Академический Документы
Профессиональный Документы
Культура Документы
This workbook forms part of AKMX's approach to Advanced Life Cycle Asset Management.
Background:
This spreadsheet provides a framework within which life cycle costs associated with a project can be developed and projected. The level of detail and analysis
available through this Tool has been set at level 2, meaning that it is more than a basic framework model but less than one incorporating exhaustive detail
(although it can accomodate an unlimited level of detail should the user with to modify the layout by adding rows to relevant categories of cost).
Aim: Assist the evaluation of project options by the typical asset manager by facilitating life cycle cost analysis of each option at a reasonable level of detail.
Available WorksheeThis spreadsheet provides six types of worksheets based upon user inputs and associated outputs:
HELP - Discusses and outlines the major components of this spreadsheet
Project Basics - Characterizes the project and options being analyzed, including expected start date and duration
Options - A standardized sheet is available for each project option to document costs (note: the user may add worksheets through Excel's insert, then copy and paste functions)
Project Analysis Summary - a summary presentation of the various options developed in the Tool
Average Annual Costs Chart - a summary graphic depiction of the average annualized and annuitized costs of each option
LCC Comparison Chart - Outlines the life cycle costs derived for this option
Instruction:
Definitions:
1. Select The Project Basics sheet, complete the details for the project and for each option being considered.
2. Complete the relevant sections of the Costs sections for each option, on the respective sheet.
3. Review the summary data at the bottom of each option sheet.
4. Review the Summary Analysis, Average Costs Chart, and LCC Comparison Chart sheets to review all project options together.
5. Recommend activities which can be undertaken to provide the greatest improvement.
Average Annualized Costs - Calculations (discounted and undiscounted) to enable comparison of project options of different duration to be compared
against each
other.
Analysis
Period
- Total expected life of project starting when work is expected to commence plus design, construction and commissioning, plus the design
life of treatments considered for an option.
LCC - Life Cycle Cost
PROJECT OPTIONS
Option Number
Number of Years
to Analyze
Shunk
2016
10
Telsonic
2016
10
Branson
2016
10
Shunk
1
COST COMPONENTS
A. Capital Cost
A.1 Planning
1: Shunk
DESCRIPTIONS
A.2 Environmental
A.3 Design
- Conceptual design
- Detailed Engineering Design
A.5 Construction
- Construction costs
- Construction Management cost
A.6 Close-Out
TOTALS
Detail by Year
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
The capit al costs include all costs associated with the planning, design, implement at ion and
commissioning of t he projec t in question.
- Feasibility study
$
- Permit
$
- Equipment
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total A $
(150,000) - 150,000
(150,000) - 150,000
OPTION DETAILS
Description:
Option Number:
Shunk
1
B. Operating Costs
The operat ing costs include all costs associat ed with the ongoing operations of the projec t onc e it is
commissioned.
B.1 Labor
Associate
CFE
Stapla technician
1: Shunk
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
(66,000) - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000
(11,000) - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000 - 1,000
(110,000) - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000 - 10,000
(1,650) 150 150 150 150 150 150 150 150 150 150 150
(1,500)
- 300 300 300 300 300
-
OPTION DETAILS
Description:
Option Number:
Shunk
1
1: Shunk
Sub-total B $
C. Maintenance
Costs
Labor technician
Downtime
C.2 Preventative
maintenance
(190,150) - 17,150 - 17,150 - 17,150 - 17,150 - 17,150 - 17,150 - 17,450 - 17,450 - 17,450 - 17,450 - 17,450
Spares (Filters)
Labor technician
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total C $
D. Renewal Costs
Include anticipated major repair ( repair not funded through Maintenance funds) and rehabiltation
costs in this it em if relevant to the analysis ; s how in t he year expect ed if single disbursement or as
debt s ervice as relevant .
Change Generator
D.2 Refurbishment
The maintenanc e cost s cover all t he costs associated with ongoing maintenanc e of the project .
Include basic rehabilitation costs in this it em.
