Вы находитесь на странице: 1из 16

CRONOGRAMA ACELERADO DE OBRA

: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE


AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

01

ESPECIFICACIONES

OBRAS PROVISIONALES

COSTO
PARCIAL

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO

JUNIO

JULIO

AGOSTO

8,796.72

8,796.72

01.01

CAMPAMENTO PROVISIONAL DE OBRA

7,500.00

7,500.00

01.02

CARTEL DE IDENTIFICACION DE OBRA

1,116.72

1,116.72

01.03

LIMPIEZA DEL TERRENO MANUAL

180.00

180.00

43,085.00

6,190.31

10,736.55

10,742.80

30,585.00

5,320.52

7,901.13

7,901.13

869.79

1,291.67

1,291.67

1,543.75

1,550.00

02

FLETE TERRESTRE

02.01

FLETE DE TRANSPORTE TERRESTRE

02.02

FLETE RURAL

5,000.00

02.03

ACARREO DE MATERIALES DE ALMACEN A OBRA

7,500.00

23,373.80

3,815.80

3,959.50

3,959.50

23,373.80

3,815.80

3,959.50

3,959.50

03
03.01
04
04.01

PRESUPUESTO SOCIAL
TOTAL COSTO DIRECTO DEL COMPONENTE SOCIAL
SECTOR JACHA TITILACA
AGUA POTABLE

600,509.73

6,737.07

5,904.61

7,416.40

135,523.96

121,481.44

165,484.74

6,737.07

5,904.61

7,416.40

46,776.33

33,083.69

5,191.16

827.58

871.28

458.99

04.01.01

CAPTACION (2 und)

6,018.74

04.01.02

LINEA DE CONDUCCION

1,968.64

04.01.03

CAMARA DE REUNION DE CAUDALES

1,161.68

1,161.68

04.01.04

RESERVORIO 7 M3

7,238.63

3,601.22

120.32

518.06

3,637.41

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

04.01.05

CASETA DE VALVULAS

2,630.13

04.01.06

RED DE DISTRIBUCION

29,202.99

04.01.07

VALVULA DE CONTROL 6 und

04.01.08
04.01.09
04.02

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO
-

6,616.75

JUNIO
-

5,904.61

JULIO
-

6,898.34

AGOSTO

1,308.49

1,321.64

6,027.00

3,756.29

1,417.82

PILETAS DOMICILIARIAS

60,126.51

18,873.98

10,471.47

CONEXIONES DOMICILIARIAS

55,719.60

9,741.52

11,671.00

434,554.99

88,366.75

88,366.75

AGUAS RESIDUALES

939.31

04.02.01

BAOS CON ARRASTRE HIDRAULICO

259,730.80

56,107.52

56,107.52

04.02.02

INSTALACION DE BIODIGESTORES 90 UNIDADES

174,824.19

32,259.23

32,259.23

470.00

380.88

31.00

04.03

CONTROL DE CALIDAD

04.03.01

DISEO DE MEZCLAS DE CONCRETO

350.00

350.00

04.03.02

PRUEBA DE COMPRESION DE CONCRETO

120.00

30.88

31.00

05
05.01

SECTOR MACHAQA MARCA


AGUA POTABLE

594,190.85

5,962.88

7,113.09

11,734.90

134,316.27

125,874.22

172,475.43

5,962.88

7,113.09

11,734.90

55,628.92

28,370.92

5,191.16

827.58

335.96

559.50

05.01.01

CAPTACION (2 und)

