53790 Federal Register / Vol. 70, No.

175 / Monday, September 12, 2005 / Notices

The Commission encourages g. Filed Pursuant to: Federal Power comment date for the particular
electronic submission of protests and Act, 16 U.S.C. 791a–825r. application.
interventions in lieu of paper, using the h. Applicant Contacts: Mr. James o. Filing and Service of Responsive
FERC Online links at http:// Price, P.O. Box 5550, Aiken, SC 29804, Documents—Any filings must bear in
www.ferc.gov. To facilitate electronic (803) 642–2749. all capital letters the title
service, persons with Internet access i. FERC Contact: Any questions on ‘‘COMMENTS’’,
who will eFile a document and/or be this notice should be addressed to ‘‘RECOMMENDATIONS FOR TERMS
listed as a contact for an intervenor Mohamad Fayyad at (202) 502–8759, or AND CONDITIONS’’, ‘‘PROTEST’’, OR
must create and validate an e-mail address: mfayyad@ferc.gov ‘‘MOTION TO INTERVENE’’, as
eRegistration account using the j. Deadline for filing comments and or applicable, and the Project Number of
eRegistration link. Select the eFiling motions: October 7, 2005. the particular application to which the
link to log on and submit the k. Description of Filing: The City of filing refers. All documents (original
intervention or protests. Marion, Kentucky, and Smithland and eight copies) should be filed with:
Persons unable to file electronically Hydroelectric Partners filed an Magalie R. Salas, Secretary, Federal
should submit an original and 14 copies application to modify the configuration Energy Regulatory Commission, 888
of the intervention or protest to the of the Smithland Lock and Dam Project. First Street, NE., Washington, DC 20426.
Federal Energy Regulatory Commission, The licensees propose to install three A copy of any motion to intervene must
888 First St. NE., Washington, DC generating units (as was originally also be served upon each representative
20426. authorized) instead of the currently of the Applicant specified in the
The filings in the above proceedings authorized Hydromatrix design that particular application.
are accessible in the Commission’s consists of 140 small generating units. p. Agency Comments—Federal, State,
eLibrary system by clicking on the The proposed design would change the and local agencies are invited to file
appropriate link in the above list. They installed capacity from 79.8 MW to 71 comments on the described application.
are also available for review in the MW, and the hydraulic capacity from A copy of the application may be
Commission’s Public Reference Room in 55,200 cfs to 49,000 cfs. obtained by agencies directly from the
Washington, DC. There is an l. Locations of Applications: A copy of Applicant. If an agency does not file
eSubscription link on the Web site that the application is available for comments within the time specified for
enables subscribers to receive e-mail inspection and reproduction at the filing comments, it will be presumed to
notification when a document is added Commission in the Public Reference have no comments. One copy of an
to a subscribed dockets(s). For Room, located at 888 First Street, NE., agency’s comments must also be sent to
assistance with any FERC Online Room 2A, Washington, DC 20426, or by the Applicant’s representatives.
service, please e-mail calling (202) 502–8371. This filing may q. Comments, protests and
FERCOnlineSupport@ferc.gov, or call also be viewed on the Commission’s interventions may be filed electronically
(866) 208–3676 (toll free). For TTY, call Web site at http://www.ferc.gov using via the Internet in lieu of paper. See, 18
(202) 502–8659. the ‘‘eLibrary’’ link. Enter the docket CFR 385.2001(a)(1)(iii) and the
number excluding the last three digits in instructions on the Commission’s Web
Magalie R. Salas, site at http://www.ferc.gov under the ‘‘e-
the docket number field to access the
Secretary. Filing’’ link.
document. You may also register online
[FR Doc. E5–4955 Filed 9–9–05; 8:45 am] at http://www.ferc.gov/docs-filing/ Magalie R. Salas,
BILLING CODE 6717–01–P esubscription.asp to be notified via e- Secretary.
mail of new filings and issuances [FR Doc. E5–4961 Filed 9–9–05; 8:45 am]
related to this or other pending projects.
DEPARTMENT OF ENERGY BILLING CODE 6717–01–P
For assistance, call toll-free 1–866–208–
Federal Energy Regulatory 3676 or e-mail
Commission FERCOnlineSupport@ferc.gov. For TTY, DEPARTMENT OF ENERGY
call (202) 502–8659. A copy is also
Notice of Application for Amendment available for inspection and Federal Energy Regulatory
of License and Soliciting Comments, reproduction at the address in item (h) Commission
Motions To Intervene, and Protests above.
m. Individuals desiring to be included Notice of Application Tendered for
September 6, 2005. on the Commission’s mailing list should Filing With the Commission, Soliciting
Take notice that the following so indicate by writing to the Secretary Additional Study Requests, and
application has been filed with the of the Commission. Establishing Procedural Schedule for
Commission and is available for public n. Comments, Protests, or Motions To Relicensing and a Deadline for
inspection: Intervene—Anyone may submit Submission of Final Amendments
a. Application Type: Amendment of comments, a protest, or a motion to September 6, 2005.
license to change project design and intervene in accordance with the
capacity. Take notice that the following
requirements of Rules of Practice and hydroelectric application has been filed
b. Project No.: 10228–038. Procedure, 18 CFR 385.210, .211, .214. with the Commission and is available
c. Date Filed: May 5, 2005. In determining the appropriate action to for public inspection.
d. Applicant: Cannelton Hydroelectric take, the Commission will consider all a. Type of Application: Subsequent
Project, L.P. protests or other comments filed, but license.
e. Name of Project: Cannelton. only those who file a motion to b. Project No.: 1051–012.
f. Location: The project would be intervene in accordance with the c. Date Filed: August 29, 2005.
located at the existing Corps of Commission’s Rules may become a d. Applicant: Alaska Power &
Engineers’ Cannelton Locks and Dam on party to the proceeding. Any comments, Telephone Company (AP&T).
the Ohio River, Hancock County, protests, or motions to intervene must e. Name of Project: Skagway-Dewey
Kentucky. be received on or before the specified Lakes Project.