$
$
$
$
$
$
Sub-total D $
(30,000)
(30,000)
100 500 -
200
50
100 500 -
100 500 -
100 500 -
200
50
100 500 -
100 500 -
100 500 -
200
50
100 500 -
100
500
- 15,000
- 15,000
- 15,000
- 15,000
OPTION DETAILS
Description:
Option Number:
Shunk
1
E. Disposal Costs
Costs associated with disposal of the asset at the end of the design life.
F. Other Costs
Item 1
Item 2
Item 3
Item 4
Item 5
OPTION SUMMARY
1: Shunk
20,000
$
$
Sub-total E $
20,000
$
$
$
$
$
$
$
$
$
$
Sub-total F $
20,000
20,000
OPTION DETAILS
Description:
Option Number:
Total Costs:
PV Total Costs:
Cumulative Costs:
Years of Analysis:
Average Annualized Costs
(Undiscounted):
Shunk
1
1: Shunk
$
$
34,350 29,740 -
34,600 25,937 -
34,350 22,294 -
49,350 27,731 -
34,600 16,833 -
34,650 14,595 -
34,650 12,637 -
34,900 11,020 -
49,650 13,573 -
14,650
3,468
- 184,350 - 218,700 - 253,300 - 287,650 - 337,000 - 371,600 - 406,250 - 440,900 - 475,800 - 525,450 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 -
540,100 -
540,100 -
540,100 -
540,100 -
540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100
10
(54,010)
PV of Tot al Costs / Number of years of analys is. The lower the value the bett er.
(36,218)
(73,545)
CHART DATA
1
2
3
4
5
6
7
8
9
10
11
Year number
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Year
Costs by year $ (184,350) $ (34,350) $ (34,600) $ (34,350) $ (49,350) $ (34,600) $ (34,650) $ (34,650) $ (34,900) $ (49,650) $ (14,650)
Cummulative Costs by year $ (184,350) $ (218,700) $ (253,300) $ (287,650) $ (337,000) $ (371,600) $ (406,250) $ (440,900) $ (475,800) $ (525,450) $ (540,100)
PV of $1 at a point in time
Average annualized (undiscounted) costs $
SUMMARY CHART
1: Shunk
$2016
2017
2018
2019
2020
2021
2022
2023
$(100,000)
$(200,000)
$(300,000)
$(400,000)
$(500,000)
$(600,000)
Cost by Year
Cumulative Cost
2024
2025
2026
1.000
(54,010) $
0.866
(54,010) $
0.750
(54,010) $
0.649
(54,010) $
0.562
(54,010) $
0.487
(54,010) $
0.421
(54,010) $
0.365
(54,010) $
0.316
(54,010) $
0.27
(54,010) $
0.24
(54,010)
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.20
#N/A
0.18
#N/A
0.15
#N/A
0.13
#N/A
0.12
#N/A
0.10
#N/A
0.09
#N/A
0.07
#N/A
0.06
#N/A
0.06
#N/A
0.05
#N/A
0.04
#N/A
0.04
#N/A
0.03
#N/A
0.03
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
- 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100 - 540,100
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
Telsonic
2
COST COMPONENTS
A. Capital Cost
A.1 Planning
2: Telsonic
DESCRIPTIONS
A.2 Environmental
A.3 Design
- Conceptual design
- Detailed Engineering Design
A.5 Construction
- Construction costs
- Construction Management cost
A.6 Close-Out
TOTALS
Detail by Year
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
The capit al costs include all costs associated with the planning, design, implement at ion and
commissioning of t he projec t in question.
- Feasibility study
$
- Permit
$
- Equipment
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total A $
(100,000) - 100,000
(100,000) - 100,000
OPTION DETAILS
Description:
Option Number:
Telsonic
2
B. Operating Costs
The operat ing costs include all costs associat ed with the ongoing operations of the projec t onc e it is
commissioned.
B.1 Labor
Associate
CFE
Telsonic technician
2: Telsonic
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
(66,000) - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000
(198,000) - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000 - 18,000
(2,200) 200 200 200 200 200 200 200 200 200 200 200
-
OPTION DETAILS
Description:
Option Number:
Telsonic
2
2: Telsonic
Sub-total B $
C. Maintenance
Costs
Labor technician
Downtime
C.2 Preventative
maintenance
Spares (Filters)
Labor technician
D. Renewal Costs
D.1 Major repair
D.2 Refurbishment
(266,200) - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200 - 24,200
The maintenanc e cost s cover all t he costs associated with ongoing maintenanc e of the project .
