5830 Federal Register / Vol. 71, No.

23 / Friday, February 3, 2006 / Notices

information, and alternatives in the comments, terms and conditions, Average annual generation would be
Scoping Document (SD).3 recommendations, and prescriptions: 60 10,400,000 kilowatt-hours.
Copies of the SD outlining the subject days from the issuance of this notice. m. A copy of the application is
areas to be addressed in the EA were All documents (original and eight available for review at the Commission
distributed to the parties on the copies) should be filed with: Magalie R. in the Public Reference Room or may be
Commission’s mailing list. Copies of the Salas, Secretary, Federal Energy viewed on the Commission’s Web site at
SD may be viewed on the Web at Regulatory Commission, 888 First http://www.ferc.gov using the
http://www.ferc.gov using the Street, NE., Washington, DC 20426. ‘‘eLibrary’’ link. Enter the docket
‘‘eLibrary’’ link (see item m above). The Commission’s Rules of Practice number, excluding the last three digits,
require all intervenors filing documents in the docket number field to access the
Magalie R. Salas, document. For assistance, contact FERC
with the Commission to serve a copy of
Secretary. Online Support at
that document on each person on the
[FR Doc. E6–1443 Filed 2–2–06; 8:45 am] FERCOnlineSupport@ferc.gov or toll-
official service list for the project.
BILLING CODE 6717–01–P
Further, if an intervenor files comments free at 1–866–208–3676, or for TTY,
or documents with the Commission (202) 502–8659. A copy is also available
relating to the merits of an issue that for inspection and reproduction at the
DEPARTMENT OF ENERGY address in item h above.
may affect the responsibilities of a
particular resource agency, they must Register online at http://
Federal Energy Regulatory www.ferc.gov/docs-filings/
Commission also serve a copy of the document on
that resource agency. esubscription.asp to be notified via e-
mail of new filings and issuances
Notice of Application Accepted for Scoping comments, motions to
related to this or other pending projects.
Filing, Soliciting Motions To Intervene intervene, protests, comments, terms
For assistance, contact FERC Online
and Protests; Ready for Environmental and conditions, recommendations, and
Support.
Analysis, and Soliciting Comments, prescriptions may be filed electronically n. Any qualified applicant desiring to
Terms and Conditions, via the Internet in lieu of paper. The file a competing application must
Recommendations, and Prescriptions; Commission strongly encourages submit to the Commission on or before
Paper Scoping and Soliciting Scoping electronic filings. See 18 CFR the specified deadline date for the
Comments 385.2001(a)(1)(iii) and the instructions particular application, a competing
on the Commission’s Web site (http:// development application, or a notice of
January 27, 2006. www.ferc.gov) under the ‘‘e-Filing’’ link.
Take notice that the following intent to file such an application.
k. This application has been accepted Submission of a timely notice of intent
hydroelectric application has been filed for filing, and is now ready for
with the Commission and is available allows an interested person to file the
environmental analysis. competing development application no
for public inspection. l. The proposed Upper Turnbull Drop
a. Type of Application: New Major later than 120 days after the specified
Project would be built at the Spring deadline date for the particular
License, 5 MW or Less. Valley Canal’s Upper Turnbull drop
b. Project No.: 12598–002.1 application. Applications for
structure, which is a reinforced concrete preliminary permits will not be
c. Date Filed: November 28, 2005.
d. Applicant: Birch Power Company. structure 1,102 feet long, with a total accepted in response to this notice.
e. Name of Project: Upper Turnbull drop of 101.6 feet. The applicant A notice of intent must specify the
Drop Hydroelectric Project. proposes to construct: (1) A check exact name, business address, and
f. Location: On the Spring Valley structure, consisting of a spillway gate telephone number of the prospective
Canal, in Teton County, Montana, about panel anchored to a ballast concrete applicant, and must include an
4 miles west of Fairfield, Montana. The structure spanning the full width of the unequivocal statement of intent to
project would occupy lands of the canal floor between new concrete submit, if such an application may be
United States administered by the abutment walls; (2) an intake structure filed, either a preliminary permit
Bureau of Reclamation. to divert flows from the left side of the application or a development
g. Filed Pursuant to: Federal Power canal; (3) 84-inch-diameter, 1,100-feet- application (specify which type of
Act 16 U.S.C. 791(a)—825(r). long steel or polyethylene penstock that application). A notice of intent must be
h. Applicant Contact: Ted Sorenson, would be completely buried; (4) a served on the applicant(s) named in this
Sorenson Engineering, 5203 South 11th powerhouse containing two horizontal public notice.
East, Idaho Falls, ID 83404, (208) 522– Francis turbines and one generator with Anyone may submit comments, a
8069. a rated output of 4.1 MW; (5) a draft protest, or a motion to intervene in
i. FERC Contact: Dianne Rodman, tube and tailrace discharging flows into accordance with the requirements of
Federal Energy Regulatory Commission, the canal about 40 feet downstream of Rules of Practice and Procedure, 18 CFR
888 First Street, NE., Washington, DC the drop structure’s existing stilling 385.210, 385.211, and 385.214. In
20426; telephone (202) 502–6077 or by basin; (6) a 1.3-mile-long, 12.5-kilovolt determining the appropriate action to
e-mail at Dianne.rodman@ferc.gov. (kV) transmission line; (7) a switchyard; take, the Commission will consider all
j. Deadline for Filing Scoping and (8) a 1.7-mile-long, 69-kV protests or other comments filed, but
Comments: 30 days from the issuance transmission line extending from the only those who file a motion to
date of this notice; deadline for filing switchyard to interconnect with an intervene in accordance with the
motions to intervene and protests, existing Sun River Electric Cooperative Commission’s Rules may become a
transmission line. The project would party to the proceeding. Any comments,
hsrobinson on PROD1PC70 with NOTICES

