ANNEXURE C

TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 1 OF 19

TENDER NO: NFV/ MM/ EBEA 120029L/ High Velocity


Water Spray System
(AMMONIA-1 & FFT Substation)

Procurement of High Velocity Water Spray System &


Associated Equipment to Extinguish The Transformer
Fire Of 7 MVA & 4 MVA

LAST DATE FOR SUBMISSION: 1300HRS ON 04 JUNE 2012


TENDER OPENING TIME & DATE: 1430HRS ON 04 JUNE 2012

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 2 OF 19

A. Introduction: National Fertilizers Limited (NFL) Vijaipur owns & operates two nos. Ammonia
plants of 1520 MTPD each reassessed capacity & four streams of Urea plant each having
reassessed capacity of 1310 MTPD at NFL, Vijaipur, Distt Guna in the state of Madhya Pradesh.
NFL, Vijaipur is already implementing Energy Saving & Capacity Enhancement projects so as to
enhance capacity of existing AmmoniaI & II plants from 1520 MTPD to 1750 MTPD & 1864
MTPD respectively & that of UreaI & II plants to 2 X 1515 MTPD & 2 X 1615.5 MTPD
respectively.
Now, NFL intends to install a high velocity water spray system & associated equipment to
Extinguish the transformer fire of 7 MVA (2Nos) & 4MVA (2Nos) to compliance the IS & CEA
requirements.
1. Description
SERVICE CONDITIONS
Ambient Conditions:
Min. ambient Temp.: 2.2 degree Celsius
Max. ambient Temp.: 50 degree Celsius
Design Temperature: 65C maximum
Fire water hydrant available pressure:
6 to 7 kg/cm2
Fire water hydrant Design pressure: 12 kg/cm2
Hydro test Pressure: 18.0 Kg/cm (g)
Relative Humidity: 100 % Max.
Alt. Above sea:
< 1000 M
Atmospheric Pollution: Dust: Urea
Vapour: Ammonia
2. SYSTEM DESCRIPTION:
2.1. The water spray system belongs to the category of fixed fire fighting installations. The purpose
of providing water spray system is to guarantee sufficient exposure protection to equipment
containing hazardous substances, flammable liquids by means of cooling their surfaces using
devices like water spray nozzles, to reduce heat input from adjacent fire and limit the spread of
flames.
High velocity water spray system is provided to extinguish fires involving combustible liquids
that constitute the hazard with flash point of 65 deg C or higher. As per IS 3034, Transformers
handling cooling oil capacity of 2000 litres & above shall be protected by this system.
In the present plant, there are four transformers having cooling oil capacity of 2000 litres or
above. Hence these two transformers are protected with high velocity water spray system.
2.2. Procurement of raw material, manufacturing, inspection, testing, painting, insulation, supply,
erection (including civil, mechanical, electrical & instrumentation), precommissioning,
commissioning & GTR of complete unit of high velocity water spray system of 7 MVA & 4
MVA transformer & associated equipment at AmmoniaI & FFT Substation of NFL Vijaipur,
Guna (Distt), Madhya Pradesh, India for high velocity water spray system as per the technical
specifications provided in Annexure I . 7 MVA & 4 MVA transformer GA drawing along-with
PID and MTO & Technical data are provided at Annexure I.
Completion: Fully commissioned high velocity water spray system Unit as per IS requirement.

3.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 3 OF 19

Vendors General Scope of Supply:

3.1. Procurement of raw material, manufacturing, inspection, testing, painting, supply, erection
(including civil & structural, mechanical, electrical & instrumentation), precommissioning,
commissioning & GTR of complete unit of high velocity water spray system of 7 MVA & 4 MVA
transformer & associated equipment at AmmoniaI & FFT Substation of NFL Vijaipur, Guna
(Distt), Madhya Pradesh, India for high velocity water spray system as per the technical
specifications provided at Annexure I. 7 MVA & 4 MVA transformer GA drawing & Technical
data are provided at Annexure - I.
The dimensions of the 7 MVA and 4MVA transformer.
Bidder shall note that the provisions for protection, control, monitoring etc shall be clearly
indicated with bid.
3.2. Vendors may send their technical representative to site, for carrying out preliminary study
and technical discussions with the plant authorities before submission of bid.
4. Mechanical requirements
4.1. ValvesIsolation valves shall be installed at inlet and outlet to enable easy maintenance of the
all deluge system of High velocity water spray. The isolation valves of water shall be flanged
type, gate valves of reputed make as per relevant IS.
4.2. MOC of pipes, pipe fittings and valvesThe MOC for fire water line shall be as per Annexure
I.
4.3. Painting All metallic parts of the high velocity water spray system unit shall be painted with 2
coats of high built chlorinated rubber based red oxide zinc phosphate primer followed by 2
coats of high built CR dark red for water line & sky blue for Instrument air line, finished paint.
Total DFT should be 140 microns. The interior CS surfaces which are in contact with cold air
shall be applied with two coats of epoxy paint (Neogose #200).
4.4. List of parties for procurement of piping material shall be submitted to NFL for
approval.
5.

Electrical requirements:
Erection
scope.

and

commissioning

and

Testing

5.1. Power supply:


- To feed the power & control supply to the motor shall be fed from Existing Amm-1
Substation & FFT Substation respectively if required.
- Party shall clearly spell out about the requirement of power supply in their bid.
- Supply of power & Control cable shall be under the scope of NFL, all termination at both
ends, laying of cables and cable glanding along-with supply of these items shall also be under
the scope of NFL.

of

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 4 OF 19

6. Instrumentation requirements:
Erection and commissioning and Testing of the entire instrumentation system shall be in
Vendors scope.
1. Available control power supply for the panel & its instrumentation shall be 110 V AC UPS.
Party shall confirm the same in the technical bid.
2. All Cables for instrumentation purpose shall be under the scope of NFL, all termination at
both ends, Laying of cables and cable glanding along-with supply of these items shall also be
under the scope of NFL.
B.

SCOPE

The scope covers supply of High velocity water spray system [Water spray 10 liter per minute
per m2 (lpm/m2) over Transformer external surface as per IS-3034] - total 4 numbers and its
associated equipment including all accessories to extinguish the transformer fire and complete
technical requirements of manufacture, testing before dispatch as per Annuxure-1, delivery in well
packed condition for following rating of
specification.
This equipment is intended to be installed in the Ammonia-I Plant and Fire Fighting sub-station of
National Fertilizer Limited at Vijaipur, M.P., India.
1. The High velocity water spray system and associated equipment shall generally consist of the
following :
a) One Deludge valve between two transformer suitable to use for
i)
Two 7MVA and
ii)
Two 4MVA transformers.
b) Quartzoid bulb (79 degree Celsius operating temperature) as per relevant IS as per annuxure-1.
c) Solenoid valves as per Annuxure-1.
d) Pressure transmitters as per Annuxure-1
e) Control panel & interlocked system shall be such that, if one Quartzoid bulb got
activate/damage it will generate LOW pressure alarm and whenever more than one Quartzoid
bulb shall be activate /damage or melted system shall generate LOW-LOW alarm and also
give trip command to the respective transformer. LOW-LOW alarm signal shall operate the
deluge valve.
f) Water spray nozzle to be provided surrounding transformer as per annuxure-1.
g) Size and MOC of different size pipes and its accessory as per annuxure-1.
h) Pipe and valve to connect deluge valve from fire hydrant and instrument air line shall be as
per annuxure-1

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 5 OF 19

i) Control cables to get control power supply and send command to transformer to trip and to
control room for alarm.
j) Any other equipment not specified, but required for safe & proper operation of the system.
k) The design & operation features of equipment shall also comply with provision of the latest
issue of the Indian Electricity Rules & other relevant statutory acts & regulation (CEA
gadget dated 24th September 2010). The supplier shall, wherever, necessary, make suitable
modification in the equipment to comply with the above.
l) Wherever, any requirement laid down in this specification differs, from that in Indian
standard specification, the requirement specified herein shall prevail. Equipment complying
with equivalent IEC standards shall also be acceptable.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 6 OF 19