Include basic rehabilitation and renewal costs in this it em.
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total C $
100 500 -
200
50
100 500 -
100 500 -
100 500 -
100 500 -
100 500 -
100
500
-
Include anticipated major repair ( repair not funded through Maintenance funds) and rehabiltation
costs in this it em if relevant to the analysis ( seeTool, Step 2 Box 2.2 for discussion) ; show in t he year
expected if s ingle disbursement or as debt s ervice as relevant.
$
$
$
$
$
$
Sub-total D $
(30,000)
(30,000)
- 15,000
- 15,000
- 15,000
- 15,000
OPTION DETAILS
Description:
Option Number:
Telsonic
2
E. Disposal Costs
Costs associated with disposal of the asset at the end of the design life.
F. Other Costs
Item 1
Item 2
Item 3
Item 4
Item 5
OPTION SUMMARY
2: Telsonic
500
500
$
$
Sub-total E $
500
500
$
$
$
$
$
$
$
$
$
$
Sub-total F $
OPTION DETAILS
Description:
Option Number:
Total Costs:
PV Total Costs:
Cumulative Costs:
Years of Analysis:
Average Annualized Costs
(Undiscounted):
Telsonic
2
2: Telsonic
$
$
36,650 31,732 -
36,900 27,661 -
36,650 23,786 -
51,650 29,023 -
36,900 17,952 -
36,650 15,438 -
36,650 13,366 -
36,900 11,651 -
51,650 14,120 -
36,150
8,556
- 136,650 - 173,300 - 210,200 - 246,850 - 298,500 - 335,400 - 372,050 - 408,700 - 445,600 - 497,250 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 -
533,400 -
533,400 -
533,400 -
533,400 -
533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400
10
(53,340)
PV of Tot al Costs / Number of years of analys is. The lower the value the bett er.
(32,993)
(66,998)
CHART DATA
1
2
3
4
5
6
7
8
9
10
11
Year number
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Year
Costs by year $ (136,650) $ (36,650) $ (36,900) $ (36,650) $ (51,650) $ (36,900) $ (36,650) $ (36,650) $ (36,900) $ (51,650) $ (36,150)
Cummulative Costs by year $ (136,650) $ (173,300) $ (210,200) $ (246,850) $ (298,500) $ (335,400) $ (372,050) $ (408,700) $ (445,600) $ (497,250) $ (533,400)
PV of $1 at a point in time
Average annualized (undiscounted) costs $
SUMMARY CHART
2: Telsonic
$2016
2017
2018
2019
2020
2021
2022
2023
$(100,000)
$(200,000)
$(300,000)
$(400,000)
$(500,000)
$(600,000)
Cost by Year
Cumulative Cost
2024
2025
2026
1.000
(53,340) $
0.866
(53,340) $
0.750
(53,340) $
0.649
(53,340) $
0.562
(53,340) $
0.487
(53,340) $
0.421
(53,340) $
0.365
(53,340) $
0.316
(53,340) $
0.27
(53,340) $
0.24
(53,340)
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.20
#N/A
0.18
#N/A
0.15
#N/A
0.13
#N/A
0.12
#N/A
0.10
#N/A
0.09
#N/A
0.07
#N/A
0.06
#N/A
0.06
#N/A
0.05
#N/A
0.04
#N/A
0.04
#N/A
0.03
#N/A
0.03
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
- 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400 - 533,400
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
Branson
3
COST COMPONENTS
A. Capital Cost
A.1 Planning
3: Branson
DESCRIPTIONS
A.2 Environmental
A.3 Design
- Conceptual design
- Detailed Engineering Design
A.5 Construction
- Construction costs
- Construction Management cost
A.6 Close-Out
TOTALS
Detail by Year
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
The capit al costs include all costs associated with the planning, design, implement at ion and
commissioning of t he projec t in question.
