Вы находитесь на странице: 1из 70

Proprietary Use pursuant to Company instruction

PRELIMINARY

Title page

W-CDMA
Alcatel-Lucent 9300 W-CDMA Product Family | V7.1
Intra-Roc Node B reparenting (NRP)

NN-20500-088
ISSUE 12.03
NOVEMBER 2009

PRELIMINARY

Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction

PRELIMINARY

Proprietary Use pursuant to Company instruction


Legal notice
Legal notice

Alcatel, Lucent, Alcatel-Lucent and the Alcatel-Lucent logo are trademarks of Alcatel-Lucent. All other trademarks are the property of their respective
owners.
The information presented is subject to change without notice. Alcatel-Lucent assumes no responsibility for inaccuracies contained herein.
Copyright 2009 Alcatel-Lucent. All rights reserved.
Contains proprietary/trade secret information which is the property of Alcatel-Lucent and must not be made available to, or copied or used by anyone outside
Alcatel-Lucent without its written authorization.
ot to be used or disclosed except in accordance with applicable agreements.
Trademarks

PRELIMINARY

Microsoft and Windows are either registered trademarks or trademarks of Microsoft Corporation in the United States and/or other countries.

Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction

About this document


Purpose

............................................................................................................................................................................................. ix
ix

Reason for revision

...................................................................................................................................................................... ix
ix

ew in this release

....................................................................................................................................................................... ix
ix

Intended audience

......................................................................................................................................................................... ix
ix

Supported systems

......................................................................................................................................................................... x
x

PRELIMINARY

Contents

How to use this document ........................................................................................................................................................... xx


Prerequisites ..................................................................................................................................................................................... xx
Vocabulary conventions ............................................................................................................................................................... xx
Conventions used

........................................................................................................................................................................... x
x

Related information
Document support

...................................................................................................................................................................... xii
xii

Technical support

....................................................................................................................................................................... xii
xii

How to order

................................................................................................................................................................................. xii
xii

How to comment
1

..................................................................................................................................................................... xi
xi

......................................................................................................................................................................... xii
xii

Roadmap to Configuration Management documentation


Overview ....................................................................................................................................................................................... 1-1
1-1
Roadmap to Configuration Management documentation

........................................................................................... 1-2

Node B reparenting overview


Overview ....................................................................................................................................................................................... 2-1
2-1

................................................................................................................................................................... 2-2
2-2

Procedure description
Overview ....................................................................................................................................................................................... 3-1
3-1

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
iii
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

ode B reparenting

PRELIMINARY

Contents
...................................................................................................................................................................................................................................

Procedure description

............................................................................................................................................................... 3-2
3-2

Intra-ROC ode B reparenting restriction

....................................................................................................................... 3-4

Mean time (TBC) ....................................................................................................................................................................... 3-5


3-5
Impacts ........................................................................................................................................................................................... 3-6
3-6
Limitations

................................................................................................................................................................................... 3-7
3-7

Prerequisites ................................................................................................................................................................................. 3-8


3-8
4

NodeB reparenting preparation under WPS


Overview ....................................................................................................................................................................................... 4-1
4-1
Description

................................................................................................................................................................................... 4-2
4-2

Sheet 1 - Reverse Engineering


Sheet 2a - iBTS Reparenting

.............................................................................................................................................. 4-4
4-4

................................................................................................................................................. 4-6
4-6

Sheet 2b - OneBTS (ATM) Reparenting ......................................................................................................................... 4-10


Sheet 2c - OneBTS (IP) Reparenting
Sheet 3 - odeB Update

.............................................................................................................................. 4-13

....................................................................................................................................................... 4-16
4-16

Optional Sheet 4 : eighboring Plan Update


Sheet 6 - Consistency Checks

................................................................................................................ 4-18

............................................................................................................................................. 4-19
4-19

Sheet 7 - Export workorders ................................................................................................................................................ 4-20


4-20
5

Installation and commissioning


Overview ....................................................................................................................................................................................... 5-1
5-1
Performing checks before reparenting
Change I&C parameters

............................................................................................................................... 5-2

.......................................................................................................................................................... 5-3
5-3

On Site activities for transmission network update

PRELIMINARY

Reconfiguration activation in WMS


odeB verification

....................................................................................................... 5-4

................................................................................................................................... 5-5
5-5

.................................................................................................................................................................. 5-11
5-11

Performing checks after reparenting

................................................................................................................................ 5-12

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

iv

...................................................................................................................................................................................................................................

Reverse operation
Overview ....................................................................................................................................................................................... 6-1
6-1
Reverse operation

...................................................................................................................................................................... 6-2
6-2

PM and FM impacts

PRELIMINARY

Contents

Impacts ........................................................................................................................................................................................... 7-1


7-1
Glossary

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
v
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

2-1

General description for an iBTS

.......................................................................................................................... 2-2

2-2

General description for a OneBTS

3-1

ode B reparenting

...................................................................................................................... 2-3

PRELIMINARY

List of figures

.................................................................................................................................................. 3-3
3-3

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
vii
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

PRELIMINARY

About this document


About this document

Purpose

The purpose of this document is to describe the etwork Reconfiguration Procedure


(RP) applicable for ode B reparenting under the same ROC in the UMTS network,
without interruption of service on the existing RC.
Reason for revision

The reissue reasons are:


Issue number

Issue date

Reason for reissue

12.03

ovember 2009

Updated after internal review.

12.02

ovember 2009

Preliminary issue

12.01

October 2009

Initial draft issue for V7.1

New in this release


New features:

one

Other changes:

one

Intended audience

The audience for this document is:


Configuration management personnel
etwork administration personnel

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
ix
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

About this document


...................................................................................................................................................................................................................................

Supported systems

This document applies to Alcatel-Lucent W-CDMA V7.1 system release.


This document applies to the following systems:

odeB
RC
WMS
WPS

The following topics are out of the scope of this document:

Transmission backbone (IuB, ItF-R, ItF-B)


Core etwork activity

How to use this document

Start with the first chapter and work through the manual to the end. Once you have done
this, you will have carried out the re-configuration procedure in the proper sequence.
Prerequisites

A good knowledge of UTRA configuration principles as well as Microsoft Windows T


4.0, Windows 2000 or Windows XP is required before reading this RP.
It is also recommended that readers become familiar with:

Alcatel-Lucent 9300 W-CDMA Product Family - Terminology, (-20500-002)


Alcatel-Lucent 9353 Management System - System Overview, (-20500-031)
Alcatel-Lucent 9353 Management System - User Guide, (-20500-032)
Alcatel-Lucent 9300 W-CDMA Product Family - Parameters Reference Guide,
(-20500-027)
Alcatel-Lucent 9352 Provisioning System - User Guide, (-20500-036)
Alcatel-Lucent odeB UA6.x DHCP Activation, IM 30-6239
Alcatel-Lucent OneBTS UA6.x DHCP Activation, IM 30-6232

Vocabulary conventions

one.

PRELIMINARY

Conventions used

one.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

...................................................................................................................................................................................................................................

