First Commercial Production (FCP) - Garraf Field Development Project

Activity ID

Classic WBS Layout

Activity Name

Original Remaining Start


Duration Duration

First Commercial Production (FCP) - Garraf Field Development Proj...


Project
Detail Design Engineering
Coordination

Finish

132

129 15-Aug-10

09-Feb-11

132

129 15-Aug-10

09-Feb-11

132

65 15-Aug-10

11-Nov-10

132

65 15-Aug-10

11-Nov-10*

Technical Document Register

DECGD0002

Master Project Schedule (for Detaul Design activities)

88

23 15-Aug-10

14-Sep-10*

DECPR0001

Document Numbering Procedure

81

23 15-Aug-10

14-Sep-10*

DECRE0001

Engineering Decision Register

72

22 15-Aug-10

13-Sep-10*

DECSP0001

Basic Engineering Design Data (BEDD) becomes Job Design Specification

82

23 15-Aug-10

14-Sep-10*

DECSP0003

Project Scope of Work (Excluding Pipelines/ Drilling)

80

22 15-Aug-10

13-Sep-10*

DECSP0004

Modularization Strategy Document

49

22 15-Aug-10

13-Sep-10*

80

76 15-Aug-10

28-Nov-10

80

33 15-Aug-10

28-Sep-10

Specifications
DECVSP0001

Civil Structural Design Basis

80

23 15-Aug-10

14-Sep-10*

DECVSP0002

General Specification for Excavation and Filling

73

23 15-Aug-10

14-Sep-10*

DECVSP0006

General Specification for Concrete Works

73

23 15-Aug-10

14-Sep-10*

DECVSP0007

General Specification for Structural Steel

73

23 15-Aug-10

14-Sep-10*

DECVSP0012

General Specification for Steel Piled Foundation

38

23 15-Aug-10

14-Sep-10*

DECVSP0013

Civil Structural Scope of Work for Construction Works at EPS

22

22 30-Aug-10

28-Sep-10*

DECVSP0016

Architectural Scope of Work

22

22 30-Aug-10

28-Sep-10*

33

33 30-Aug-10

13-Oct-10

General Civil Drawings


DECVDW0116

General Notes Sheets (2 Sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0117

EPS Site Layout and GA

33

33 30-Aug-10

13-Oct-10*

DECVDW0118

EPS Surface Drainage Plans (13 sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0119

EPS Underground Closed Drains Piping Network (6 sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0120

Details for Collection Sumps, Pits and Drainage Man-holes (3 Sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0121

EPS Foundation Plan - Piles (17 Sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0122

EPS Foundation Plan - Concrete (8 Shees)

33

33 30-Aug-10

13-Oct-10*

DECVDW0123

Tank Foundations, Concrete Rings and Slabs and AB Layouts

22

22 30-Aug-10

28-Sep-10*

DECVDW0124

Details for Steel Piles (6 Sheets)

33

33 30-Aug-10

13-Oct-10*

DECVDW0125

Reinforced Concrete Foundation Details (6 Sheets)

33

33 30-Aug-10

13-Oct-10*

76

76 15-Aug-10

28-Nov-10

Building drawings
DECVDW0209

Switch Gear, Battery UPS Building General Arrangement

66

45 15-Aug-10

14-Oct-10*

DECVDW0210

Switch Gear, Battery UPS Building Views and Sections

66

45 15-Aug-10

14-Oct-10*

DECVDW0223

Control Room Plans & Details (10 Sheets, Arch & Struct)

42

42 30-Sep-10

28-Nov-10*

DECVDW0224

Electrical Substation Plans & Details (12 Sheets, Arch & Struct)

42

42 30-Sep-10

28-Nov-10*

DECVDW0225

Process Interface Building Plans & Details (6 Sheets, Arch & Struct)

42

42 30-Sep-10

28-Nov-10*

73

73 15-Aug-10

23-Nov-10

Concrete
DECVDW0303

Tank Foundation Plan, Section & Detail

50

13 15-Aug-10

31-Aug-10*

DECVDW0304

Foundation for Flare

39

39 30-Sep-10

23-Nov-10*

DECVDW0305

Vessel Foundations (KO Drums, Closed Drain, etc)

39

39 30-Sep-10

23-Nov-10*

76

76 15-Aug-10

28-Nov-10

STRUCTURAL
DES DW0101

Module Size and Configuration

43

21 15-Aug-10

12-Sep-10*

DES DW0109

Pipe Rack Plans and Details, PAR's

42

42 30-Sep-10

28-Nov-10*

DES DW0110

Pipe Rack Plans and Details, Stick-built & Sleepers

42

42 30-Sep-10

28-Nov-10*

DES DW0111

Structural Steel Drawings for PAU's

42

42 30-Sep-10

28-Nov-10*

DES DW0112

Structural Steel Details for Lifting and Transporting PAU's and PAR's

42

42 30-Sep-10

28-Nov-10*

99

98 15-Aug-10

28-Dec-10

ELECTRICAL

Actual Work

Critical Remaining Work

Remaining Work

Milestone

2010
Jun

DECGD0001

CIVILS

Page 1 of 19 12-Aug-10 13:02


Jul

First Commercial Production (FCP) - Garraf Field


Development Project

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

TASK filter: Item.


Oracle Corporation

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name
Electrical Calculations
DEELCCA0004

Protection Relay Settings and Coordination Study Report

Electrical Datasheet

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

2010
Jun

50

50 30-Aug-10

07-Nov-10

50

50 30-Aug-10

07-Nov-10*

98

98 15-Aug-10

28-Dec-10

DEELCDS0010

General - Datasheet for LV Electrical Motors

89

55 15-Aug-10

28-Oct-10*

DEELCDS0011

General - Datasheet for MV Electrical Motors

89

55 15-Aug-10

28-Oct-10*

DEELCDS0031

Main Substation 6.6kV Switchgear Datasheet

89

55 15-Aug-10

28-Oct-10*

DEELCDS0032

Main Substation 400V Switchgear Datasheet

89

55 15-Aug-10

28-Oct-10*

DEELCDS0034

Process Substation 400V Switchgear Datasheet

89

55 15-Aug-10

28-Oct-10*

DEELCDS0037

Well Cluster 1 Substation 400V Switchgear Datasheet

89

55 15-Aug-10

28-Oct-10*

DEELCDS0038

Well Cluster 2 Substation 400V Switchgear Datasheet

89

55 15-Aug-10

28-Oct-10*

DEELCDS0039

Admin Substation 400V Switchgear Datasheet (SB-7720)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0040

Water Intake Substation 400V Switchgear Datasheet (SB-7760)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0042

Personnel Camp Substation 400V Switchgear Datasheet (SB-7730)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0050

Substation 110VDC Uninterruptible Power Supply Datasheet Book(Commo...

89

55 15-Aug-10

28-Oct-10*

DEELCDS0051

Plant 230VAC Uninterruptible Power Supply Datasheet Book(Common DS ...

89

55 15-Aug-10

28-Oct-10*

DEELCDS0060

Transformer Datasheet Book (Common DS for Facility)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0100

Personnel Camp 6.6kV Ring Main Unit No.1 Datasheet (RMU-7530)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0101

Personnel Camp 6.6kV Ring Main Unit No.2 Datasheet (RMU-7531)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0102

Well Cluster No.1 6.6kV Ring Main Unit No.1 Datasheet (RMU-7540)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0103

Well Cluster No.1 6.6kV Ring Main Unit No.2 Datasheet (RMU-7541)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0104

Well Cluster No.2 6.6kV Ring Main Unit No.1 Datasheet (RMU-7550)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0105

Well Cluster No.2 6.6kV Ring Main Unit No.2 Datasheet (RMU-7551)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0106

Water Intake Station 6.6kV Ring Main Unit Datasheet (RMU-7560)

89

55 15-Aug-10

28-Oct-10*

DEELCDS0200

Busduct Datasheet Book (Common datasheet for facility)

53

53 17-Oct-10

28-Dec-10*

99

98 15-Aug-10

28-Dec-10

Electrical Drawings

Page 2 of 19 12-Aug-10 13:02

DEELCDW0001

Single Line Diagrams

78

45 15-Aug-10

14-Oct-10*

DEELCDW0102

Switchgear Symbols Legend (Added 14-Jun-10)

78

45 15-Aug-10

14-Oct-10*

DEELCDW0120

Main Substation 6.6kV Switchboard Metering & Protection Diagram (SB-75...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0130

Main Substation 400V Switchboard Metering and Protection Diagram (SB-...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0131

Process Substation 400V Switchboard Metering and Protection Diagram (S...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0132

Admin. Substation 400V Switchboard Metering and Protection Diagram (S...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0133

Well Cluster No.1 Substation 400V Switchboard Metering and Protection D...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0134

Well Cluster No.2 Substation 400V Switchboard Metering and Protection D...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0140

Main Substation 230VAC Uninterruptible Power Supply Single Line Diagram

42

42 29-Sep-10

25-Nov-10*

DEELCDW0141

Process Substation 230VAC Uninterruptible Power Supply Single Line Dia...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0142

Admin. Substation 230VAC Uninterruptible Power Supply Single Line Diagr...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0143

Well Cluster No.1 Substation 230VAC Uninterruptible Power Supply Single...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0144

Well Cluster No.2 Substation 230VAC Uninterruptible Power Supply Single...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0150

Main Substation 110VDC Uninterruptible Power Supply Single Line Diagram

42

42 29-Sep-10

25-Nov-10*

DEELCDW0151

Process Substation 110VDC Uninterruptible Power Supply Single Line Dia...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0152

Admin. Substation 110VDC Uninterruptible Power Supply Single Line Diagr...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0153

Well Cluster No.1 Substation 110VDC Uninterruptible Power Supply Single...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0154

Well Cluster No.2 Substation 110VDC Uninterruptible Power Supply Single...

42

42 29-Sep-10

25-Nov-10*

DEELCDW0200

Main Substation Layout

99

65 15-Aug-10

11-Nov-10*

DEELCDW0201

Process Substation Layout

99

65 15-Aug-10

11-Nov-10*

DEELCDW0202

Admin. Substation Layout

42

42 01-Nov-10

28-Dec-10*

DEELCDW0203

Well Cluster No.1 Substation Layout

42

42 01-Nov-10

28-Dec-10*

DEELCDW0204

Well Cluster No 2 Substation Layout

77

45 15-Aug-10

14-Oct-10*

DEELCDW0206

Personnel Camp 6.6kV Substation Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0220

CPS Electric al Equipment Layout Key Plan

31

31 01-Nov-10

13-Dec-10*

DEELCDW0221

CPS Area 1 Electrical Equipment Layout

31

31 01-Nov-10

13-Dec-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

CPS Area 2 Electrical Equipment Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0223

CPS Area 3 Electrical Equipment Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0224

CPS Area 4 Electrical Equipment Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0225

CPS Area 5 Electrical Equipment Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0241

CPS Area 1 Cable Routing Nodal Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0242

CPS Area 2 Cable Routing Nodal Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0243

CPS Area 3 Cable Routing Nodal Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0244

CPS Area 4 Cable Routing Nodal Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0245

CPS Area 5 Cable Routing Nodal Layout

31

31 01-Nov-10

13-Dec-10*

DEELCDW0300

Well Cluster No.1 Cable Routing Nodal Layout

68

45 15-Aug-10

14-Oct-10*

97

87 15-Aug-10

13-Dec-10

DEELCLS0001

Electrical Load List

97

45 15-Aug-10

14-Oct-10*

DEELCLS0002

Electrical Equipment List

73

45 15-Aug-10

14-Oct-10*

DEELCLS0004

Electrical Cable Schedule

73

45 15-Aug-10

14-Oct-10*

DEELCLS0005

Essential Power Generation Electrical Load List

73

45 15-Aug-10

14-Oct-10*

DEELCLS0006

Electrical Material Take-off

31

31 01-Nov-10

13-Dec-10*

88

45 15-Aug-10

14-Oct-10

Electrical Specifications and Philosophies


DEELCSP0001

Electrical System Design Philosophy

78

45 15-Aug-10

14-Oct-10*

DEELCSP0003

Specification for Electrical Installation

88

45 15-Aug-10

14-Oct-10*

DEELCSP0004

Earthing and Lightning Protection Philosophy

83

45 15-Aug-10

14-Oct-10*

DEELCSP0005

Technical Specification for Electrical Requirements on Packaged Equipment

88

45 15-Aug-10

14-Oct-10*

DEELCSP0030

Specification for Low Voltage Switchgear and Controlgear

88

45 15-Aug-10

14-Oct-10*

DEELCSP0031

Specification for Medium Voltage Switchgear and Controlgear

88

45 15-Aug-10

14-Oct-10*

DEELCSP0033

Specification for Power Transformers and Neutral Earthing Resistors

88

45 15-Aug-10

14-Oct-10*

DEELCSP0035

Specification for Cathodic Protection Equipment and Materials

83

45 15-Aug-10

14-Oct-10*

DEELCSP0039

Technical Specification for Uninterruptible Power Supplies

83

45 15-Aug-10

14-Oct-10*

DEELCSP0040

Technical Specification for DC Batteries and Chargers

83

45 15-Aug-10

14-Oct-10*

DEELCSP0043

Technical Specification for Transportable Packaged Substations

88

45 15-Aug-10

14-Oct-10*

DEELCSP0044

Technical Specification for Ring Main Units (Added 8-Jul-10)

83

45 15-Aug-10

14-Oct-10*

DEELCSP0150

Specification for Low Voltage Power and Control Cables

83

45 15-Aug-10

14-Oct-10*

DEELCSP0151

Specification for Medium Voltage Power and Control Cables

83

45 15-Aug-10

14-Oct-10*

DEELCSP0281

Specification for Low Voltage Induction Motors

83

45 15-Aug-10

14-Oct-10*

DEELCSP0282

Specification for Medium Voltage Induction Motors

83

45 15-Aug-10

14-Oct-10*

22

22 01-Nov-10

30-Nov-10

Electrical Equipment Requistions


DEELCMR0001

Equipment Requisition for Switchgear

22

22 01-Nov-10

30-Nov-10*

DEELCMR0002

Equipment Requisition for Power Transformers and Neutral Earthing Resist...