- Feasibility study
$
- Permit
$
- Equipment
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total A $
(90,000) - 90,000
(90,000) - 90,000
OPTION DETAILS
Description:
Option Number:
Branson
3
B. Operating Costs
The operat ing costs include all costs associat ed with the ongoing operations of the projec t onc e it is
commissioned.
B.1 Labor
Associate
CFE
Branson technician
3: Branson
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
(66,000) - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000 - 6,000
(275,000) - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000 - 25,000
(3,300) 300 300 300 300 300 300 300 300 300 300 300
(550) 50 50 50 50 50 50 50 50 50 50 50
-
OPTION DETAILS
Description:
Option Number:
Branson
3
3: Branson
Sub-total B $
C. Maintenance
Costs
Labor technician
Downtime
C.2 Preventative
maintenance
Spares (Filters)
Labor technician
D. Renewal Costs
D.1 Major repair
D.2 Refurbishment
(344,850) - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350 - 31,350
The maintenanc e cost s cover all t he costs associated with ongoing maintenanc e of the project .
Include basic rehabilitation and renewal costs in this it em.
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total C $
100 500 -
200
50
100 500 -
100 500 -
100 500 -
100 500 -
100 500 -
100
500
-
Include anticipated major repair ( repair not funded through Maintenance funds) and rehabiltation
costs in this it em if relevant to the analysis ( seeTool, Step 2 Box 2.2 for discussion) ; show in t he year
expected if s ingle disbursement or as debt s ervice as relevant.
$
$
$
$
$
$
Sub-total D $
OPTION DETAILS
Description:
Option Number:
Branson
3
E. Disposal Costs
Costs associated with disposal of the asset at the end of the design life.
F. Other Costs
Item 1
Item 2
Item 3
Item 4
Item 5
OPTION SUMMARY
3: Branson
(300)
$
$
Sub-total E $
(300)
$
$
$
$
$
$
$
$
$
$
Sub-total F $
300
300
OPTION DETAILS
Description:
Option Number:
Total Costs:
PV Total Costs:
Cumulative Costs:
Years of Analysis:
Average Annualized Costs
(Undiscounted):
Branson
3
3: Branson
$
$
49,350 42,727 -
49,600 37,181 -
49,350 32,029 -
49,350 27,731 -
49,600 24,131 -
49,350 20,787 -
49,350 17,998 -
49,600 15,661 -
49,350 13,491 -
49,650
11,752
- 139,350 - 188,700 - 238,300 - 287,650 - 337,000 - 386,600 - 435,950 - 485,300 - 534,900 - 584,250 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 -
633,900 -
633,900 -
633,900 -
633,900 -
633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900
10
(63,390)
PV of Tot al Costs / Number of years of analys is. The lower the value the bett er.
(38,284)
(77,740)
CHART DATA
1
2
3
4
5
6
7
8
9
10
11
Year number
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
Year
Costs by year $ (139,350) $ (49,350) $ (49,600) $ (49,350) $ (49,350) $ (49,600) $ (49,350) $ (49,350) $ (49,600) $ (49,350) $ (49,650)
Cummulative Costs by year $ (139,350) $ (188,700) $ (238,300) $ (287,650) $ (337,000) $ (386,600) $ (435,950) $ (485,300) $ (534,900) $ (584,250) $ (633,900)
PV of $1 at a point in time
Average annualized (undiscounted) costs $
SUMMARY CHART
3: Branson
$2016
2017
2018
2019
2020
2021
2022
2023
$(100,000)
$(200,000)
$(300,000)
$(400,000)
$(500,000)
$(600,000)
$(700,000)
Cost by Year
Cumulative Cost
2024
2025
2026
1.000
(63,390) $
0.866
(63,390) $
0.750
(63,390) $
0.649
(63,390) $
0.562
(63,390) $
0.487
(63,390) $
0.421
(63,390) $
0.365
(63,390) $
0.316
(63,390) $
0.27
(63,390) $
0.24
(63,390)
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.20
#N/A
0.18
#N/A
0.15
#N/A
0.13
#N/A
0.12
#N/A
0.10
#N/A
0.09
#N/A
0.07
#N/A
0.06
#N/A
0.06
#N/A
0.05
#N/A
0.04
#N/A
0.04
#N/A
0.03
#N/A
0.03
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
- 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900 - 633,900
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0
0
COST COMPONENTS
A. Capital Cost
A.1 Planning
0: 0
DESCRIPTIONS
A.2 Environmental
A.3 Design
- Conceptual design
- Detailed Engineering Design
A.5 Construction
- Construction costs
- Construction Management cost
A.6 Close-Out
- Equipment
Detail by Year
2015
NA
TOTALS
The capit al costs include all costs associated with the planning, design, implement at ion and
commissioning of t he projec t in question.
