Вы находитесь на странице: 1из 2

Federal Register / Vol. 71, No.

1 / Tuesday, January 3, 2006 / Notices 115

Docket No. Date received Presenter or requester

1. Project Nos. 2539–000 and 12522–000 ............................................................................. 12–7–05 Kristin LaChappelle.


2. Project Nos. 2539–000 and 12522–000 ............................................................................. 12–19–05 Sister Joanne St. Hilaire.
Exempt:
1. CP04–411–000 .................................................................................................................... 12–16–05 David L. Scott.
2. CP05–412–000 .................................................................................................................... 12–16–05 Herman Der.
3. ER05–1522–000, ER05–1533–000 .................................................................................... 11–30–05 Hon. Arnold
Schwarzenegger.
4. Project No. 2630–004 ......................................................................................................... 12–20–05 David Leonhardt.

Magalie R. Salas, revealed that a number of public listed in the caption of this order has
Secretary. utilities that previously had been met those obligations.5
[FR Doc. E5–8160 Filed 12–30–05; 8:45 am] granted authority to sell power at 7. Accordingly, this order notifies
BILLING CODE 6717–01–P market-based rates have failed to file those public utilities that their market-
Electric Quarterly Reports in 2005. based rate authorizations will be
Accordingly, this order notifies those revoked unless they comply with the
DEPARTMENT OF ENERGY public utilities that their market-based Commission’s requirements within 15
rate authorizations will be revoked days of the issuance of this order.
Federal Energy Regulatory unless they comply with the 8. In addition, the above-captioned
Commission Commission’s requirements. companies’ failure to comply with their
3. In Order No. 2001, the Commission Electric Quarterly Report filing
Order on Intent To Revoke Market- requirements provides a basis for the
Based Rate Authority stated that,
Commission to institute a proceeding
[i]f a public utility fails to file a[n] Electric under section 206 of the FPA, to
Issued December 22, 2005. Quarterly Report (without an appropriate
Before Commissioners: Joseph T. Kelliher, determine whether these companies
request for extension), or fails to report an
Chairman; Nora Mead Brownell, and agreement in a report, that public utility may may continue to make wholesale power
Suedeen G. Kelly forfeit its market-based rate authority and sales at market-based rates and whether
In the matter of: ER02–2001–004, ER04– may be required to file a new application for any refunds would be appropriate. In
0292–000, ER04–0646–000, ER02–0388–000, market-based rate authority if it wishes to cases where, as here, the Commission
ER03–0827–000, ER98–4301–000, ER02– resume making sales at market-based rates.2 institutes a section 206 investigation on
1324–000, ER03–0182–000, ER03–0261–000, 4. The Commission further stated that, its own motion, section 206(b) of the
Electric Quarterly Reports, Bravo Energy FPA, as recently amended by section
Resources, LLC, Core Equities, Inc., HC [o]nce this rule becomes effective, the
requirement to comply with this rule will 1285 of the Energy Policy Act of 2005,6
Power Marketing, Maxim Energy Partners,
LLC, Mountainview Power Company, Mt. supersede the conditions in public utilities’ requires that the Commission establish
Carmel Cogen, Inc., Phoenix Energy market-based rate authorizations, and failure a refund effective date that is no earlier
Associates, L.L.C., USP&G (Pennsylvania), to comply with the requirements of this rule than the date of publication of notice of
Ltd. will subject public utilities to the same its initiation of the investigation, but no
consequences they would face for not later than five months subsequent to
1. Section 205 of the Federal Power satisfying the conditions in their rate
Act (FPA), 16 U.S.C. 824d (2000), and that date. Consistent with our general
authorizations, including possible revocation policy,7 we will set the refund effective
18 CFR part 35 (2005), require, among of their authority to make wholesale power
other things, that all rates, terms and sales at market-based rates.3
date as the date publication of notice of
conditions of jurisdictional services be its initiation of the investigation.
5. Pursuant to these requirements, the 9. In the event that any of the above-
filed with the Commission. In Order No. Commission has revoked or withdrawn
2001, which established revised public captioned market-based rate sellers have
the market-based rate tariffs of several
utility filing requirements for rates, market-based rate sellers that failed to 5 According to the Commission’s records, the
terms and conditions of jurisdictional submit their Electric Quarterly Report.4 companies subject to this order last filed their
services, the Commission required Electric Quarterly Reports in the quarters and years
6. Commission staff review of the
public utilities, including power shown below:
marketers, to file, among other things, Electric Quarterly Report submittals has Bravo Energy Resources, LLC, Docket No. ER04–
Electric Quarterly Reports summarizing identified a number of public utilities 0292–000, 2004, Quarter 3.
the contractual terms and conditions in that previously had been granted Core Equities, Inc., Docket No. ER04–0646–000,
their agreements for all jurisdictional authority to sell power at market-based 2004, Quarter 3.
rates that have failed to file Electric HC Power Marketing, Docket No. ER02–0388–
services (including market-based power 000, 2003, Quarter 4.
sales, cost-based power sales, and Quarterly Reports. Commission staff has
Maxim Energy Partners, LLC, Docket No. ER03–
transmission service) and transaction made a concerted effort to contact the 0827–000, 2004, Quarter 1.
information (including rates) for short- non-filing utilities listed in the caption Mountainview Power Company, Docket No.
term and long-term power sales during to remind them of their regulatory ER98–4301–000, 2002, Quarter 4.