6,018.74

05.01.02

LINEA DE CONDUCCION

1,300.48

05.01.03

CAMARA DE REUNION DE CAUDALES

1,159.92

05.01.04

RESERVORIO 8 M3

7,903.19

79.90
29.52

325.12

1,159.92

4,680.53

3,193.14

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

05.01.05

CASETA DE VALVULAS

2,724.90

05.01.06

RED DE DISTRIBUCION

39,545.39

05.01.07

VALVULA DE CONTROL 6 und

05.01.08

VALVULAS DE AIRE

05.01.09
05.01.10
05.02

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO
-

5,853.46

JUNIO
-

7,113.09

JULIO
-

3,256.25

AGOSTO

1,355.64
23,322.59

1,369.26
-

1,417.82

939.31

168.46

32.82

PILETAS DOMICILIARIAS 90 und

58,344.83

CONEXIONES DOMICILIARIAS

53,891.70

420,465.42

AGUAS RESIDUALES

8,153.53

10,161.18

10,161.18

9,421.94

11,288.13

77,585.89

97,451.63

05.02.01

BAOS CON ARRASTRE HIDRAULICO

251,280.72

46,367.28

58,239.55

05.02.02

INSTALACION DE BIODIGESTORES 90 UNIDADES

169,184.70

31,218.61

39,212.09

1,250.00

1,101.46

51.67

1,050.00

1,050.00

200.00

51.46

51.67

05.03

CONTROL DE CALIDAD

05.03.01

DISEO DE MEZCLAS DE CONCRETO

05.03.02

PRUEBA DE COMPRESION DE CONCRETO

06
06.01

SECTOR NUEVA ALIANZA


AGUA POTABLE

06.01.01

CAPTACION (2 und)

06.01.02
06.01.03

373,385.98

5,408.52

5,712.26

1,569.75

86,097.69

93,732.34

155,041.72

5,408.52

5,712.26

1,569.75

44,920.86

43,381.78

3,004.83

2,591.67

413.16

PLANTA DE BOMBEO

33,117.73

8,569.21

10,266.50

ESTUDIO ACOMETIDA ELECTRICA C.P. TITILACA S

12,379.90

10,677.66

1,702.24

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO

JUNIO

JULIO

AGOSTO

06.01.04

LINEA DE IMPULSION

9,845.00

3,568.81

6,276.19

06.01.05

RESERVORIO 5 M3

4,768.11

1,151.52

1,435.06

06.01.06

CASETA DE VALVULAS

2,643.89

1,315.34

1,328.55

06.01.07

RED DE DISTRIBUCION

27,590.61

6,109.35

9,574.25

06.01.08

VALVULA DE CONTROL (2)

562.04

372.35

06.01.09

VALVULA DE AIRE (2)

336.92

74.40

06.01.10

PILETAS DOMICILIARIAS 47 und

31,863.29

06.01.11

CONEXIONES DOMICILIARIAS

28,929.40

217,094.26

128,742.25

06.02

AGUAS RESIDUALES

06.02.01

BAOS CON ARRASTRE HIDRAULICO

06.02.02

INSTALACION DE BIODIGESTORES 93 UNIDADES

06.03

CONTROL DE CALIDAD

06.03.01

DISEO DE MEZCLAS DE CONCRETO

06.03.02

PRUEBA DE COMPRESION DE CONCRETO

07
07.01
07.01.01

SECTOR CHARCAS HUINCALLA


AGUA POTABLE
CAPTACION (2 und)