Related information
ode B Capacity Licensing

[R2] Installation
Method 30-9196

UMTS BTS Integration in an Exiting UTRA

[R3]
-20500-036

Alcatel-Lucent 9352 Provisioning System - User Guide

[R4]
-20500-090

eighboring Plan Update

[R5]
-20500-032

Alcatel-Lucent 9353 Management System - User Guide

[R6] Installation
Method 24-9356

UMTS iBTS commissioning Procedure

[R7]
UMT/OMC/DD/
007615

CM XML format Description

[R8]
-20500-002

Product Family - Terminology

[R9]
-20500-031

Alcatel-Lucent 9353 Management System - System Overview

[R10]
UMT/SYS/DD/
0089

UMTS Drop & Insert via IBTS with fractional ATM over single E1

[R11]
-20500-033

Alcatel-Lucent 9300 W-CDMA Product Family - Performance Management

[R12]
-20500-057

Alcatel-Lucent 9313 Micro ode B and 9314 Pico ode B - Local


Maintenance Tool Manual

[R13]
-20500-058

Alcatel-Lucent 9313 Micro ode B and 9314 Pico ode B - Operation and
Maintenance Manual

[R14]
-20500-049

Intra-ROC E Rehoming

[R15]

Alcatel-Lucent odeB UA7.x DHCP Activation

IM 30-6239
[R16]

Alcatel-Lucent OneBTS UA7.x DHCP Activation

IM 30-6232

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
xi
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

[R1]
-20500-154

PRELIMINARY

About this document

PRELIMINARY

About this document


...................................................................................................................................................................................................................................

[R17]

9300 W-CDMA Product Family - Activation of ative IP IuB

-20500-261

Document support

For support in using this or any other Alcatel-Lucent document, contact Alcatel-Lucent at
one of the following telephone numbers:

1-888-582-3688 (for the United States)


1-317-377-8618 (for all other countries)

Technical support

For technical support on the product, contact your local Alcatel-Lucent customer support
team. See the Alcatel-Lucent Support web site (http://www.alcatel-lucent.com/support/)
for contact information.
How to order

To order Alcatel-Lucent documents, contact your local sales representative or use Online
Customer Support (OLCS) (https://support.lucent.com).
How to comment

PRELIMINARY

To comment on this document, go to the Online Comment Form (http://infodoc.


alcatel-lucent.com/comments/enus/) or e-mail your comments to the Comments Hotline
(comments@alcatel-lucent.com) .

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

xii

PRELIMINARY

1oadmap to Configuration
R
Management
documentation

Overview
Purpose

This chapter provides the roadmap for Configuration Management documentation.


Contents
Roadmap to Configuration Management documentation

1-2

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
1-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Roadmap to Configuration Management documentation

...................................................................................................................................................................................................................................

Roadmap to Configuration Management documentation


The following figure shows where the current document stands within the W-CDMA
customer documentation.
For a global view of the W-CDMA customer documentation, see the Roadmap chapter in:

PRELIMINARY

Roadmap to Configuration Management documentation

Alcatel-Lucent 9300 W-CDMA Product Family - Document Collection Overview,


-20500-050
Alcatel-Lucent 9300 W-CDMA Product Family - Access etwork Management
Overview, -20500-031

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

1-2

PRELIMINARY

2 ode B reparenting
N
overview

Overview
Purpose

The odeB reparenting procedure aims at reparenting  active odeB(s) from the
"Source" RC to the "Target" RC.
Contents
ode B reparenting

2-2

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
2-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Node B reparenting overview

Node B reparenting

...................................................................................................................................................................................................................................

Node B reparenting
Overview diagrams for iBTS and OneBTS

as displayed in the diagram below:


Figure 2-1 General description for an iBTS
Source
RNC
Optical
RNC
ATM/OC3 or STM1

CN

Source
RNC

IN

WPS
XML

IBTS

ATM/E1
or T1

Inter RNC
Reparenting

IuB
Backbone

Itf-R/Itf-B

WMS

Target
RNC
IP

CN
ATM/OC3 or STM1

PRELIMINARY

IP Backbone

IN

IP

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

2-2

Node B reparenting

...................................................................................................................................................................................................................................

Figure 2-2 General description for a OneBTS


Itf-B
Source
RNC
Optical
RNC
ATM/OC3 or STM1

CN

Source
RNC

IN

PRELIMINARY

Node B reparenting overview

WPS
XML

OneBTS

ATM/E1
or T1

DCHP Relay
Function

IuB
Backbone

Inter RNC
Reparenting

Itf-R

WMS

Target
RNC
IP

CN
ATM/OC3 or STM1

IP Backbone

IN

IP

Definitions
Itf-B

Interface between the odeB and its Element Manager

Itf-R

Interface between the RC and its Element Manager

For more information refer to [R8].


Procedure overview

The following Es are involved in this procedure:

The reparented odeB(s)


The source RC I-ode, source RC C-ode

The target RC I-ode, target RC C-ode

This procedure applies when both Source and Target RCs are managed by the same
ROC

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
2-3
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY
PRELIMINARY

Node B reparenting overview

Node B reparenting

...................................................................................................................................................................................................................................

ote: For details relating to DHCP activation, refer to one of the folowing
documents:

For a odeB use document [R15], Alcatel-Lucent odeB UA7.x DHCP


Activation, IM 30-6239
For a OneBTS use document [R16], Alcatel-Lucent OneBTS UA7.x DHCP
Activation, IM 30-6232

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

2-4

PRELIMINARY

Procedure description
3

Overview
Purpose

This chapter describes the procedure.


Contents
Procedure description

3-2

Intra-ROC ode B reparenting restriction

3-4

Mean time (TBC)

3-5

Impacts

3-6

Limitations

3-7

Prerequisites

3-8

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
3-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Procedure description

Procedure description

...................................................................................................................................................................................................................................

Procedure description
Main steps

The following diagram displays the different steps to be conducted in order to complete
the odeB(s) reparenting.
The preparation under WPS is offline. It can be made anytime before WMS and etwork
related Online actions.
ote:

PRELIMINARY

This procedure is not applicable for Micro/Pico ATM odeB.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

3-2

Procedure description

...................................................................................................................................................................................................................................

Figure 3-1 Node B reparenting

PRELIMINARY

Procedure description

For the main steps of this procedure, reverse operations are presented at the end of the
document.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
3-3
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Procedure description

Intra-ROC Node B reparenting restriction

...................................................................................................................................................................................................................................

Intra-ROC Node B reparenting restriction


Restriction

Important! In case of the reparenting is applicable to a iBTS or a OneBTS.


And if the Source and the Target RCs are not managed by the same Main Server of
the ROC.

PRELIMINARY

Then, see chapter Prerequisites of this document to check all the conditions where this
document applies.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

3-4

Mean time (TBC)

...................................................................................................................................................................................................................................

Mean time (TBC)


Purpose

This topic summarizes the duration given for each step of the procedure. evertheless, as
the timing depends on too many heterogeneous parameters (hardware configuration,
software configuration, size of the network, transmission network performance, etc.) and
then might significantly vary from a configuration to another, the times given in this
chapter are only for information and planning purpose.

PRELIMINARY

Procedure description

ote: ote that durations are given for the reparenting of 1 odeB in a etwork
containing 7 RCs and 860 odeBs.
Step times
odeB reparenting preparation under WPS
Step

Sheet

Timing

1 (Optional)

Sheet 1 - Reverse Engineering

30 minutes

2 (For each
odeB)

Sheet 2a - odeB Reparenting

2 minutes

Sheet 2b - OneBTS (ATM) Reparenting

3 minutes

Sheet 2c - OneBTS (IP) Reparenting

3 minutes

(Optional) Sheet 3 - odeB Update

5 minutes

(Optional) iBTS and OneBTS with associated


Site if any ? OAM Intra-ROC rehoming

See document
referenced in [R14]

3 (Optional)

Sheet 4 - eighboring plan update

<10 minutes

Sheet 6- Consistency Checks

<5 minutes

Sheet 7 - Export workorders

<1 minute

Reconfiguration Activation Pre-Checks


Step

Chapter

Timing

6(Optional)

Reconfiguration Activation Pre-Checks

<1hour

Reconfiguration Activation in WMS


Step

Chapter

Timing

Reconfiguration Activation in WMS

<10 minutes
Depend on test
strategy

Change I&C parameters

<10 minutes

On site activities for transmission etwork update

Depend on
Transmission etwork

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
3-5
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

odeB Verification

PRELIMINARY
PRELIMINARY

Procedure description

Impacts

...................................................................................................................................................................................................................................

