Submitted by:
1- Muhammad Abdullah
2012-ME-37
2- Pralhad Gupta
2012-ME-59
Submitted to:
Sir Wasim
Department of Mechanical Engineering ,Uet Lahore
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Contents of Report:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Part1
Part2
Part3
Part4
Part5
Part6
Assemblin
g
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Part-1 Mounting:
Step#1:
In this step we did simple revolved protrusion.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Step#2:
In this step we did cutout.
Step#3:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Step#4:
In this step we made a solid cylinder by simple
protrusion.
Step#5:
In this step we did cutout.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Step#6:
In this step we made a solid cylinder by simple
protrusion command and then pattern it along the
central circle.
Step#7:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
Step#8:
In this step we did cutout and made a cylinder then
pattern it.
Step#9:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
command.
Step#10:
In this step we did cutout.
Step#11:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
10
Step#12:
In this step we did rounding of edges and out part
is complete.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
11
Step#1:
In this step we made a simple cylinder by
protrusion.
Step#2:
In this step we did simple cutout.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
12
Step#3:
Step#4:
In this step we made a teeth of helical gear by
using lofted protrusion command then pattern it
along the circumference.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
13
Step#5:
In this step we did chamfer.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
14
Step#1:
In this step we made a cylinder by simple
protrusion.
Step#2:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
15
protrusion.
Step#3
In this step we did pattern of the tooth.
Step#4:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
16
Step#5:
In this step we did cutout and chamfer.
Part 4 Holder:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
17
Step#1:
In this step we did revolve protrusion.
Step#2:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
18
Step#3:
In this step we made a rectangular bar on the
periphery of the last cylinder and pattern it along
the cylinder.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
19
Step#4:
In this step we did protrusion and cutouts and
pattern. We first made cylinder by protrusion then
then we did cutout then we did pattern then we
Step#5:
In this we made protrusion and pattern it.
Step#6:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
20
Step#7:
In this step we did rounding of edges.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
21
Part 5 Screw:
Step#1:
In this step we made a cylinder by simple
protrusion.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
22
Step#2:
In this step we made the head by simple
protrusion.
Step#3:
In this step we did helical cutout.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
23
Step#4:
In this step we did two cutouts.
Step#5:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
24
Step#1:
In this step we made a solid cylinder by simple
protrusion.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
25
Step#2:
In this step we did simple cutout, revolve cutout
and pattern.
Step#3:
In this step we did protrusions and cutouts.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
26
Step#4:
In this step we did simple cutout and revolved
cutout.
Step#5:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
27
Step#6:
In this step we make a helical gear by lofted
protrusion.
Step#7:
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
28
Step#8:
In this step we did cutout , drafting , pattern and
rounding the edges.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
29
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
30
Step#1:
We inserted the Clutch main housing which was
our part 6.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
31
Step#2:
In this step we inserted spur gear part#3 and
aligned it to our previous inserted Clutch main
housing.
Assignment of Md Lab final report
Clutch Housing
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
32
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
33
Step#3:
In this step we did insert the part #1 and aligning
it.
Before inserting it was like this
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
34
Step#4:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
35
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
36
Step#5:
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
37
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59
38
Step#6:
In this step we inserted the helical gear part#2 and
we didnt aligned it we just positioned it because
for the motor command to work.
Made by
M.Abdullah 2012-ME-37
Pralhad Gupta 2012-ME-59