C A S E S T U DY
Table of Contents
Summary............................................................................................................................................. 3
Vortex Generator Technology.........................................................................................................3
Actual AEP Increase from VG Installation............................................................................................ 4
VG ROI Analysis................................................................................................................................... 5
Importance of Accurate Data Analysis ................................................................................................ 6
Synchronized Data Acquisition.......................................................................................................6
Raw Data Filtering...........................................................................................................................7
Data Normalization.........................................................................................................................7
Power Curves (CTRL WTG & VG WTG)............................................................................................7
Annual Production Estimation........................................................................................................7
Improving Installation Process............................................................................................................ 8
Reduced Turbine Downtime...........................................................................................................8
Repeatability...................................................................................................................................8
Improving VG Lifetime......................................................................................................................... 9
Durability........................................................................................................................................9
Adhesives........................................................................................................................................9
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
Summary
Vortex Generators (VGs) have been a hot topic over the past several years in the wind industry and
after extensive testing, fine tuning, and more testing, solid results are finally in. The results prove
the importance of durable materials, reliable installation processes, customized VG placement,
suitable wind regime on the site, and meticulous data analysis to accurately project and measure
results. It is nearly impossible to precisely forecast wind turbine performance with VGs but based
on current and historical data, and analysis based on a comprehensive methodology, we can
achieve a confident forecast that can be used to generate a projected ROI for the owner.1
After more than a year of experience and data from approximately 22,000 individual installations,
what have we learned? We know how to accurately measure and project the AEP increase, which
for the site data examined in this case resulted in a 2.2% site wide improvement.
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
The key to the UpWind Solutions/SMART BLADE/3M VG solution is a deep analysis of the
blade aerodynamics in actual field conditions. Armed with a highly accurate map of the blade
aerodynamics, a VG solution is designed specifically for that unique blade design. Unlike most
other VGs available, the UpWind/SMART BLADE/3M VG Solution has the flexibility to place each
individual VG in exactly the right location and orientation resulting in maximum AEP gains.
12
10
8
6
4
2
0
12.2
8.7
7.5
4.5
4.5
2.7
1.7
1.7
2.3
5.5-6.0
6.0-6.5
6.5-7.0
7.0-7.5
7.5-8.0
1.5
1.5
8.0-8.5 8.5-9.0
1.6
1.1
9.0-9.5 9.5-10.0
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
VG ROI Analysis
By using the measured 2.2% AEP increase from this specific site's data analysis and applying it to
a standard size wind farm with 60 GE 1.5MW turbines, we can project when the asset owner will
realize a positive ROI. An average 40% capacity factor (actual energy produced) and price of $50/
MWh were used to determine that a VG installation would pay itself off in 1.77 years.
VG AEP
Increase
Example
VG Install Cost
$10,000
2.20%
MWh
Increase
60 WTG
windfarm
60
112
Average
price per MWh
Site-wide
VG install
$600,000
$50
Revenue per
turbine/year
Revenue
per year
$338,223
$5,637
Positive
ROI
1.77
Years
*CF: Capacity Factor based on UpWind averages on 5 GE 1.5 SLE wind farms over 12 months.
PROJECT YOUR
Calculate
Calculate
AEP
NOW
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
Importance of Accurate
Data Analysis
VG AEP Delta Model
CNTRL WTG
MET-MAST
VG WTG
Data Aquisition
1-10 second data intervals
Data Validation
Valid wind sector?
Turbine in normal power generation mode?
False
True
Data Normalization
Computation of air density
Normalization of nacelle anemometer wind speeds
False
True
(CTRL WTG)
(VG WTG)
AEP Estimation
AEP Estimation
(CTRL WTG)
(VG WTG)
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
980
960
940
920
900
880
860
840
820
01-Jan-11
01-Mar-11
01-May-11
01-Jul-11
01-Sep-11
Data Normalization
The wind speed was normalized using the meteorological data from MET tower.
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
The AEP of the WTG is estimated by application of the power curve to the measured wind speed
probability distribution of the site.
[AEP = T O(U)f(U)dU]
where P(U) is the Power Curve, f(U) is the probability density function of the wind speed and T is
the number of hours that the turbine is available within a year.
Repeatability
The UpWind team has successfully been
able to complete the VG installations with
high quality standards and in an efficient
and repeatable manner. Using a repeatable
process ensured quality was not sacrificed
due to speed and vice versa.
Quality control is essential to ensure a long
lifetime for the VG and long-term returns on
investment. UpWind utilizes a 35 point quality
checklist with photo documentation of key
steps to allow highly detailed quality auditing.
We use a template to enable a quick and
repeatable installation process with proven
2-10 millimeter accuracy that improves both
quality and speed.
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
Improving VG Lifetime
To install the VGs, rope access technicians apply a durable, proprietary rapid curing adhesive tape
created by 3M, an industry leader in adhesive technology. The self-adhesive tape assures firm
bonding of the VG on the blade even in extreme climates.
Materials
Durability
Historically, a problem with VGs has been fins weakening, cracking or breaking in harsh conditions.
This failure has been completely eliminated within the first year even in extreme weather
conditions. One VG site in New York had zero damage to VG fins despite the record breaking cold
temperatures, ice, and wind speeds through the first winter. A competitors VG solution on the
same site showed significant breakage of fins. UV degradation is one root cause of fin breakage due
to brittleness. UpWind wanted a material that could last 10-20 years so we worked to find the best
matching plastic and adhesive. Once we found the best weathering-resistant and UV-stable plastic,
we discovered our original tape selection didn't perform to our standards. We had to institute
additional surface prep on the plastic so that the bonding between the adhesive and the VG is
matching the demanding requirements demonstrating a superior durability.
Adhesives
Adhesive to blade
With the 1st generation of VGs we observed 1 out of 22,000
installs in 2013 that detached. This single VG detachment
occurred at the lowest region where centripetal forces are
the highest. In addition, the VGs have performed well
where there have been significant icing events.
Although the goal of a VG install is to have no loss during
the life of the turbine, according to parametric load
simulations, a loss of 10% of the VGs of one blade in a row
or 13% spread along the VG installation line is allowable
before the turbine is required to stop and be re-equipped
with VGs.
Adhesive to VG
At the end of 2013 we selected a new gray plastic so that the VGs would not negatively contrast
with the blades and to improve UV tolerance. The plastic selected did not exhibit the same reliable
bond between the VG and the adhesive. After further testing and root cause analysis, we were
able to modify the surface preparation so that the bond matched the reliable bond between the
adhesive and the blade, optimizing both the VG plastic against UV degradation, improving adhesive
bonding, and limiting the contrast with the blade.
Share this Ebook.
Page 9
www.upwindsolutions.com
2014 UpWind Solutions, Inc.
C A S E S T U DY
PROJECT YOUR
Calculate
Calculate
AEP
NOW
www.upwindsolutions.com
2014 UpWind Solutions, Inc.