Impacts
Purpose

This topic summarizes the impacts on the service given for each step of the Procedure.

Main Steps

Impacts on service

odeB reparenting preparation under WPS

one

Change I&C parameters

Supervision Outage and possible Telecom


outage.

On site activities for transmission etwork update

Telecom outage

Reconfiguration Activation Pre-Checks

one

Reconfiguration Activation in WMS

Telecom outage

odeB Verification

Depend on test strategy

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

3-6

Limitations

...................................................................................................................................................................................................................................

Limitations
Purpose

o intra RC reparenting is supported by the current procedure.


o inter ROC reparenting is supported by the current procedure.
This procedure does not cover the GSM etwork Elements impact.

Manufacturer parameter setting is out of scope in the procedure. As Manufacturer


parameters can be different on the target RC than on the source one, contact your
local engineering in order to set them accordingly.
The procedure focuses on UTRA Es: RC and odeB. Core etwork
reconfiguration is out of the scope in this document.
Iso DHCP configuration.
Frequencies used are not modified.
eighboring cell managed by other ROC is out of the scope in this document.

PRELIMINARY

Procedure description

o modifications should be done on the source, Target, RCs and their associated
MO (Managed Object) through WMS GUI, WICL from the beginning of the RP
(export CM XML file from main server, sheet 1) until the end of the procedure.
The partial reverse is not supported. The reverse is made for all the  odeB(s). Due
to this limitation it is recommended to choose , the number of odeBs as small as
possible.

Remarks relating to National Roaming Management:

Be careful to avoid any Cell Reparenting (which is defined as a neighboring cell of an


access network of a second operator) to a target RC belonging to the same operator with
a PLMID different from the one of the source RC: this destination RC could belong
to a shared coverage areas that will forbid access to this cell for the second operator.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
3-7
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Procedure description

...................................................................................................................................................................................................................................

Prerequisites
Purpose

The odeB reparenting RP described in this document applies if all the following
conditions are verified:

PRELIMINARY

Prerequisites

The etwork and the OMC are up and running without any problem. (Alarm, OMC
MIB State, Synchronization State, etc.).
The ItF-R interface between WMS and the source and target RCs are up and
running.
The same WMS Main Server hosts the source and target RCs
The Itf-B interface:
For the iBTS: The Itf-B interface between WMS and the odeB is implemented
via the RC Iode in both source and target configurations for all involved
odeB(s). See the corresponding picture in chapter General description.
For the OneBTS: The Itf interface links the WMS to the IuB Backbone. See
corresponding picture in chapter General description.
The source and target RCs share the same system version.
Intra-ROC Inter-MainServer(Cluster) odeB reparenting: in the ROC if the
Source and the Target RC are not homed by the same MainServer (ClusterId
are not the Same), prior to the execution of the RP the related BTS Equipment
and its associated Site (if exists) must have been re-homed from the source
RC's MainServer(Cluster1) to the Target RC's MainServer(Cluster2). See
document [R14].
BTS Equipment software version is not modified.
The LAC, RAC, SAC of the odeB(s) must be well declared at Core etwork side.
In case of reparenting of a BTS1 in Drop & Insert (initially configured in Drop &
Insert or not) as dropped or dropping of another BTS2 which already exist on the
Target RC, the BTS2 on the target RC must be already configured in Drop &
Insert (See document [R3]).

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

3-8

PRELIMINARY

4 odeB reparenting
N
preparation under WPS

Overview
Purpose

This chapter defines the data provisioning required to reparent the  odeB(s) in the live
network
The resultant data consists of a Workorder (CM XML) file that contains:

The new configuration to be activated on the reparented odeB(s)


The modifications to be applied on the following objects:

The RC C-odes and RC I-odes source and target

Contents
Description

4-2

Sheet 1 - Reverse Engineering

4-4

Sheet 2a - iBTS Reparenting

4-6

Sheet 2b - OneBTS (ATM) Reparenting

4-10

Sheet 2c - OneBTS (IP) Reparenting

4-13

Sheet 3 - odeB Update

4-16

Optional Sheet 4 : eighboring Plan Update

4-18

Sheet 6 - Consistency Checks

4-19

Sheet 7 - Export workorders

4-20

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Description

...................................................................................................................................................................................................................................

Description
Purpose

The following figure presents an overview of the algorithm to be applied in order to


provide the OMC team with the relevant data set required to reparent  odeB(s).

The procedure that follows is derived from the preceding figure, and gathers all the main
steps and notes, which need to be followed to reparent a odeB.
The main steps to complete the odeB reparenting datafill preparation are:
Step

Sheet

1 (Optional)

OMC Snapshot import

PRELIMINARY

Sheet 1 - Reverse Engineering


2 (for each odeB)

Sheet 2a - odeB Reparenting


Sheet 2b - OneBTS (ATM)Reparenting
Sheet 2c - OneBTS (IP) Reparenting
(Optional) Sheet 3 - odeB Update

3 (Optional)

Sheet 4 - eighboring Plan Update

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-2

Description

...................................................................................................................................................................................................................................

Step

Sheet

Sheet 6 - Consistency Checks

Sheet 7 - Export workorders

The result of these main steps is that a Workorder (CM XML) file, which describes the
odeB(s) to reparent, is available.

PRELIMINARY

NodeB reparenting preparation under WPS

Additional steps

In addition to the reparenting steps performed in step 2 above using the IuB wizard, the
following updates may be required

If DCHP is to be updated, new subnets may be required on the target RC.


OneBTS backplane may require updating if new Vlan Ids have been used for the
transport network to connect to the target RC.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-3
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 1 - Reverse Engineering

...................................................................................................................................................................................................................................

Sheet 1 - Reverse Engineering


Purpose

This topic ensures that an up-to-date view of the current network configuration is
available.
Presentation

This step details how to proceed with WPS and the main server to import a view of the
current network configuration into WPS if the WPS view is not up-to-date.
This step is recommended when a problem has occurred. You can bypass it if you are sure
that your WPS view is synchronized with the network. In this case, please go to the next
step.
Once the CM XML export is performed, no "on line" modifications can take place on the
target E(s) until the end of the overall procedure in order to guarantee that the initial
view, on which the procedure is based, is synchronous with the Main server MIB.
Input parameters

one
Initial status

WPS and WMS are installed and ready to be used. The template files are uploaded.
Step Duration

Step duration depends on the number of E available on the network. Example: for a
network with 7 RC, 860 BTSEquipments and 2540 Cells, durations are the following:

Action 1: less than 20 minutes


Action 2: less than 10 minutes

Impact on service

one
Procedure

PRELIMINARY

...................................................................................................................................................................................................

Export from the Main server (Global UTRA export) the XML file describing the
network (If required transfer the file to a WPS PC directory).

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-4

Sheet 1 - Reverse Engineering

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Under WPS:

Open a new Workspace. Refer to the procedure "Creating a new workspace" in


document [R3] for details of workspace creation
From the file menu launch Import and Export...
Select Import Snapshot (form the Local file system or the Live server repository)
and click Next
Select "Replace initial snapshot and discard existing workorders" and click Next

Click Browse

Select the XML file exported step 1 and Click Open

Click Next

If a part of the snapshot need to be excluded Click Edit Filter... Choose Objects
to import and Click Next otherwise Click directly Next
Select "o, proceed without saving" and click Start

PRELIMINARY

NodeB reparenting preparation under WPS

...................................................................................................................................................................................................

After import completion, check the report and close it.


E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

Stop the global procedure and redo this procedure.


