58400 Federal Register / Vol. 70, No.

193 / Thursday, October 6, 2005 / Notices

from the issuance of this notice; reply Boulder Plant substation; and (11) other persons listed in the service list
comments are due 105 days from the appurtenant structures and equipment. prepared by the Commission in this
issuance date of this notice. Garkane proposes to reconstruct the proceeding, in accordance with 18 CFR
All documents (original and eight West Fork dam to provide storage for 4.34(b) and 385.2010.
copies) should be filed with: Magalie R. fishery enhancement. Garkane would You may also register online at
Salas, Secretary, Federal Energy increase the height of the dam by 12.5 http://www.ferc.gov/docs-filing/
Regulatory Commission, 888 First feet to a new height of 36.5 feet, esubscription.asp to be notified via
Street, NE., Washington, DC 20426. resulting in a surface area of about 4.8 email of new filings and issuances
The Commission’s Rules of Practice acres and a storage capacity of 54.2 acre- related to this or other pending projects.
require all intervenors filing documents feet. Garkane would continue to operate For assistance, contact FERC Online
with the Commission to serve a copy of the project in run-of-river mode. Support.
that document on each person on the m. A copy of the application is
available for review at the Commission Magalie R. Salas,
official service list for the project.
in the Public Reference Room or may be Secretary.
Further, if an intervenor files comments
viewed on the Commission’s Web site at [FR Doc. E5–5496 Filed 10–5–05; 8:45 am]
or documents with the Commission
relating to the merits of an issue that http://www.ferc.gov using the BILLING CODE 6717–01–P

may affect the responsibilities of a ‘‘eLibrary’’ link. Enter the docket


particular resource agency, they must number excluding the last three digits in
the docket number field to access the DEPARTMENT OF ENERGY
also serve a copy of the document on
that resource agency. document. For assistance, contact FERC
Online Support at Federal Energy Regulatory
Motions to intervene and protests, Commission
FERCOnlineSupport@ferc.gov or toll-
comments, recommendations, terms and
free at 1–866–208–3676, or for TTY,
conditions, and prescriptions may be Notice of Application for Non-Project
(202) 502–8659. A copy is also available
filed electronically via the Internet in Use of Project Lands and Waters and
for inspection and reproduction at the
lieu of paper. The Commission strongly Soliciting Comments, Motions To
address in item h above.
encourages electronic filings. See 18 n. Anyone may submit comments, a Intervene, and Protests
CFR 385.2001(a)(1)(iii) and the protest, or a motion to intervene in
instructions on the Commission’s Web September 30, 2005.
accordance with the requirements of Take notice that the following
site (http://www.ferc.gov) under the ‘‘e- Rules of Practice and Procedure, 18 CFR
Filing’’ link. application has been filed with the
385.210, .211, .214. In determining the Commission and is available for public
k. This application has been accepted appropriate action to take, the
for filing. inspection:
Commission will consider all protests or a. Application Type: Non-Project Use
l. The existing project consists of: (1) other comments filed, but only those
The West Fork rock-filled 20-foot-high, Of Project Lands And Waters.
who file a motion to intervene in b. Project No: 2232–495.
30-foot-long diversion dam with accordance with the Commission’s c. Date Filed: September 7, 2005.