ANNEXURE I
TECHNICAL REQUIREMENT
1. Alarm system: The following instrumentation for each deluge valve shall be provided in order to
obtain audio/visual alarm signals in the F&G mimic located inside the main control room and also
to make possible the remote activation of the system through hand switch from the shutdown
console in main control room.
PS & PAL : Alarm of LOW pressure in pneumatic detection system.
PS & PALL: Alarm of LOW-LOW pressure in Pneumatic detection system and deluge valve
opens.
PS & PAH : Activation and alarm of deluge system in operation.
HS

: Hand switch to activate the deluge system manually from shutdown console
located in control room.

First alarm LOW pressure should appear when one Quartzoid bulb got activated/damaged/
melted. Second alarm LOW-LOW pressure should appear whenever more than one Quartzoid
bulb got activated/damaged/melted & give signal to operate the deluge valve to quench the fire
& simultaneously give trip command to trip the respective transformer.
2.

Interlock System: Whenever more than one Quartzoid bulb got activated/damaged/melted then
it will generate LOW-LOW pressure alarm signal to operate the deluge valve & same time give
trip command to trip the respective transformer feeder. This alarm indication shall also be hook
up in respective plant DCS/PLC/ESD to give the status of transformer [Hook up of the alarm to
the control room & up to the respective transformer panel under the scope of NFL.

3.

Solenoid valve: Explosion proof, Body and trim material shall be 316 SS. solenoid valve is
required as per annuxure-1.

4.

Detectors: Detectors shall consist of Quartzoid bulbs (79 degree Celsius operating temperature)
as per relevant IS. Detectors shall be within 300 mm from the transformers.

5.

WATER ALARM GONG: A water alarm gong shall be provided and shall be activated
by the flow of the water in case of fire. The gong shall continuously sound when a deluge
system is in
operation. Water alarm gong shall be UL/FM/TAC approved or equivalent.

6.

UTILITIES CONDITIONS: The electrical supply for instrument connections and solenoid
valves shall be 110 V (A.C. UPS). Solenoid valves shall be closed and de-energized in normal
operating condition of the plant. In emergency condition the solenoid valve shall be energized
and consequently opened. In accordance to NFPA 15, electrical circuits of the deluge systems
shall be completely supervised in a manner that will result in positive notifications of an
abnormal condition.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 7 OF 19

Instrument air is available at the battery limit at the following conditions:


- Minimum/normal Operating pressure
- Design pressure
- Operating temperature
7.

7.0 Kg/cm2(g)
10.0 Kg/cm2(g)
Ambient (50C maximum)

Deluge Valve:
Automatic water spray Deluge system shall be hydraulically designed according to the
applicable requirements of NFPA-13, NFPA -15 and TAC requirements taking into account
the following criteria using Hazen Williams formula.
Deluge systems shall be hydraulically balanced.
Deluge system shall be pneumatically operated as per annuxure-1 & shall be capable to
generate required pressure & flow as per IS to quench the fire. Valve will be sized for
minimum pressure drop and at the design maximum flow rate. Deluge valve to be located
minimum 15 meter from the transformer. Deluge valve shall be located under a shed.
Necessary sloping towards deluge valve end shall be provided.
Material of construction of Deluge valves shall be of Cast Steel.
i) Specification for Gate Valve 50NB & above shall be:

Carbon Steel Double Flanged , rising spindle type, for 50NB & above
Design standard: API-600
Pressure Rating: 150#
End Connections: As per ASME-B16.5
Body & Bonnet Material: ASTM-A216Gr.WCB
Spindle: AISI-410
Body & Back Seat Rings: 13%Cr Steel
Gaskets & Gland Packing: Non-Asbestos
Bolts/Nuts: ASTM-A193Gr.B7 / A194Gr.2H
Testing Standard: API-598

ii) Specifications for Gate / Globe Valves below 50NB:

Carbon Steel Socket Welded , rising spindle type, for below 50NB
Design standard: API-602
Pressure Rating: 800#
End Connections: SW as per ASME-B16.11
Body & Bonnet Material: ASTM-A105
Spindle: AISI-410
Body & Back Seat Rings: 13%Cr Steel
Gaskets & Gland Packing: Non-Asbestos
Bolts/Nuts: ASTM-A193Gr.B7 / A194Gr.2H
Testing Standard: API-598

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 8 OF 19

Hydrant Valves End flanges and companion Flange: As per ASME-B16.5 150# rating. Deluge
valves shall be UL/FM/TAC approved or equivalent. The system shall be so designed that the
pressure at the hydraulically most remote nozzles in the network is not less than 3.5 kg/cm2g.
The maximum pressure in any nozzle within the network shall not exceed 5 kg/cm2g. The
velocity in the feed pipes shall not exceed 10 m/s. The spray system for transformers shall
confirm to the requirement of TAC.
Rate of application for the water spray system shall be 10.2 LPM/M2 on the body of
transformers.
Transformers shall be protected using ring of nozzles at the top of transformer. A separate ring
shall be provided for the oil tank of the transformer. The nozzles shall be located between 500
mm to 800 mm from the transformer.
The sprinkler heads shall be located as close to the body of transformers as possible (but not
more than 300 mm) at all places subject to electrical clearance for transformers. There shall be
a ring of detectors around the top of the transformer and a second ring around the oil tank.
Material for deluge water spray system piping shall be Galvanized Carbon steel, ERW as per
IS 1239, heavy. Fittings shall be welded, Galvanized as per IS 1239, part II.
Fittings material shall be Carbon Steel ASTM-A105 up to less than 50 NB and Carbon Steel
ASTM-A234WPB for 50 NB & above.
Flanges material shall be Carbon Steel ASTM-A105 up to 150 NB and Carbon Steel IS-2062
for 200 NB & above.
Flanges thickness & drilling shall be as per ASME-B16.5.
Flanges type shall be SORF (Slip on Raised Face) & Flange rating shall be 150#.

All instrument items such as pressure switches shall be as per standard project instrument
philosophy. Other instruments such as pressure gauges which are part of UL configuration of
the deluge valve shall be supplied as per
electrical hazardous classification.
Spray system piping shall have supports and hangers in accordance with the requirements of
NFPA 13.
Piping supports shall be adequately supported in order to maintain the integrity under fire
conditions, and braced so as to reduce movement due to nozzle reaction under water surges.
Above ground water spray system piping shall be painted fire red as per IS 5 and as per project
painting specification.
Water spray systems shall be protected to prevent pipe breakage for earthquakes in accordance
with the requirements of NFPA 13 section 6-4 and FM "Loss prevention data 2-8".

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 9 OF 19

All water spray system pipes and fittings shall be installed so that the system can be drained to
a safe location and drain valves, where provided, shall be accessible.
Sealing material shall be asbestos, ceramic fibres and quartz free.
Deluge valve shall be pneumatically actuated and fitted with all the necessary accessories and
instruments for proper operation (i.e. solenoid valve, pressure switches, pressure gauges,
pressure regulator, orifice plates and water alarm gong etc.).
Isolation valve shall be provided upstream and downstream of the deluge valve so as to be
readily accessible during the emergency.
Deluge valve shall be located under a weather protection shed at a minimum distance of 15mtr
from the hazard it protects in an unclassified area.
The response time for deluge system to activate in the event of bursting of sprinkler heads shall
be 40 seconds as per TAC.
8. System Activation :
Automatic Operated Deluge Water Spray System:
Deluge water spray system shall be automatically activated by pilot operated sprinkler heads
(Quartzoid bulb detectors) and manually activated by a hand switch (hard) located on shutdown
console in Main Control room (MCR). Deluge valve shall be manually activated locally from
deluge valve assembly located in the field.
Water spray deluge system shall be activated by a pneumatic (instrument air) detection system
with pilot operated sprinkler heads consisting of a piping network. The sprinkler heads are
rated for a minimum bursting temperature of 79C. The sprinkler heads will break when the
temperature reaches 79C or more in case of increase in temperature due to fire and hence the
reduction of pressure in detection piping will lead to automatic opening of deluge valve.
The pilot head operated sprinkler heads shall be located so as to promptly respond to a fire
without delay.
9.