Final Status

At this step, you have a Workspace with an Initial Snapshot describing your current
network.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-5
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 2a - iBTS Reparenting

...................................................................................................................................................................................................................................

Sheet 2a - iBTS Reparenting


Purpose

This activity provides the steps to reparent an iBTS from a source RC to a target RC,
from WPS perspective.
During this reparenting procedure, two features are configured:

Alcap
This feature tracks the implementation of Alcap for the management of the AAL2
connections on the Iub interface (as specified by 3GPP) instead of the partially
proprietary solution.

Hybrid Iub
This feature introduces support for a hybrid transport (IP & ATM) Iub interface
through a software upgrade and the addition of two (1+1) 4ptGigE Cards on the RC.

Both features can be activated through the Iub wizard. For more information, see
document [R3] - "Iub Creation".
To parent a new OneBTS, see sheet 2b or 2c- OneBTS Reparenting.
Input parameters

All design parameters regarding the iBTS need to be provided to the Application
Engineer by the etwork Designers. The design parameters required are:

Cell planning information


Topological information
Relevant parameters values written in WPS templates
ote: For any questions concerning the odeB DHCP activation or configuration,
refer to the documents [R15]:

Alcatel-Lucent odeB UA07.x DHCP Activation, IM 30-6239

Both features can be activated through the Iub wizard. For more information, see
document [R3] - "Iub Creation".
To parent a new OneBTS, see sheet 2b or 2c- OneBTS Reparenting.

PRELIMINARY

Initial status

Under WPS, a Workspace describing the current configuration of your network is


available. Templates files and RRM tree are imported.
A odeB is parented to a source RC and a target RC is available.
Step Duration

2 minutes for 1 odeB


...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-6

Sheet 2a - iBTS Reparenting

...................................................................................................................................................................................................................................

Impact on service

one
Procedure
...................................................................................................................................................................................................

Under WPS, create a new Workorder (if needed) and rename it (for example: "odeB
<odeB reparenting>") as described in document [R3].

PRELIMINARY

NodeB reparenting preparation under WPS

...................................................................................................................................................................................................

In the etwork Tree, select the odeB and launch IuB Wizard
...................................................................................................................................................................................................

In the IuB Wizard:

Delete the Iub:


In the "odeB parenting" task, launch Delete Iub Operation
Select only the option "Delete Atm Switching at RC Optical level" and unselect
the others available option

Parent the odeB to a new RC:


In the "odeB parenting" task, launch the "Parent odeB to a RC" Operation
Select the target RC
If required change the odeB.IubIf

Click OK

Click OK

Go through all tasks and fulfill all requested information as described in document
[R3] - "Iub Creation".

...................................................................................................................................................................................................

Configure the Alcap link: once the Iub wizard is launched, select Streams Definition and
click Add streams
...................................................................................................................................................................................................

Check that the Number of Alcap streams to be added is set to 1


...................................................................................................................................................................................................

Fill in the following stream parameters if required:


umber of AAL2 streams
ATM rules

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-7
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 2a - iBTS Reparenting

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Fulfill with the correct value then click OK:

Aggregation point of OAM stream

BTS sap A2EA

...................................................................................................................................................................................................

Select Streams definition and click Configure OAM & Cplane & Alcap streams
...................................................................................................................................................................................................

A window opens, select the correct value for both parameters Qaal2Params and
SscopParms
...................................................................................................................................................................................................

10

Click OK
...................................................................................................................................................................................................

11

From the Iub wizard tree, select BTS ATM configuration, click Configure ATM switching
...................................................................................................................................................................................................

12

For the object AlcapBearer/0 fill in the values of the Vp, Vc, ServiceCategory and
holdingPriority and choose the correct template in Vcc template
...................................................................................................................................................................................................

13

Click OK
...................................................................................................................................................................................................

14

From the Iub wizard, select Switching configuration then click Configure Iub ATM
switching
...................................................................................................................................................................................................

15

Fill in all the parameters


...................................................................................................................................................................................................

16

Click OK
...................................................................................................................................................................................................

17

In the network tree, select the BTSEquipment linked to the new nodeB.

PRELIMINARY

...................................................................................................................................................................................................

18

In the Object window, select the Edition tab.


...................................................................................................................................................................................................

19

Check that the parameter AlcapActivation is set to true.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-8

Sheet 2a - iBTS Reparenting

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

20

If you want to configure an hybrid Iub interface:

The Ethernet cable must be connected to the lower level of the plug.

The TIL or the site LA must be connected to the upper level of the plug.
1. Select the odeB and launch Iub wizard.
2. Select odeB parenting and click Reconfigure IUB Transport Type

PRELIMINARY

NodeB reparenting preparation under WPS

3. Fill in Transport type with atm+ip


4. Click OK
5. In the network tree, select BTSEquipment and click IpRan
6. In the Object BTSEquipment part, select the Edition mode
7. Fill in with the right value, both parameters:
ipRanodeBaddress
ipRanSubnetMask
8. Click Set to record the new value of each parameter
E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of trouble, delete the Workorder and redo this procedure.


Final Status

At this step, you have a Workorder containing the scenario to reparent an iBTS.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-9
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 2b - OneBTS (ATM) Reparenting

...................................................................................................................................................................................................................................

Sheet 2b - OneBTS (ATM) Reparenting


Purpose

The procedure details how to parent an ATM OneBTS to an existing RC with WPS.
This feature can be activated through the Iub wizard. For more information, see document
[R3] Alcatel-Lucent 9352 Provisioning System - User Guide, -20500-036.
In this case the OneBTS bears only ATM protocol. So no IP link is available on this
equipment. OneBTS requires specific templates.
Input parameters

All Design parameters regarding the odeB need to be provided to the Application
Engineer by the etwork Designers. These design parameters are the following:

Cell planning information


Topological information

Relevant parameters values written in WPS templates


ote: For any questions concerning the OneBTS DHCP activation or configuration,
refer to the documents [R16]:

Alcatel-Lucent OneBTS UA7.x DHCP Activation, IM 30-6232

Initial status

Under WPS, a Workspace describing the current configuration of your network is


available. Templates files and RRM tree are imported.
A odeB is parented to a source RC and a target RC is available.
Step Duration

The step duration to parent 1 OneBTS is 3 minutes.


Impact on service

one
Procedure

PRELIMINARY

...................................................................................................................................................................................................

Under WPS, create a new Workorder (if needed) and rename it (for example: "odeB
<odeB reparenting>") as described in document [R3].
...................................................................................................................................................................................................

In the etwork Tree, select the odeB and launch IuB Wizard

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-10

Sheet 2b - OneBTS (ATM) Reparenting

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

In the IuB Wizard:

Delete the Iub:


1. In the "odeB parenting" task, launch Delete Iub Operation
2. Select only the option Delete Atm Switching at RNC Optical level and unselect
the others available option
3. Click OK

PRELIMINARY

NodeB reparenting preparation under WPS

...................................................................................................................................................................................................

In the etwork Tree, Select the odeB and click Iub wizard
...................................................................................................................................................................................................

Select odeB parenting and click Parent NodeB to a RNC


...................................................................................................................................................................................................

Fill in with the correct values, select the right target RC, Transport Type must be ATM
and click OK
...................................................................................................................................................................................................

Verify:

The OneBTS is located under the target RC


If needed, check that Aggregation Point Definition is correctly defined

...................................................................................................................................................................................................

In the Iub wizard tree, select Streams definition and click Add streams
...................................................................................................................................................................................................

Fill in with the correct values. Set ATM Rules and Click OK
...................................................................................................................................................................................................

10

In the Iub wizard tree, select Streams definition and click Configure OAM & CPlane &
Alcap Streams
...................................................................................................................................................................................................