22

22 01-Nov-10

30-Nov-10*

DEELCMR0003

Equipment Requisition for Uninterruptible Power Supplies

22

22 01-Nov-10

30-Nov-10*

DEELCMR0004

Equipment Requisition for Electrical Cables

22

22 01-Nov-10

30-Nov-10*

110

65 15-Aug-10

11-Nov-10

HSE

2010
Jun

DEELCDW0222

Electrical Lists and Schedules

Page 3 of 19 12-Aug-10 13:02

DEHSLS0001

Schedule of Hazardous Sources (Added 28-Jun-10)

65

45 15-Aug-10

14-Oct-10*

DEHSPL0001

Project QHSSE Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0002

Pipeline HSSE Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0003

Project Health Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0004

Environmental Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0005

Waste Management Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0006

Facility Operations Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPL0007

Construction HSE Plan

65

22 15-Aug-10

13-Sep-10*

DEHSPR0001

HSE Plan

77

34 15-Aug-10

29-Sep-10*

DEHSPR0002

Health Risk Assessment

77

34 15-Aug-10

29-Sep-10*

DEHSRE0001

QRA Study

110

65 15-Aug-10

11-Nov-10*

DEHSRE0002

Design Safety Philosophy

95

45 15-Aug-10

14-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Overall System description and philosophy report

95

45 15-Aug-10

14-Oct-10*

DEHSRE0004

Utility System description and philosophy report

95

45 15-Aug-10

14-Oct-10*

DEHSRE0005

HAZID Terms of Reference Updated for DD

88

45 15-Aug-10

14-Oct-10*

DEHSRE0006

HAZOP Procedure (Report) Updated for DD

76

45 15-Aug-10

14-Oct-10*

DEHSRE0007

SIL (Instrumented Protected Function) Assessment Report

88

45 15-Aug-10

14-Oct-10*

DEHSRE0008

Operating control and safeguarding philosophy

88

45 15-Aug-10

14-Oct-10*

DEHSRE0009

Alarm and Shutdown & Controller set up point

88

45 15-Aug-10

14-Oct-10*

DEHSRE0010

Flare Radiation Study (in conjunction with Process)

88

45 15-Aug-10

14-Oct-10*

DEHSRE0011

Overall System dDescription and Philosophy Report

89

45 15-Aug-10

14-Oct-10*

DEHSRE0012

Utility System Description & Philosophy Report

89

45 15-Aug-10

14-Oct-10*

DEHSRE0013

Operating Control & Safeguarding Philosophy

89

45 15-Aug-10

14-Oct-10*

DEHSRE0014

Alarm and Shutdown & Controller Set-Up Point

69

45 15-Aug-10

14-Oct-10*

DEHSRE0015

HAZOP Study Report - Updated for DD

69

45 15-Aug-10

14-Oct-10*

DEHSRE0016

HAZID Study Report Updated for DD

69

45 15-Aug-10

14-Oct-10*

DEHSSP0001

Specification for Fire Fighting System

88

45 15-Aug-10

14-Oct-10*

98

97 15-Aug-10

27-Dec-10

DEINSDW0001

Control System Overall Architecture Diagram (Sheet 1 of 2)

55

11 15-Aug-10

29-Aug-10*

DEINSDW0002

Process Control System Architecture

54

11 15-Aug-10

29-Aug-10*

DEINSDW0003

ESD System Architecture

53

11 15-Aug-10

29-Aug-10*

DEINSDW0004

Custody Metering System Architecture (Sheet 1 of 3)

51

11 15-Aug-10

29-Aug-10*

DEINSDW0005

Well Site/Cluster Control Architecture

50

11 15-Aug-10

29-Aug-10*

DEINSDW0006

Fire & Gas System Architecture

52

11 15-Aug-10

29-Aug-10*

DEINSDW0007

Pipeline Leak Detection System Architecture

48

11 15-Aug-10

29-Aug-10*

DEINSDW0008

Cause and Effect Matrix

43

11 15-Aug-10

29-Aug-10*

DEINSDW0009

General Arrangement for Control & interface rooms

98

65 15-Aug-10

11-Nov-10*

DEINSLS0001

Instrument Index

95

65 15-Aug-10

11-Nov-10*

56

56 15-Aug-10

31-Oct-10

Instrument Datasheets

2010
Jun

DEHSRE0003

INSTRUMENTATION

Page 4 of 19 12-Aug-10 13:02

DEINSDS100

Data Sheets for Analysers

22

22 15-Sep-10

14-Oct-10*

DEINSDS101

Data Sheets for Control Valves

24

22 16-Aug-10

14-Sep-10*

DEINSDS102

Data Sheets for DP Flow Transmitters

22

22 15-Sep-10

14-Oct-10*

DEINSDS103

Data Sheets for Fire Detectors

22

22 16-Aug-10

14-Sep-10*

DEINSDS104

Data Sheets for Flow Meters

22

22 16-Aug-10

14-Sep-10*

DEINSDS105

Data Sheets for Flow Switch

22

22 30-Sep-10

31-Oct-10*

DEINSDS106

Data Sheets for Gas Detectors (LOS)

22

22 16-Aug-10

14-Sep-10*

DEINSDS107

Data Sheets for Gas Detectors (Point)

22

22 30-Sep-10

31-Oct-10*

DEINSDS108

Data Sheets for Level Switches (External)

22

22 30-Sep-10

31-Oct-10*

DEINSDS109

Data Sheets for Level Switches (Insertion)

22

22 30-Sep-10

31-Oct-10*

DEINSDS110

Data Sheets for Level Transmitters (Displacer)

22

22 30-Sep-10

31-Oct-10*

DEINSDS111

Data Sheets for Level Transmitters (Insertion)

22

22 15-Sep-10

14-Oct-10*

DEINSDS112

Data Sheets for Level Transmitters (Tankage)

22

22 15-Sep-10

14-Oct-10*

DEINSDS113

Data Sheets for MOVs

24

24 15-Aug-10

15-Sep-10*

DEINSDS114

Data Sheets for Orifice Plates

24

24 15-Aug-10

15-Sep-10*

DEINSDS115

Data Sheets for Pig Detectors

22

22 15-Sep-10

14-Oct-10*

DEINSDS116

Data Sheets for Pressure gauges

22

22 15-Sep-10

14-Oct-10*

DEINSDS117

Data Sheets for Pressure Switches

22

22 15-Sep-10

14-Oct-10*

DEINSDS118

Data Sheets for Pressure Transmitters

22

22 15-Sep-10

14-Oct-10*

DEINSDS119

Data Sheets for Regulators

22

22 16-Aug-10

14-Sep-10*

DEINSDS120

Data Sheets for Relief Valves

24

24 15-Aug-10

15-Sep-10*

DEINSDS121

Data Sheets for Restriction Orifice Plates

24

24 15-Aug-10

15-Sep-10*

DEINSDS122

Data Sheets for Shut Down Valves

24

24 15-Aug-10

15-Sep-10*

DEINSDS123

Data Sheets for Temperature Gauges

22

22 15-Sep-10

14-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Data Sheets for Temperature Transmitters

22

22 15-Sep-10

14-Oct-10*

DEINSDS125

Data Sheets for Thermowells

24

24 15-Aug-10

15-Sep-10*

DEINSDS126

Data Sheets for Vibration Switches

22

22 15-Sep-10

14-Oct-10*

73

73 16-Sep-10

27-Dec-10

DEINSMR200

Requisition for Level Interface Transmitters

22

22 28-Nov-10

27-Dec-10*

DEINSMR201

Requisition for Analysers

22

22 28-Nov-10

27-Dec-10*

DEINSMR202

Requisition for Building Fire Detection System

22

22 16-Sep-10

17-Oct-10*

DEINSMR203

Requisition for CCTV

22

22 28-Nov-10

27-Dec-10*

DEINSMR204

Requisition for Control Valves

22

22 16-Sep-10

17-Oct-10*

DEINSMR205

Requisition for DP Flow Transmitters

22

22 28-Nov-10

27-Dec-10*

DEINSMR206

Requisition for ESD System

22

22 16-Sep-10

17-Oct-10*

DEINSMR207

Requisition for Fire & gas System

22

22 16-Sep-10

17-Oct-10*

DEINSMR208

Requisition for Fire Detectors

22

22 28-Nov-10

27-Dec-10*

DEINSMR209

Requisition for Flow Computer System

22

22 16-Sep-10

17-Oct-10*

DEINSMR210

Requisition for Flow Metering Skid

22

22 16-Sep-10

17-Oct-10*

DEINSMR211

Requisition for Flow Meters

22

22 16-Sep-10

17-Oct-10*

DEINSMR212

Requisition for Flow Switch

22

22 28-Nov-10

27-Dec-10*

DEINSMR213

Requisition for Gas Detectors (LOS)

22

22 16-Sep-10

17-Oct-10*

DEINSMR214

Requisition for Gas Detectors (Point)

22

22 28-Nov-10

27-Dec-10*

DEINSMR215

Requisition for High-Sensitivity Smoke Detection System

22

22 16-Sep-10

17-Oct-10*

DEINSMR216

Requisition for Level Gauges

22

22 28-Nov-10

27-Dec-10*

DEINSMR217

Requisition for Level Interface Transmitters

22

22 28-Nov-10

27-Dec-10*

DEINSMR218

Requisition for Level Switches (External)

22

22 28-Nov-10

27-Dec-10*

DEINSMR219

Requisition for Level Switches (Insertion)

22

22 28-Nov-10

27-Dec-10*

DEINSMR220

Requisition for Level Transmitters (Displacer)

22

22 28-Nov-10

27-Dec-10*

DEINSMR221

Requisition for Level Transmitters (Insertion)

22

22 27-Oct-10

25-Nov-10*

DEINSMR222

Requisition for Level Transmitters (Tankage)