Piping:
Piping material shall be Carbon steel IS1239 Heavy Seamless p to 150 NB and Carbon Steel
API-5L-GR.B, ERW Sch20 for 200 NB & above.
Instrument air line shall be SS-304.
Low point drain shall be provided.
The
mm.

Instrument

air

detection
e line at an inter distance
line
of 200
shal

Painting shall be done as per IS, final colour shall be Fire Red as per shade no. 536 of IS: 5.

10.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 10 OF 19

Spray Nozzles & Sprinkler Heads:


Water spray nozzles shall be permanently marked with their characteristics according to their
listing.
Material of construction of water spray nozzles shall be stainless steel and sprinkler heads shall
be Brass with chrome finish.
Spray nozzles shall be UL/FM/TAC approved or equivalent.
Sprinkler heads shall be UL/FM/TAC approved or equivalent.
Thermo-sensitive glass bulb sprinkler heads shall be used for the detection system. Sprinkler
heads shall be set at a minimum bursting temperature of 79 C.
Selection of spray nozzles and sprinkler heads quantities shall ensure the required water density
over the protected equipment.
The vertical distance between nozzles shall not exceed 3 m where rundown is contemplated for
vertical or inclined surfaces. The horizontal distance between spray nozzles shall be such that
spray patterns meet or overlap at the protected surface.
Spacing between two adjacent nozzles shall not exceed 1 m.
Nozzle spacing shall be as per TAC guidelines of water spray system for above-mentioned
areas.
Spray nozzles on the rings shall be located at not less than 500 mm and not more than 800 mm
from the equipment surface.
Orientation of spray nozzles shall be suitably adjusted so as to cover entire surface of the object
/ equipment to be sprayed to maintain 10 litre per minute per sq. meter.
The End connection
(MALE) threaded.

11.

for

spray nozzle

is

STRAINER:
One - Y
type strainer shall be provided upstream of the Deluge valve. Size of the strainer
shall be 6.
Material of construction : Body: carbon steel, Basket/ filter element: Stainless steel.
The strainer shall be complete with back washing lines. Size of the mess shall be such that it
can filter all foreign particles of size 6 mm or more.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 11 OF 19

12. REFERENCE CODES & DOCUMENTS


a. The specification of deludge system shall be read in conjunction with specification sheet
attached for 7 MVA and 4MVA transformer.
b. The design, manufacture and testing of equipment shall be in compliance with following
Indian Standards, unless otherwise specified:
IS: 3034-1993- Code of practice for fire safety of industrial buildings: electrical Generating and
Distributing stations.
IS;1641: code of practice for fire safety of buildings and general principles of fire grading and
Classifications.
IS;1642: code of practice for fire safety of buildings. Details of construction.
IS;1643: code of practice for fire safety of buildings .Exposure hazard.
IS;1644: code of practice for fire safety of buildings. Exit requirements and personal hazard.
IS:1646-1997- Code of practice for fire safety of buildings. Electrical installations.
IS:2175- Specification for heat sensitive fire detectors for use in automatic fire alarm system.
IS:2189- Code of practice for selection installation and maintenance of automatic fire detection
and alarm system.
IS:2871- Specification for branch pipe, universal for fire fighting purposes.
IS:11101- Specification for extended branch pipe for fire brigade use.
IS:11360- Specification for smoke detectors for use in automatic electrical fire alarm system
extended branch pipe for fire brigade use.
IS:15394-1993- Code of practice for Fire and safety in petroleum refineries and Fertilizer plants.
NFPA 13 - Standard for the Installation of Sprinkler Systems
NFPA 15 - Standard for Water Spray Fixed Systems for Fire Protection water spray system
manual by TAC (Tariff Advisory Committee)
ASME-B31.3: Piping Erection
ASME SECTION IX: Welding
ASME-B16.5: Flanges