11

Fill in with the correct values. Set ATM Rules and Click OK
...................................................................................................................................................................................................

12

verify that the following objects are well defined:


OneBTS Physical resource Configuration
OneBTS ATM Configuration

...................................................................................................................................................................................................

13

In the Iub wizard, select Interface ode Configuration and click Switching configuration

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-11
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 2b - OneBTS (ATM) Reparenting

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

14

Click Configure Iub ATM switching


...................................................................................................................................................................................................

15

Set ATM Rules, set all Vcc Template with the correct templates and Click OK

E....................................................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of trouble, delete the Workorder and redo this procedue.


Final Status

PRELIMINARY

At this step, you have a Workorder containing the scenario to reparent a OneBTS.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-12

Sheet 2c - OneBTS (IP) Reparenting

...................................................................................................................................................................................................................................

Sheet 2c - OneBTS (IP) Reparenting


Purpose

The procedure details how to parent an IP OneBTS to an existing RC with WPS.
This feature can be activated through the Iub wizard. For more information, see document
[R3] Alcatel-Lucent 9352 Provisioning System - User Guide, -20500-036

PRELIMINARY

NodeB reparenting preparation under WPS

In this case OneBTS bears IP protocol.


Input parameters

All Design parameters regarding the odeB need to be provided to the Application
Engineer by the etwork Designers. These design parameters are the following:

Cell planning information


Topological information

Relevant parameters values written in WPS templates


IuB user rules file installed under \Program Files\9352 WPS\<version>\user.
ote: For any questions concerning the OneBTS DHCP activation or configuration,
refer to the documents [R16]:

Alcatel-Lucent OneBTS UA7.x DHCP Activation, IM 30-6232

Initial status

Under WPS, a Workspace describing the current configuration of your network is


available. Templates files and RRM tree are imported.
A odeB is parented to a source RC and a target RC is available.
WiPS checks for OneBTS and source and target RC did not show unexpected
consistency check errors.
If this is the first OneBTS to be connected via IP under the target RC, check if the 4pGe
cards are already created. Otherwise run WO #1 from Chapter 4 in 9300 W-CDMA
Product Family - Activation of ative IP IuB, -20500-261s
Step Duration

The step duration to parent 1 OneBTS is 3 minutes.

one

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-13
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Impact on service

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 2c - OneBTS (IP) Reparenting

...................................................................................................................................................................................................................................

Procedure
...................................................................................................................................................................................................

Under WPS, create a new Workorder (if needed) and rename it (for example: "odeB
<odeB reparenting>") as described in document [R3].
...................................................................................................................................................................................................

In the etwork Tree, select the odeB and launch IuB Wizard
...................................................................................................................................................................................................

In the IuB Wizard:

Delete the Iub:


1. In the "odeB parenting" task, launch Delete Iub Operation
2. Select the following options:
Delete IuB at BTS level
Delete IuB at RNC level
Deparent NodeB
Delete incoming Neighbours

3. Click OK
...................................................................................................................................................................................................

In the etwork Tree, Select the odeB and click Iub wizard
...................................................................................................................................................................................................

Select odeB parenting and click Parent NodeB to a RNC


...................................................................................................................................................................................................

Fill in with the correct values, select the right target RC, Transport Type must be IP and
click OK
...................................................................................................................................................................................................

Verify that the OneBTS is located under the target RC.


...................................................................................................................................................................................................

In the Iub wizard tree, select Streams definition and click Add Cplane streams
...................................................................................................................................................................................................

PRELIMINARY

Run Configure Cplane streams, fill in the correct values and click OK.
...................................................................................................................................................................................................

10

In the Iub wizard tree, select Streams definition and click Add Uplane streams
umber of Uplane streams to be added = 4 for QoS 3,2,1,0.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-14

Sheet 2c - OneBTS (IP) Reparenting

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

11

Run Configure Uplane streams, fill in correct values and Click OK.
...................................................................................................................................................................................................

12

In the IuB wizard refer to the following :

OneBTSEquipment IP Configuration

External RC IuB IP Configuration

PRELIMINARY

NodeB reparenting preparation under WPS

Check if the attributes to be configured via these tasks require updating and update
accordingly:

odeB telecom subnet IP address / subnet mask / VLA Id


Routing table
PTP odeB subnet IP address / subnet mask / VLA Id

...................................................................................................................................................................................................

13

Re-create the eighbour Relations which have been removed during step 3 above Delete
IuB.
To synchronise the re-creation of eighbour Relations to a new eighboring plan, see
Optional Sheet 4 : eighboring Plan Update (p. 4-18).
...................................................................................................................................................................................................

14

Run WPS checks for OneBTS, source and target RC and fix any consistency check
errors related to OneBTS re-parenting operation.
E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of trouble, delete the Workorder and redo this procedure.


Final Status

At this step, you have a Workorder containing the scenario to reparent a OneBTS.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-15
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 3 - NodeB Update

...................................................................................................................................................................................................................................

Sheet 3 - NodeB Update


Purpose

This activity aims at updating odeB configuration if some configuration parameters


need to be modified (FddCellId, Lac, Rac, Sac, RRM references, etc.).
If not required, this step can be skipped.
Input parameters

All Design parameters regarding the reparented odeB such as:

Fdd Cell Id (unique id per RC)

Lac, Rac, Sac.


RRM references

Initial status

WPS is installed and ready to be used. Templates files and RRM tree are imported.
Under WPS, a Workspace with the reparented odeB(s) is available.
Step Duration

This step lasts 5 minutes for 1 odeB.


Impact on service

one
Procedure
...................................................................................................................................................................................................

Under WPS, create a new Workorder and rename it (for example: "odeB <odeB
name> update") as described in document [R3].
...................................................................................................................................................................................................

PRELIMINARY

Under WPS, in the etwork Tree, select the reparented odeB under the Target RC and
launch the odeB Wizard. Go through the Wizard and update the parameters as specified
into document [R3], chapter "odeB/BTSEquipment creation".

For RRM references update:


In "odeB Configuration" task launch the Operation "Links Setting":
For each FDDCell Set the attributes by selecting the relevant class given in Input.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-16

Sheet 3 - NodeB Update

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

Update of the relatedFDDCell attribute of the incoming UMTS FDD eighboring Cells:

In the etwork Tree, Select the etwork

Launch the Checks (See document [R3])


Select a Check and Right Click Disable All

In the category "eighboring", enable the check "Target Cell Consistency" Id


EI_UMTS_51 and EI_UMTS_55, and select "Autofix" and Click OK
Click Re-run check session and Check that no more error appears on the incoming
UMTS FDD eighboring Cells.

PRELIMINARY

NodeB reparenting preparation under WPS

...................................................................................................................................................................................................

If the LAC and/or RAC of the FDDCell have been changed: Update of the LAC and/or
RAC attributes of the incoming UMTS FDD eighboring Cells:

In the etwork Tree, Select the etwork


Launch the Checks (See document [R3])

Select a Check and Right click Disable All

In the category "eighboring", enable the checks "Target Cell Consistency" Id


EI_UMTS_51 and EI_UMTS_55, and select "Autofix" and Click OK.
Click Re-run check session and Check that no more error appear on the incoming
UMTS FDD eighboring Cells.

E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of trouble, delete the Workorder and redo this procedue.


Final Status

At this step, you have a Workorder containing the scenario to update the odeB.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-17
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

NodeB reparenting preparation under WPS

Optional Sheet 4 : Neighboring Plan Update

...................................................................................................................................................................................................................................