- Feasibility study
$
- Permit
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total A $
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
OPTION DETAILS
Description:
Option Number:
0
0
B. Operating Costs
The operat ing costs include all costs associat ed with the ongoing operations of the projec t onc e it is
commissioned.
B.1 Labor
0: 0
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
OPTION DETAILS
Description:
Option Number:
0
0
0: 0
Sub-total B $
C. Maintenance
Costs
C.2 Preventative
maintenance
D. Renewal Costs
D.1 Major repair
D.2 Refurbishment
The maintenanc e cost s cover all t he costs associated with ongoing maintenanc e of the project .
Include basic rehabilitation and renewal costs in this it em.
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total C $
Include anticipated major repair ( repair not funded through Maintenance funds) and rehabiltation
costs in this it em if relevant to the analysis ( seeTool, Step 2 Box 2.2 for discussion) ; show in t he year
expected if s ingle disbursement or as debt s ervice as relevant.
$
$
$
$
$
$
Sub-total D $
OPTION DETAILS
Description:
Option Number:
0
0
E. Disposal Costs
Costs associated with disposal of the asset at the end of the design life.
F. Other Costs
Item 1
Item 2
Item 3
Item 4
Item 5
OPTION SUMMARY
0: 0
$
$
Sub-total E $
$
$
$
$
$
$
$
$
$
$
Sub-total F $
OPTION DETAILS
Description:
Option Number:
Total Costs:
PV Total Costs:
Cumulative Costs:
Years of Analysis:
Average Annualized Costs
(Undiscounted):
0
0
0: 0
$
$
#DIV/0!
PV of Tot al Costs / Number of years of analys is. The lower the value the bett er.
#DIV/0!
#DIV/0!
CHART DATA
1
Year number
2015
Year
Costs by year $
Cummulative Costs by year $
PV of $1 at a point in time
Average annualized (undiscounted) costs
SUMMARY CHART
0: 0
$1
$1
$1
$1
$1
$1
$0
$0
$0
$0
$2015
Cost by Year
Cumulative Cost
1.000
#DIV/0!
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.866
#N/A
0.750
#N/A
0.649
#N/A
0.562
#N/A
0.487
#N/A
0.421
#N/A
0.365
#N/A
0.316
#N/A
0.27
#N/A
0.24
#N/A
0.20
#N/A
0.18
#N/A
0.15
#N/A
0.13
#N/A
0.12
#N/A
0.10
#N/A
0.09
#N/A
0.07
#N/A
0.06
#N/A
0.06
#N/A
0.05
#N/A
0.04
#N/A
0.04
#N/A
0.03
#N/A
0.03
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0
0
COST COMPONENTS
A. Capital Cost
A.1 Planning
0: 0
DESCRIPTIONS
A.2 Environmental
A.3 Design
- Conceptual design
- Detailed Engineering Design
A.5 Construction
- Construction costs
- Construction Management cost
A.6 Close-Out
- Equipment
Detail by Year
2015
NA
TOTALS
The capit al costs include all costs associated with the planning, design, implement at ion and
commissioning of t he projec t in question.
- Feasibility study
$
- Permit
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total A $
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
OPTION DETAILS
Description:
Option Number:
0
0
B. Operating Costs
The operat ing costs include all costs associat ed with the ongoing operations of the projec t onc e it is
commissioned.
B.1 Labor
0: 0
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
OPTION DETAILS
Description:
Option Number:
0
0
0: 0
Sub-total B $
C. Maintenance
Costs
C.2 Preventative
maintenance
D. Renewal Costs
D.1 Major repair
D.2 Refurbishment
The maintenanc e cost s cover all t he costs associated with ongoing maintenanc e of the project .