22

22 27-Oct-10

25-Nov-10*

DEINSMR223

Requisition for MOVs

22

22 23-Sep-10

24-Oct-10*

DEINSMR224

Requisition for Orifice Plates

22

22 23-Sep-10

24-Oct-10*

DEINSMR225

Requisition for Pig Detectors

22

22 27-Oct-10

25-Nov-10*

DEINSMR226

Requisition for Pipeline Block Valve Stations PCS

22

22 23-Sep-10

24-Oct-10*

DEINSMR227

Requisition for Pipeline Leak detection system

22

22 23-Sep-10

24-Oct-10*

DEINSMR228

Requisition for Pipeline Leak Detection System

22

22 23-Sep-10

24-Oct-10*

DEINSMR229

Requisition for Pressure gauges

22

22 27-Oct-10

25-Nov-10*

DEINSMR230

Requisition for Pressure Switches

22

22 27-Oct-10

25-Nov-10*

DEINSMR231

Requisition for Pressure Transmitters

22

22 27-Oct-10

25-Nov-10*

DEINSMR232

Requisition for Process Control System

22

22 23-Sep-10

24-Oct-10*

DEINSMR233

Requisition for Regulators

22

22 23-Sep-10

24-Oct-10*

DEINSMR234

Requisition for Relief Valves

22

22 23-Sep-10

24-Oct-10*

DEINSMR235

Requisition for Restriction Orifice Plates

22

22 23-Sep-10

24-Oct-10*

DEINSMR236

Requisition for Security System

22

22 27-Oct-10

25-Nov-10*

DEINSMR237

Requisition for Shut Down Valves

22

22 23-Sep-10

24-Oct-10*

DEINSMR238

Requisition for Temperature Gauges

22

22 27-Oct-10

25-Nov-10*

DEINSMR239

Requisition for Temperature Transmitters

22

22 27-Oct-10

25-Nov-10*

DEINSMR240

Requisition for Thermowells

22

22 23-Sep-10

24-Oct-10*

DEINSMR241

Requisition for Vibration Switches

22

22 27-Oct-10

25-Nov-10*

38

38 05-Sep-10

26-Oct-10

Instrument Specifications

2010
Jun

DEINSDS124

Instrument Requistions

Page 5 of 19 12-Aug-10 13:02

DEINSSP400

Functional Design Specification for Buildings Fire Detection System

19

19 30-Sep-10

26-Oct-10*

DEINSSP401

Functional Design Specification for CCTV

19

19 30-Sep-10

26-Oct-10*

DEINSSP402

Functional Design Specification for ESD System

20

20 05-Sep-10

30-Sep-10*

DEINSSP403

Functional Design Specification for Fire & gas System

20

20 05-Sep-10

30-Sep-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

2010
Jun

DEINSSP404

Functional Design Specification for Flow Computer System

20

20 05-Sep-10

30-Sep-10*

DEINSSP405

Functional Design Specification for Flow Metering Skid

20

20 05-Sep-10

30-Sep-10*

DEINSSP406

Functional Design Specification for High-Sensitivity Smoke Detection System

20

20 05-Sep-10

30-Sep-10*

DEINSSP407

Functional Design Specification for Pipeline Block Valve Stations PCS

19

19 30-Sep-10

26-Oct-10*

DEINSSP408

Functional Design Specification for Pipeline Leak detection system

20

20 05-Sep-10

30-Sep-10*

DEINSSP409

Functional Design Specification for Pipeline Leak Detection System

20

20 05-Sep-10

30-Sep-10*

DEINSSP410

Functional Design Specification for Process Control System

20

20 05-Sep-10

30-Sep-10*

43

43 29-Aug-10

26-Oct-10

Instrument Drawings

Page 6 of 19 12-Aug-10 13:02

DEINSDW500

ESD Cause and Effects Matrix

20

20 29-Aug-10

23-Sep-10*

DEINSDW501

F&G Cause and Effects Matrix

20

20 29-Aug-10

23-Sep-10*

DEINSDW502

Layout Drawing of EPS AMS system

19

19 30-Sep-10

26-Oct-10*

DEINSDW503

Layout Drawing of EPS Cable Routes

19

19 30-Sep-10

26-Oct-10*

DEINSDW504

Layout Drawing of EPS CCR Equipment

19

19 30-Sep-10

26-Oct-10*

DEINSDW505

Layout Drawing of EPS ESD Network

20

20 29-Aug-10

23-Sep-10*

DEINSDW506

Layout Drawing of EPS F&G detectors

19

19 30-Sep-10

26-Oct-10*

DEINSDW507

Layout Drawing of EPS FGS Matrix Panel

19

19 30-Sep-10

26-Oct-10*

DEINSDW508

Layout Drawing of EPS FGS Network

20

20 29-Aug-10

23-Sep-10*

DEINSDW509

Layout Drawing of EPS Fibre Optic Cables

19

19 30-Sep-10

26-Oct-10*

DEINSDW510

Layout Drawing of EPS Instrument locations

19

19 30-Sep-10

26-Oct-10*

DEINSDW511

Layout Drawing of EPS PCS Equipment Room

19

19 30-Sep-10

26-Oct-10*

DEINSDW512

Layout Drawing of EPS PCS Network

19

19 07-Sep-10

03-Oct-10*

DEINSDW513

Layout Drawing of EPS PCS Remote Equipment Rooms

19

19 30-Sep-10

26-Oct-10*

DEINSDW514

Layout Drawing of MCC IRP panels

19

19 30-Sep-10

26-Oct-10*

DEINSDW515

Layout Drawing of Water Intake Station Cable Routes

19

19 30-Sep-10

26-Oct-10*

DEINSDW516

Layout Drawing of Water Intake Station Equipment Room

19

19 30-Sep-10

26-Oct-10*

DEINSDW517

Layout Drawing of Water Intake Station ESD Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW518

Layout Drawing of Water Intake Station F&G detectors

19

19 30-Sep-10

26-Oct-10*

DEINSDW519

Layout Drawing of Water Intake Station FGS Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW520

Layout Drawing of Water Intake Station Fibre Optic Cables

19

19 30-Sep-10

26-Oct-10*

DEINSDW521

Layout Drawing of Water Intake Station Instrument locations

19

19 30-Sep-10

26-Oct-10*

DEINSDW522

Layout Drawing of Water Intake Station PCS Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW523

Layout Drawing of WellSites Cable Routes

19

19 30-Sep-10

26-Oct-10*

DEINSDW524

Layout Drawing of WellSites Equipment Room

19

19 30-Sep-10

26-Oct-10*

DEINSDW525

Layout Drawing of WellSites ESD Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW526

Layout Drawing of WellSites F&G detectors

19

19 30-Sep-10

26-Oct-10*

DEINSDW527

Layout Drawing of WellSites FGS Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW528

Layout Drawing of WellSites Fibre Optic Cables

19

19 30-Sep-10

26-Oct-10*

DEINSDW529

Layout Drawing of WellSites Instrument locations

19

19 30-Sep-10

26-Oct-10*

DEINSDW530

Layout Drawing of WellSites PCS Network

19

19 30-Sep-10

26-Oct-10*

DEINSDW531

Loop Drawings for Block Valve Stations IO Field Devices

19

19 30-Sep-10

26-Oct-10*

DEINSDW532

Loop Drawings for EPS ESD IO Field Devices

19

19 07-Sep-10

03-Oct-10*

DEINSDW533

Loop Drawings for EPS FGS IO Field Devices

19

19 14-Sep-10

10-Oct-10*

DEINSDW534

Loop Drawings for EPS PCS IO Field Devices

19

19 14-Sep-10

10-Oct-10*

DEINSDW545

Standard Drawings for Control Valve Hookup

19

19 14-Sep-10

10-Oct-10*

DEINSDW547

Standard Drawings for Flow Transx (DP) Hookup

19

19 14-Sep-10

10-Oct-10*

DEINSDW549

Standard Drawings for Instrument Air Hookup

19

19 14-Sep-10

10-Oct-10*

DEINSDW550

Standard Drawings for Instrument Mountings

19

19 14-Sep-10

10-Oct-10*

DEINSDW551

Standard Drawings for Junction Box Mounting

19

19 14-Sep-10

10-Oct-10*

DEINSDW552

Standard Drawings for Level Transx (DP) Hookup

19

19 14-Sep-10

10-Oct-10*

DEINSDW553

Standard Drawings for MOV Hookup

19

19 14-Sep-10

10-Oct-10*

DEINSDW555

Standard Drawings for Orifice Plates

19

19 14-Sep-10

10-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Standard Drawings for Pressure Switch Hookups

19

19 14-Sep-10

10-Oct-10*

DEINSDW558

Standard Drawings for Pressure Trx Hookups

19

19 21-Sep-10

17-Oct-10*

DEINSDW559

Standard Drawings for Shut Down Valve Hookup

19

19 21-Sep-10

17-Oct-10*

DEINSDW560

Standard Drawings for Thermowell

19

19 21-Sep-10

17-Oct-10*

DEINSDW561

Standard Drawings for Thermowell Installations

19

19 21-Sep-10

17-Oct-10*

41

41 30-Sep-10

25-Nov-10

DEINSLS707

EPS ESD Control System IO Allocations

19

19 30-Sep-10

26-Oct-10*

DEINSLS708

EPS FGS Control System IO Allocations

19

19 30-Sep-10

26-Oct-10*

DEINSLS709

EPS Instrument drawing list

19

19 01-Nov-10

25-Nov-10*

DEINSLS710

EPS Instrument Index

19

19 01-Nov-10

25-Nov-10*

DEINSLS711

EPS MTO List

19

19 01-Nov-10

25-Nov-10*

DEINSLS712

EPS PCS Control System IO Allocations

19

19 07-Oct-10

02-Nov-10*

DEINSLS713

EPS Preliminary MTO List

19

19 07-Oct-10

02-Nov-10*

12

12 30-Sep-10

17-Oct-10

Technical Note
DEINSTN800

Technical Note for DCS Configuration Standard

12

12 30-Sep-10

17-Oct-10*

DEINSTN801

Technical Note for DCS HMI Standard

12

12 30-Sep-10

17-Oct-10*

DEINSTN802

Technical Note for DCS HMI Layout

12

12 30-Sep-10

17-Oct-10*

DEINSTN804

Technical Note for Interface Requirement to Oil Heaters UCP

12

12 30-Sep-10

17-Oct-10*

DEINSTN806

Technical Note for Interface Requirements to Local Panels

12

12 30-Sep-10

17-Oct-10*

DEINSTN807

Technical Note for Interface Requirements to Pipe Line Leak Detection

12

12 30-Sep-10

17-Oct-10*

DEINSTN808

Technical Note for Interface Requirements to Flow Computers

12

12 30-Sep-10

17-Oct-10*

DEINSTN812

Technical Note for Interface Requirements to PCS by 3rd Party

12

12 30-Sep-10

17-Oct-10*

DEINSTN813

Technical Note for Instrumentation Requirements for Package Equipment

12

12 30-Sep-10

17-Oct-10*

13

13 14-Sep-10

30-Sep-10

Calculations
DEINSCA900

Thermowell Wake & Stress Calc

13

13 14-Sep-10

30-Sep-10*

DEINSCA901

Level Setting diagrams

13

13 14-Sep-10

30-Sep-10*

DEINSCA902

SIL testing time calcs

13

13 14-Sep-10

30-Sep-10*

DEINSCA903

SIL Calculation Report

13

13 14-Sep-10

30-Sep-10*

DEINSCA904

Orifice Plate Calculations

13

13 14-Sep-10

30-Sep-10*

DEINSCA905

Choke Valve Sizing Calculations

13

13 14-Sep-10

30-Sep-10*

DEINSCA906

Flow Meter Sizing

13

13 14-Sep-10

30-Sep-10*

DEINSCA907

Control Valve Sizing

13

13 14-Sep-10

30-Sep-10*

DEINSCA908

Intrinsically Safe Integrity Calculations

13

13 14-Sep-10

30-Sep-10*

88

60 15-Aug-10

04-Nov-10

65

38 15-Aug-10

05-Oct-10

MECHANICAL
Datasheets - Heat Exchangers
DEMDS0001

Mechanical Datasheet for Train 1 & 2 Crude/Crude Heat Exchanger 1E-10...

65

22 15-Aug-10

13-Sep-10*

DEMDS0002

Mechanical Datasheet for Train 1 & 2 Crude Rundown Air Cooler 1E-1415 ...

65

22 15-Aug-10

13-Sep-10*

DEMDS0003

Mechanical Datasheet for Train 1 & 2 Wash Water Heater 1E-5110 & 2E-5...

