Contents
1
Huawei Confidential
UL(MHz)
1850 - 1865
1865-1895
1895 - 1897.5
1897.5 - 1910
DL(MHz)
1930 - 1945
1945-1975
1975 - 1977.5
1977.5 - 1990
BandWidth(MHz)
15
30
2.5
12.5
Operator
Claro
Other Operator
Claro
Other Operator
Consider to have most efficiency frequency using, after 10M GL refarming, LTE will use the left 10MHz to avoid any
interference from other operator, and right continuous 5MHz will be GSM, which means total 25 TCHs, far away 2.5MHz
will be GSM BCCHs. The Buffer Zone and 5Mz LTE areas spectrum distribution is like following:
GSM
5MHz
LTE
5MHz
TCHs
Buffer Zone:
1 Carrier with 5M
Buffer Zone
5MHz
LTE
5MHz
1 Carrier with 5M
LTE
10MHz
30MHz
Huawei Confidential
GSM
2.5MHz
BCCHs
TCHs
GSM
5MHz
30MHz
GSM
2.5MHz
BCCHs
TCHs
GSM
5MHz
GSM
5MHz
30MHz
GSM
2.5MHz
BCCHs
TCHs
3
1900M
Downlink:1930-1990MHz,
Uplink: 1850-1910MHz;
Specifications
Original transmiting:40MHz
Customized for GL:47.5M
Receiving: 60MHz
Weight
20MH
z
GO: S8
UO: S4
GU: G6+U2; G5+U3;
G4+U4
Flexible Configuration
GO/UO/LO
GU/GL/UL dual mode
GL: G6+L1
Huawei Confidential
LTE Carrier
Output Power x
GSM Carrier
Output Power x
LTE Carrier
Bandwidth supported
by LTE
1 (MIMO)
20W
2x20W
8 (Dynamic
Power Sharing)
1 (MIMO)
20W
2x20W
IBW up to 60M
60M
Item
Specification
Dimensions (H x W x D)
Volume
18L
Blade RRU
40M
IBW
Up to 10W/L @160W,18L
20
18
16
14
12
10
8
6
4
2
0
140
18
100
12
80
10
Huawei Confidential
80
60
60
40
6.7
20
3.3
Output Power(W)
120
160
volume (L)
0
W/L
Miniaturization
Standardization
Reusing:
-Fiber Optical
-Power Cable
Scenario 1:
Band 1900
Sector 1
Scenario 2:
Band 1900 + APT700
Or Sector 1 + 2
Huawei Confidential
Scenario 3:
Band 1900 + APT700 + AWS
Or Sector 1 + 2 + 3
6Boxes
Multi-band 1:
1900M+APT
2Boxes
Multi-band 2:
1900+APT+AWS
Multi-Sector:
Sector1+2+3
Multi-band 3:
850M+1900M+APT
6 Fiber Cables
6 Power Cables
2 Fiber Cables
2 Power Cables
Huawei Confidential
HUAWEI VAMOS
Solution Package
NON
SAIC
MUTE
SAIC
BLACK
SAIC
VHR
SAIC
VHR
GBFD-115830
VAMOS
VHR
VHR
GBFD-115832
VAMOS Call Drop Solution
dBm
Receive Signal>-70
Receive Signal(-75,70]
Receive Signal(-80,75]
Receive Signal(-85,80]
Receive Signal(-90,85]
Receive Signal(-95,90]
Receive Signal(-100,95]
Receive Signal<=-100
&
Huawei Confidential
%
Bad Block Rate<0.2%
Bad Block Rate[0.2%,0.4%)
Bad Block Rate[0.4 %,0.8%)
Bad Block Rate[0.8%,1.6%)
Bad Block Rate[1.6%,3.2%)
Bad Block Rate[3.2%,6.4%)
Bad Block Rate[6.4%,12.8%)
Bad Block Rate>=12.8%
8
4
14.4
12
12
IBCA II Gain
Network
9.6
3.8
4.8
4.4
S222
S333
S444
S555
S666
Normal Frequency Reuse Pattern(4X3)
Tighter Frequency Reuse(with IBCA II 1X3)
Call Drop Rate
1.15%
3X3
1.86%
2X3
*Based on Simulation
2.29%
1X3
5.4
5.00%
4.00%
3.00%
2.00%
1.00%
0.00%
Scenario
7.2
4.8
3.2
Single Band
/Co-BCCH
1.83%
1X3 with
IBCA II
Keep
Same
Capacity
&
Spectrum
to
Improve
KPI
CDR
15~30%
5~15%
10~25%
Keep the
Same
HQI
20~40%
6~30%
15~30%
5~20%
MOS
0.05~0.2
0.03~0.1
0.05~0.15
0.02~0.07
20~25%
8~12%
15~20%
5~10%
Keep the
Same
Keep the
Same
Keep the
Same
Keep the
Same
Keep
Same Capacity
Resource
to
Improve
KPI
Capacity
Huawei Confidential
Huawei Confidential
S666@20W | S666@20W
10
S888@20W
STEP 1-Swap
12.5M
12.5M
12.5M
85% of Usage
Current
7.5M
Go to STEP 2
NO
Traffic
of 2G cell
YES
10M+2.5M=12.5M
3*3
1*3
5M+2.5M=7.5M
11
Need:
VAMOS
or
Need :
VAMOS
& IBCA II
Not Need
IBCA II
S9/9/9
Contents
1
Huawei Confidential
12
LIMBSC04
Polo1
WL Topology
UMTS&GSM<E
UGW
7BSC
1013 BTS+eNodeB
New
EPC
LIMBSC05
Polo2
S-GW/P-GW
PS Core
USN
MME
LIMBSC06
VES
SGSN
GGSN
LIMBSC07
Aeropuerto
UE
MSC
MW+MPLS
CSFB Proxy/
SRVCC IWF/MGCF
LIMBSC08
TBD
eNodeB(LTE)
+
BTS(GSM)
MGW
LIMBSC09
TBD
UE
LIMBSC10
TBD
Huawei Confidential
13
Project Scope
EQUIPMENT
SERVICES
IMPLEMENTATION STATUS
213
LTE ON AIR
244
290
1013
31
46
575
723
100
48
46
LTE ON GOING
LTE TO START
SOLUTION STATUS
179
Standard Site
64
19
15
28
TI PO belong to HUAWEI
511
Standard Site
71
55
476
New Requirement
19
129
Pending to define
JUST IN CASE
Huawei Confidential
14
a
n
t
e
n
n
a
RRU3942
RRU3942
a
n
t
e
n
n
a
RRU3942
FAN
UMPT
a
n
t
e
n
n
a
a
n
t
e
n
n
a
RRU3942
UEIU
LBBP
RRU3942
a
n
t
e
n
n
a
RRU3942
LBBP
Swap
UPEUc
UEIU
UBRI
Router
LBBP
ETH cable
ETH cable
Router
Router
Description
Huawei Confidential
15
N// site
3G
3G
3G
DC Power
Huawei 3G
GL
GL
GL
Step 2: Cutover
Register the current azimuth and tilt (Data report)
Disconnect the jumpers on the side of the antenna that are on the
Node B Huawei.
Old antennas are uninstalled
TX Cabinet
LSW
Step 3:
The new TETRA antennas are installed considering the Azimuth and
Tilt registered in RASV.
Connect jumper from 3G RRU and RRU 2G4G Huawei to new
Antennas
Huawei GL
Existing 3G Site
UBRI
Huawei Confidential
16
Page 16
UBRI
UEIU
Huawei Confidential
17
Page 17
Requires:
1 UMPT
1 UBRI
2 jumpers
1 LBBPd2
1RRU3953 per sector for LTE 1900 &
3G
1 Port GE
Huawei Confidential
18
4 jumpers
MIMO 2x4
2G/4G
Requires:
12 Ports Antenna
*For GSM Expansion
1 UMPT
1 UBRI
2 jumpers
1 LBBPd2
1RRU3953 per sector for LTE 1900 &
3G
2 Port GE
Huawei Confidential
19
4 jumpers
MIMO 2x4
2G/4G
Requires:
1 UMPT
1 UBRI
4 jumpers
MIMO 2x4
1 LBBPd2
2 jumpers
3G
2G/4G
2 Port GE
HUAWEI TECHNOLOGIES CO., LTD.