5,408.52

5,712.26

786.23

783.52

5,879.54

5,879.54

5,057.76

6,059.54

40,059.06

50,316.12

23,756.01

29,838.70

88,352.01

16,303.05

20,477.42

1,250.00

1,117.77

34.44

1,050.00

1,050.00

200.00

67.77

34.44

910,037.02

4,461.43

6,116.49

194,832.00

214,961.69

277,501.22

4,461.43

6,116.49

77,524.73

86,588.52

5,191.16

827.58

6,018.74

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO

101.52

JUNIO
-

JULIO

07.01.02

LINEA DE CONDUCCION

1,763.12

440.78

1,027.98

07.01.03

CAMARA DE REUNION DE CAUDALES

1,163.54

1,163.54

07.01.04

RESERVORIO 13 M3

11,505.99

1,846.40

AGOSTO
192.84
4,820.08

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

07.01.05

CASETA DE VALVULAS

3,206.65

07.01.06

RED DE DISTRIBUCION

72,140.27

07.01.07

VALVULA DE CONTROL 7 und

07.01.08

VALVULAS DE AIRE

07.01.09
07.01.10
07.02

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO
-

4,359.91

JUNIO
-

JULIO
-

4,325.45

AGOSTO

581.36

1,517.65

14,908.99

25,011.59

1,899.78

1,258.60

701.36

154.88

PILETAS DOMICILIARIAS 137 und

88,614.94

CONEXIONES DOMICILIARIAS

90,486.83

631,715.80

AGUAS RESIDUALES

1,350.26

30,522.92

30,522.92

22,282.38

22,282.38

116,566.60

128,352.50

07.02.01

BAOS CON ARRASTRE HIDRAULICO

374,179.09

69,044.95

80,830.85

07.02.02

INSTALACION DE BIODIGESTORES 93 UNIDADES

257,536.71

47,521.65

47,521.65

820.00

740.67

20.67

07.03

CONTROL DE CALIDAD

07.03.01

DISEO DE MEZCLAS DE CONCRETO

700.00

700.00

07.03.02

PRUEBA DE COMPRESION DE CONCRETO

120.00

40.67

20.67

08
08.01

SECTOR JANTA
AGUA POTABLE

08.01.01

CAPTACION

08.01.02

LINEA DE CONDUCCION

08.01.03

RESERVORIO 6 M3

580,342.74

6,496.63

12,495.00

2,310.58

140,973.30

134,255.09

224,655.46

6,496.63

12,495.00

2,310.58

74,735.93

68,752.96

2,833.22

1,309.10

1,524.12

396.90

126.97

208.54

5,522.36

1,555.74

2,555.12

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES

COSTO
PARCIAL

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO

RED DE DISTRIBUCION

08.01.06

VALVULA DE CONTROL 4 und

951.20

210.06

08.01.07

VALVULAS DE AIRE

182.22

40.24

08.01.08

PILETAS DOMICILIARIAS 90 und

49,738.64

08.01.09

CONEXIONES DOMICILIARIAS

47,158.70

354,867.28

AGUAS RESIDUALES

12,495.00

AGOSTO

08.01.05

6,496.63

JULIO

CASETA DE VALVULAS

114,588.20

JUNIO

08.01.04

08.02

3,284.02

ABRIL

PLAZO DE EJECUCION

1,352.35

958.23

907.67

1,131.16

52,005.51

42,238.71

8,662.35

8,662.35

10,168.59

12,182.66

65,481.46

65,481.46

08.02.01

BAOS CON ARRASTRE HIDRAULICO

212,000.20

39,119.08

39,119.08

08.02.02

INSTALACION DE BIODIGESTORES 76 UNIDADES

142,867.08

26,362.38

26,362.38

820.00

755.91

20.67

08.03

CONTROL DE CALIDAD

08.03.01

DISEO DE MEZCLAS DE CONCRETO

700.00

700.00

08.03.02

PRUEBA DE COMPRESION DE CONCRETO

120.00

55.91

20.67

TOTAL COSTO DIRECTO

3,133,721.84

29,066.53

31,224.96

47,950.95

706,439.27

705,007.08

GASTOS DE RESIDENTE DE OBRA

348,261.00

3,230.26

3,470.13

5,328.95

78,508.96

78,349.80

GASTOS DE SUPERVISION

135,642.60

1,258.14

1,351.57

2,075.55

30,578.10

30,516.11

GASTOS DE EXPEDIENTE

66,908.00

620.60

666.68

1,023.80

15,083.16

15,052.58

CRONOGRAMA ACELERADO DE OBRA


: MEJORAMIENTO Y AMPLIACIN DEL SISTEMA DE
AGUA Y DISPOSICIN SANITARIA DE EXCRETAS EN EL
OBRA
CENTRO POBLADO DE TITILACA DEL DISTRITO DE
PLATERIA
PUNO
COSTO TOTAL DEL PROYECTO
3,684,533.44
PRESUPUESTO ASIGNADO (S/3,496,626.00