ungated spillway and gates on the West Rules may become a party to the d. Applicant: Duke Energy
Fork of Boulder Creek; (2) a buried proceeding. Any comments, protests, or Corporation.
17,600-foot-long, 27-inch-diameter motions to intervene must be received e. Name of Project: The Catawba-
concrete conduit running from the West on or before the specified comment date Wateree Project, which includes the
Fork dam to the East Fork of Boulder for the particular application. Cowans Ford development, also known
Creek; (3) the East Fork earth-filled 29- All filings must (1) bear in all capital as Lake Norman.
foot-high, 630-foot-long forebay dam letters the title ‘‘PROTEST’’, ‘‘MOTION f. Location: The proposed action will
with an ogee concrete spillway on the TO INTERVENE’’, ‘‘COMMENTS,’’ take place at the Cowans Ford
East Fork of Boulder Creek; (4) a 22,200- ‘‘REPLY COMMENTS,’’ development, also known as Lake
foot-long, 31.5 to 34-inch-diameter steel ‘‘RECOMMENDATIONS,’’ ‘‘TERMS Norman, which is located in Iredell
penstock running from the East Fork AND CONDITIONS,’’ or County, on the Catawba River
dam to the Boulder Plant powerhouse; ‘‘PRESCRIPTIONS;’’ (2) set forth in the approximately 16 miles northwest of
(5) the seasonally-operated Peterson heading the name of the applicant and Charlotte, North Carolina and 7 miles
Plant powerhouse located about 17,000 the project number of the application to west-northwest of Huntersville, North
feet below the East Fork dam with an which the filing responds; (3) furnish Carolina.
installed capacity of 100 kilowatts (kW); the name, address, and telephone g. Filed Pursuant to: Federal Power
(6) the Boulder Plant powerhouse number of the person protesting or Act, 16 U.S.C. 791(a) 825(r) and sections
located at the downstream end of the intervening; and (4) otherwise comply 799 and 801.
penstock with an installed capacity of with the requirements of 18 CFR h. Applicant Contact: Mr. Joe Hall,
1,400 kW; (7) an afterbay re-regulating 385.2001 through 385.2005. All Lake Management Representative; Duke
pool formed by a 12-foot-high earth- comments, recommendations, terms and Energy Corporation; P.O. Box 1006;
filled dam with gates and ditches; (8) a conditions or prescriptions must set Charlotte, NC; 28201–1006; (704) 382–
35,000-foot-long, 7.2-kilovolt (kV) forth their evidentiary basis and 8576
distribution and communication line otherwise comply with the requirements i. FERC Contact: Any questions on
from the West Fork dam to the East Fork of 18 CFR 4.34(b). Agencies may obtain this notice should be addressed to
dam and on to the Peterson Plant copies of the application directly from Lesley Kordella at (202) 502–6406, or by
powerhouse; (9) a 4,725-foot-long, the applicant. A copy of any protest or e-mail: Lesley.Kordella@ferc.gov.
12.47/7.2-kV distribution and motion to intervene must be served j. Deadline for filing comments and or
communication line from the Peterson upon each representative of the motions: October 31, 2005.
Plant powerhouse to the Boulder Plant applicant specified in the particular All documents (original and eight
substation; (10) a 100-foot-long, 2,400- application. A copy of all other filings copies) should be filed with: Ms.
volt transmission line connecting the in reference to this application must be Magalie R. Salas, Secretary, Federal
Boulder Plant powerhouse with the accompanied by proof of service on all Energy Regulatory Commission, 888