VerDate Aug<18>2005 15:25 Sep 09, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1
Federal Register / Vol. 70, No. 175 / Monday, September 12, 2005 / Notices 53791

f. Location: On Pullen, Dewey, Reid, 385.2001(a)(1)(iii) and the instructions Hydro Licensing Schedule. Revisions to
Icy, and Snyder Creeks within the city on the Commission’s Web site (http:// the schedule will be made as
limits of Skagway, Alaska. The project www.ferc.gov) under the ‘‘e-Filing’’ link. appropriate.
does not utilize any Federal lands. m. This application is not ready for Issue Deficiency Letter (if needed)
g. Filed Pursuant to: Federal Power environmental analysis at this time.
Issue Acceptance letter—October 2005
Act, 16 U.S.C. 791 (a)–825(r). n. Project Description: Water from
Issue Scoping Document for comments—
h. Applicant Contact: Bob Grimm, Reid Falls, Icy Creek, and Snyder Creek November 2005
AP&T, P.O. Box 3222, Port Townsend, is diverted to Lower Dewey Lake, which Request Additional Information (if needed)—
Washington 98368, (360) 385–1733, ext. in turn, flows into Dewey reservoir. The January 2005
120. project withdraws water from Dewey Notice of application is ready for
i. FERC Contact: Alan Mitchnick, reservoir to supply the powerhouse. environmental analysis—April 2006
(202) 502–6074 or Existing project features include: the 26- Notice of the availability of the EA—
alan.mitchnick@ferc.gov. foot-long, 8-foot-high Reid Falls September 2006
j. Cooperating Agencies: We are diversion dam that diverts water into a Ready for Commission’s decision on the
asking Federal, State, local, and tribal 14-inch-diameter, 1,280-foot-long steel application—December 2006
agencies with jurisdiction and/or pipeline running to Icy Creek; the 102- Final amendments to the application
special expertise with respect to foot-long, 5-foot-high Icy Lake dam must be filed with the Commission no
environmental issues to cooperate with impounding the 3.4-acre Icy Lake; the later than 30 days from the issuance
us in the preparation of the 30-foot-long and 3-foot-high Snyder date of the notice of ready for
environmental document. Agencies who Creek diversion dam that diverts water environmental analysis.
would like to request cooperating status from Snyder Creek into a diversion
should follow the instructions for filing channel that conveys water to Lower Magalie R. Salas,
such requests described in item l below. Dewey Lake; the 629-foot-long, 28-foot- Secretary.
Cooperating agencies should note the high Lower Dewey Lake dam, [FR Doc. E5–4962 Filed 9–9–05; 8:45 am]
Commission’s policy that agencies that impounding the 32.8-acre Lower Dewey BILLING CODE 6717–01–P
cooperate in the preparation of the Lake; the 132-foot-long, 30-foot-high,
environmental document cannot also Dewey reservoir dam, impounding 2.7
intervene. See, 94 FERC ¶ 61,076 (2001). acres; a 300-foot-long canal running DEPARTMENT OF ENERGY
k. Pursuant to section 4.32(b)(7) of 18 between Lower Dewey Lake and Dewey
CFR of the Commission’s regulations, if reservoir; three penstocks that run from Federal Energy Regulatory
any resource agency, Indian tribe, or the Dewey reservoir dam about 1,850 Commission
person believes that an additional feet to the project’s powerhouse that sits Notice of Application To Amend
scientific study should be conducted in adjacent to Pullen Creek within the City License, and Soliciting Comments,
order to form an adequate factual basis of Skagway; and a powerhouse
Motions To Intervene, and Protests
for a complete analysis of the containing four turbines with a total
