Академический Документы
Профессиональный Документы
Культура Документы
MerchandisingRecieving
the
techpack
from
buyer
and
receiving the order
on the basis of
buying sample.
After
buying
sample
approval
Fit sample is sent
to buyer on the
basis
of
which
buyer appoves P.O.
PPCPre
Production Meeting
to
discuss
the
production
files
with Merchant and
go ahead for Pilot
sampling.
Washing- Pieces
sent to washing
after Kaj button
and the washed as
per
approved
recipe for washing,
lot wise.
Packing- Again after
100% audit the pieces
are sent for packing,
here
pieces
are
packed as per buyer
requirements
with
given packing trims
Sewing-Producing
arments from cut
panels
through
progressive bundle
system. Inspection
of
pieces
at
endline
and
dispatch area.
Other
types
of
defects
are
mended
in
finishing
room,
then the pieces are
sent
for
initial
checking, pressing
and
then
final
checking.
Buyer
Audit
and
dispatchAfter
packing pieces are
sent to Buyer QA for
approval
of
the
shipment at AQL
and then dispatched
in container.
Store:
Fabric Inhouse
Temprory
stored on
pallets
fabric
inspection
Cutting:
Temprory
stored on
racks
issued to
cutting/washi
ng
Sewing:
Production sample recieved
Line planning
Line setting
Piece feeding
sewing
inline inspection
end line inspection
Quality Audit
issued to washing/finishing
Finishing:
lot recieved from sewing/washing
sorting
inspection
alteration
spotting
button marking
buton sew
lable/tag attatchment
Auditing
issued to packing
Packing:
lot recieved from finishing
passed through needle testing machine
size wise sorting
piece packing
carton packing
final auditing
dispatch to delivery
Description
Sewing Machines
Production Per day
Racks(1x0.5)
Sewing Floor 2
Capacity
300
1900 pcs
200
Description
Sewing Machines
Production Per day
Racks(1x0.5)
Sewing Floor 1
Capacity
300
2500 pcs
200
Description
Sewing Machines
Description
Cutting Tables
Capacity
Description
Trolley
Racks (2x3)
Racks (4x4.2)
Production
Quality
Finishing
Washing
Packing
HR
Maintenance
Store
IE
Cutting
IT
353
26
112
9
12
4
3
7
7
29
1