Optional Sheet 4 : Neighboring Plan Update


Purpose

This procedure details how to manage the neighboring plan update under WPS.
Presentation

If the eighboring Plan Update is not required, this step can be skipped.
evertheless if the reparenting of the odeB(s) requires an update of the neighboring
plan, this procedure details how to manage the neighboring plan update under WPS.
To update efficiently the eighboring Plan refer to chapter 'eighboring Plan update
procedures' in document [R4].
Impact on service

one.
Final status

PRELIMINARY

At this step, you have a Workorder containing the scenario to update the neighboring
plan.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-18

Sheet 6 - Consistency Checks

...................................................................................................................................................................................................................................

Sheet 6 - Consistency Checks


Purpose

The procedure details how to check the configuration consistency, according to


engineering rules.

PRELIMINARY

NodeB reparenting preparation under WPS

Input parameters

one.
Initial status

To have new odeB(s) reparented to RC in a Workspace under WPS.


Step Duration

This step lasts less than 5 minutes for a etwork containing 7 RCs and 860 odeBs.
Impact on service

one
Procedure
...................................................................................................................................................................................................

Under WPS, create a new workorder (if needed) and rename it (for example: "consistency
checks") as described in document [R3].
...................................................................................................................................................................................................

Launch checks from the network as described in document [R3].


...................................................................................................................................................................................................

Check that no error appears in the check session report.


E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of error, contact your local Engineering representative and correct the reported
errors.

After the execution of this procedure, all the checks must be error free.

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-19
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Final Status

PRELIMINARY

NodeB reparenting preparation under WPS

Sheet 7 - Export workorders

...................................................................................................................................................................................................................................

Sheet 7 - Export workorders


Purpose

This procedure details how to generate the XML file, which describes the modified Es
between the initial and the final network configuration.
This procedure enables to speed up the whole process, by exporting on the main server
only the relevant modifications to apply.
Input parameters

one.
Initial status

To have the odeB(s) reparented to RC in a Workspace under WPS.


To have the initial snapshot representing the initial network state and workorders
representing the modifications to apply on the network.
Step Duration

This step lasts a few seconds for 1 odeB.


Impact on service

one
Procedure
...................................................................................................................................................................................................

Under WPS, from the workorders Menu select "Merge etwork Changes".
...................................................................................................................................................................................................

Select an option to save your Workspace, if needed enter a new Workspace ame, and
Click RUN.
...................................................................................................................................................................................................

Close the report window and go to the workspace area.

PRELIMINARY

...................................................................................................................................................................................................

In the workorders folder select the "Merge" workorder, right click Export workorder...
(choose "on local file system" or on "live server repository").
...................................................................................................................................................................................................

Enter a <Filename>, select a <Result_folder> and click Save

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

4-20

Sheet 7 - Export workorders

...................................................................................................................................................................................................................................

ote:

Select:

1. HOST

2. Username and Password (of the server)


Browse in the folders and give a name to the file
Click OK

PRELIMINARY

NodeB reparenting preparation under WPS

E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

In case of trouble during generation of XML file redo this step.


Final Status

At this step, the <Result_folder> contains the workorder (CM XML) file
<Filename>.xwo which describes the odeB(s) to reparent. This file will be used for the
direct operation. If the reverse operations needs to be applied, the Workorder file
<Filename_reverse>.xwo in the <Result_folder> will be used.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
4-21
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

PRELIMINARY

I5nstallation and
commissioning

Overview
Purpose

This chapter provides installation and commissioning procedures.


Contents
Performing checks before reparenting

5-2

Change I&C parameters

5-3

On Site activities for transmission network update

5-4

Reconfiguration activation in WMS

5-5

odeB verification

5-11

Performing checks after reparenting

5-12

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Installation and commissioning

Performing checks before reparenting

...................................................................................................................................................................................................................................

Performing checks before reparenting


Purpose

This procedure verifies that:

The network and the OMC are up and running without any problem. (Alarm, OMC
MIB State, Synchronization State, etc.)
Calls can be achieved on the impacted odeB
Calls can be achieved on the target RC
The odeB is ready to be reparented.

This procedure must be repeated for each impacted odeB.


This procedure is a recommendation and is not mandatory if all the states given by the
checks described above are well known.
Actions

Following operations may be performed:

Check that no impacting Alarm exist (See documents [R5] and [R9])
Perform an audit of the impacted RC (See document [R5])
Perform calls on the impacted RCs. Especially perform a call on the impacted
odeB(s)'s Cells

For Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB, see documents [R2],
[R12] and [R13]
Launch the TIL on the new odeB to check I&C parameters (See documents [R2] and
[R6])

Final status

The network and the OMC are up and running without any problem. (Alarm, OMC MIB
State, Synchronization State, etc.)

PRELIMINARY

The impacted RCs are up and running and the odeB is ready to be reparented.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-2

Change I&C parameters

...................................................................................................................................................................................................................................

Change I&C parameters


Purpose

This activity modifies I&C parameters of the BTS.


For example, if DHCP configuration is not used, the IP address of the BTS has to be
changed. It is performed by using:

PRELIMINARY

Installation and commissioning

The LMT for Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB.(See
document [R12])
The TIL for all other BTS (See document [R6]).
ote: For any questions concerning the DHCP activation or configuration, refer to the
documents [R15] or [R16]:

For a odeB use document [R15], Alcatel-Lucent odeB UA7.x DHCP


Activation, IM 30-6239

For a OneBTS use document [R16], Alcatel-Lucent OneBTS UA7.x DHCP


Activation, IM 30-6232

For Drop & Insert configuration, see documents [R10] and [R6].
Important! Before any IP address modifications, be sure of its new value. Any error
will need a change via a local TIL or RMT.
ote: After any IP address modification, a reset of the ode B is mandatory. This
operation will make a Supervision and a Telecom outages.
Actions

Out of scope of this document. Specific information could be found in the documents:

For Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB, see document [R12]
For all other BTS, see document [R6].
UMTS Drop & Insert via IBTS with fractional ATM over single E1

Final status

I&C parameters of the odeB are compliant with the target RC interface.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-3
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Installation and commissioning

On Site activities for transmission network update

...................................................................................................................................................................................................................................

On Site activities for transmission network update


Purpose

These activities update the transmission network in order to move the connection of the
odeB(s) from the source RC to the target RC.
Especially if a Point of Concentration ode (POC, AM) is used. It might be
reconfigured in order to correctly re-direct the IuB to the target RC.
Actions

Out of scope of this document.


For information on the subject:

For Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB, see documents [R13]
and [R12]
For all other BTS, see document [R2].
ote: Do not forget to synchronize the reparenting work with the transmission
operational service.

Final status

The transmission network provides interconnection between the reparented odeB(s) and
the target RC(s).

PRELIMINARY

ote: If some transmission problems occur, refer to the transmission external team.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-4

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................

Reconfiguration activation in WMS


Purpose

This step activates the reparented odeB(s) so that they can start providing wireless
services again. It is performed on the WMS server using Access Module GUIs.
The activation is performed through "Activation Manager" mechanism in order to avoid
any interruption of service on the other odeB(s) of the RCs.

PRELIMINARY

Installation and commissioning

At this step, on site activities should have been completed in order to resume BTS
Equipment supervision.
Input parameters

The IP address of the BTS must be known (I&C parameters)


The workorder (CM XML) file <Filename>.xwo is available in a folder
(/<Result_folder>) of the main server as described in document [R5].
Initial status

The I&C parameters of the BTS Equipment(s) and the Transmission etwork are up to
date.
Parameters at Core etwork Side are synchronized with the potential reconfigurations.
The etwork and the OMC are up and running without any problem. (Alarm, OMC MIB
State, Synchronization State, etc.).
All the workorder (CM XML) files from /<Result_folder> directory generated by WPS
have been transferred to a /<Result_folder> Main Server directory as described in
document [R5].
Step Duration

This step lasts for 1 odeB: TBC.