3 One SD has been prepared for the Lower use flows as they are provided in protests, or motions to intervene must
Turnbull Drop Project, the Upper Turnbull Drop accordance with the needs of the be received on or before the specified
Project, and the Mill Coulee Drops Project. Greenfield Irrigation District, which
1 The applicant has split its Turnbull Drop Project
comment date for the particular
No. 12539, for which it holds a preliminary permit,
operates the canal. The project would application.
into the Lower Turnbull Drop Project No. 12597 not impound water and would be The Commission directs, pursuant to
and the Upper Turnbull Drop Project No. 12598. operated strictly as a run-of-river plant. section 4.34(b) of the Regulations (see

VerDate Aug<31>2005 15:00 Feb 02, 2006 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\03FEN1.SGM 03FEN1
Federal Register / Vol. 71, No. 23 / Friday, February 3, 2006 / Notices 5831

Order No. 533 issued May 8, 1991, 56 Copies of the SD outlining the subject All documents (original and eight
FR 23108, May 20, 1991) that all areas to be addressed in the EA were copies) should be filed with: Magalie R.
comments, recommendations, terms and distributed to the parties on the Salas, Secretary, Federal Energy
conditions, and prescriptions Commission’s mailing list. Copies of the Regulatory Commission, 888 First
concerning the application be filed with SD may be viewed on the Web at Street, NE., Washington, DC 20426.
the Commission within 60 days from http://www.ferc.gov using the The Commission’s Rules of Practice
the issuance date of this notice. All ‘‘eLibrary’’ link (see item m above). require all intervenors filing documents
reply comments must be filed with the with the Commission to serve a copy of
Magalie R. Salas,
Commission within 105 days from the that document on each person on the
date of this notice. Secretary.
official service list for the project.
[FR Doc. E6–1444 Filed 2–2–06; 8:45 am] Further, if an intervenor files comments
All filings must (1) bear in all capital
BILLING CODE 6717–01–P or documents with the Commission
letters the title ‘‘PROTEST,’’ ‘‘MOTION
TO INTERVENE,’’ ‘‘NOTICE OF relating to the merits of an issue that
INTENT TO FILE COMPETING may affect the responsibilities of a
DEPARTMENT OF ENERGY particular resource agency, they must
APPLICATION,’’ ‘‘COMPETING
APPLICATION,’’ ‘‘COMMENTS,’’ Federal Energy Regulatory also serve a copy of the document on
‘‘REPLY COMMENTS,’’ Commission that resource agency.
‘‘RECOMMENDATIONS,’’ ‘‘TERMS Scoping comments, motions to
AND CONDITIONS,’’ or Notice of Application Accepted for intervene, protests, comments, terms
‘‘PRESCRIPTIONS;’’ (2) set forth in the Filing, Soliciting Motions To Intervene and conditions, recommendations, and
heading the name of the applicant and and Protests; Ready for Environmental prescriptions may be filed electronically
the project number of the application to Analysis, and Soliciting Comments, via the Internet in lieu of paper. The
which the filing responds; (3) furnish Terms and Conditions, Commission strongly encourages
the name, address, and telephone Recommendations, and Prescriptions; electronic filings. See 18 CFR
number of the person protesting or Paper Scoping and Soliciting Scoping 385.2001(a)(1)(iii) and the instructions
intervening; and (4) otherwise comply Comments on the Commission’s Web site (http://
with the requirements of 18 CFR www.ferc.gov) under the ‘‘e-Filing’’ link.
385.2001 through 385.2005. All January 27, 2006. k. This application has been accepted
comments, recommendations, terms and Take notice that the following for filing, and is now ready for
conditions, or prescriptions must set hydroelectric application has been filed environmental analysis.
forth their evidentiary basis and with the Commission and is available l. The proposed project would be built
otherwise comply with the requirements for public inspection. at the Mill Coulee Canal’s Upper and