VerDate Aug<31>2005 19:52 Oct 05, 2005 Jkt 208001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\06OCN1.SGM 06OCN1
Federal Register / Vol. 70, No. 193 / Thursday, October 6, 2005 / Notices 58401

First Street, NE., Washington DC 20426. o. Filing and Service of Responsive Regulatory Commission, 888 First
Please include the project number (P– Documents—Any filings must bear in Street, NE., Washington, DC 20426.
2232–495) on any comments or motions all capital letters the title The Commission’s Rules of Practice
filed. Comments, protests, and ‘‘COMMENTS’’, require all intervenors filing documents
interventions may be filed electronically ‘‘RECOMMENDATIONS FOR TERMS with the Commission to serve a copy of
via the internet in lieu of paper. See, 18 AND CONDITIONS’’, ‘‘PROTEST’’, OR that document on each person on the
CFR 385.2001(a)(1)(iii) and the ‘‘MOTION TO INTERVENE’’, as official service list for the project.
instructions on the Commission’s Web applicable, and the Project Number of Further, if an intervenor files comments
site under the ‘‘e-Filing’’ link. The the particular application to which the or documents with the Commission
Commission strongly encourages e- filing refers. A copy of any motion to relating to the merits of an issue that
filings. intervene must also be served upon each may affect the responsibilities of a
k. Description of Request: Duke representative of the Applicant particular resource agency, they must
Energy Corporation (Duke Power), specified in the particular application. also serve a copy of the document on
licensee for the Catawba Wateree p. Agency Comments—Federal, state, that resource agency.
Hydroelectric Project, has requested and local agencies are invited to file Scoping comments may be filed
Commission approval to lease to the comments on the described electronically via the Internet in lieu of
Davidson Pointe Homeowners applications. A copy of the applications paper. The Commission strongly
Association, Inc. (Davidson Pointe), 0.78 may be obtained by agencies directly encourages electronic filings. See 18
total acres of project lands on Lake from the Applicant. If an agency does CFR 385.2001(a)(1)(iii) and the
Norman for a commercial/residential not file comments within the time instructions on the Commission’s Web
marina. Davidson Pointe, a commercial- specified for filing comments, it will be site (http://www.ferc.gov) under the
residential development is located on presumed to have no comments. One ‘‘eFiling’’ link.
copy of an agency’s comments must also k. This application is not ready for
Lake Davidson on Bridges Farm Road in
be sent to the Applicant’s environmental analysis at this time.
Iredell County, North Carolina. The l. The existing Danbury Project
applicant proposes that 0.69 acres of the representatives.
consists of: (1) A35-foot-high concrete
total 0.78 acres to be leased would have Magalie R. Salas, dam with a 48-foot-wide spillway with
one pier with 16 double boat slips and three sections, each of which is
Secretary.
4 end ties for boats or 36 docking equipped with 7-foot-high slide gates;
locations. The applicant also proposes [FR Doc. E5–5497 Filed 10–5–05; 8:45 am]
BILLING CODE 6717–01–P
(2) a 300-foot-long earthen dike
to construct a dry hydrant on the connecting to the right side of the
remaining 0.9 acres as requested by the concrete dam; (3) a powerhouse (Plant
State Fire Marshall. There will be no 1) integral to the dam containing a 176-
dredging during construction and the DEPARTMENT OF ENERGY
kW turbine generating unit and a 300-
pier will be built on site. Federal Energy Regulatory kW turbine generating unit; (4) a 255-
l. Location of the Application: This Commission acre reservoir with a negligible net
filing is available for review at the storage capacity at a water surface
Commission or may be viewed on the [Project No. 9184–013]
elevation of 929.21 feet NGVD from
Commission’s Web site at http:// April through October and 928.11 feet
www.ferc.gov, using the ‘‘eLibrary’’ link. Flambeau Hydro, LLC; Notice
Soliciting Scoping Comments NGVD from November through March;
Enter the docket number excluding the (5) a 2,500-foot-long power canal that
last three digits in the docket number September 30, 2005. conveys water to; (6) a second
field to access the document. For Take notice that the following powerhouse (Plant 2) containing a
assistance, contact FERC Online hydroelectric application has been filed single 600-kW turbine generating unit;
Support at with the Commission and is available and (7) appurtenant facilities. The
FERCOnlineSupport@ferc.gov or toll- for public inspection. applicant estimates that the total
free at (866) 208–3676, or for TTY, a. Type of Application: Subsequent average annual generation is 3,844
contact (202) 502–8659. License. megawatt-hours.
m. Individuals desiring to be included b. Project No.: P–9184–013. m. A copy of the application is
on the Commission’s mailing list should c. Date filed: June 10, 2005. available for review at the Commission
so indicate by writing to the Secretary d. Applicant: Flambeau Hydro, LLC. in the Public Reference Room or may be
of the Commission. e. Name of Project: Danbury viewed on the Commission’s Web site at
n. Comments, Protests, or Motions to Hydroelectric Project. http://www.ferc.gov using the
Intervene—Anyone may submit f. Location: On the Yellow River in ‘‘eLibrary’’ link. Enter the docket
comments, a protest, or a motion to Burnett County, Wisconsin. The project number excluding the last three digits in
intervene in accordance with the does not occupy federal lands. the docket number field to access the
requirements of Rules of Practice and g. Filed Pursuant to: Federal Power document. For assistance, contact FERC
Procedure, 18 CFR 385.210, .211, .214. Act 16 U.S.C. 791(a)–825(r). Online Support at
In determining the appropriate action to h. Applicant Contact: Scott Klabunde, FERCOnlineSupport@ferc.gov or toll-
take, the Commission will consider all North American Hydro, Inc., PO Box free at 1–866–208–3676, or for TTY,
protests or other comments filed, but 167, Neshkoro, WI 54960; 920–293– (202) 502–8659. A copy is also available
only those who file a motion to 4628 ext. 14. for inspection and reproduction at the
intervene in accordance with the i. FERC Contact: Tim Konnert, (202) address in item h above.
Commission’s Rules may become a 502–6359 or timothy.konnert@ferc.gov. n. You may also register online at
party to the proceeding. Any comments, j. Deadline for filing scoping http://www.ferc.goo.esubscribenow.htm
protests, or motions to intervene must comments: October 31, 2005. to be notified via email of new filings
be received on or before the specified All documents (original and eight and issuances related to this or other
comment date for the particular copies) should be filed with: Magalie R. pending projects. For assistance, contact
application. Salas, Secretary, Federal Energy FERC Online Support.

VerDate Aug<31>2005 19:52 Oct 05, 2005 Jkt 208001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\06OCN1.SGM 06OCN1