GSM Expansion/
Huawei Confidential
20
RF Services
Refarming (5Mhz)
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
21
Order
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Huawei Confidential
22
Proposal Refarming
Sequence (Phase 1)
HW_BSC
CL01
HLIMBSC05
CL02
HLIMBSC05
CL03
HLIMBSC05
CL04
HLIMBSC05
CL04
HLIMBSC10
CL05
HLIMBSC05
CL06
HLIMBSC05
CL11
HLIMBSC06
CL14
HLIMBSC04
CL17
HLIMBSC04
Huawei Confidential
23
Contents
1
Huawei Confidential
24
Project Scope
Project Scope will cover all the requirements agreed and signed off (in Mexico) in the document Acuerdo
modernizacin Per, detailed as follows:
LTE implementation
723 new LTE sites
Including TSS, SA, TI, commissioning,
integration, ATP, project management
Transportation from Lima W/H Ransa to
sites.
Dismantlement and return transportation for
20% GSM sites (only including flexi BTS, not
including auxiliary materials such as feeders,
cables, fibers, antennas etc.) *
Huawei Confidential
GSM swap
Pick-up UBRI board from Claro warehouse and
transport to site.
Install new UBRI board in BBU and re-locate
fibers from LBBP to UBRI board (200 sites for
free) *
GSM Commissioning, integration and project
management
External environment alarms swap (Claro must
provide the mapping and position for each alarm in
original alarm box)
Others
RF planning consultancy service (1 person
for 1 year). Support in Planning, on-site at
Claro, SLA 5x8 .or 12 months.Only Huawei Staff
delivery
Support service
Planning courses for 10 days, for 3 groups of
10 people. O&M courses for 15 days, for 3
groups of 10 people. The courses will be in
Spanish in Claro's office.
25
Project Scope
EQUIPMENT
SERVICES
IMPLEMENTATION STATUS
213
LTE ON AIR
244
290
1013
31
46
575
723
100
48
46
LTE ON GOING
LTE TO START
SOLUTION STATUS
179
Standard Site
64
19
15
28
TI PO belong to HUAWEI
511
Standard Site
71
55
476
New Requirement
19
129
Pending to define
JUST IN CASE
Huawei Confidential
26
Huawei
Customer
Service Content
Huawei
Customer
Swap Preparations
Project team establishment
Field delivery team establishment
Information collection
Data design
Onsite survey
Engineering survey
Installation design
Installation design (main equipments)
BTS/NodeB script generation
Cutover
Huawei
Customer
Antenna design
Transmission configuration
Service Content
Hardware installation
Equipment inspection
Hardware power-on
Software debugging
Data preparation
System debugging
Acceptance testing.