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 12 OF 19

C. Note:
1) To get fire water from existing hydrant approximately 100 meter of length is required for
both transformer however vendor shall visit the site before bidding to get the exact
distance of fire hydrant and to decide how much length of the pipe shall be above the
ground and underground.
2) About 100 meters SS-304 pipe for 7MVA and approximately same length of SS-304 pipe
for 4MVA Transformer required to get 7kg/cm2 instrument air from Instrument air
Header however vendor shall visit the site before bidding to get the exact distance of
Instrument air header.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 13 OF 19

13. DOCUMENTATION SCHEDULE:


Drawings and documents as per table shall be supplied, unless otherwise specified as mentioned
below.
Sr.
No.

Description

Documents required (Y / N)
With Bid

For approval

Final

1.

Technical Details

2.

General
arrangement
Drawing and Foundation
Drawing
Schematic
/
Wiring
Drawing
Illustrative and Descriptive
literature
Catalogue for brought out
accessories
Installation, operation and
Maintenance manual
Test Certificates
1) Type Test
2) Routine Test
Guarantee Certificates
Spare Parts List

Y
N
Y
Y

N
N
Y
Y

Y
Y
Y
Y

3.
4.
5.
6.
7.

8.
9.

Key: Y Yes and N - No


Note:
a.

04 No. hard copies & 1 No. Soft copies shall be supplied with bid.

b.

04 No. hard copies & 1 No. Soft copies shall be supplied for approval after order

c.

06 No. hard copies & 2 copies in CD shall be supplied as final documents prior to dispatch of the
equipment. These shall be made in sets and supplied on fine plastic coated folder.

d.

All drawings & documents shall have the following description written boldly.

-Name of Client
- Enquiry / Order number with plant / project name
- Code no. and Description
Special Note:
1.

Vendor shall submit all documents / drawing to NFL for approval.

2.

Any other equipment required for the completeness of the system shall also be incorporated in
this scope. The vendor shall not be absolved from his responsibility of providing the same if the
requirement comes up at the later stage.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 14 OF 19

14. TESTING & INSPECTION


Testing and inspection of High velocity water spray system shall be carried out as per relevant Indian
standards.
All the supplied items shall be subjected to routine test and their component as per relevant IS.
Additional tests, whenever specified, shall be carried out.
All the above test shall be carried out in presence

of owners

representat

These inspections shall however, not absolve the vendor from its responsibility for making good any
defect which shall be noticed subsequently.
15. SPARE
15.1

Spares for operation and maintenance:

Item wise unit prices of spare parts shall be quoted along


recommendation.
15.2

with

the

equipme

Commissioning Spares:

As required, shall be supplied with the main equipment without any price implication to owner. Item
wise list of recommended commissioning spares shall be furnished for approval.
Any other spare parts not specified, but required, shall also be quoted along with the offer.
All spare parts shall be identical to the parts used in the equipments.
16. Erection and Commissioning:
16.1. Erection and commissioning job including supervision and labour for the High velocity water
spray system is in Vendors scope which
16.1.a. Transportation of equipment to site.
16.1.b. Unloading of the equipment. Vendor shall arrange all required manpower and tools and
tackles for this job.
16.1.c. Taking the equipment on the foundation and its erection including labour as required for it.
16.1.d. Vendor shall start erection job after receipt of the High velocity water spray system unit at
site.
16.1.e. Completeness of all the erection and pre commissioning activities will be considered as
mechanical completion. The mechanical completion will be certified by NFL.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 15 OF 19

16.1.f. Vendor shall take up and complete the commissioning as per schedule approved by NFL.
Vendor shall also provide supervision services for commissioning as well as GUARANTEE
TEST.
16.1.g. All the consumables and spares required for commissioning are in