65

22 15-Aug-10

13-Sep-10*

DEMMR0200

Requisition Crude / Crude Heat Exchangers

16

16 14-Sep-10

05-Oct-10*

DEMMR0201

Requisition Air Cooler

16

16 14-Sep-10

05-Oct-10*

DEMMR0202

Requisition Wash Water Heater

16

16 14-Sep-10

05-Oct-10*

65

38 15-Aug-10

05-Oct-10

Datasheets - Heaters
DEMDS0030

Mechanical Datasheet for Train 1 & 2 Crude Heater 1F-1010 & 2F-1010

65

22 15-Aug-10

13-Sep-10*

DEMDS0031

Mechanical Datasheet for Fuel Gas Scrubber

65

22 15-Aug-10

13-Sep-10*

DEMMR0203

Requisition Crude Heater

16

16 14-Sep-10

05-Oct-10*

DEMMR0204

Requisition Fuel Gas Scrubber

16

16 14-Sep-10

05-Oct-10*

83

38 15-Aug-10

05-Oct-10

Datasheets - Pumps

2010
Jun

DEINSDW557

List

Page 7 of 19 12-Aug-10 13:02

DEMDS0050

Mechanical Datasheet for Crude Oil Booster Pumps P-1300 A/S

60

22 15-Aug-10

13-Sep-10*

DEMDS0051

Mechanical Datasheet for Crude Oil Export Pumps P-1310 A/S

60

22 15-Aug-10

13-Sep-10*

DEMDS0052

Mechanical Datasheet for Offspec Crude Oil Transfer Pumps P-1320 A/S

60

22 15-Aug-10

13-Sep-10*

DEMDS0053

Mechanical Datasheet for Water Intake Pump (Diesel) P-4000

83

33 15-Aug-10

28-Sep-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Mechanical Datasheet for Water Intake Pump (Electric) P-4010

83

33 15-Aug-10

28-Sep-10*

DEMDS0055

Mechanical Datasheet for Water Transfer Pumps P-4020 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0056

Mechanical Datasheet for Produced Water Transfer Pumps P-4200 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0057

Mechanical Datasheet for Produced Water Eductor Pumps P-4210-A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0058

Mechanical Datasheet for Service Water Distribution Pumps P-5100 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0059

Mechanical Datasheet for Potable Water Distribution Pumps P-5200 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0060

Mechanical Datasheet for Fire Water Pump (Diesel) P-5300

60

22 15-Aug-10

13-Sep-10*

DEMDS0061

Mechanical Datasheet for Fire Water Pump (Diesel) P-5310

60

22 15-Aug-10

13-Sep-10*

DEMDS0062

Mechanical Datasheet for Fire Water Jocky Pumps P-5320 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0063

Mechanical Datasheet for LP Flare KO Drum Pumps P-6200 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0064

Mechanical Datasheet for ATM Flare KO Drum Pumps P-6210 A/S

83

33 15-Aug-10

28-Sep-10*

DEMDS0066

Mechanical Datasheet for Diesel Transfer Pumps P-6710 A/B

83

33 15-Aug-10

28-Sep-10*

DEMDS0067

Mechanical Datasheet for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1...

60

22 15-Aug-10

13-Sep-10*

DEMDS0068

Mechanical Datasheet for Train 1 & 2 Wash Water Recirculation Pumps 1...

60

22 15-Aug-10

13-Sep-10*

DEMDS0069

Mechanical Datasheet for Well Cluster 1 & 2 Corrosion Inhibitor Injection P...

83

33 15-Aug-10

28-Sep-10*

DEMMR0205

Requistion Pumps-1

16

16 14-Sep-10

05-Oct-10*

DEMMR0206

Requistion Pumps-2

4 29-Sep-10

04-Oct-10*

83

60 15-Aug-10

04-Nov-10

DEMDS0090

Mechanical Datasheet for Diesel Strainer S-6700 A/S

83

45 15-Aug-10

14-Oct-10*

DEMDS0091

Mechanical Datasheet for Water Intake Filter Unit SQ-4000

83

45 15-Aug-10

14-Oct-10*

DEMMR0207

Requisition Filters / strainers

16

15 17-Oct-10

04-Nov-10*

78

60 15-Aug-10

04-Nov-10

Datasheets - Tanks
DEMDS0110

Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 T-1400 A/B

65

22 15-Aug-10

13-Sep-10*

DEMDS0112

Mechanical Datasheet for Crude Oil Off Spec Tank T-1420

65

22 15-Aug-10

13-Sep-10*

DEMDS0113

Mechanical Datasheet for Produced Water Buffer Tank T-4200

55

22 15-Aug-10

13-Sep-10*

DEMDS0114

Mechanical Datasheet for Service Water Tank T-5100

78

45 15-Aug-10

14-Oct-10*

DEMDS0115

Mechanical Datasheet for Potable Water Storage Tank T-5210

78

45 15-Aug-10

14-Oct-10*

DEMDS0116

Mechanical Datasheet for Fire Water Storage Tank T-5300

55

22 15-Aug-10

13-Sep-10*

DEMDS0117

Mechanical Datasheet for Diesel Storage Tank T-6700

55

22 15-Aug-10

13-Sep-10*

DEMDS0118

Mechanical Datasheet for Well Cluster 1 Corrosion Inhibitor Storage Tank ...

78

45 15-Aug-10

14-Oct-10*

DEMMR0208

Requistion Tanks -1

16

16 14-Sep-10

05-Oct-10*

DEMMR0209

Requistion Tanks-2

16

15 17-Oct-10

04-Nov-10*

16

16 30-Sep-10

21-Oct-10

Drawings - Tanks
DEMCA0008

Calculation API650

16

16 30-Sep-10

21-Oct-10*

DEMDW0001

General arrangements

16

16 30-Sep-10

21-Oct-10*

DEMDW0002

Roof Structure

16

16 30-Sep-10

21-Oct-10*

DEMDW0003

Roof Plates

16

16 30-Sep-10

21-Oct-10*

DEMDW0004

Bottom Plates

16

16 30-Sep-10

21-Oct-10*

DEMDW0005

Shell Plates

16

16 30-Sep-10

21-Oct-10*

DEMDW0006

Ladder and Railings

16

16 30-Sep-10

21-Oct-10*

DEMDW0007

Anchor Bolts

16

16 30-Sep-10

21-Oct-10*

88

50 15-Aug-10

21-Oct-10

Datasheets - Vessels

2010
Jun

DEMDS0054

Datasheets - Filters/Strainers

Page 8 of 19 12-Aug-10 13:02

DEMDS0140

Mechanical Datasheet for Gathering Station 1 Test Separator V-1000

70

22 15-Aug-10

13-Sep-10*

DEMDS0141

Mechanical Datasheet for Crude Oil Storage Tank 1 & 2 Degassing Boots ...

50

22 15-Aug-10

13-Sep-10*

DEMDS0142

Mechanical Datasheet for Crude Oil Off Spec Tank Degassing Boot V-1420

50

22 15-Aug-10

13-Sep-10*

DEMDS0143

Mechanical Datasheet for Corrugated Plate Interceptor V-4200

50

22 15-Aug-10

13-Sep-10*

DEMDS0144

Mechanical Datasheet for Induced Gas Flotation Vessel V-4210

50

22 15-Aug-10

13-Sep-10*

DEMDS0145

Mechanical Datasheet for Fuel Gas KO Drum V-6000

50

22 15-Aug-10

13-Sep-10*

DEMDS0146

Mechanical Datasheet for LP Flare KO Drum V-6200

50

22 15-Aug-10

13-Sep-10*

DEMDS0147

Mechanical Datasheet for ATM Flare KO Drum V-6210

50

22 15-Aug-10

13-Sep-10*

DEMDS0148

Mechanical Datasheet for Closed Drain Drum V-6400

50

22 15-Aug-10

13-Sep-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Mechanical Datasheet for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-...

70

22 15-Aug-10

13-Sep-10*

DEMDS0150

Mechanical Datasheet for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V...

70

22 15-Aug-10

13-Sep-10*

DEMDS0151

Mechanical Datasheet for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030

50

22 15-Aug-10

13-Sep-10*

DEMDS0152

Mechanical Datasheet for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510

70

22 15-Aug-10

13-Sep-10*

DEMDS0153

Mechanical Datasheet for Train 1 & 2 Desalters 1V-1520 & 2V-1520

70

22 15-Aug-10

13-Sep-10*

DEMDS0160

Mechanical Datasheet for Emergency Diesel Generator

68

45 15-Aug-10

14-Oct-10*

DEMLS0001

Mechanical Equipment List

75

22 15-Aug-10

13-Sep-10*

DEMMR0210

Requistion Vessels

16

16 14-Sep-10

05-Oct-10*

DEMMR0211

Requistion Emergency Diesel Generator

15

15 26-Sep-10

14-Oct-10*

DEMMR0212

Requsition Chemical Injection skids

16

16 30-Sep-10

21-Oct-10*

DEMRE0001

Material Selection Report

65

22 15-Aug-10

13-Sep-10*

DEMSP0001

Mechanical Specification for Daearator Package

75

22 15-Aug-10

13-Sep-10*

DEMSP0002

General Specification for Unfired Pressure Vessels (Static)

65

22 15-Aug-10

13-Sep-10*

DEMSP0003

General Mechanical Specification for Centrifugal Pumps (Rotating)

65

22 15-Aug-10

13-Sep-10*

DEMSP0004

Specification for Packaged Skidded Equipment (Static & Rotating)

65

22 15-Aug-10

13-Sep-10*

DEMSP0006

General Specification for Air Coolers (Rotating)

88

45 15-Aug-10

14-Oct-10*

DEMSP0007

Specification for Piping and Valve Materials (Static)

65

22 15-Aug-10

13-Sep-10*

DEMSP0008

Specification for Piping Design (Static)

65

22 15-Aug-10

13-Sep-10*

DEMSP0009

Specification for Piping Fabrication and Installation (Static)

88

45 15-Aug-10

14-Oct-10*

DEMSP0010

Specification for Piping Testing and Completion (Static)

88

45 15-Aug-10

14-Oct-10*

DEMSP0011

Specification for Shell & Tube Heat Exchanger (Previously Spec for HVAC)

65

22 15-Aug-10

13-Sep-10*

DEMSP0013

Specification for Emergency Diesel Generator

78

45 15-Aug-10

14-Oct-10*

DEMSP0014

Specification for Instrument Air Compressor Package

72

45 15-Aug-10

14-Oct-10*

DEMSP0015

Specification for Potable Water Membrane Package

70

45 15-Aug-10

14-Oct-10*

DEMSP0016

Specifiation for Allowable Loads at Equipment Nozzles & Flanged

47

22 15-Aug-10

13-Sep-10*

DEMSP0017

Flare Ignition System

16

16 30-Sep-10

21-Oct-10*

129

129 15-Aug-10

09-Feb-11

DEPLDW0002

Key Plan - Export Pipeline Option 1 (KP0-AHDEB Tie-In Point)

65

22 15-Aug-10

13-Sep-10*

DEPLDW0003

Overall Gathering Line & Export Pipeline System

60

22 15-Aug-10

13-Sep-10*

DEPLDW0015

Route Map - Option 1 KP 00 -05

65

22 15-Aug-10

13-Sep-10*

DEPLDW0016

Route Map - Option 1 KP 05 - AHDEB Tie-In Point

65

22 15-Aug-10

13-Sep-10*

DEPLDW0018

Typical Trench & Backfilling Details - Open Cut

65

22 15-Aug-10

13-Sep-10*

DEPLDW0019

Typical Waterway/Creek Crossing Details - Open Cut

65

22 15-Aug-10

13-Sep-10*

DEPLDW0020

Typical Road Crossing Details - Open Cut

65

22 15-Aug-10

13-Sep-10*

DEPLDW0021

Typical Road Crossing Details - Bored

65

22 15-Aug-10

13-Sep-10*

DEPLDW0022

Typical Crossing Details - Horizontal Directional Drilling (HDD)

