ENVIRONMENTAL MANAGEMENT PLAN

(For Non Covered Sub Project)


Name of Sub Project:
Description of Sub Project:
Location of Sub Project:
Estimated Sub Project:
ACTIVITIES/STAGES

Construction of (9m x 7m) VAWC Centre


With Cr, Slab Roofing, Plumbing fixtures, Electrical fixtures, Paintings
Brgy. Poblacion, Pio V. Corpus, Masbate
Php 1,075,000.00
POTENTIAL NEGATIVE IMPACT

MITIGATING MEASURES

PRE IMPLEMENTATION STAGE


(Social preparation, Land/ROW
Acquisition and Damage
Compensation, hiring,
Procurement)

1. Participation of the
community especially
women in the planning and
activities.
2. Land acquisition, damages
to crops and nearby
structures.
3. Entry of workers outside the
barangay or municipality.
4. Possible illegal or
unauthorized sourcing out of
construction materials.

1. Conduct community
consultation involving equal
participation of men and
women.
2. Prior to land acquisition,
select areas where no or
less crops and nearby
structures can be damaged.
3. Give the community
residents a chance to be
hired as workers
particularly those who are
capable.
4. Procure materials from
sources/suppliers with valid
environmental sources or
permits.

IMPLEMENTATION STAGE
(Mobilization, Construction
Proper, Demobilization)

1. Erosion and destabilization


due to earthworms such as
excavation.
2. The construction Premises
can be dangerous to
students.
3. Increased the health risk
due to improper
construction waste disposal.

1. Implementation appropriate
control measures, to avoid
soil erosion and provide
slope stabilization
measures. Designate
easement of the
construction site where the
excavated soil can be

RESPONSIBLE PERSON/S OR
COMMITTEE
1. BLGU to lead the conduct
of coordination in the
community.
2. BLGU to secure proper
document in acquiring the
area of land for the sub
project.
3. BLGU to facilitate the
arrangements for local
hiring of workers.
4. ACT to monitor the
procurement process.

1. BLGU, ACT, And BSPMC to


supervise the
implementation.
2. BLGU, ACT, and BSPMC to
supervise the
implementation and ensure
that the control measures
are being implemented.
3. BLGU, ACT, and BSPMC to

dumped.
2. Provide appropriate
barricade/enclosure for the
construction site to avoid
possible incidents, Provide
traffic for the incoming and
outgoing vehicles which
deliver construction
materials. Provide areas
near the construction site
where the materials such as
sand and gravel can be
stockpiled. Provide
necessary PPE (Personal
Protective Equipment) for
the workers and conduct
tool box meeting to orient
the workers regarding
construction safety.
3. Provide sanitary facilities
and waste management
facilities for workers, Ensure
to have proper garbage
disposal for the
construction waste.
POST IMPLEMENTATION STAGE
(Operation and Maintenance)

1. Lack of participation of
women in the operation
and maintenance of the
Sub Project.
2. The sub project is not
properly operated and
maintained. Lack of fund
for the maintenance of the
sub project.

1. Sustain the participation of


women thru coordination
and conduct/indication of
meetings for the operation
and maintenance.
2. Organized a group or
association that will be in
charge of the operation and
maintenance. Conduct fund
raising activities for

ensure the implementation


of these measures.

1. BLGU to lead the


community coordination
and consultation.
2. BLGU to lead the
organizing of the group or
association for the
operation and
maintenance. ACT to assist
the BLGU.

maintenance of the sub


project.

Prepared by:
____________________
JUVY S. CHING
BSPMC Chairman
Municipal Engineer
Date: _________
____________

Reviewed by:
____________________
PPT Head
Date: _________

____________________

ENGR. KERWIN JAY C. CONDOR

Barangay Chairperson
Date: _____________

Noted by:
ENGR.

Deputy Area Coordinator


Date: _______________

Date: