Вы находитесь на странице: 1из 38

1

Lab Report of Machine Design

Submitted by:
1- Muhammad Abdullah
2012-ME-37
2- Pralhad Gupta
2012-ME-59
Submitted to:

Sir Wasim
Department of Mechanical Engineering ,Uet Lahore

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

Contents of Report:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

Part1

Part2

Part3

Part4

Part5

Part6
Assemblin
g

Clutch Housing Report


Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

In this report we modeled our housing by making 6


parts then assembling into a single part by
Assembly. In every part the steps are given what
we did in this step.

Part-1 Mounting:

Step#1:
In this step we did simple revolved protrusion.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

Step#2:
In this step we did cutout.

Step#3:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

In this step we did protrusion and pattern.

Step#4:
In this step we made a solid cylinder by simple
protrusion.

Step#5:
In this step we did cutout.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

Step#6:
In this step we made a solid cylinder by simple
protrusion command and then pattern it along the

central circle.
Step#7:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

In this step we did cutout and pattern.

Step#8:
In this step we did cutout and made a cylinder then

pattern it.
Step#9:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

In this step we made a solid cylinder by protrusion

command.
Step#10:
In this step we did cutout.

Step#11:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

10

In this step we made a rectangular bar by simple


protrusion then we did pattern along the central
circle.

Step#12:
In this step we did rounding of edges and out part
is complete.

Part 2 Small Helical gear:


Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

11

Step#1:
In this step we made a simple cylinder by
protrusion.

Step#2:
In this step we did simple cutout.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

12

Step#3:

In this step we made keyways by simple cutout


and then we made two sketches as shown.

Step#4:
In this step we made a teeth of helical gear by
using lofted protrusion command then pattern it
along the circumference.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

13

Step#5:
In this step we did chamfer.

Part 3 Spur gear:


Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

14

Step#1:
In this step we made a cylinder by simple
protrusion.

Step#2:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

15

In this step we made a gear teeth by simple

protrusion.
Step#3
In this step we did pattern of the tooth.

Step#4:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

16

In this step we did cutout.

Step#5:
In this step we did cutout and chamfer.

Part 4 Holder:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

17

Step#1:
In this step we did revolve protrusion.

Step#2:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

18

In this step we made a cylinder by simple


protrusion.

Step#3:
In this step we made a rectangular bar on the
periphery of the last cylinder and pattern it along

the cylinder.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

19

Step#4:
In this step we did protrusion and cutouts and
pattern. We first made cylinder by protrusion then
then we did cutout then we did pattern then we

make a rectangular bar and pattern it.

Step#5:
In this we made protrusion and pattern it.

Step#6:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

20

In this we made a cutout and we build a cylinder


by protrusion and then we pattern it.

Step#7:
In this step we did rounding of edges.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

21

Part 5 Screw:

Step#1:
In this step we made a cylinder by simple

protrusion.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

22

Step#2:
In this step we made the head by simple

protrusion.
Step#3:
In this step we did helical cutout.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

23

Step#4:
In this step we did two cutouts.

Step#5:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

24

In this step we did rounding of edges.

Part 6 Main Clutch


housing:

Step#1:
In this step we made a solid cylinder by simple
protrusion.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

25

Step#2:
In this step we did simple cutout, revolve cutout
and pattern.

Step#3:
In this step we did protrusions and cutouts.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

26

Step#4:
In this step we did simple cutout and revolved

cutout.
Step#5:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

27

In this step we did simple protrusion and pattern.

Step#6:
In this step we make a helical gear by lofted
protrusion.

Step#7:
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

28

In this step we did helical cutout and simple cutout


and drafted it.

Step#8:
In this step we did cutout , drafting , pattern and
rounding the edges.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

29

Assembly of the parts


Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

30

We did assembly of the parts with the steps in


coming pages:

Step#1:
We inserted the Clutch main housing which was
our part 6.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

31

Step#2:
In this step we inserted spur gear part#3 and
aligned it to our previous inserted Clutch main
housing.
Assignment of Md Lab final report
Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

32

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

33

Step#3:
In this step we did insert the part #1 and aligning
it.
Before inserting it was like this

And after inserting and aligning it.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

34

Step#4:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

35

In this step we inserted its upper part which is


part#4 and aligned it.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

36

Step#5:

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

37

In this step we inserted and aligned the screws


part#5 axially.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

38

Step#6:
In this step we inserted the helical gear part#2 and
we didnt aligned it we just positioned it because
for the motor command to work.

Assignment of Md Lab final report


Clutch Housing

Made by

M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59

Вам также может понравиться