Impact on service

If required BTS Build otherwise none for the other odeB(s) of the impacted RCs.
Actions

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-5
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Activation of source and target RCs and, if required, Pre-Activation of


BTSEquipment(s)

PRELIMINARY

Installation and commissioning

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................

Procedure
...................................................................................................................................................................................................

From the WMS client menu bar, select Configuration -> Sessions Manager.
Result: The Sessions Manager window appears.
...................................................................................................................................................................................................

From the Sessions Manager window, either:

in Session Tasks pane, click Create new session, or

in Available Sessions pane, right-click Sessions list and select New.


Result: The Create Session window appears.

...................................................................................................................................................................................................

In the Create Session window - Creation parameters pane, enter a <Session ame>.
...................................................................................................................................................................................................

From the Create Session window - Workorder(s) Selection pane, in the


cmXML/<Result_folder> folder, select the workorder you want to activate.
...................................................................................................................................................................................................

Click Add to list.


Result: The Workorder is added in the right pane.
...................................................................................................................................................................................................

Click Next to list the impacted nodes.


Result:

The Create Session window - Excluded odes pane appears and details, for each
impacted node, activation details and impacted objects.

Select the node(s) to be excluded, if needed.

...................................................................................................................................................................................................

PRELIMINARY

In the "Create Session" window:

Click Launch

In the "Sessions Manager" window Click Summary for <session_name> and check
the activation status of the nodes:
I-ode(s) should be in "Loaded" state

RC(s) should be in "Validated state


If listed, BTSEquipment(s) should be in "Validated" state

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-6

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

After session creation completion without errors, in the "Actions for <session_name>" tab
click Validation:

Select all the impacted I-ode(s) and click Launch

Check the validation report of each node in the summary section:


In the "Sessions Manager" window Click Summary for <session_name> (Iode(
s) should be in released state), select a node in the table and click the hyperlink to
display the HTML validation report

PRELIMINARY

Installation and commissioning

...................................................................................................................................................................................................

After validation completion without errors, in the "Actions for <session name>" tab click
Pre-activation:

If listed, select all the impacted odes BTSEquipment(s) and click Launch

...................................................................................................................................................................................................

10

After validation and pre-activation completion without errors, in the "Actions for
<session name>" tab click Activation:

Select all the impacted I-ode(s) and click Launch

When all tasks are completed, in the "Sessions Manager" window Click Summary for
<session name> to check that all impacted I-ode(s) are Released

For each odeB (except Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB):
Open link and activation of the new equipment

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-7
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Installation and commissioning

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

11

Check that the ode B become reachable and send a Ping command to the BTS
Equipment in order to check the OAM link.
Result: The ping correctly responds
...................................................................................................................................................................................................

12

Select the reparented BTS Equipment in WMS Graphical etwork Display.


ote: If the BTS Equipment was not in the same layout that the Target RC it might
be necessary to move it in your Layout from the E Store. For more information
please refer to document [R9].
...................................................................................................................................................................................................

13

If necessary, set the OAM link administrative state of the BTS Equipment to "unlocked"
in the "Set E's OAM Link Administrative State Action Window" command window.
...................................................................................................................................................................................................

14

After BTS Equipment connection request success, in the "Sessions Manager" window:

In the "Actions for <session name>" tab click Launch

If listed, select the BTS Equipment and click Launch


When all tasks are completed, in the "Sessions Manager" window Click Summary for
<session name> to check that the BTSEquipment is released

Post-condition: The BTS Equipment is released with unlocked administrative state.


Repeat step 11, 12, 13 and 14 for each reparented odeB.
Activation of source and target RCs (C-ode Part)
...................................................................................................................................................................................................

15

In the "Sessions Manager" window:

In the "Actions for <session name> tab click Activation

Select all the impacted RCs and click Launch

When all tasks are completed, in the "Sessions Manager" window click Summary for
<session name> to check that all nodes are released.

...................................................................................................................................................................................................

PRELIMINARY

16

From the "Sessions Manager" window, in the Session list Right click <session name>
and in scroll down menu select "Terminate" in order to delete the session
Post-condition: The odeB sub-tree is released on the target RC with unlocked
administrative states and de-activated from the source RC

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-8

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................

ote: After terminating the session if you want to restore the initial configuration go
toReverse operation (p. 6-2) and activate the reverse Workorder
E...................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

PRELIMINARY

Installation and commissioning

ote : All commands are logged in the Command Manager (See [R7])
Failed Step

Node Status

Action

"Excluded"

In case of errors in session creation, analyze logs or


contact your local support or etwork Designers in order
to correct the XML file, Abort then terminate the session
and return to step 1.

"Validation Failed"

In case of errors in session validation, analyze logs or


contact your local support or etwork Designers in order
to correct the XML file, Abort then terminate the session
and return to step 1.

"Validated"

In case of error in pre-activation, return to step 5.

"Validation Failed"

In case of errors in session validation, analyze logs or


contact your local support or etwork Designers in order
to correct the XML file, Abort then terminate the session
and return to step 1.

11

Ping does not


respond

In case of ping failure, contact your local support or


networks designers in order to correct XML file, Abort
then terminate the session and return to step 1.

"Locked"

In case of unlock command failure, contact your local


support or network designers in order to identify and
correct the problem and return to step 9 to check the
correction.

10

"Validated"

In the Command Manager window check the status of


impacted BTSEquipment:

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-9
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

In case of Build failure (the Status is "Stopped with


errors") analyze the logs or contact your local support or
networks designers in order to correct the problem. Once
the problem identified and corrected, return to step 10
otherwise terminate the session and go toReverse
operation (p. 6-2) to restore the initial configuration.

PRELIMINARY

Installation and commissioning

Reconfiguration activation in WMS

...................................................................................................................................................................................................................................

Failed Step

Node Status

Action

11

"Activation partly
realized"

If the Status is "Completed with errors":


Fallback all the RC C-odes and all the RC I-odes
(see document [R5]):

If the Fallback is completed : Terminate.

If the Fallback failed: Abort then terminate the


session and go toReverse operation (p. 6-2) to
restore the initial configuration.

Final status
WMS Level
Object

State

Value

BTSEquipment

OAMlinkadministrativeState

unlocked

odeB

administrativeState

unlocked

FDDcell

administrativeState

unlocked

Object

State

Value

RC

Activation

Released

RC I-ode

Activation

Released

BTSEquipment

Activation

Released

odeB(s) is(are) available for monitoring.


NodeB Level

The odeB(s) is(are) ready to provide service


RNC

PRELIMINARY

The RC ensures call management for the reparented odeB(s).


Mobility
The UMTS outgoing neighboring links are active.

The UMTS incoming neighboring links are active.

ote: If the reparented ode B is managed by a new RC, a new organization of the
WMS layout may be possible.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-10

NodeB verification

...................................................................................................................................................................................................................................

NodeB verification
Purpose

This activity ensures that the reparented odeB provides the expected level of wireless
service.

PRELIMINARY

Installation and commissioning

Actions

Out of scope of this document, specific information could be found in the following
documents:

For Alcatel-Lucent 9313 Micro odeB and 9314 Pico odeB, see documents [R2],
[R12] and [R13]
For all other BTS, see document [R2].

Final status

The odeB(s) is (are) fully available for wireless services.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
5-11
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Installation and commissioning

Performing checks after reparenting

...................................................................................................................................................................................................................................

Performing checks after reparenting


Purpose

This procedure aims at verifying the following points:

The network and the OMC are up and running without problem (Alarms, OMC MIB
state, synchronization state, etc.)
Calls can be achieved on the reparented ode B.

This procedure has to be repeated for each impacted ode B.