65

22 15-Aug-10

13-Sep-10*

DEPLDW0023

Typical Block Valve Station

60

22 15-Aug-10

13-Sep-10*

DEPLDW0024

Crossing Location Plan

60

22 15-Aug-10

13-Sep-10*

DEPLDW0025

Pipeline Route Option Layout

54

22 15-Aug-10

13-Sep-10*

DEPLDW0026

Alignment Sheets

39

39 31-Aug-10

24-Oct-10*

60

22 15-Aug-10

13-Sep-10

Calculations
DEPLCA0001

Wall Thickness Calculation

60

22 15-Aug-10

13-Sep-10*

DEPLCA0002

Pipeline Sizing Calculation

60

22 15-Aug-10

13-Sep-10*

DEPLCA0003

Calculation for Pipeline Stress Analysis

60

22 15-Aug-10

13-Sep-10*

75

22 15-Aug-10

13-Sep-10

Lists
DEPLLS0001

Pipeline Drawing Index

75

22 15-Aug-10

13-Sep-10*

DEPLLS0002

Pipeline Materials Take-off including Major Long Lead Items

60

22 15-Aug-10

13-Sep-10*

88

45 15-Aug-10

14-Oct-10

Reports

2010
Jun

DEMDS0149

PIPELINE

Page 9 of 19 12-Aug-10 13:02

DEPLRE0002

Pipeline Internal/External Corrosion Mitigation Philosophy

88

45 15-Aug-10

14-Oct-10*

DEPLRE0003

Cathodic Protection Design Philosopy

88

45 15-Aug-10

14-Oct-10*

DEPLRE0004

Site Investigation Plan - Pipeline

88

45 15-Aug-10

14-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name
DEPLRE0005

Route Definition Report

Scope of Work
DEPLRE0001

Pipeline Construction Scope of Work

Specifications

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

71

45 15-Aug-10

14-Oct-10*

66

45 15-Aug-10

14-Oct-10

66

45 15-Aug-10

14-Oct-10*

99

55 15-Aug-10

28-Oct-10

1) Specification for Line Pipe

77

45 15-Aug-10

14-Oct-10*

DEPLSP0003

2) Specifications for External Coating of Line Pipe

77

45 15-Aug-10

14-Oct-10*

DEPLSP0004

3) Specifications for Hot Induction Bends

77

45 15-Aug-10

14-Oct-10*

DEPLSP0005

4) Specifications for Pig Launchers / Receivers

77

45 15-Aug-10

14-Oct-10*

DEPLSP0006

5) Specifications for Fiber Optic Cable & Installation

77

45 15-Aug-10

14-Oct-10*

DEPLSP0007

6) Specifications for Barred Tees

77

45 15-Aug-10

14-Oct-10*

DEPLSP0008

7) Specifications for Insulating Joints

77

45 15-Aug-10

14-Oct-10*

DEPLSP0009

8) Specifications for Anchor Flanges

88

55 15-Aug-10

28-Oct-10*

DEPLSP0010

9) Specifications for Fittings and Flanges

88

55 15-Aug-10

28-Oct-10*

DEPLSP0011

10) Specification for Onshore Pipeline Construction

88

55 15-Aug-10

28-Oct-10*

DEPLSP0012

11) Specification for Field Joint Coating

88

55 15-Aug-10

28-Oct-10*

DEPLSP0013

12) Specification for Coating of Bends & Fittings

88

55 15-Aug-10

28-Oct-10*

DEPLSP0014

13) Specification for Pipeline welding

88

55 15-Aug-10

28-Oct-10*

DEPLSP0016

15) Specification for Topographic Survey Works

99

55 15-Aug-10

28-Oct-10*

DEPLSP0017

16) Specification for Geotechnical Survey

99

55 15-Aug-10

28-Oct-10*

DEPLSP0018

17) Specification for Leak Monitoring System

94

55 15-Aug-10

28-Oct-10*

94

55 15-Aug-10

28-Oct-10

DEPLDS0001

1) Data Sheet for Line Pipe & Coating

94

55 15-Aug-10

28-Oct-10*

DEPLDS0002

2) Datasheet for Hot Induction bends

94

55 15-Aug-10

28-Oct-10*

DEPLDS0003

3) Data Sheet for Pig Launchers / Receivers

94

55 15-Aug-10

28-Oct-10*

DEPLDS0004

4) Data Sheet for Barred Tees

94

55 15-Aug-10

28-Oct-10*

DEPLDS0005

5) Data Sheet for Insulating Joints

94

55 15-Aug-10

28-Oct-10*

DEPLDS0006

6) Data Sheet for Anchor Flanges (Preliminary)

94

55 15-Aug-10

28-Oct-10*

89

89 15-Aug-10

15-Dec-10

P&ID(IPC)
DEPLDW1000

Overall Pipeline System P&ID

72

72 15-Aug-10

22-Nov-10*

DEPLDW1001

Pipeline P&ID

72

72 15-Aug-10

22-Nov-10*

DEPLDW1002

BV P&ID for BV1

72

72 05-Sep-10

13-Dec-10*

DEPLDW1003

BV P&ID for BV2

72

72 07-Sep-10

15-Dec-10*

110

110 15-Aug-10

Calculation

13-Jan-11

DEPLCA1004

Stress Analysis Calculation for HDD Crossing

92

92 15-Aug-10

20-Dec-10*

DEPLCA1005

Stress Analysis Calculation for Road Crossing

92

92 05-Sep-10

10-Jan-11*

DEPLCA1006

Anchor Flange Calculation

92

92 15-Aug-10

20-Dec-10*

DEPLCA1007

Pipeline Load Case Analysis Calculation

92

92 06-Sep-10

11-Jan-11*

DEPLCA1008

Concrete Coating Thickness Calculation

92

92 06-Sep-10

11-Jan-11*

DEPLCA1009

Buoyancy Control Calculation

92

92 15-Aug-10

20-Dec-10*

DEPLCA1010

Set-on Weight Spacing Calculation

92

92 06-Sep-10

11-Jan-11*

DEPLCA1011

Screw Anchor Spacing Calculation

92

92 08-Sep-10

13-Jan-11*

DEPLCA1012

Control Valve Sizing Calculation

92

92 15-Aug-10

20-Dec-10*

DEPLCA1013

PSV Sizing Calculation

92

92 06-Sep-10

11-Jan-11*

DEPLCA1014

Pipeline Transient Analysis (Hydraulic Detail Study)

92

92 15-Aug-10

20-Dec-10*

DEPLCA1015

Cathodic Protection Calculation

92

92 15-Aug-10

20-Dec-10*

112

112 15-Aug-10

Data Sheet

2010
Jun

DEPLSP0002

Datasheets

Page 10 of 19 12-Aug-10 13:02

17-Jan-11

DEPLDS1016

Data Sheet for Control Valve

92

92 12-Sep-10

17-Jan-11*

DEPLDS1017

Data Sheet for Pig Detector

92

92 15-Aug-10

20-Dec-10*

DEPLDS1018

Data Sheet for On-Off Valve (Motor Actuator)

92

92 15-Aug-10

20-Dec-10*

DEPLDS1019

Data Sheet for On-Off Valve (G/H Actuator)

92

92 15-Aug-10

20-Dec-10*

DEPLDS1020

Data Sheet for Pig Signaller

92

92 15-Aug-10

20-Dec-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

Data Sheet for Heat Shrink Sleeves

92

92 06-Sep-10

11-Jan-11*

DEPLDS1022

Data Sheet for Pressure Transmitter 16" Pipeline Pig Launcher at Garraf F...

92

92 06-Sep-10

11-Jan-11*

DEPLDS1023

Data Sheet for Pressure Transmitter 16" Pipeline Pig Receiver at Ahdab Ti...

92

92 06-Sep-10

11-Jan-11*

DEPLDS1024

Data Sheet for Pressure Gauge at Block valve stations

92

92 06-Sep-10

11-Jan-11*

DEPLDS1025

Data Sheet for Pressure Transmitter at BVS-1

92

92 09-Sep-10

16-Jan-11*

DEPLDS1026

Data Sheet for Pressure Transmitter at BVS-2

92

92 09-Sep-10

16-Jan-11*

DEPLDS1027

Data Sheet for Pressure Gauge Pipeline Pig Launcher at Garraf FCP

5 15-Aug-10

19-Aug-10*

DEPLDS1028

Data Sheet for Pressure Gauge Pipeline Pig Receiver at Ahdab Tie-in

5 15-Aug-10

19-Aug-10*

125

125 15-Aug-10

03-Feb-11

125

125 15-Aug-10

03-Feb-11

Alignment Sheet
DEPLDS1029

Stanadard Symbols and Abbreviations on Alignment Sheets

108

108 15-Aug-10

11-Jan-11*

DEPLDS1030

Alignment Sheet Key Plan

108

108 15-Aug-10

11-Jan-11*

DEPLDS1031

Alignment Sheets - KP 0 + 000 - KP 1 + 400

108

108 02-Sep-10

31-Jan-11*

DEPLDS1032

Alignment Sheets - KP 1 + 400 - KP 2 + 800

108

108 02-Sep-10

31-Jan-11*

DEPLDS1033

Alignment Sheets - KP 2 + 800 - KP 4 + 200

108

108 05-Sep-10

01-Feb-11*

DEPLDS1034

Alignment Sheets - KP 4 + 200 - KP 5 + 600

108

108 05-Sep-10

01-Feb-11*

DEPLDS1035

Alignment Sheets - KP 5 + 600 - KP 7 + 000

108

108 06-Sep-10

02-Feb-11*

DEPLDS1036

Alignment Sheets - KP 7 + 000 - KP 8 + 400

108

108 06-Sep-10

02-Feb-11*

DEPLDS1037

Alignment Sheets - KP 8 + 400 - KP 9 + 800

108

108 07-Sep-10

03-Feb-11*

DEPLDS1038

Alignment Sheets - KP 9 + 800 - KP 10 + 500 (Ahdab Tie-in)

108

108 07-Sep-10

03-Feb-11*

105

105 15-Aug-10

06-Jan-11

DEPLDW1039 Road (Bored) KP 4+802

81

81 14-Sep-10

04-Jan-11*

DEPLDW1040 Garraf River (HDD) KP 8+547

81

81 16-Sep-10

06-Jan-11*

DEPLDW1041 Highway 7 (Bored) KP 9+141

81

81 15-Aug-10

05-Dec-10*

120

120 15-Aug-10

DEPLDW1042 Typical for Power Transmission Lines

91

91 15-Aug-10

19-Dec-10*

DEPLDW1043 Typical for Concrete Slab

91

91 15-Aug-10

19-Dec-10*

DEPLDW1044 Typical for Construction Site Preparation for Bored crossing

91

91 15-Aug-10

19-Dec-10*

DEPLDW1045 Typical for Construction Site Preparation for Horizontal Directional Drilling (...

91

91 06-Sep-10

10-Jan-11*

DEPLDW1046 Typical Installation of FOC Manhole

91

91 06-Sep-10

10-Jan-11*

DEPLDW1047 Typical Set-on Weight

91

91 06-Sep-10

10-Jan-11*

DEPLDW1048 Typical Pipeline Warning Tape

91

91 09-Sep-10

13-Jan-11*

DEPLDW1049 Typical Warning Sign for FOC Manhole

91

91 09-Sep-10

13-Jan-11*

DEPLDW1050 Typical for Hot Bend General Arrangement Drawing

91

91 09-Sep-10

13-Jan-11*

DEPLDW1051 Typical for Pipeline Marker

91

91 14-Sep-10

18-Jan-11*

DEPLDW1052 TTypical for Aerial Marker

91

91 20-Sep-10

24-Jan-11*

DEPLDW1053 Typical for Cable trench/routing and inst. Location layout at Pig stations

91

91 20-Sep-10

24-Jan-11*

DEPLDW1054 Typical for Cable trench/routing and inst. Location layout at block valve stat...