the most recent calendar quarter.1 obligations. None of the public utilities Mt. Carmel Cogen, Inc., Docket No. ER02–1324–
000, 2002, Quarter 4.
2. Commission staff review of the Phoenix Energy Associates, L.L.C., Docket No.
2 Order No. 2001, at P 222.
Electric Quarterly Report submittals has ER03–0182–000, 2004, Quarter 2.
3 Id.
at P 223. USP&G (Pennsylvania), Ltd., Docket No. ER03–
1 Revised Public Utility Filing Requirements, 4 See Intent to Revoke Market-Based Rate 0261–000, 2003, Quarter 4.
bjneal on PROD1PC70 with NOTICES

6 Energy Policy Act of 2005, Public Law No. 109–


Order No. 2001, 67 Fed. Reg. 31043, FERC Stats. & Authority, 107 FERC ¶ 61,310 (2004); Notice of the
Regs. ¶ 31,127 (April 25, 2002), reh’g denied, Order Revocation of Market-Based Rate Tariffs, et al., 69 58, 119 Stat. 594 (2005).
No. 2001–A, 100 FERC ¶ 61,074, reconsideration Fed. Reg. 57,679 (September 27, 2004); Intent to 7 See, e.g., Seminole Electric Cooperative, Inc. v.

and clarification denied, Order No. 2001–B, 100 Withdraw Market-Based Rate Authority, 104 FERC Florida Power & Light Co., 65 FERC ¶ 61,413 at
FERC ¶ 61,342, order directing filings, Order No. ¶ 61,139 (2003); and Order on Market-Based Rates, 63,139 (1993); Canal Electric Co., 46 FERC ¶ 61,153
2001–C, 101 FERC ¶ 61,314 (2002). 105 FERC ¶ 61,219 (2003). at 61,539, reh’g denied, 47 FERC ¶ 61,275 (1989).

VerDate Aug<31>2005 15:18 Dec 30, 2005 Jkt 208001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\03JAN1.SGM 03JAN1
116 Federal Register / Vol. 71, No. 1 / Tuesday, January 3, 2006 / Notices