application on its merit, the resource installed capacity of 943 kilowatts. No September 6, 2005.
agency, Indian tribe, or person must file changes to the project are proposed. Take notice that the following
a request for a study with the o. A copy of the application is hydroelectric application has been filed
Commission not later than 60 days from available for review at the Commission with the Commission and is available
the date of filing of the application, and in the Public Reference Room or may be for public inspection:
serve a copy of the request on the viewed on the Commission’s Web site at a. Application Type: Amendment of
applicant. http://www.ferc.gov using the license to change project design and
l. Deadline for Filing Additional ‘‘eLibrary’’ link. Enter the docket capacity.
Study Requests and Requests for number excluding the last three digits in b. Project No.: 6641–067.
Cooperating Agency Status: October 28, the docket number field to access the c. Date Filed: May 3, 2005.
2005. document. For assistance, contact FERC d. Applicant: City of Marion,
All Documents (Original and Eight Online Support at Kentucky, and Smithland Hydroelectric
Copies) Should Be Filed With: Magalie FERCOnlineSupport@ferc.gov or toll- Partners.
R. Salas, Secretary, Federal Energy free at 1–866–208–3676, or for TTY, e. Name of Project: Smithland Lock
Regulatory Commission, 888 First (202) 502–8659. A copy is also available and Dam Project.
Street, NE., Washington, DC 20426. for inspection and reproduction at the f. Location: The Project is located on
The Commission’s Rules of Practice address in item h above. the Ohio River in Livingston County,
require all intervenors filing documents You may also register online at http:// Kentucky. The project will affect federal
with the Commission to serve a copy of www.ferc.gov/docs-filing/ lands at the U.S. Army Corps of
that document on each person on the esubscription.asp to be notified via e- Engineers’ Smithland Lock and Dam.
official service list for the project. mail of new filings and issuances g. Filed Pursuant to: Federal Power
Further, if an intervenor files comments related to this or other pending projects. Act, 16 U.S.C. 791a–825r.
or documents with the Commission For assistance, contact FERC Online h. Applicant Contact: Mr. James Price,
relating to the merits of an issue that Support. P.O. Box 5550, Aiken, SC 29804, (803)
may affect the responsibilities of a p. With this notice, we are initiating 642–2749.
particular resource agency, they must consultation with the Alaska State i. FERC Contact: Any questions on
also serve a copy of the document on Historic Preservation Officer (SHPO), as this notice should be addressed to
that resource agency. required by § 106, National Historic Mohamad Fayyad at (202) 502–8759 or
Additional study requests and Preservation Act, and the regulations of mfayyad@ferc.gov.
requests for cooperating agency status the Advisory Council on Historic j. Deadline for filing comments and/
may be filed electronically via the Preservation, 36 CFR 800.4. or motions: October 7, 2005.
Internet in lieu of paper. The q. Procedural Schedule and Final k. Description of Filing: The City of
Commission strongly encourages Amendments: The application will be Marion, Kentucky, and Smithland
electronic filings. See 18 CFR processed according to the following Hydroelectric Partners filed an

VerDate Aug<18>2005 15:25 Sep 09, 2005 Jkt 205001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\12SEN1.SGM 12SEN1