Mr. Balasubramaniyam
Member 3:
Assessment Date:
Last review date:
Next review date:
Approved By :
Signature
HAZARD IDENTIFICATION
S.N.
Work Activity
(Job steps in sequence)
Consequence
(Possible injury/Ill-Health/
Persons-at-Risk &
Environmental)
Hazards
1. Caving
2. Pit collapses
1
Excavation
3.
Excavator topple
Rebar placing
1. Serious injury
Form work
2. Tripping /
Slipper / Pock with sharp edges
1. Health hazard
1. Asphyxiation / skin diseases
2. Person hit by material dragging
Serious injuries
bucket
3.
3. Human body burn
Electrocution
1. Serious injury
property damage
3. Form work give way
2.
2.
1. Tripping
2. Serious injury
3. Occupational Health
issues
4. Formwork collapse
1. Serious injuries
2. Person hit by the objects
7
De shuttering
3. Formwork material falling from
height
Tower erection
10
11
Material handling
1.Serious injuries
2.
Lifting failure
3. Material
falling
4. Vehicle
collision
1. Serious injuries
2. Dramatics
2.
12
Instrumentation of installation
1. Serious injuries
2.
Material falling from height
13
1. Serious injuries
2.
Material falling from height
14
GENERAL NOTES:
1- BGRE Work Package (Work permit, Pre job briefing, Method statem
shall be obtained for all works prior to start, in any works which req
shall be obtained.30:31
2-All persons must be Safety Inducted.
3-Mandatory PPEs are Safety helmet, Hard toe safety shoes/Gum Bo
vest, Full/half sleeve (at least 4 inch long) shirt ,Full length pant/trou
4-Probability, Severity & risk Table is attached for reference
RISK EVALUATION
Risk Level (Low- L;
Medium- M; High- H)
Rev. No.:
Ref. No. :
???
d.
, Hard toe safety shoes/Gum Boot, Safety glasses, Reflective
long) shirt ,Full length pant/trousers
attached for reference
RISK CONTROL
Residual Risk (LowL; Medium- M;
High- H)
Person responsible