Академический Документы
Профессиональный Документы
Культура Документы
silitonga
Paper Copies are Uncontrolled | EDMS | 24/07/2015 11:51:19
mk.herbert.silitonga
Paper Copies are Uncontrolled | EDMS | 24/07/2015 11:51:19
Page
Date
All
23-Dec-2011
All
23-Dec-2011
All
23-Dec-2011
PHEONWJ-U-GMS-0060 Rev.2
Paper Copies are Uncontrolled
Revise
All PHE ONWJ Ltd. change to PT. PHE ONWJ
Change document number from PHEONWJ-U-PRC-0137 to PHEONWJU-GMS-0060
Change document type from Procedure (PRC) to Generic Maintenance
Strategy (GMS)
Page 2
mk.herbert.silitonga
Paper Copies are Uncontrolled | EDMS | 24/07/2015 11:51:19
Scope
Required Performance
a) Reliability
100%.
b) Availability
100%.
PHEONWJ-U-GMS-0060 Rev.2
Paper Copies are Uncontrolled
Maintenance Strategy
Description
Inspection of complete system
Flushing pipe work and
chemically treated for corrosion
protection.
Maintenance of valves
Equipment Function
Purpose
Maintenance
2
Routine
PHEONWJ-UPRC-0223
PHEONWJ-UPRC-0224
PHEONWJ-UPRC-0225
Interval
6 months
12 months
12 months
Required Resource
Related Standards/Reference
Page 3