Federal Register / Vol. 70, No.

158 / Wednesday, August 17, 2005 / Notices 48443

NUCLEAR REGULATORY sleeve reference and the TIG (tungsten floor), Rockville, Maryland. Publicly
COMMISSION inert gas) welded SG sleeve repair limit available records will be accessible from
for BVPS–2 only, (10) revising the the Agencywide Documents Access and
[Docket Nos. 50–334 and 50–412]
specific activity for the primary coolant Management System’s (ADAMS’s)
FirstEnergy Nuclear Operating system for BVPS–1 only, (11) increasing Public Electronic Reading Room on the
Company (FENOC), et al.; Notice of the band for accumulator water volume Internet at the NRC Web site, http://
Consideration of Issuance of and nitrogen pressure, (12) revising the www.nrc.gov/reading-rm/doc-
Amendments to Facility Operating required charging pump discharge collections/cfr/. If a request for a hearing
Licenses and Opportunity for a pressure for reactor coolant pump seal or petition for leave to intervene is filed
Hearing injection flow, (13) revising the by the above date, the Commission or a
tolerance settings for the main steam presiding officer designated by the
The U.S. Nuclear Regulatory safety valves (MSSVs), (14) changing the Commission or by the Chief
Commission (the Commission) is allowable power limits associated with Administrative Judge of the Atomic
considering issuance of amendments to inoperable MSSVs, (15) revising the Safety and Licensing Board Panel, will
Facility Operating License Nos. DPR–66 primary plant demineralized water rule on the request and/or petition; and
and NPF–73, issued to FENOC (the storage tank volume, (16) revising the the Secretary or the Chief
licensee), for operation of the Beaver specific activity of the secondary Administrative Judge of the Atomic
Valley Power Station, Unit Nos. 1 and coolant system for BVPS–1 only, and Safety and Licensing Board will issue a
2 (BVPS–1 and 2) located in Beaver (17) adding WCAP–14565 and WCAP– notice of a hearing or an appropriate
County, Pennsylvania. 15025 to the list of NRC-approved order.
The proposed amendments would methodologies in TS 6.9.5. As required by 10 CFR 2.309, a
revise the BVPS–1 and 2 Facility In addition, the licensee has requested petition for leave to intervene shall set
Operating Licenses to allow operation at numerous TS changes that are not forth with particularity the interest of
a maximum authorized power level of directly related to the EPU request. the petitioner/requestor in the
2900 megawatts thermal (MWt), from These include: (1) Deleting the Power proceeding, and how that interest may
the current maximum authorized power Range, Neutron Flux High Negative Rate be affected by the results of the
level of 2689 MWt. This represents an trip, (2) adding a footnote to Table 3.3– proceeding. The petition should
approximate 8% increase in the 3, ‘‘Engineered Safety Features specifically explain the reasons why
maximum authorized power level and is Actuation System Instrumentation,’’ intervention should be permitted with
categorized as an extended power concerning time constraints for particular reference to the following
uprate (EPU). The proposed steamline pressure low for BVPS–1 general requirements: (1) The name,
amendments would authorize operation only, (3) removing the boron injection address and telephone number of the
of BVPS–1 with replacement Model 54F tank concentration TS for BVPS–1 only, requestor or petitioner;
steam generators (SGs) installed. The and (4) renaming the boron injection (2) the nature of the requestor’s/
proposed amendments would authorize tank flow path TS for BVPS–1 only. petitioner’s right under the Act to be
the use of an alternate source term Administrative TS changes to remove made a party to the proceeding; (3) the
(AST) in accordance with Title 10 of the the amendment number from the nature and extent of the requestor’s/
Code of Federal Regulations (10 CFR), operating licenses in paragraphs 2.C(2) petitioner’s property, financial, or other
part 50, Section 50.67, ‘‘Accident source for BVPS–1 and 2 and to correct an interest in the proceeding; and (4) the
term.’’ Specific guidance for AST inconsistency regarding a referenced possible effect of any decision or order
implementation is contained in permissive for BVPS–1 were also which may be entered in the proceeding
Regulatory Guide 1.183, ‘‘Alternative proposed. on the requestor’s/petitioner’s interest.
Radiological Source Terms for Before issuance of the proposed The petition must also identify the
Evaluating Design Basis Accidents at license amendment, the Commission specific contentions which the
Nuclear Power Reactors.’’ The licensee will have made findings required by the petitioner/requestor seeks to have
has superseded the portion of this Atomic Energy Act of 1954, as amended litigated at the proceeding.
amendment request related to the (the Act), and the Commission’s Each contention must consist of a
BVPS–1 SG replacement by its regulations. specific statement of the issue of law or
applications dated April 13, 2005, for Within 60 days after the date of fact to be raised or controverted. In
BVPS–1 SG replacement. Specific publication of this notice, the licensee addition, the petitioner/requestor shall
Technical Specification (TS) changes may file a request for a hearing with provide a brief explanation of the bases
requested to support the EPU include: respect to issuance of the amendment to for the contention and a concise
(1) Revising the definition of Rated the subject facility operating license and statement of the alleged facts or expert
Thermal Power, (2) revising fuel any person whose interest may be opinion which support the contention
assembly specific departure from affected by this proceeding and who and on which the petitioner intends to
nucleate boiling ratios and correlations, wishes to participate as a party in the rely in proving the contention at the
(3) raising the maximum temperature of proceeding must file a written request hearing. The petitioner must also
the refueling water storage tank, (4) for a hearing and a petition for leave to provide references to those specific
modifying Overtemperature DT and intervene. Requests for a hearing and a sources and documents of which the
Overpower DT equations for BVPS–1 petition for leave to intervene shall be petitioner is aware and on which the
only, (5) revising the SG water level filed in accordance with the petitioner intends to rely to establish
low-low and high-high trip setpoints for Commission’s ‘‘Rules of Practice for those facts or expert opinion. The
BVPS–1 only, (6) revising the required Domestic Licensing Proceedings’’ in 10 petition must include sufficient
SG secondary side level in Modes 4 and CFR Part 2. Interested persons should information to show that a genuine
5 for BVPS–1 only, (7) raising the consult a current copy of 10 CFR 2.309, dispute exists with the applicant on a
tolerance settings for the pressurizer which is available at the Commission’s material issue of law or fact.
safety valves, (8) revising the SG TSs to public document room (PDR), located at Contentions shall be limited to matters
reflect the replacement SGs for BVPS– One White Flint North, Public File Area within the scope of the amendment
1 only, (9) revising the SG TS tube O–1F21, 11555 Rockville Pike (first under consideration. The contention