Vend

16.2. NFLs Scope


a. Crane required for unloading and erection jobs shall be arranged by NFL on hire charges to
pay basis. There are 120 T, 75 T, 35 T, 18 T & 08 T cranes available with NFL The crane
accessibility for the existing location shall be discussed during technical discussion and
Vendor shall confirm that the job can be done with existing cranes available with NFL, after
considering weights of all components.
b. Necessary tiein points from existing NFL plant for Instrument Air, Fire water make up water
piping for the High velocity water spray system unit shall be confirmed by NFL. Tiein points
will be discussed & finalized at site in presence of vendor representative. Vendor has to lay
the utilities lines from tie in points up to & within High velocity water spray system battery
limit.
c. Single source incoming power cable shall be arranged by NFL up to the electrical panel
installed by the vendor.
d. For erection & construction jobs, power & water connection will be provided by NFL at any
one point within High velocity water spray system battery limit. Construction water & power
shall be metered but will not be charged. Vendor shall indicate tentative max requirement of
construction power & water at any given point of time.
e. Instrument air header tapping shall be taken from the nearest instrument air header at
respective transformer location.
f. All valves, pipings, fittings etc for the High velocity water spray system unit shall be in the
scope of Bidder.
17.

Guarantee

17.1 The supplier shall guarantee the equipment and their components against faulty Design and
manufacturing with regard to mechanical / electrical / instrumentation adequacies like reliable
performance and workmanship.
17.2 The supplier shall give guarantee for sustained trouble free operation of High velocity water
spray system unit for 7 MVA & 4 MVA Transformers for conditions specified in the NIT i.e.
50 deg C & 100% RH max.
17.3 Above guarantees shall be for trouble free operation for period of 12 months from date of
successful commissioning or 24 months from date of mechanical completion, whichever is
earlier.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 16 OF 19

17.4 During GTR, vendor shall demonstrate that the utility consumption, i.e. power and fire water
make up, shall be as specified in the specifications submitted by the vendor during the
technical bid.
17.5 The power consumption is the sum total of power drawn by High velocity water spray system
installed water pumps.
17.6 In case of any deviation in any of the above performance, vendor shall carry out all the
necessary modifications to meet the performance criteria, at his own risk and cost, within
reasonable time. Even after modification, if the performance does not meet the above criteria,
then equipment will not be accepted. In such case Vendor shall be given mutually agreed time
frame to make any rectifications required to meet the required performance, at his own risk and
cost.
17.7 The performance of the equipment shall be checked under different ambient conditions
including summer, with in the Guarantee period, i.e. within 12 months from date of
commissioning, and if performance criterion is not met subject to the design conditions i.e. 50
deg C & 100% RH max.
17.8 Mutually agreed damages duece to
& in case
delays
of failure to in
meet performance guarantees shall be leviable as per Tender Terms and Conditions.

17.9 Availability of Existing Utilities:


The following utilities shall be made available by NFL at the Tiein points of the High velocity
water spray system unit.
Utility name

Normal Pr. (Kg/Cm2g)

Fire Water (S/R)

6.0 -7.0

Mech.
design
(Kg/Cm2g)
12.0

Instrument Air

7.0

10.0

Electricity: 3 phase, 50 Hz, 415 V supply.


Control Supply for Instrumentation: 110 V A.C. [UPS]

Pr.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 17 OF 19

ANNEXURE-II
Vendor shall submit following data along with technical bid (For both 7 MVA & 4 MVA
Transformer (for guarantee purpose as well as for bid evaluation purpose).
1)

Fire water circuit :


Fire water spray on the transformer in litre/minute/ sq. meter & pressure and flow at in/out of
deluge valve.

2)

Electrical Circuit :
Power supply details.
Absorbent pump motor rating KW if required.
Instrument Control Supply.

3)

Physical Data (Indicative):


Length X Width X Height of High velocity water spray system

4)

Drawings:
Confirmation of list of equipments as per annuxure-1 in High velocity water sprays system.