91

91 23-Sep-10

27-Jan-11*

129

129 15-Aug-10

09-Feb-11

129

129 15-Aug-10

09-Feb-11

DEPLDW1055 Piping Arrangement Drawing

106

106 15-Aug-10

09-Jan-11*

DEPLDW1056 Piping Isometric Drawing

106

106 05-Sep-10

30-Jan-11*

DEPLDW1057 Plot Plan, Access Road and Section

106

106 07-Sep-10

01-Feb-11*

DEPLDW1058 Cross section and Details

106

106 09-Sep-10

03-Feb-11*

DEPLDW1059 Block Valve Station Foundation Plan reinfocement and details

106

106 13-Sep-10

07-Feb-11*

DEPLDW1060 Typical Pipe Support

106

106 15-Sep-10

09-Feb-11*

DEPLDW1061 Details of Security fence

5 15-Aug-10

19-Aug-10*

DEPLDW1062 Details of Security gate and safety barrier

5 15-Aug-10

19-Aug-10*

DEPLDW1063 Details of Stair and Handrail

5 15-Aug-10

19-Aug-10*

129

129 15-Aug-10

09-Feb-11

106

106 15-Aug-10

09-Jan-11*

Crossing Drawing

Typical Drawing

Block Valve Station


Block Valve Station 1

Block Valve Station 2


DEPLDW1064 Piping Arrangement Drawing

2010
Jun

DEPLDS1021

Drawing

Page 11 of 19 12-Aug-10 13:02

27-Jan-11

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

106

106 05-Sep-10

30-Jan-11*

DEPLDW1066 Plot Plan, Access Road and Section

106

106 07-Sep-10

01-Feb-11*

DEPLDW1067 Cross section and Details

106

106 09-Sep-10

03-Feb-11*

DEPLDW1068 Block Valve Station Foundation Plan reinfocement and details

106

106 13-Sep-10

07-Feb-11*

DEPLDW1069 Typical Pipe Support

106

106 15-Sep-10

09-Feb-11*

DEPLDW1070 Details of Security fence

5 15-Aug-10

19-Aug-10*

DEPLDW1071 Details of Security gate and safety barrier

5 15-Aug-10

19-Aug-10*

DEPLDW1072 Details of Stair and Handrail

5 15-Aug-10

19-Aug-10*

92

92 15-Aug-10

20-Dec-10

92

92 15-Aug-10

20-Dec-10*

108

108 15-Aug-10

DEPLDW1073

Detailed Pipeline Material Take-Off

Specification

11-Jan-11

DEPLSP1074

Specification for Pipe Class Summary and Piping Classes

92

92 15-Aug-10

20-Dec-10*

DEPLSP1075

Specification for Mechanical Completion and Commissioning

92

92 15-Aug-10

20-Dec-10*

DEPLSP1076

Specification for Requirement of Spares

92

92 15-Aug-10

20-Dec-10*

DEPLSP1077

Specification for Site Preparation

92

92 15-Aug-10

20-Dec-10*

DEPLSP1078

Specification for Above Ground Painting

92

92 06-Sep-10

11-Jan-11*

DEPLSP1079

Specification for Under Ground Painting

92

92 15-Aug-10

20-Dec-10*

DEPLSP1080

Specification for Blasting

92

92 15-Aug-10

20-Dec-10*

DEPLSP1081

Specification for Horizontal Directional Drilled Crossings

92

92 15-Aug-10

20-Dec-10*

DEPLSP1082

Specification for Pipe Boring/Pipe Jack Construction

92

92 15-Aug-10

20-Dec-10*

DEPLSP1083

Specification for Linepipe 3LPE Coating Repair

92

92 15-Aug-10

20-Dec-10*

DEPLSP1084

Specification for Welding Pipe for Stations

92

92 15-Aug-10

20-Dec-10*

DEPLSP1085

Specification for Reinforced Concrete Pipe

92

92 15-Aug-10

20-Dec-10*

DEPLSP1086

Specification for Supply and Installation of Fencing and Gates

92

92 15-Aug-10

20-Dec-10*

DEPLSP1087

Specification for Pig Detector

92

92 15-Aug-10

20-Dec-10*

DEPLSP1088

Specification for Pipeline Ball Valves (API 6D)

92

92 15-Aug-10

20-Dec-10*

DEPLSP1089

Specification for Pipeline Plug Valve

92

92 15-Aug-10

20-Dec-10*

DEPLSP1090

Specification for Pipeline Check Valves (Full Bore)

92

92 15-Aug-10

20-Dec-10*

DEPLSP1091

Specification for Pig Signaller

92

92 15-Aug-10

20-Dec-10*

DEPLSP1092

Specification for pre-commissioning of Onshore Pipeline

92

92 15-Aug-10

20-Dec-10*

DEPLSP1093

Specification for pre-commissioning of Block Valve Station

92

92 15-Aug-10

20-Dec-10*

DEPLSP1094

Specification for Block Valve Station Construction

92

92 15-Aug-10

20-Dec-10*

DEPLSP1095

Specification for Radiographic Test

92

92 15-Aug-10

20-Dec-10*

DEPLSP1096

Specification for Magnetic Particle Test

92

92 15-Aug-10

20-Dec-10*

DEPLSP1097

Specification for Liquid Penetrate Test

92

92 15-Aug-10

20-Dec-10*

DEPLSP1098

Specification for Ultrasonic Test

92

92 15-Aug-10

20-Dec-10*

DEPLSP1099

Specification for Buoyancy Control

92

92 15-Aug-10

20-Dec-10*

DEPLSP1100

Specification for Continued Concrete Coating

92

92 15-Aug-10

20-Dec-10*

DEPLSP1101

Specification for Set on Weight

92

92 15-Aug-10

20-Dec-10*

DEPLSP1102

Specification for Reinforced Concrete Structure

92

92 15-Aug-10

20-Dec-10*

DEPLSP1103

Specification for Pipe Haulage, Storage and Stockpiling

92

92 15-Aug-10

20-Dec-10*

DEPLSP1104

Specification for Solar Panel

92

92 15-Aug-10

20-Dec-10*

DEPLSP1105

Specification for Pipeline Baseline Survey

92

92 15-Aug-10

20-Dec-10*

127

127 15-Aug-10

07-Feb-11

Cathodic Protection

2010
Jun

DEPLDW1065 Piping Isometric Drawing

List&Report

Page 12 of 19 12-Aug-10 13:02

DEPLDW1106

Typical Power Source Unit Installation Details

106

106 15-Aug-10

09-Jan-11*

DEPLDW1107

Typical Power Source Unit Schematic

106

106 15-Aug-10

09-Jan-11*

DEPLDW1108

Typical Power Source Unit Remote Monitoring Schematic

106

106 05-Sep-10

30-Jan-11*

DEPLDW1109

Typical Ground Bed Construction Detail

106

106 05-Sep-10

30-Jan-11*

DEPLDW1110

Typical Exothermic Welding Details

106

106 07-Sep-10

01-Feb-11*

DEPLDW1111

Typical Test Post Fabrication and Construction Details

106

106 07-Sep-10

01-Feb-11*

DEPLDW1112

Typical Test Post Installation Details

106

106 09-Sep-10

03-Feb-11*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

2010
Jun

DEPLDW1113

Typical Zinc Ribbon Installation Details

106

106 09-Sep-10

03-Feb-11*

DEPLDW1114

AC & DC Mitigation System Overall Schematic

106

106 13-Sep-10

07-Feb-11*

DEPLDW1115

Layout/location plan of CP network

106

106 13-Sep-10

07-Feb-11*

DEPLDW1116

Temporary Sacrificial Anodes (where required)

5 15-Aug-10

19-Aug-10*

DEPLDW1117

Typical AC/DC Mitigation Installation Detail (As required)

5 15-Aug-10

19-Aug-10*

DEPLDW1118

Typical Foreign Pipeline Crossing Installation Detail (Where required)

5 15-Aug-10

19-Aug-10*

DEPLDW1119

Typical Isolating Flange/Joint Detail

5 15-Aug-10

19-Aug-10*

115

88 15-Aug-10

14-Dec-10

PIPING

Page 13 of 19 12-Aug-10 13:02

DELDW0001

Piping Drawing Index

49

22 15-Aug-10

13-Sep-10*

DELDW0002

EPS - Overall Site Layout

65

22 15-Aug-10

13-Sep-10*

DELDW0003

EPS - General Site Layout Plan (Sheet 1 & 2)

65

22 15-Aug-10

13-Sep-10*

DELDW0004

Raw Water Intake - Site Layout Plan

65

22 15-Aug-10

13-Sep-10*

DELDW0006

Cluster Well Pad - Typical Site Layout

65

22 15-Aug-10

13-Sep-10*

DELDW0007

Single Well Pad - Typical Site Layout

65

22 15-Aug-10

13-Sep-10*

DELDW0020

EPS - Oil Line Study Transposition

49

22 15-Aug-10

13-Sep-10*

DELDW0021

EPS - Gas Line Study Transposition

49

22 15-Aug-10

13-Sep-10*

DELDW0022

EPS - Produced Water Line Study Transposition

49

22 15-Aug-10

13-Sep-10*

DELDW0023

EPS - Raw Water Line Study Transposition

49

22 15-Aug-10

13-Sep-10*

DELDW0024

EPS - Firewater Ring Main Line Study Transposition

49

22 15-Aug-10

13-Sep-10*

DELDW0030

Equipment Location Key Plan

33

33 30-Aug-10

13-Oct-10*

DELDW0031

Equipment Location Plan - WC-1

33

33 30-Aug-10

13-Oct-10*

DELDW0032

Equipment Location Plan -WC-2

33

33 30-Aug-10

13-Oct-10*

DELDW0033

Equipment Location Plan - EPS - Area 1

33

33 30-Aug-10

13-Oct-10*

DELDW0034

Equipment Location Plan - EPS - Area 2

33

33 30-Aug-10

13-Oct-10*

DELDW0035

Equipment Location Plan - EPS - Area 3

33

33 30-Aug-10

13-Oct-10*

DELDW0036

Equipment Location Plan - EPS- Area 4

33

33 30-Aug-10

13-Oct-10*

DELDW0037

Equipment Location Plan - EPS - Area 5

33

33 30-Aug-10

13-Oct-10*

DELDW0038

Equipment Location Plan -EPS- Area 6

33

33 30-Aug-10

13-Oct-10*

DELDW0039

Equipment Location Plan - EPS - Area 7

33

33 30-Aug-10

13-Oct-10*

DELDW0040

Equipment Location Plan - EPS- Area 6

33

33 30-Aug-10

13-Oct-10*

DELDW0041

Equipment Location Plan - EPS - Area 8

33

33 30-Aug-10

13-Oct-10*

DELDW0042

Equipment Location Plan - EPS - Area 9

33

33 30-Aug-10

13-Oct-10*

DELDW0043

Equipment Location Plan - EPS - Area 10

33

33 30-Aug-10

13-Oct-10*

DELDW0044

Equipment Location Plan - EPS - Area 11

33

33 30-Aug-10

13-Oct-10*

DELDW0045

Equipment Location Plan - EPS - Area 12

33

33 30-Aug-10

13-Oct-10*

DELDW0046

Equipment Location Plan - EPS - Area 13

33

33 30-Aug-10

13-Oct-10*

DELDW0047

Equipment Location Plan - EPS - Area 14

33

33 30-Aug-10

13-Oct-10*

DELDW0048

Equipment Location Plan - EPS - Area 15

33

33 30-Aug-10

13-Oct-10*

DELDW0049

Equipment Location Plan - EPS - Area 16

33

33 30-Aug-10

13-Oct-10*

DELDW0050

Equipment Location Plan - Water Intake

33

33 30-Aug-10

13-Oct-10*

DELDW0060

Model Key Plan

33

33 30-Aug-10

13-Oct-10*

DELDW0100

Typical Piping Support Index

115

88 15-Aug-10

14-Dec-10*

DELDW0101

Typical Piping Vent, Drain & Instrument Connection Detail Index

115

88 15-Aug-10

14-Dec-10*

DELDW0102

Specialty Items Index

33

33 30-Aug-10

13-Oct-10*

DELDW0103

Specialty Supports Index

33

33 30-Aug-10

13-Oct-10*

DELDW0104

Isometric Drawing Index

33

33 30-Aug-10

13-Oct-10*

DELDW0105

Tie-in Schedule Index

33

33 30-Aug-10

13-Oct-10*

DELDW0106

Model Drawing Index

33

33 30-Aug-10

13-Oct-10*

DELDW0107

Index

33

33 30-Aug-10

13-Oct-10*

DELDW0108

Index

33

33 30-Aug-10

13-Oct-10*

DELDW0109

Index

33

33 30-Aug-10

13-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Page 14 of 19 12-Aug-10 13:02

Finish

2010
Jun

DELDW0110

Piping MTO

33

33 30-Aug-10

13-Oct-10*

DELDW0200

General Arrangement PAU Area 1

32

32 29-Sep-10

11-Nov-10*

DELDW0201

General Arrangement PAU Area 1

32

32 29-Sep-10

11-Nov-10*

DELDW0202

General Arrangement PAU Area 1

32

32 29-Sep-10

11-Nov-10*

DELDW0203

General Arrangement PAU Area 1

32

32 29-Sep-10

11-Nov-10*

DELDW0204

General Arrangement PAU Area 1

32

32 29-Sep-10

11-Nov-10*

DELDW0205

General Arrangement PAU Area 2 - T1

32

32 29-Sep-10

11-Nov-10*

DELDW0206

General Arrangement PAU Area 2 - T1

32

32 29-Sep-10

11-Nov-10*

DELDW0207

General Arrangement PAU Area 2 - T1

32

32 29-Sep-10

11-Nov-10*

DELDW0208

General Arrangement & Isometrics PAU Area 2 - T1

32

32 29-Sep-10

11-Nov-10*

DELDW0209

General Arrangement & Isometrics PAU Area 2 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0210

General Arrangement & Isometrics PAU Area 2 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0211

General Arrangement & isometrics PAU Area 2 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0212

General Arrangement & Isometrics PAU Area 2 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0213