VerDate jul<14>2003 13:34 Aug 16, 2005 Jkt 205001 PO 00000 Frm 00075 Fmt 4703 Sfmt 4703 E:\FR\FM\17AUN1.SGM 17AUN1
48444 Federal Register / Vol. 70, No. 158 / Wednesday, August 17, 2005 / Notices

must be one which, if proven, would Rockville, Maryland. Publicly available only during those portions of the
entitle the petitioner/requestor to relief. records will be accessible electronically meeting that are open to the public.
A petitioner/requestor who fails to from the ADAMS Public Electronic Further information regarding this
satisfy these requirements with respect Reading Room on the Internet at the meeting can be obtained by contacting
to at least one contention will not be NRC Web site, http://www.nrc.gov/ the Designated Federal Official between
permitted to participate as a party. reading-rm/adams.html. Persons who 7:30 a.m. and 4:15 p.m. (e.t.). Persons
Those permitted to intervene become do not have access to ADAMS or who planning to attend this meeting are
parties to the proceeding, subject to any encounter problems in accessing the urged to contact the above named
limitations in the order granting leave to documents located in ADAMS, should individual at least two working days
intervene, and have the opportunity to contact the NRC PDR Reference staff by prior to the meeting to be advised of any
participate fully in the conduct of the telephone at 1–800–397–4209, 301– potential changes in the agenda.
hearing. 415–4737, or by e-mail to pdr@nrc.gov. Dated: August 3, 2005.
Nontimely requests and/or petitions
Dated at Rockville, Maryland, this 11th day Michael L. Scott,
and contentions will not be entertained
of August, 2005. Branch Chief, ACRS/ACNW.
absent a determination by the
For the Nuclear Regulatory Commission. [FR Doc. E5–4484 Filed 8–16–05; 8:45 am]
Commission or the presiding officer of
the Atomic Safety and Licensing Board Timothy G. Colburn, BILLING CODE 7590–01–P
that the petition, request and/or the Senior Project Manager, Section 1, Project
contentions should be granted based on Directorate I, Division of Licensing Project
a balancing of the factors specified in 10 Management, Office of Nuclear Reactor NUCLEAR REGULATORY
Regulation. COMMISSION
CFR 2.309(a)(1)(i)–(viii).
A request for a hearing or a petition [FR Doc. E5–4483 Filed 8–16–05; 8:45 am]
for leave to intervene must be filed by: BILLING CODE 7590–01–P Advisory Committee on Reactor
(1) First class mail addressed to the Safeguards; Meeting of the
Office of the Secretary of the Subcommittee on Early Site Permits;
Commission, U.S. Nuclear Regulatory NUCLEAR REGULATORY Notice of Meeting
Commission, Washington, DC 20555– COMMISSION
The ACRS Subcommittee on Early
0001, Attention: Rulemaking and Site Permits will hold a meeting on
Advisory Committee on Reactor
Adjudications Staff; (2) courier, express September 7, 2005, Room T–2B3, 11545
Safeguards; Subcommittee Meeting on
mail, and expedited delivery services: Rockville Pike, Rockville, Maryland.
Planning and Procedures; Notice of
Office of the Secretary, Sixteenth Floor, The entire meeting will be open to
Meeting
One White Flint North, 11555 Rockville public attendance.
Pike, Rockville, Maryland 20852. The ACRS Subcommittee on Planning The agenda for the subject meeting
Attention: Rulemaking and and Procedures will hold a meeting on shall be as follows:
Adjudications Staff; (3) E-mail September 7, 2005, Room T–2B1, 11545
addressed to the Office of the Secretary, Wednesday, September 7, 2005—8:30
Rockville Pike, Rockville, Maryland. a.m. Until the Conclusion of Business