already filed their required Electric DEPARTMENT OF ENERGY Letter is non-public material. The
Quarterly Reports in compliance with Commission’s eFiling system is not
the Commission’s requirements, its Federal Energy Regulatory ready to accept non-public material at
inclusion herein is inadvertent. Any Commission this time and therefore, it is not
such market-based rate seller is available for the filing of requests for
[Docket No. PL06–4–000]
directed, within 15 days of the date of No-Action Letter.
issuance of this order, to identify itself Informal Staff Advice on Regulatory [FR Doc. E5–8178 Filed 12–30–05; 8:45 am]
and provide details about its prior Requirements; Notice of New Docket BILLING CODE 6717–01–P
filings that establish that it complied Prefix ‘‘NL’’ and Guidelines for Filing
with the Commission’s Electric Request for No-Action Letter
Quarterly Report filing requirements. ENVIRONMENTAL PROTECTION
December 27, 2005.
10. If any of the above-captioned AGENCY
On November 18, 2005, the
market-based rate sellers does not wish
Commission issued an Interpretive [EPA–HQ–ORD–2005–0553; FRL–8016–5]
to continue having market-based rate Order Regarding No-Action Letter
authority and does not foresee entering Process 1 in Docket PL06–4–000. Notice Request for Nominations for a Human
into any contracts to sell power at is hereby given that the Commission has Studies Review Board
market-based rates, it may file a notice established a new docket prefix ‘‘NL’’ to
of cancellation with the Commission AGENCY: Environmental Protection
identify issuances related to No-Action Agency (EPA).
pursuant to section 205 of the FPA to Letters.
cancel its market-based rate tariff and ACTION: Notice.
The prefix will have the format
relieve it of its obligation to submit NLFY–NNN–000, where ‘‘FY’’ stands SUMMARY: The U.S. Environmental
further Electric Quarterly Reports. for the fiscal year in which the request Protection Agency (EPA or Agency)
The Commission Orders for No-Action Letter was received by the Office of the Science Advisor (OSA) is
Commission and ‘‘NNN’’ is a sequential soliciting nominations of qualified
(A) Within 15 days of the date of number. individuals to serve on a proposed
issuance of this order, each public The Commission is also issuing with Human Studies Review Board (HSRB).
utility listed in the caption of this order this notice guidelines for filing requests The Agency anticipates establishment of
shall file all delinquent Electric for No-Action Letter. The guidelines are such a board to provide advice and
Quarterly Reports. If a public utility available on http://www.ferc.gov under recommendations on issues related to
fails to make this filing, the Commission the Documents and Filing tab. the scientific and ethical review of
will revoke that public utility’s Magalie R. Salas, human subjects research. EPA was
authority to sell power at market-based Secretary.
directed to establish such a Board
rates and terminate its electric market- pursuant to the 2006 EPA
based rate tariff. Upon expiration of the Filing Guidelines for Requests for No- Appropriations Act and included such a
filing deadline in this order, the Action Letter Board in a proposed rule for protection
Secretary shall promptly issue a notice, What to Submit: Submit one original of subjects in human research. See:
effective on the date of issuance, listing and two paper copies of the request, ‘‘Department of Interior, Environment,
the public utilities whose tariffs have along with a text-searchable file (or and Related Agencies Appropriations
been revoked. files) on a 31⁄4’’ diskette or CD–ROM. Act, 2006’’, Public Law No. 109–54 and
Each page of the request and any ‘‘Protections for Subjects in Human
(B) Pursuant to the authority
supporting information or documents Research: Proposed Rule,’’ 70 FR
contained in and subject to the
should include a header or footer stating 53,838; September 12, 2005.
jurisdiction conferred upon the Federal
‘‘Request for No-Action Letter.’’ DATES: Nominations should be
Energy Regulatory Commission by
section 402(a) of the Department of Contact Info: Each request must submitted to EPA no later than February
Energy Organization Act and by the include the name, address, telephone 2, 2006.
Federal Power Act, particularly section number, and e-mail address of the ADDRESSES: Submit your nominations
206 thereof, and pursuant to the person to whom the response should be (‘‘comments’’), identified by Docket ID
Commission’s Rules of Practice and directed. No. EPA–HQ–ORD–2005–0553, by one
Procedure and the regulations under the Where to Submit: Send your request of the following methods:
Federal Power Act (18 CFR Chapter I), to: Federal Energy Regulatory • http://www.regulations.gov: Follow
the Commission hereby institutes a Commission, Office of the General the on-line instructions for submitting
proceeding to determine whether the Counsel, Room 10A–01, ATTN: Request comments.
for No-Action Letter, 888 First Street, • E-mail: ORD.Docket@epa.gov.
above-captioned companies may
NE., Washington, DC 20426. • Mail: ORD Docket, Environmental
continue to make wholesale power sales
Use express mail or courier services to Protection Agency, Mailcode: 28221T,
at market-based rates and whether any 1200 Pennsylvania Ave., NW.,
refunds would be appropriate, as submit a Request for No-Action Letter to
FERC. Regular mail sent through the US Washington, DC 20460.
discussed in the body of this order. • Hand Delivery: EPA Docket Center
Postal Service to the Commission is
(C) The Secretary is hereby directed to subject to a 7–10 day delay for scanning. (EPA/DC), Room B102, EPA West
publish this order in the Federal The scanning process also may destroy Building, 1301 Constitution Avenue,
Register. any diskettes and CD–ROMs included in NW., Washington, DC 20460, Attention
By the Commission. the submittal. Docket ID No. EPA–HQ–ORD–2005–
bjneal on PROD1PC70 with NOTICES

The Commission determined that, at 0553. Deliveries are only accepted from
Magalie R. Salas,
least initially, a Request for No-Action 8:30 a.m. to 4:30 p.m., Monday through
Secretary. Friday, excluding legal holidays.
[FR Doc. E5–8159 Filed 12–30–05; 8:45 am] 1 Interpretive Order Regarding No-Action Letter Special arrangements should be made
BILLING CODE 6717–01–P Process, 113 FERC ¶ 61,174 (2005). for deliveries of boxed information.

VerDate Aug<31>2005 15:18 Dec 30, 2005 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\03JAN1.SGM 03JAN1

Вам также может понравиться