Action

The following actions must be performed:

Check that no impacting alarm exist (See document [R5] and [R9])
Perform an audit of the impacted RC
Perform calls on the impacted RC and ode B.
Launch the TIL or RMT (as appropriate) on the reparented ode B to check the I&C
parameters (See documents [R2] and [R6])

Final status

The network and the OMC are up and running without problem.

PRELIMINARY

The impacted RC and the reparented ode B are up and running.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

5-12

PRELIMINARY

Reverse operation
6

Overview
Purpose

This chapter provides the reverse operation to retrieve the initial configuration.
Contents
Reverse operation

6-2

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
6-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

Reverse operation

Reverse operation

...................................................................................................................................................................................................................................

Reverse operation
Overview

If the BTS Equipment, in final configuration, does not manage to open the OAM
connection, it will go back to the initial configuration to re-establish a connection with the
OMC. In this case, a reverse operation described below is to be done.
The reverse operation is also required when the activation step has not been successfully
completed or if the operator wants to retrieve the initial configuration.
Input parameters

The data mandatory for reverse operation (See /<Result_folder> folder) must be
available.

The used workorder (CM XML) file will be found under this latter folder only

Step Duration

This step lasts for 1 odeB: TBC.


Impact on service

RC build in case of Fallback failure in troubleshooting part of chapterReconfiguration


activation in WMS (p. 5-5) otherwise one.
Actions

Reverse workorder activation


Go through the following sequences, taking into account data coming from
/<Result_folder> folder.
Procedure
...................................................................................................................................................................................................

Important! Be aware that the I&C modification parameters can lead to transmission
lost. Then all modification can be done via local TIL.

PRELIMINARY

If the I&C parameters are modified, return to the initial I&C parameters (see chapter
Change I&C parameters (p. 5-3)).
...................................................................................................................................................................................................

Update back the transmission network in order to move back the connection of the
odeB(s) from the target RC to the source one (see chapter On Site activities for
transmission network update (p. 5-4)).
ote: If some transmission problems occur, refer to the transmission external team.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

6-2

Reverse operation

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

From the WMS client menu bar, select Configuration -> Sessions Manager.
Result: The Sessions Manager window appears.
...................................................................................................................................................................................................

From the Sessions Manager window, either:

in Session Tasks pane, click Create new session, or

in Available Sessions pane, right-click Sessions list and select New.

PRELIMINARY

Reverse operation

Result: The Create Session window appears.


...................................................................................................................................................................................................

In the "Create Session " window:

Enter a <reverse session name>


Select in the <Result_folder> folder the workorder (CM XML)
file<Filename>_reverse.xwo to be activated
Click Show impacts in order to list the impacted nodes
If the fallback have been already performed, exclude the RC C-ode(s) by selecting
them in the list
Click Launch
In the "Sessions Manager" window Click Summary for <reverse session name> and
check the activation status of the nodes:

I-ode(s) should be in "Loaded" state


RC(s) should be in "Validated" state
If listed, BTSEquipment(s) should be in "Validated" state

...................................................................................................................................................................................................

After session creation completion without errors, in the "Actions for <reverse session
name>" tab click Validation:

Select all the impacted I-ode(s) and click Launch

Check the validation report of each node in the summary section:


Click Summary for <reverse session name> (I-ode(s) should be in released.

Check the odesBs are removed

...................................................................................................................................................................................................

After validation completion without errors, in the "Actions for <reverse session name>
tab click Activation

Select all the impacted I-ode(s) and click Launch

When all tasks are completed, click Summary for <reverse session name> to check
that all impacted I-ode(s) are activated

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
6-3
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

Reverse operation

Reverse operation

...................................................................................................................................................................................................................................
...................................................................................................................................................................................................

In the "Sessions Manager" window:

In the "Actions for <reverse session name>" tab click Activation

Select all the impacted RCs and BTSEquipment(s) and click Launch

When all tasks are completed, click Summary for <reverse session name> to check
that all nodes are activated

...................................................................................................................................................................................................

The Command Manager window can be launched to display the status of each command.
...................................................................................................................................................................................................

10

When all tasks are completed check the logs for each command to confirm the completion
of the activation.
...................................................................................................................................................................................................

11

From the "Sessions Manager" window, in the Session List Right click <reverse session
name> and in scroll down menu select "Terminate" in order to delete the session.

E....................................................................................................................................................................................................................................
N D O F S T E P S

Troubleshooting

PRELIMINARY

ote: All commands are logged in the Command Manager (See document [R5])
Failed Step

Node Status

Action

"Excluded"

In case of errors in session creation, analyze logs or


contact your local support or etwork Designers in
order to correct the XML file, Abort then terminate the
session and return to step 3.

"Validation Failed"

In case of errors in session validation, analyze logs or


contact your local support or etwork Designers in
order to correct the XML file, Abort then terminate the
session and return to step 3.

"Validated"

In case of error in pre-activation, return to step 7.

"Validation Failed"

In case of errors in session validation, analyze logs or


contact your local support or etwork Designers in
order to correct the XML file, Abort then terminate the
session and return to step 3.

...................................................................................................................................................................................................................................
Alcatel-Lucent Internal
NN-20500-088
Proprietary Use pursuant to Company instruction
Issue 12.03 November 2009

6-4

Reverse operation

...................................................................................................................................................................................................................................

Failed Step

Node Status

Action

"Validated" for
BTSEquipment

In the Command Manager window check the status


of impacted BTSEquipment(s):
In case of Build failure (the Status is "Stopped with
errors") analyze the logs or contact your local support
or networks designers in order to correct the problem.
Once the problem identified and corrected, return to
step 8.

"Activation partly
realized"

PRELIMINARY

Reverse operation

If the Status is "Completed with errors": terminate


the session and check the RCs Alarms:
If the Critical Alarm "Cnode internal synchronization
error" exists, the RC(s) must be built on-line in order
to restore its initial configuration. Contact your local
support and if really required launch the Build On-line
on the impacted RC(s) (See document [R5]).

Final Status

WMS, source RC, and target RC are back to their initial state.
The neighboring plan goes back to the initial configuration.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
6-5
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

PM and FM impacts
7

PRELIMINARY

Impacts
PM impact

If I&C modifications are performed ChapterChange I&C parameters (p. 5-3) in order to
change the IP address, the BTS should be reset (in order to connect BTS to OMC-B). As a
consequence, the BTS Performance counter history is cleared. This implies that the PM
System cannot get the BTS counters related to the latest period before IP change (for
more details see Chapter "How to retrieve counters further to an odeB IP address
change" in document [R11]).
The reparented odeB(s) is managed by the PM system.
FM impact

The procedure ensures the correct declaration of the reparented odeB(s) with respect to
FM management.

PRELIMINARY

...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
7-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY

...................................................................................................................................................................................................................................

AN

Access ode

PRELIMINARY

Glossary

...................................................................................................................................................................................................................................

CM

Configuration Management
CN

Control ode
...................................................................................................................................................................................................................................

EM

Equipment Monitor
...................................................................................................................................................................................................................................

GUI

Graphic User Interface


...................................................................................................................................................................................................................................

IN

Interface ode
...................................................................................................................................................................................................................................

MO

Managed Object
...................................................................................................................................................................................................................................

PM

Performance Management
...................................................................................................................................................................................................................................

WICL

Wireless Internet Command Language


WMS

Wireless Management System (the old name was W-MS)


...................................................................................................................................................................................................................................
NN-20500-088
Alcatel-Lucent Internal
GL-1
Issue 12.03 November 2009
Proprietary Use pursuant to Company instruction

PRELIMINARY

PRELIMINARY
PRELIMINARY

Glossary
...................................................................................................................................................................................................................................

WPS

Wireless Provisioning System

...................................................................................................................................................................................................................................