ITEM

ESPECIFICACIONES
COSTO TOTAL
% AVANCE FISICO EJECUTADO

COSTO
PARCIAL
3,684,533.44

ABRIL

PLAZO DE EJECUCION

: 240 DIAS

FECHA DE INICIO
FECHA DE TERMINO

: 06/05/2015
: 01/12/2015

MAYO

JUNIO

JULIO

AGOSTO

34,175.53

36,713.34

56,379.25

830,609.49

828,925.57

0.93%

1.00%

1.53%

22.54%

22.50%

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

8,796.72

7,500.00

1,116.72

180.00

43,085.00

10,396.25

3,662.84

1,356.25

7,646.25

1,815.97

30,585.00

1,250.00

296.87

5,000.00

1,500.00

1,550.00

1,356.25

7,500.00

3,831.77

3,959.50

3,831.77

15.96

23,373.80

3,831.77

3,959.50

3,831.77

15.96

23,373.80

124,236.66

102,356.34

96,763.96

89.29

600,509.73

21,906.70

22,142.47

21,428.19

89.29

165,484.74

6,018.74

1,968.64

1,161.68

7,238.63

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

2,630.13

29,202.99

1,417.82

478.51
10,133.68

10,471.47

10,133.68

42.23

60,126.51

11,294.51

11,671.00

11,294.51

47.06

55,719.60

102,299.96

80,185.75

75,335.77

434,554.99

54,561.50

47,926.52

45,027.73

259,730.80

47,738.46

32,259.23

30,308.04

174,824.19

30.00

28.12

470.00

350.00

120.00

30.00

28.12

116,284.30

99,133.27

93,685.44

86.48

594,190.85

21,285.45

21,500.51

20,792.28

86.48

172,475.43

6,018.74

1,300.48

1,159.92

7,903.19

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

2,724.90

39,545.39

1,417.82

168.46

478.51
49.55

51.20

34.89

9,833.40

10,161.18

9,833.40

40.96

58,344.83

10,923.99

11,288.13

10,923.99

45.52

53,891.70

94,948.85

77,585.89

72,893.16

420,465.42

56,743.83

46,367.28

43,562.79

251,280.72

38,205.03

31,218.61

29,330.37

169,184.70

50.00

46.87

1,250.00

1,050.00

200.00

50.00

46.87

74,274.95

57,288.09

49,254.25

48.13

373,385.98

25,217.73

17,194.59

11,588.10

48.13

155,041.72

9,935.32
-

4,346.70
-

3,004.83

33,117.73

12,379.90

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE
1,388.77

OCTUBRE
792.76

NOVIEMBRE

DICIEMBRE

ACUMULADO

9,845.00

4,768.11

2,643.89

27,590.61

562.04

336.92

189.69
112.31

116.05

34.16

7,727.57

5,879.54

5,689.87

23.71

31,863.29

5,864.07

6,059.54

5,864.07

24.42

28,929.40

49,023.89

40,059.06

37,636.13

217,094.26

29,072.38

23,756.01

22,319.15

128,742.25

19,951.51

16,303.05

15,316.98

88,352.01

33.33

34.44

30.02

1,250.00

1,050.00

33.33

34.44

30.02

200.00

223,460.96

147,490.28

118,714.17

910,037.02

74,497.74

19,117.11

9,195.20

277,501.22

6,018.74

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

1,763.12

1,163.54

11,505.99

4,664.59

174.92

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

1,107.64

3,206.65

23,534.33

72,140.27

641.18

1,899.78

701.36

88,614.94

233.79
26,218.84

241.58
-

71.11
-

18,097.37

18,700.61

9,124.09

90,486.83

148,927.98

128,352.50

109,516.22

631,715.80

78,603.59

80,830.85

64,868.85

374,179.09

70,324.39

47,521.65

44,647.37

257,536.71

35.24

20.67

2.75

820.00

700.00

120.00

35.24

20.67

2.75

103,273.56

109,647.10

70,856.58

34.91

580,342.74

23,117.97

27,378.54

9,332.94

34.91

224,655.46

2,833.22

61.39

396.90

1,411.50

5,522.36

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

SETIEMBRE
1,094.67
-

OCTUBRE
150.52
-

NOVIEMBRE

DICIEMBRE

ACUMULADO

3,284.02

114,588.20

317.07

327.64

96.43

951.20

60.74

62.76

18.48

182.22

8,382.92

14,654.96

8,382.92

11,789.68

12,182.66

835.11

47,158.70

80,135.59

82,247.89

61,520.89

354,867.28

47,873.56

49,135.46

36,753.02

212,000.20

32,262.03

33,112.43

24,767.87

142,867.08

20.00

20.67

2.75

820.00

700.00

120.00

34.91

49,738.64

20.00

20.67

2.75

655,758.45

523,537.42

434,462.42

274.66

3,133,721.84

72,876.63

58,182.47

48,283.26

30.52

348,261.00

28,384.39

22,661.23

18,805.63

11.89

135,642.60

14,001.08

11,178.03

9,276.19

5.86

66,908.00

ACELERADO DE OBRA
DEPARTAMENTO: PUNO
PROVINCIA
DISTRITO

SETIEMBRE

Municipalidad
Distrital de Plateria

: PUNO
: PLATERIA

OCTUBRE

NOVIEMBRE

DICIEMBRE

ACUMULADO

771,020.55

615,559.14

510,827.51

322.94

3,684,533.44

20.93%

16.71%

13.86%

0.01%

100.00%

Вам также может понравиться