of 18 CFR 4.34(b). Agencies may obtain a. Type of Application: Minor Lower Mill Coulee drop structures,
copies of the application directly from License. which are reinforced concrete structures
the applicant. A copy of any protest or b. Project No.: 12599–002.1 290 and 190 feet long, respectively. The
motion to intervene must be served c. Date Filed: November 28, 2005. total drop for the two structures is 101.6
upon each representative of the d. Applicant: Wade Jacobsen. feet. The applicant proposes to
applicant specified in the particular e. Name of Project: Mill Coulee Drops construct: (1) A check structure,
application. A copy of all other filings Hydroelectric Project. consisting of a spillway gate panel
in reference to this application must be f. Location: On the Mill Coulee Canal, anchored to a ballast concrete structure
accompanied by proof of service on all in Cascade County, Montana, about 4 spanning the full width of the canal
persons listed in the service list miles west of Fairfield, Montana. The floor between new concrete abutment
prepared by the Commission in this project would occupy in part lands of walls, upstream from the concrete
proceeding, in accordance with 18 CFR the United States administered by the transition of the Upper Mill Coulee
4.34(b) and 385.2010. Bureau of Reclamation. chute drop; (2) an intake structure to
o. Scoping Process: The Commission g. Filed Pursuant to: Federal Power divert flows from the left side of the
intends to prepare an Environmental Act 16 U.S.C. 791(a)–825(r). canal; (3) a 48-inch-diameter, 1,400-feet-
Assessment (EA) on the project in h. Applicant Contact: Ted Sorenson, long pre-stressed concrete, tape-coated
accordance with the National Sorenson Engineering, 5203 South 11th steel, or polyethylene penstock that
Environmental Policy Act.2 The EA will East, Idaho Falls, ID 83404, (208) 522– would be completely buried; (4) a
consider both site-specific and 8069. powerhouse containing one horizontal
cumulative environmental impacts and i. FERC Contact: Dianne Rodman, Francis turbine and one generator with
reasonable alternatives to the proposed Federal Energy Regulatory Commission, a rated output of 1.05 MW; (5) a draft
action. 888 First Street, NE., Washington, DC tube and 2,650-feet-long tailrace
20426; telephone (202) 502–6077 or by discharging flows into the canal below
Commission staff does not propose to
e-mail at Dianne.rodman@ferc.gov. the Lower Mill Coulee drop structure;
conduct any on-site scoping meetings at
j. Deadline for Filing Scoping (6) a switchyard immediately adjacent
this time. Instead, we will solicit
Comments: 30 days from the issuance to the powerhouse; and (7) a 0.7-mile-
comments, recommendations,
date of this notice; deadline for filing long, 69-kV transmission line extending
information, and alternatives in the
motions to intervene and protests, from the switchyard to interconnect
Scoping Document (SD).3
comments, terms and conditions, with an existing Sun River Electric
2 One EA will be prepared for the Upper Turnbull
recommendations, and prescriptions: 60 Cooperative transmission line. The
hsrobinson on PROD1PC70 with NOTICES

Drop Project and two other projects proposed to be


days from the issuance of this notice. project would use flows as they are
constructed on nearby canals, the Lower Turnbull provided in accordance with the needs
Drop Project No. 12597 and the Mill Coulee Drops 1 The Mill Coulee Drops Project No. 12599 would
of the Greenfield Irrigation District,
Project No. 12599. be located at the sites of the Mill Coulee Lower
3 One SD has been prepared for the Upper Project No. 12536 and the Mill Coulee Upper
which operates the canal. The project
Turnbull Drop Project, the Lower Turnbull Drop Project No. 12537, for which the applicant holds would not impound water and would be
Project, and the Mill Coulee Drops Project. preliminary permits. operated strictly as a run-of-river plant.