and sharklet inspections.

Other minor adaptations

TSM: no impact identified to this date


IPC: 80 items identified as modified further review on-going.
ASM / AWM: 6 items identified( ATA 33) on-going.
Page 19
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

GSE
7 specific tools considered for Sharklet Removal / installation
Hoist Sharklet - 98D57356715
Extractor - Lower Pins - 98D57304000
Grid - Nut Torque - 98D57304001
Collar - Aileron - 98D27104005
Protector - Manhole - 98F57004049
Protector - Sharklet - 98D57304003
Torque Tool - TBC
+ Fuel LEL measuring device

Fuel LEL
measuring
tool*
* Picture given as illustration only

No specific tools needed for lights


Page 20

GSE are planned available for loan and sales stock

AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

AMM & GSE on Aircraft validation


Maintenance trial performed 24-26 sept 2012 on Flight Test
Aircraft

Sh arklet Removal/Installation
Lights and PSU Removal/Installation
Final draft AMM and GSE final concept used

AMM & GSE validated with minor update needed (ongoing)


Sharklet removal / installation in less than one shift
Page 21
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Scheduled Maintenance
Reinforced a/c with WTF: no maintenance program change considered.
Sharklet Aircraft: preliminary assessment done
Minimum impact on existing inspection
update of interval / threshold
No new task except for sharklet

New inspections on sharklet and RIB27


RIB 27 lug inspection
Sharklet inspection (borescope)
Threshold/Interval considered: 12 YE / 12 YE

MRBR/ALS part2 dossier under preparation for Certification


Reviewed during A318 / A319 / A320 / A321 STRUCTURE
WORKING GROUP - SAFAM SWG MEETING 27

11th 12th September 2012, Toulouse, France


Page 22

Minimum impact is targeted for sharklet Aircraft

AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

SRM
Complete revalidation of existing SRM is ongoing for both
reinforced Aircraft and Sharklet Aircraft

Objective is to complete all SRM task revalidation by end 2013


Outlook today indicated 65% temporary & ADL revalidated for Sharklet
Aircraft A320 EIS:
Nose Fwd fuselage (s11/12), Fwd fuselage (s13/14), Aft fuselage (s18), Aft Tail cone
(s19.1), PAX doors, landing gear doors, belly fairings, VTP,THS, rudder, elevator, pylons

SRM introduction includes Aircraft reinforcement and sharklet


modifications into repairs / ADL effectivity list.

Repairs shown as not applicable would need RAS in case-by-case basis


Sharklet device ADL/Repairs on-going:
Metallic Leading Edge ADL (Scratches, Gouges, Abrasions, Corrosion and Dents)
Lightning Strike damage
Sharklet composite structure repairs

Sharklet SRM coverage will be maintained vs current A320.


Same level of reparability vs current A320 family
Page 23
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Impact Flight Ops & Training Domain


AFM / FCOM:
To be updated to reflect Perfo improvements
Minor adaptation to reflect sharklet impact on systems

WBM :

no change for A320


possible minor changes on Weight and CG data for A319 or
A321

MMEL:
Update of perfo charts
Possible update due to introduction of LAF (Load Alleviation Function)

Maintenance & Flight training: Minor update

(mainly on Familiarization

training)

No impact on crew qualification same type rating


Page 24
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Impact Flight Ops & Training Domain - dispatch


Dispatch after sharklet heavy damage (out of SRM and CDL scope)
Ferry Flight with damaged sharklet removed and replaced by a complete
wingtip (modified wingtip compatible with reinforced wing).
Benefit: Wingtip & fence can be transported in A320 Family. Sharklet cant.
Will be managed through AFM specific instructions. Targeted at 1Q13
Perfo penalties under definition
Flight Tests to be completed by end Oct2012

CDL : complete scope under review


Available at 1st EIS: static discharger.
Other CDL items under review: nav & strobe lights glazing's , PSU access
door
Page 25
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Flight Ops : performance tools update


Impact on performance applications
PEP

[Performance Program]
new version 5.2.1 with new performance Database
FlySmart with Airbus (former LPC NG)
new version L3.2 with new performance Database
Pre-requisite: version L3.0 shall be already in service in the Airline

Availability
PEP 5.2.1 and PAADMIN 7.1
FlySmart with Airbus

20 Nov 2012
10 Dec 2012

with same performance database as AFM / pending AFM approval


A320 CFM (A320-216 & -214):
A320 IAE (A320-232 & -233):

Page 26
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

30 Nov 2012
20 Dec 2012

A320 Family Regional Seminar

Spare & transportation


Spare sharklets
Two sets of sharklets planned to be available at EIS in Airbus to
support the fleet. One set in Singapore and one in Hamburg at EIS.

Out of production secured


Parts that will be out of production after Aircraft reinforcement is standard in
production have been identified and secured for aftermarket (Airbus Material,
Logistics and Suppliers in Hamburg).

Sharklet transportation
Airworthy box defined
(H)1186mm X (W)1722mm x (L)4572mm

Fits in A330/A340 and cargo


Do not fit into A320 Family Aircraft
Page 27
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content
1

Sharklet benefits

Technical & project highlights

Entry Into Service

Sharklet retrofit solutions

Summary

Page 28
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklets for the A320 Family


Production line
New-build aircraft delivered with:
Modified structure (centre wing box and wing)
Required flight computers functionality
Sharklets

Production retrofit
New-build aircraft delivered with modified structure
To be retrofitted post-delivery:
Flight computers functionality
Sharklets

In-service retrofit
Retrofit:
Wing structure reinforcement
Sharklets
Flight computer functionality

Page 29
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet production retrofit: Airbus solution

Production retrofit availability target : H1 2013


Page 30
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet in-service retrofit: Airbus solution

In-service retrofit availability target : end 2013


Page 31
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Sharklet in-service retrofit


Impact on the aircraft

9 Pre-requisites
(flight computers):
FMGC
SEC
ELAC
FAC
FCDC
FWC

Embodiment time : 10 days


Aircraft downtime : 15 days

Page 32
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Content
1

Sharklet benefits

Technical & project highlights

Entry Into Service

Sharklet retrofit solutions

Summary

Page 33
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

A320 Family Regional Seminar

Key messages

Q2 2012

Q4 2012

Provisioned wings EIS


Start of ramp-up

1H2013

1st Sharklets certification, EIS and


start of ramp-up

2012

2013
Provisions ramp-up
Sharklets ramp-up
EIS preparation with Airlines

Page 34

AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

1Q2014

Retrofit solution for ProvisionedRetrofit solution for non


Provisioned Aircraft
Aircraft

2014

A320 Family Regional Seminar

AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the
delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting
grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.

Page 35
AIRBUS S.A.S. All rights reserved. Confidential and proprietary document.

Вам также может понравиться