Site design
R
R
R
S
S
S
Datafill Provide
R-responsible
S-support
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
27
Responsibility Matrix - RF
Huawei Confidential
28
Project Milestone (swap 867 GSM sites, deploy 723 LTE sites )
LOI/PO issued
Project start
P1 TI
start
TSS start
2/23
Phase 0
20 sites
P2 refarming start
& P3 TI start
2015-7-1
2015-6-1
2015-9-1
2015-8-1
2015-10-1
GSM
Swap
Installation
4/1
Manufacturing & Transportation
4/22
Installation
6/1
Installation & GSM Swap
7/31
1st Refarming
PO ready
2nd Refarming
finished
6/22
Phase 2
300 sites
P3 refarming
finished
P3 refarming
start
2/27
2/10
Phase 1
457 sites
P1 refarming &
P2 TI start
2015-5-1
2015-4-1
2015-3-1
2014-12-9 2015-2-16
P1 swap
start
7/31
9/7
Refarming
PO ready
7/22
3/15
Phase 3
107 sites
Installation
& GSM Swap
PO ready
WE ARE
HERE
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Confidential
8/15
29
10/7
Refarming
Huawei Confidential
30
Huawei Confidential
31
Logistic Flow
Huawei Confidential
32
Logistic Solution
Box Type A
Site Model
Content
Box
Qty
1
BBU+1RRU
1
1
BBU+2RRU
2
BBU+3RRU
BBU/BBU
boards/Power
cable label/Optic
transiver/DCDU/
RRU
Package/SiteMM
Box Type B
Content
Box Type C
Box
Qty
Package/
Site
MM
Content
Package
Box
375*225*
95
Power
cables/ground
ing
cables/jumper
s/CPRI fiber
Item
Mandatory
auxiliary
material/colo
r ring/ feeder
label
BBU+4RRU
BBU+5RRU
BBU+6RRU
Huawei Confidential
33
Acceptance Procedure
Huawei Confidential
34
Contents
1
Huawei Confidential
35
PD (Liu Haifeng)
CM ( Xie Jia)
TD Wubeihai/Salim
PCM (Jose C)
RF TEAM
(Lixieyong)
WLL TEAM
(Teh Eng Toon)
Cesar Farro
TBD
TEAM 1
TEAM n
TEAM 15
TEAM 1
TEAM n
TEAM 15
TEAM 1
TEAM n
TEAM 15
Juan Carlos M
IM & SO
Engineer
Maitenace team
IM & SO
Swap team
IM & SO
Iintegratiion team
Cllean up team
TI TEAM
(Xie Yong)
10
Huawei Confidential
36
PM (Manuel A/Renato C)
CORE TEAM
RF TEAM
O&M TEAM
Core Administration
Team
RF Planning Team
RF Optimization
Team
Manuel Alva(M)
Renato Cordova(A)
Huawei Confidential
IMP TEAM
37
TX TEAM
TX Planning Team
O&M TX Team
Communication Plan
Event
Project Governance
meeting
Schedule
As required
Mode
Formal
Participants /
Initiated by
Out Put
Recipients
As required
Project decisions,
MoM
Weekly meeting
Formal
PM Claro
Claro: Sub-directors,
PM, managers,
Action Items , Risks ,
chief
Issues
HW: AD, PD, PM,
PCM, TD
Teamwork
Every day
N/A
Implementation
Team
Daily work
Weekly report
Every Monday
PDF attachment in
Email
PM Huawei
N/A
Weekly report
Huawei Confidential
38
01
Risk
02
Equipment supplying
03
Confirmation/approval
for TSS template, TSSR,
MW delay
Impact
Solution
OyM & IMP check the sites list and try to solve the
possible access issues in advance
Set up a team dedicated to solve the access issues
Shutdown the NSN GSM site if possible. If not possible
Claro needs to config the frequency with NSN
04
Huawei Confidential
39
Cooperation Required
#
Issue
Owner
Deadline
01
Teamwork (warroom) office and facilities for Huawei team (15 people)
CTO
Feb 28th
02
CTO
Feb 28th
03
Jesus M/ Shirley M
April 22nd
04
Claro needs to share the Tx status for all Lima sites and get Tx ready
before TI
Miguel N/ Edison J
Feb 28th
05
Jesus M / Mario P
Before TI
06
Claro needs to check the extern alarm solution and provide the mapping
and position for each alarm in original alarm box
Manuel Alva
March 15th
07
BSC TSS. Confirmation of using energy cable and fiber cord from China
Feb 20th
Huawei Confidential
40
PO Detail Status
Item
eNodeB Equipment
Qty Sites
723
PO Status
PO received for 490 sites
Pending to receive 233 Sites
575
200
200
GSM Gabinet
Un-Installation
1013
RF Planning Consultant
1 Eng
1 Year
25 Days
119 (20%)
723
Special Clarification
Huawei Confidential
41
Thank you !