Include basic rehabilitation and renewal costs in this it em.
$
$
$
$
$
$
$
$
$
$
$
$
Sub-total C $
Include anticipated major repair ( repair not funded through Maintenance funds) and rehabiltation
costs in this it em if relevant to the analysis ( seeTool, Step 2 Box 2.2 for discussion) ; show in t he year
expected if s ingle disbursement or as debt s ervice as relevant.
$
$
$
$
$
$
Sub-total D $
OPTION DETAILS
Description:
Option Number:
0
0
E. Disposal Costs
Costs associated with disposal of the asset at the end of the design life.
F. Other Costs
Item 1
Item 2
Item 3
Item 4
Item 5
OPTION SUMMARY
0: 0
$
$
Sub-total E $
$
$
$
$
$
$
$
$
$
$
Sub-total F $
OPTION DETAILS
Description:
Option Number:
Total Costs:
PV Total Costs:
Cumulative Costs:
Years of Analysis:
Average Annualized Costs
(Undiscounted):
0
0
0: 0
$
$
#DIV/0!
PV of Tot al Costs / Number of years of analys is. The lower the value the bett er.
#DIV/0!
#DIV/0!
SUMMARY CHART
1
Year number
2015
Year
Costs by year $
Cummulative Costs by year $
PV of $1 at a point in time
Average annualized (undiscounted) costs
SUMMARY CHART
0: 0
$1
$1
$1
$1
$1
$1
$0
$0
$0
$0
$2015
Cost by Year
Cumulative Cost
1.000
#DIV/0!
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.866
#N/A
0.750
#N/A
0.649
#N/A
0.562
#N/A
0.487
#N/A
0.421
#N/A
0.365
#N/A
0.316
#N/A
0.27
#N/A
0.24
#N/A
0.20
#N/A
0.18
#N/A
0.15
#N/A
0.13
#N/A
0.12
#N/A
0.10
#N/A
0.09
#N/A
0.07
#N/A
0.06
#N/A
0.06
#N/A
0.05
#N/A
0.04
#N/A
0.04
#N/A
0.03
#N/A
0.03
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.02
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.01
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
NA
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
0.00
#N/A
Shunk
10
Annual
Annual
Annuitized
Average Total PV Total Costs
Average PV
Cost Stream
Costs
Total Costs
(540,100) $
(54,010) $
(362,176) $
(36,218) $
(73,545)
Telsonic
10
(533,400) $
(53,340) $
(329,935) $
(32,993) $
(66,998)
Branson
10
(633,900) $
(63,390) $
(382,837) $
(38,284) $
(77,740)
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
Option
Number
Option description
Analysis
Period
Total Costs
Telsonic
Branson
-$10,000
-$20,000
-$30,000
$(32,993)
-$40,000
$(36,218)
$(38,284)
$(54,010)
-$60,000
$(63,390)
$(66,998)
-$70,000
$(73,545)
$(77,740)
-$80,000
-$90,000
Annual Average Total Costs
2017
2018
2019
2020
2021
2022
$(100,000)
$(200,000)
$(300,000)
Cumulative Costs
$(400,000)
$(500,000)
$(600,000)
$(700,000)
Year of Analysis
Shunk
Telsonic
Branson
2023
2024
2025
2026
MTBF
MTTR
Operacion
10 $/Hr
4,000 Hrs al ao
Disponibilidad
99.90%
Costo/TM
TM Annual
Costo TM Annual
4000
4.00 Hr
$
39.96
3.75 Hr/lab
4000
Option1
Option2
Option3
Option4
Option5
ChartXValue
2016
2016
2016
2015
2015
2016
2017
2017
2017
2018
2018
2018
2019
2019
2019
2020
2020
2020
2021
2021
2021
2022
2022
2022
2023
2023
2023
2017
2018
2019
2020
2021
2022
2023
Chart Name
Average Annual Cost: New Ultrasonic Welding Machine
LCC Comparison: New Ultrasonic Welding Machine
Yes
No
2024
2024
2024
2025
2025
2025
2026
2026
2026
2024
2025
2026
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
1
1
1
1
1
1
1
#N/A
#N/A
#N/A
#N/A