Академический Документы
Профессиональный Документы
Культура Документы
MPS-FM-003
Issue: 0
Issue Date: 20.09.2010
DURA
TION
6 AM
0
30
7 AM
0
30
8 AM
0
30
9 AM
0
30
10 AM
0
30
11 AM
0
30
12 PM
0
30
1 PM
0
30
2 PM
0
30
3 PM
0
30
4 PM
0
30
5 PM
0
30
6 PM
0
30
7 PM
0
30
8 PM
0
30
9 PM
0
10 hrs
EAF
0 hrs
0 hrs
Sun Sep 20
DEPT
7:00 AM
EAF STOP
EAF START
5:00 PM
11 hrs
CCM
0 hrs
0 hrs
CCM STOP
9:00 AM
CCM START
8:00 PM
7
8
CRANES
10.03 hrs
9 hrs
10
Crane 102 PM
3 hrs
11
Crane 102 PM
3 hrs
CR M
12
Crane 102 AC PM
3 hrs
M/E/CWS
13
2 hrs
14
4 hrs
CR-Elect
CR Mech
AC sec
9:00 AM
1:00 PM
CR-Elect
15
Crane 103 AC PM
2 hrs
16
Crane #106 AC PM
2 hrs
17
8 hrs
CR-M
AC Sect
AC sec
18
CR Mech
8 hrs
Contractor
19
20
22
23
24
21
10.03 hrs
10.03 hrs
1.5 hrs
:00 AM
8:30 AM
Operation
3 hrs
1 hr
2 hrs
Wellgate
E&A
Prepared By:
S.Sundaram
Maint. Planner
Approved By:
Alvin D'souza
Supervisor- Maint. Planning
1
Thu 9/17/15 2:00 PM
Doc. MPS-FM-003
Issue: 0
Issue Date: 20.09.2010
DURA
TION
DEPT
0.5 hrs
2 hrs
4 hrs
0.5 hrs
2 hrs
4 hrs
M/CWS
6 hrs
8 hrs
M/CWS
7 hrs
1 hr
2 hrs
36
7 hrs
37
Inclinometer fixing
3 hrs
E/CWS
38
4 hrs
39
6 hrs
40
0.5 hrs
41
Scraps charging
0.5 hrs
42
0 hrs
M/E/O
43
LRF
25
Scaffolding to be removed.
26
Sun Sep 20
6 AM
0
30
7 AM
0
30
8 AM
0
30
9 AM
0
30
10 AM
0
30
11 AM
0
30
12 PM
0
30
1 PM
0
30
2 PM
0
30
3 PM
0
30
4 PM
0
30
5 PM
0
30
6 PM
0
30
7 PM
0
30
8 PM
0
30
9 PM
0
Wellgate
27
28
Wellgate
Hyd
Wellgate
29
30
Mech Gr. C
Mech Gr. C/ CWS IW Gr 1
31
32
33
34
Mech Gr. C
Mech Gr. C / CWS IW Gr 2
Hyd
Hyd
35
Hyd
E&A
E&A /CWS IW Gr 2
M /CWS IW Gr 1
E&A
Operation
44
45
46
Operation
Operation
8.03 hrs
8 hrs
6 hrs
2 hrs
2 hrs
1 hr
Hyd
Mech Gr G
Wellgate
47
48
Mech Gr. C
Wellgate
Prepared By:
S.Sundaram
Maint. Planner
Approved By:
Alvin D'souza
Supervisor- Maint. Planning
2
Thu 9/17/15 2:00 PM
Doc. MPS-FM-003
Issue: 0
Issue Date: 20.09.2010
50
FTP
DURA
TION
DEPT
1 hr
Sun Sep 20
6 AM
0
30
7 AM
0
30
8 AM
0
30
9 AM
0
30
10 AM
0
30
11 AM
0
30
12 PM
0
30
1 PM
0
30
2 PM
0
30
3 PM
0
30
4 PM
0
30
5 PM
0
30
6 PM
0
30
7 PM
0
30
8 PM
0
30
9 PM
0
Mech Gr. C
5 hrs
51
3 hrs
52
2 hrs
Mech Gr G
53
54
55
56
57
Material Handling
58 BILLET CASTER
E&A
8 hrs
2 hrs
2 hrs
2 hrs
2 hrs
Mech Gr D
Mech Gr D
Mech Gr D
Mech Gr D
11.03 hrs
4 hrs
4 hrs
61
4 hrs
62
4 hrs
63
4 hrs
64
2 hrs
O/M
65
9 hrs
O/M/CWS
66
4 hrs
67
8 hrs
68
8 hrs
M/CWS
2 hrs
70
5 hrs
M/CWS
71
5 hrs
M/CWS
59
60
Operation
Operation
Operation
Operation
Operation
Wellgate
CWS FIN GR 4
69
Mech GR B
Mech GR B
CWS IW Gr 3
Wellgate
Prepared By:
S.Sundaram
Maint. Planner
Approved By:
Alvin D'souza
Supervisor- Maint. Planning
3
Thu 9/17/15 2:00 PM
Doc. MPS-FM-003
Issue: 0
Issue Date: 20.09.2010
DURA
TION
DEPT
Sun Sep 20
6 AM
0
30
72
Scaffolding removaL
1 hr
73
4 hrs
74
4 hrs
8 hrs
M/CWS
2 hrs
4 hrs
3 hrs
2 hrs
4 hrs
M/CWS
81
4 hrs
M/CWS
82
3 hrs
83
6 hrs
84
2 hrs
4 hrs
7 AM
0
30
8 AM
0
30
9 AM
0
30
10 AM
0
30
11 AM
0
30
12 PM
0
30
1 PM
0
30
2 PM
0
30
3 PM
0
30
4 PM
0
30
5 PM
0
30
6 PM
0
30
7 PM
0
30
8 PM
0
30
9 PM
0
Wellgate
E&A
75
76
77
78
Mech GR B
Mech GR B/ CWS IW Gr
E&A
Mech GR B
Mech GR B
79
80
Mech GR B
CWS Fin Gr 3/ CWS IW Gr 5
CWS Fin Gr 3/ CWS IW Gr 5
Mech GR B
Mech GR B
Mech GR B
E&A
8 hrs
87
C-3 CONVEYOR PM
4 hrs
MH-M
88
HAC-2 PM
4 hrs
MH-M
89
C-3 & 4 & RSC-1 Inspection of the side skirt rubber replaced
idf required
C-3 & 4, HAC-2 and RSC-1 Cleaning of the Drive and Tail
Station
8 hrs
MH-M
6 hrs
MH Mech'l G-1
MH Mech'l G-1
90
91 Utility
92
MH Mech'l G-2
Operation
8 hrs
8 hrs
U/CWS
Utility/ CWS Fin Gr 5
Prepared By:
S.Sundaram
Maint. Planner
Approved By:
Alvin D'souza
Supervisor- Maint. Planning
4
Thu 9/17/15 2:00 PM