U.S. Nuclear Regulatory Commission,
The entire meeting will be open to
HEARINGDOCKET@NRC.GOV; or (4) The Subcommittee will discuss and
public attendance, with the exception of
facsimile transmission addressed to the review the staff’s draft safety evaluation
a portion that may be closed pursuant
Office of the Secretary, U.S. Nuclear report related to early site permit for the
to 5 U.S.C. 552b(c)(2) and (6) to discuss
Regulatory Commission, Washington, Clinton site and the application
organizational and personnel matters
DC, Attention: Rulemakings and submitted by Exelon Generation
that relate solely to the internal
Adjudications Staff at (301) 415–1101, Company, LLC (Exelon). The
personnel rules and practices of the
verification number is (301) 415–1966. Subcommittee will hear presentations
A copy of the request for hearing and ACRS, and information the release of
by and hold discussions with
petition for leave to intervene should which would constitute a clearly
representatives of the NRC staff, Exelon,
also be sent to the Office of the General unwarranted invasion of personal
and other interested persons regarding
Counsel, U.S. Nuclear Regulatory privacy.
this matter. The Subcommittee will
Commission, Washington, DC 20555– The agenda for the subject meeting gather information, analyze relevant
0001, and it is requested that copies be shall be as follows: issues and facts, and formulate
transmitted either by means of facsimile Wednesday, September 7, 2005, 11:00 proposed positions and actions, as
transmission to 301–415–3725 or by e- a.m.–12:30 p.m. appropriate, for deliberation by the full
mail to OGCMailCenter@nrc.gov. A copy Committee.
of the request for hearing and petition The Subcommittee will discuss Members of the public desiring to
for leave to intervene should also be proposed ACRS activities and related provide oral statements and/or written
sent to Mary O’Reilly, FirstEnergy matters. The Subcommittee will gather comments should notify the Designated
Nuclear Operating Company, information, analyze relevant issues and Federal Official, Dr. Medhat M. El-
FirstEnergy Corporation, 76 South Main facts, and formulate proposed positions Zeftawy (telephone 301/415–6889) five
Street, Akron, OH 44308, attorney for and actions, as appropriate, for days prior to the meeting, if possible, so
the licensee. deliberation by the full Committee. that appropriate arrangements can be
For further details with respect to this Members of the public desiring to made. Electronic recordings will be
action, see the application for provide oral statements and/or written permitted.
amendment dated October 4, 2004, and comments should notify the Designated Further information regarding this
supplements dated February 23, May Federal Official, Mr. Sam Duraiswamy meeting can be obtained by contacting
26, and July 8, 2005, which are available (telephone: 301–415–7364) between the Designated Federal Official between
for public inspection at the 7:30 a.m. and 4:15 p.m. (e.t.) five days 7:30 a.m. and 4:15 p.m. (e.t.). Persons
Commission’s PDR, located at One prior to the meeting, if possible, so that planning to attend this meeting are
White Flint North, Public File Area O– appropriate arrangements can be made. urged to contact the above named
1F21, 11555 Rockville Pike (first floor), Electronic recordings will be permitted individual at least two working days

VerDate jul<14>2003 13:34 Aug 16, 2005 Jkt 205001 PO 00000 Frm 00076 Fmt 4703 Sfmt 4703 E:\FR\FM\17AUN1.SGM 17AUN1

Вам также может понравиться