General Arrangement & Isometrics PAU Area 3 - T1

15

15 31-Oct-10

18-Nov-10*

DELDW0214

General Arrangement & Isometrics PAU Area 3 - T1

15

15 31-Oct-10

18-Nov-10*

DELDW0215

General Arrangement & Isometrics PAU Area 3 - T1

15

15 31-Oct-10

18-Nov-10*

DELDW0216

General Arrangement & Isometrics PAU Area 3 - T1

15

15 31-Oct-10

18-Nov-10*

DELDW0217

General Arrangement & Isometrics PAU Area 3 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0218

General Arrangement & Isometrics PAU Area 3 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0219

General Arrangement & Isometrics PAU Area 3 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0220

General Arrangement & Isometrics PAU Area 3 - T2

14

14 01-Nov-10

18-Nov-10*

DELDW0221

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0222

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0223

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0224

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0225

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0226

General Arrangement & Isometrics PAU Area 5

15

15 31-Oct-10

18-Nov-10*

DELDW0227

General Arrangement & Isometrics PAU Area 6

15

15 31-Oct-10

18-Nov-10*

DELDW0228

General Arrangement & Isometrics PAU Area 6

15

15 31-Oct-10

18-Nov-10*

DELDW0229

General Arrangement & Isometrics PAU Area 6

15

15 31-Oct-10

18-Nov-10*

DELDW0230

General Arrangement & Isometrics PAU Area 6

15

15 31-Oct-10

18-Nov-10*

DELDW0231

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0232

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0233

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0234

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0235

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0236

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0237

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0238

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0239

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0240

General Arrangement & Isometrics PAU Area 7

15

15 31-Oct-10

18-Nov-10*

DELDW0300

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0301

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0302

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0303

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0304

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0305

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0306

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0307

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0308

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Page 15 of 19 12-Aug-10 13:02

Finish

2010
Jun

DELDW0309

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0310

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0311

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0312

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0313

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0314

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0315

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0316

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0317

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0318

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0319

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0320

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0321

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0322

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0323

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0324

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0325

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0326

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0327

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0328

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0329

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0330

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0331

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0332

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0333

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0334

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0335

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0336

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0337

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0338

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0339

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0340

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0341

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0342

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0343

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0344

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0345

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0346

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0347

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0348

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0349

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0350

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0351

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0352

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0353

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0354

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0355

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0356

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0357

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0358

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

DELDW0359

General Arrangement & Isometrics PAR Area 1

16

16 30-Sep-10

21-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name
DELDW0360

General Arrangement & Isometrics PAR Area 1

PROCESS
Calculation - Pumps

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

16

16 30-Sep-10

21-Oct-10*

93

45 15-Aug-10

14-Oct-10

56

11 15-Aug-10

29-Aug-10

Calculation for Crude Oil Booster Pumps P-1300 A/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0051

Calculation for Crude Oil Export Pumps P-1310 A/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0052

Calculation for Off Spec Crude Oil Transfer Pumps P-1320 A/B/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0053

Calculation for Water Intake Pump (Diesel) P-4000

56

11 15-Aug-10

29-Aug-10*

DEPCA0054

Calculation for Water Intake Pump (Electric) P-4010

56

11 15-Aug-10

29-Aug-10*

DEPCA0055

Calculation for Water Transfer Pumps P-4020 A/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0056

Calculation for Produced Water Transfer Pumps P-4200 A/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0058

Calculation for Service Water Distribution Pumps P-5100 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0059

Calculation for Potable Water Distribution Pumps P-5200 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0060

Calculation for Fire Water Pump (Diesel) P-5300

46

11 15-Aug-10

29-Aug-10*

DEPCA0061

Calculation for Fire Water Pump (Electric) P-5310

46

11 15-Aug-10

29-Aug-10*

DEPCA0062

Calculation for Fire Water Jockey Pumps P-5320 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0063

Calculation for LP Flare KO Drum Pumps P-6200 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0064

Calculation for ATM Flare KO Drum Pumps P-6210 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0065

Calculation for Closed Drain Pumps P-6400 A/S

46

11 15-Aug-10

29-Aug-10*

DEPCA0066

Calculation for Diesel Transfer Pumps P-6700 A/S

56

11 15-Aug-10

29-Aug-10*

DEPCA0067

Calculation for Train 1 & 2 Charge Pumps 1P-1010 A/S & 2P-1010

56

11 15-Aug-10

29-Aug-10*

DEPCA0068

Calculation for Train 1 & 2 Wash Water Recirculation Pumps 1P-1020 A/S ...

56

11 15-Aug-10

29-Aug-10*

DEPCA0069

Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Injection Pumps P1-6...

56

11 15-Aug-10

29-Aug-10*

65

11 15-Aug-10

29-Aug-10

DEPCA0110

Calculation for Crude Oil Storage Tank 1 & 2 T-1400 A/B

65

11 15-Aug-10

29-Aug-10*

DEPCA0111

Calculation for Nassiriya Depot Mishrif Crude Tank T-1410

56

11 15-Aug-10

29-Aug-10*

DEPCA0112

Calculation for Crude Oil Off Spec Tank T-1420

65

11 15-Aug-10

29-Aug-10*

DEPCA0113

Calculation for Produced Water Buffer Tank T-4200

61

11 15-Aug-10

29-Aug-10*

DEPCA0114

Calculation for Service Water Tank T-5100

56

11 15-Aug-10

29-Aug-10*

DEPCA0115

Calculation for Potable Water Header Tank T-5200

56

11 15-Aug-10

29-Aug-10*

DEPCA0116

Calculation for Fire Water Storage Tank T-5300

44

11 15-Aug-10

29-Aug-10*

DEPCA0117

Calculation for Diesel Storage Tank T-6700

56

11 15-Aug-10

29-Aug-10*

DEPCA0118

Calculation for Well Cluster 1 & 2 Corrosion Inhibitor Storage Tanks T1-68...

56

11 15-Aug-10

29-Aug-10*

56

11 15-Aug-10

29-Aug-10

Calculation - Separators
DEPCA0140

Calculation for Test Separator V-1000

56

11 15-Aug-10

29-Aug-10*

DEPCA0141

Calculation for Crude Oil Storage Tank 1 & 2 Degassing Boots V-1400A & ...

56

11 15-Aug-10

29-Aug-10*

DEPCA0142

Calculation for Crude Oil Off Spec Tank Degassing Boot V-1420

56

11 15-Aug-10

29-Aug-10*

DEPCA0146

Calculation for LP Flare KO Drum V-6200

56

11 15-Aug-10

29-Aug-10*

DEPCA0147

Calculation for ATM Flare KO Drum V-6210

56

11 15-Aug-10

29-Aug-10*

DEPCA0148

Calculation for Closed Drain Drum V-6400

56

11 15-Aug-10

29-Aug-10*

DEPCA0149

Calculation for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-1010

56

11 15-Aug-10

29-Aug-10*

DEPCA0150

Calculation for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-1020

56

11 15-Aug-10

29-Aug-10*

DEPCA0151

Calculation for Train 1 & 2 Fuel Gas Scrubers 1V-1030 & 2V-1030

46

11 15-Aug-10

29-Aug-10*

DEPCA0152

Calculation for Desalters & Dehydrators

56

11 15-Aug-10

29-Aug-10*

56

11 15-Aug-10

29-Aug-10

Calculation - Others
DEPCA0181

Flare Radiation Calculation

41

11 15-Aug-10

29-Aug-10*

DEPCA0182

Flare Gas Dispersion Calculation

41

11 15-Aug-10

29-Aug-10*

DEPCA0183

Line Sizing Calculation

56

11 15-Aug-10

29-Aug-10*

DEPCA0184

Process Relief / Blowdown abd PSV Sizing Calculations

41

11 15-Aug-10

29-Aug-10*

93

45 15-Aug-10

14-Oct-10

Calculation - Relief Valve

2010
Jun

DEPCA0050

Calculation - Tanks

Page 16 of 19 12-Aug-10 13:02

DEPCA0250

Relief Valve Sizing for Test Separator V-1000 PSV

55

22 15-Aug-10

13-Sep-10*

DEPCA0251

Relief Valve Sizing for Train 1 & 2 1st Stage Separators 1V-1010 & 2V-101...

55

22 15-Aug-10

13-Sep-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Page 17 of 19 12-Aug-10 13:02

Finish

2010
Jun

DEPCA0252

Relief Valve Sizing for Train 1 & 2 2nd Stage Separators 1V-1020 & 2V-10...

55

22 15-Aug-10

13-Sep-10*

DEPCA0253

Relief Valve Sizing for Train 1 & 2 Dehydrators 1V-1510 & 2V-1510 PSVs

55

22 15-Aug-10

13-Sep-10*

DEPCA0254

Relief Valve Sizing for Train 1 & 2 Desalters 1V-1520 & 2V-1520 PSVs

55

22 15-Aug-10

13-Sep-10*

DEPCA0255

Relief Valve Sizing for Train 1 & 2 Crude Heaters 1F-1010 & 2F-1010 PSVs

55

22 15-Aug-10

13-Sep-10*

DEPCA0256

Relief Valve Sizing for Train 1 & 2 Crude/Crude Heat Exchangers 1E-1010 ...

55

22 15-Aug-10

13-Sep-10*

DEPCA0300

Process Simulation Models (in native format)

93

34 15-Aug-10

29-Sep-10*

DEPCA0350

Transient simulation and Analysis - upstream flow lines

73

34 15-Aug-10

29-Sep-10*

DEPCA0351

Transient simulation and Analysis - Crude export line

73

34 15-Aug-10

29-Sep-10*

DEPDW0003

PFD - Typical Well Details-Base Case

61

22 15-Aug-10

13-Sep-10*

DEPDW0004

PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 1)

75

22 15-Aug-10

13-Sep-10*

DEPDW0005

PFD - Typical Wellhead Cluster (Mishrif, Well Cluster 2)

75

22 15-Aug-10

13-Sep-10*

DEPDW0006

PFD - Gathering Station 1

75

22 15-Aug-10

13-Sep-10*

DEPDW0007

PFD - Crude Oil Processing Train 1

75

22 15-Aug-10

13-Sep-10*

DEPDW0008

PFD - Crude Oil Processing Train 2

75

22 15-Aug-10

13-Sep-10*

DEPDW0009

PFD - Crude Oil Storage & Export

75

22 15-Aug-10

13-Sep-10*

DEPDW0010

PFD - EPS Produced Water Treatment & Disposal

75

22 15-Aug-10

13-Sep-10*

DEPDW0020

Heat & Material Balance Case A Summer (Streams 1-30)

75

22 15-Aug-10

13-Sep-10*

DEPDW0021

Heat & Material Balance Case A Summer (Streams 31-60)

75

22 15-Aug-10

13-Sep-10*

DEPDW0022

Heat & Material Balance Case A Summer (Streams 61-98)

75

22 15-Aug-10

13-Sep-10*

DEPDW0030

Heat & Material Balance Case B Winter (Streams 1-30)

75

22 15-Aug-10

13-Sep-10*

DEPDW0031

Heat & Material Balance Case B Winter (Streams 31-60)

75

22 15-Aug-10

13-Sep-10*

DEPDW0032

Heat & Material Balance Case B Winter (Streams 61-98)

75

22 15-Aug-10

13-Sep-10*

DEPDW0052

UFD - Flare & Blowdown System

81

28 15-Aug-10

21-Sep-10*

DEPDW0053

UFD - Closed Drain System

81

28 15-Aug-10

21-Sep-10*

DEPDW0054

UFD - Open Drain System

81

28 15-Aug-10

21-Sep-10*

DEPDW0055

UFD - Fuel Gas System

81

28 15-Aug-10

21-Sep-10*

DEPDW0056

UFD - Diesel Storage & Distribution

81

28 15-Aug-10

21-Sep-10*

DEPDW0057

UFD - Air Generation & Distribution

81

28 15-Aug-10

21-Sep-10*

DEPDW0058

UFD - River Water Treatment

81

28 15-Aug-10

21-Sep-10*

DEPDW0059

UFD - Nitrogen Generation & Distribution

81

28 15-Aug-10

21-Sep-10*

DEPDW0060

UFD - Service & Potable Water System

81

28 15-Aug-10

21-Sep-10*

DEPDW0100

P&ID - Legend & Symbols Sheet 1

72

28 15-Aug-10

21-Sep-10*

DEPDW0101

P&ID - Legend & Symbols Sheet 2

72

28 15-Aug-10

21-Sep-10*

DEPDW0109

P&ID - Mishrif Single Cluster Wellhead (Added 29-Jun-10)

72

28 15-Aug-10

21-Sep-10*

DEPDW0110

P&ID - Typical Wellhead Cluster(Mishrif, Well Cluster 1)

72

28 15-Aug-10

21-Sep-10*

DEPDW0111

P&ID - Typical Wellhead Cluster Mishrif, Well Cluster 2)

72

28 15-Aug-10

21-Sep-10*

DEPDW0112

P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 1)

72

28 15-Aug-10

21-Sep-10*

DEPDW0113

P&ID - Wellhead Cluster 1 Chemical Injection (Sheet 2)

72

28 15-Aug-10

21-Sep-10*

DEPDW0114

P&ID - Wellhead Cluster 1 Methanol Injection (Sheet 3)

72

28 15-Aug-10

21-Sep-10*

DEPDW0115

P&ID - Well Cluster 1 Inlet Header (Mishrif)

72

28 15-Aug-10

21-Sep-10*

DEPDW0116

P&ID - Well Cluster 1 Production Trunkline Pig Launcher

72

28 15-Aug-10

21-Sep-10*

DEPDW0117

P&ID - Well Cluster 1 Test Trunkline Pig Launcher

72

28 15-Aug-10

21-Sep-10*

DEPDW0118

P&ID - Gathering Station 1 (Well Cluster 1) Production Trunkline Pig Recei...