5)

List of spares required for 2 years operation. Refer: Annexure AI (Un-priced format):
Prices to be given separately in price bid.

6)

List of Vendors/ Sub vendors Item wise list of Vendors/ sub vendors for Mechanical items
i.e valves. Item wise list of Vendors for Electrical motors, and for Instrumentation items like
solenoid valves, all field instruments, which will be approved by NFL during Technical
evaluation.

7)

List and
scope of supply.

8)

Structural and civil foundation drawings for structural and civil work for review and approval
by NFL civil department during technical discussions.

9)

Following documents shall be supplied by the vendor: (6 copies of each along with soft copy
on CD)

Specification

a. Quality Assurance Plan

of

all

mechanical

for NFLs

approval

b. Time schedule for completion of manufacturing activities as well as erection and


commissioning activitiesBAR CHART.
c. List of instruments and accessories with brief specification [with catalogue] including
sizing.
d. Calculation of deluge valves and all solenoid valves.
e. Purchase Specification, literature & Catalogue for all instrument items for major items.

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 18 OF 19

f. Loop Diagram or safety interlock diagram


g. Power Distribution diagram
h. Control panel diagram.
i. Any item not indicated above but is essential for safe and smooth operation of the system
shall also be within the scope of the vendor.
10) Commissioning Spares List:
As required, shall be supplied with the main equipment without any price implication to owner. Item
wise list of recommended commissioning spares are as tabulated below:
Sr. No Commissioning Spare Item Description Unit Quantity
1
2
.
.
All spare parts shall be identical to the parts used in the equipment.
11) Along with supply
i) Specification of all equipment and data sheets.
ii) As built drawing of High velocity water spray system.
iii) Complete spare part list with part numbers and cross sectional drawings for all mechanical
equipments.
iv) Equipment operation and maintenance manuals for mechanical and electrical.
v) Bill of material & essential spares list for mechanical, electrical and instrumentation for two
years trouble free operation
vi) Any item not indicated above but is essential for safe and smooth operation of the system shall
also be within the scope of the vendor.
vii) Material test certificates
viii)

Results of nondestructive inspection (If applicable).

ix) Records of dimensions.


x) Results of hydraulic tests and pneumatic tests whichever applicable as per relevant code.
xi) Performance test report and

ANNEXURE C
TECHNICAL SPECIFICATION AND SCOPE OF SUPPLY

NFVP/PROJ/HVWSS/12
DOCUMENT

HIGH VELOCITY WATER SPRAY SYSTEM FOR


TRANSFORMER AT
NFL VIJAIPUR

SHEET 19 OF 19

xii) Guarantee certificate.


xiii)

Test report/guarantee certificates for all bought out items.

xiv)

Test reports for Electrical & Instrumentation equipments

12. GUARANTEE TEST RUN


1.

The Vendor shall carry out GUARANTEE TEST of the SYSTEM by providing supervision
services of competent personnel.

2.

Vendor shall prepare detailed procedures for conducting guarantee test requirements
beforehand in consultation with NFL so as to correctly evaluate the agreed guarantees.

3.

After High velocity water spray system has operated satisfactorily (At specified conditions),
NFL and VENDOR shall decide the date of commencement of GUARANTEE TEST RUN.

4.

GUARANTEE TEST RUN shall be conducted under normal operating conditions without the
help of any installed standby equipment and/or machinery. Sufficient and necessary
measurements shall be taken to ascertain the test results

5.

GUARANTEE TEST RUN shall be carried out by sustained operation of High velocity water
spray system for 2 (Two) consecutive operation according to VENDORs
recommendation.

6.

Successful completion of Guarantee Test shall not relieve VENDOR from obligation and
responsibility in any manner with regard to modification/ rectification/replacement to meet
material and workmanship guarantee.

7.

If VENDOR fails to prove the guaranteed performance figures then liabilities and liquidated
damages as per NFLs standard terms shall