72

28 15-Aug-10

21-Sep-10*

DEPDW0119

P&ID - Gathering Station 1 (Well Cluster 1) Test Trunkline Pig Receiver

72

28 15-Aug-10

21-Sep-10*

DEPDW0120

P&ID - Well Cluster 1 Closed Drain System

72

28 15-Aug-10

21-Sep-10*

DEPDW0122

P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 1)

72

28 15-Aug-10

21-Sep-10*

DEPDW0123

P&ID - Mishrif Single Cluster Wellhead Chemical Injection (Sheet 2)

72

28 15-Aug-10

21-Sep-10*

DEPDW0124

P&ID - Mishrif Single Cluster Wellhead Methanol Injection (Sheet 3)

72

28 15-Aug-10

21-Sep-10*

DEPDW0130

P&ID - Mishrif Single Cluster Wellhead Closed Drain System

72

28 15-Aug-10

21-Sep-10*

DEPDW0132

P&ID - Wellhead Cluster 2 Methanol Injection (Sheet 3)

72

28 15-Aug-10

21-Sep-10*

DEPDW0133

P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 1)

72

28 15-Aug-10

21-Sep-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Page 18 of 19 12-Aug-10 13:02

Finish

2010
Jun

DEPDW0134

P&ID - Wellhead Cluster 2 Chemical Injection (Sheet 2)

72

28 15-Aug-10

21-Sep-10*

DEPDW0135

P&ID - Well Cluster 2 Inlet Header

72

28 15-Aug-10

21-Sep-10*

DEPDW0136

P&ID - Well Cluster 2 Production Trunkline Pig Launcher

72

28 15-Aug-10

21-Sep-10*

DEPDW0137

P&ID - Well Cluster 2 Test Trunkline Pig Launcher

72

28 15-Aug-10

21-Sep-10*

DEPDW0138

P&ID - Gathering Station 1 (Well Cluster 2) Production Trunkline Pig Recei...

72

28 15-Aug-10

21-Sep-10*

DEPDW0139

P&ID - Gathering Station 1 (Well Cluster 2) Test Trunkline Pig Receiver

72

28 15-Aug-10

21-Sep-10*

DEPDW0140

P&ID - Well Cluster 2 Closed Drain System

72

28 15-Aug-10

21-Sep-10*

DEPDW0155

P&ID - Gathering Station 1 Inlet Header

78

34 15-Aug-10

29-Sep-10*

DEPDW0156

P&ID - Gathering Station 1 Test Separator

73

34 15-Aug-10

29-Sep-10*

DEPDW0157

P&ID - Train 1 1st Stage Separator

73

34 15-Aug-10

29-Sep-10*

DEPDW0158

P&ID - Train 1 1st Crude/Crude Heat Exchanger & Rundown Cooler

73

34 15-Aug-10

29-Sep-10*

DEPDW0159

P&ID - Train 1 Crude Heater

78

34 15-Aug-10

29-Sep-10*

DEPDW0160

P&ID - Train 1 2nd Stage Separator

73

34 15-Aug-10

29-Sep-10*

DEPDW0161

P&ID - Train 1 Charge Pumps

73

34 15-Aug-10

29-Sep-10*

DEPDW0162

P&ID - Train 1 Dehydrator

73

34 15-Aug-10

29-Sep-10*

DEPDW0163

P&ID - Train 1 Desalter/Wash Water Recirculation Pumps

73

34 15-Aug-10

29-Sep-10*

DEPDW0164

P&ID - Train 1 Crude Wash Water Heater

73

34 15-Aug-10

29-Sep-10*

DEPDW0167

P&ID - Train 2 1st Stage Separator

73

34 15-Aug-10

29-Sep-10*

DEPDW0168

P&ID - Train 2 1st Crude/Crude Heat Exchanger & Run Down Cooler

73

34 15-Aug-10

29-Sep-10*

DEPDW0169

P&ID - Train 2 Crude Heater

73

34 15-Aug-10

29-Sep-10*

DEPDW0170

P&ID - Train 2 2nd Stage Separator

73

34 15-Aug-10

29-Sep-10*

DEPDW0171

P&ID - Train 2 Charge Pumps

78

34 15-Aug-10

29-Sep-10*

DEPDW0172

P&ID - Train 2 Dehydrator

73

34 15-Aug-10

29-Sep-10*

DEPDW0173

P&ID - Train 2 Electrostatic Desalter/Wash Water Recirculation Pumps

73

34 15-Aug-10

29-Sep-10*

DEPDW0174

P&ID - Train 2 Crude Wash Water Heater

73

34 15-Aug-10

29-Sep-10*

DEPDW0175

P&ID - Crude Oil Storage Tanks 1 & 2

73

34 15-Aug-10

29-Sep-10*

DEPDW0176

P&ID - Crude Oil Export

73

34 15-Aug-10

29-Sep-10*

DEPDW0177

P&ID - Crude Oil Export Metering Package

73

34 15-Aug-10

29-Sep-10*

DEPDW0178

P&ID - Crude Oil Export Pig Launchers

73

34 15-Aug-10

29-Sep-10*

DEPDW0181

P&ID - Crude Oil Off Spec Tank

73

34 15-Aug-10

29-Sep-10*

DEPDW0185

P&ID - Produced Water Buffer Tank & Transfer Pumps

73

34 15-Aug-10

29-Sep-10*

DEPDW0186

CPI & IGF Packages

78

39 15-Aug-10

06-Oct-10*

DEPDW0190

P&ID - Atmospheric Flare & Train1 LP Headers

78

39 15-Aug-10

06-Oct-10*

DEPDW0191

P&ID - Train 2 LP Flare Header

78

39 15-Aug-10

06-Oct-10*

DEPDW0192

P&ID - MLP Flare Gas KO Drum

78

39 15-Aug-10

06-Oct-10*

DEPDW0193

P&ID - ATM Flare Gas KO Drum

78

39 15-Aug-10

06-Oct-10*

DEPDW0194

P&ID - EPS Closed Drain System Header

78

39 15-Aug-10

06-Oct-10*

DEPDW0195

P&ID - EPS Closed Drain System

83

39 15-Aug-10

06-Oct-10*

DEPDW0198

P&ID - Open Drain System (Sheet 1)

78

39 15-Aug-10

06-Oct-10*

DEPDW0199

P&ID - Open Drain System (Sheet 2)

78

39 15-Aug-10

06-Oct-10*

DEPDW0200

P&ID - Fuel Gas System

78

39 15-Aug-10

06-Oct-10*

DEPDW0208

P&ID - Water Treatment Dearation & Foam Generator Package

78

39 15-Aug-10

06-Oct-10*

DEPDW0210

P&ID - Potable Water System

78

39 15-Aug-10

06-Oct-10*

DEPDW0211

P&ID - Service Water System

78

39 15-Aug-10

06-Oct-10*

DEPDW0212

P&ID - Base Camp Potable Water System

78

39 15-Aug-10

06-Oct-10*

DEPDW0220

P&ID - Diesel Storage & Distribution

78

39 15-Aug-10

06-Oct-10*

DEPDW0221

P&ID - Instrument Air Compressor Package

78

39 15-Aug-10

06-Oct-10*

DEPDW0222

P&ID - Instrument Air & Plant Air Packages Distribution

78

39 15-Aug-10

06-Oct-10*

DEPDW0223

P&ID - Deaeration Package

78

39 15-Aug-10

06-Oct-10*

DEPDW0230

P&ID - Nitrogen Generation Package

78

39 15-Aug-10

06-Oct-10*

DEPDW0231

P&ID - Nitrogen Distribution

78

39 15-Aug-10

06-Oct-10*

Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr

First Commercial Production (FCP) - Garraf Field Development Project


Activity ID

Activity Name

Classic WBS Layout


Original Remaining Start
Duration Duration

Finish

P&ID - EPS Chemical Injection Packages

78

39 15-Aug-10

06-Oct-10*

DEPDW0300

Line List

84

45 15-Aug-10

14-Oct-10*

DEPLS0001

Process Drawing Register (Index)

79

22 15-Aug-10

13-Sep-10*

DEPLS0002

Utility Load List

61

22 15-Aug-10

13-Sep-10*

DEPRE0001

Corrosion Design Basis Memorandum

45

22 15-Aug-10

13-Sep-10*

DEPRE0002

Technology selection for Crude desalter & dewatering unit

45

22 15-Aug-10

13-Sep-10*

DEPRE0003

Process Design Philosophy

71

22 15-Aug-10

13-Sep-10*

DEPRE0004

Process Simulation Report

81

22 15-Aug-10

13-Sep-10*

DEPRE0005

Process Operating, control, start up and shut down philosophy

46

22 15-Aug-10

13-Sep-10*

DEPRE0006

Relief, Flare and Blowdown Report

46

22 15-Aug-10

13-Sep-10*

DEPRE0007

Pipeline and Trunkline Hydraulic Analysis Report

61

22 15-Aug-10

13-Sep-10*

DEPRE0008

HAZOP Close-Out (FEED) Report

46

22 15-Aug-10

13-Sep-10*

DEPRE0009

Transient Analysis Report

46

22 15-Aug-10

13-Sep-10*

DEPSP0001

Technical Specification for Flare System

63

34 15-Aug-10

29-Sep-10*

DEPSP0002

Technical Specification for Dehydrators & Desalters

78

34 15-Aug-10

29-Sep-10*

DEPSP0004

Technical Specification for Fired Gas Crude Heater

78

34 15-Aug-10

29-Sep-10*

DEPSP0005

Technical Specification for Produced Water Treatment System

78

34 15-Aug-10

29-Sep-10*

DEPSP0006

Technical Specification for Raw Water Intake System

78

34 15-Aug-10

29-Sep-10*

DEPSP0007

Technical Specification for Dearator Package

78

34 15-Aug-10

29-Sep-10*

DEPSP0008

Technical Specification for Nutshell Filter Package

78

34 15-Aug-10

29-Sep-10*

DEPSP0009

Technical Specification for Low Pressure & Atmospheric Flare System

78

34 15-Aug-10

29-Sep-10*

DEPSP0010

Technical Specification for IGF Package

78

34 15-Aug-10

29-Sep-10*

DEPSP0011

Technical Specification for Demineralized Water Package

78

34 15-Aug-10

29-Sep-10*

DEPSP0012

Technical Specification for Fuel Gas Sytem

78

34 15-Aug-10

29-Sep-10*

DEPSP0013

Technical Specification for Crude Oil Separators

78

34 15-Aug-10

29-Sep-10*

DEPSP0050

Isolation Philosophy

91

34 15-Aug-10

29-Sep-10*

37

22 15-Aug-10

13-Sep-10

37

22 15-Aug-10

13-Sep-10*

98

45 15-Aug-10

14-Oct-10

98

45 15-Aug-10

14-Oct-10*

DEQSP0001

External Surface Preparation & Painting Procedure

TELECOMMUNICATION
DETDW0001

Telecommunication System Block Diagram

2010
Jun

DEPDW0235

QUALITY ASSURANCE

Page 19 of 19 12-Aug-10 13:02


Jul

Aug

Sep

2011
Oct

Nov

Dec

Jan

Feb

Mar

Apr