47188 Federal Register / Vol. 70, No.

155 / Friday, August 12, 2005 / Notices

document. For assistance, please contact obtain legal status by becoming a party DEPARTMENT OF ENERGY
FERC Online Support at to the proceedings for this project
FERCOnlineSupport@ferc.gov or toll should, on or before the comment date, Federal Energy Regulatory
free at (866) 208–3676, or TTY(202) file with the Federal Energy Regulatory Commission
502–8659. Commission, 888 First Street, NE., [Project No. 2114–126]
Any questions regarding this Washington, DC 20426, a motion to
application should be directed to Anne intervene in accordance with the Public Utility District No. 2 of Grant
E. Bomar, Managing Director, requirements of the Commission’s Rules County, WA; Notice of Application for
Transmission, Rates and Regulation, Approval of Contracts for the Sale of
of Practice and Procedure (18 CFR
Dominion Resources, Inc., 120 Tredegar Power for a Period Extending Beyond
385.214 or 385.211) and the Regulations
Street, Richmond, Virginia 23219, or by the Term of the License
phone at (804) 819–2134. under the NGA (18 CFR 157.10). A
The Vaporizer Reactivation Project is person obtaining party status will be August 5, 2005.
designed to refurbish and reactivate two placed on the service list maintained by Take notice that on July 8, 2005,
unused waste heat vaporizers that were the Secretary of the Commission and Public Utility District No. 2 of Grant
originally installed at the Cove Point will receive copies of all documents County, Washington (Grant PUD) filed
LNG Terminal in the 1970s. These filed by the applicant and by all other with the Commission an application for
vaporizers will use combustion exhaust parties. A party must submit 14 copies approval of contracts for the sale of
heat from the gas turbine generators to of filings made with the Commission power from its licensed Priest Rapids
indirectly vaporize LNG. The proposed and must mail a copy to the applicant Project No. 2114, for a period from the
project will provide spare vaporization and to every other party in the expiration of its existing license on
capability that will create an proceeding. Only parties to the October 31, 2005 through the term of
opportunity to firm up sendout from the proceeding can ask for court review of any new license issued to it for the
facility, during times when the Commission orders in the proceeding. project. The project is located on the
vaporization facilities would otherwise Columbia River in Chelan, Douglas,
be limited by normal maintenance Persons who wish to comment only Kittitas, Grant, Yakima, and Benton
requirements. Cove Point LNG says that on the environmental review of this Counties, Washington.
reactivating these waste heat vaporizers project, or in support of or in opposition Section 22 of the FPA, 16 U.S.C. 815,
will enable Cove Point LNG to provide to this project, should submit an provides that contracts for the sale and
up to its current peak-day capability of original and two copies of their delivery of power for periods extending
1.0 MMDth/day of sendout for which it comments to the Secretary of the beyond the termination date of a license
is currently authorized on a year-round Commission. Environmental may be entered into upon the joint
basis, subject only to certain excused commentors will be placed on the approval of the Commission and the
interruptions. Cove Point LNG says that Commission’s environmental mailing appropriate state public service
the Vaporizer Reactivation Project will list, will receive copies of the Commission or other similar authority
not impair the ability of Cove Point LNG environmental documents, and will be in the state in which the sale or delivery
to render service at reasonable rates to notified of meetings associated with the of power is made. Grant PUD has
its existing customers. Commission’s environmental review submitted for Commission approval
Cove Point LNG requests that the process. Environmental commentors three contracts for the sale of power
Commission approve the use of the will not be required to serve copies of from the project which would extend
facilities associated with the Vapor filed documents on all other parties. beyond the term of the existing license
Reactivation Project to support an (Priest Rapids Product Sales Contract,
The Commission’s rules require that
incremental send-out service (ISQ) for Additional Product Sales Agreement,
persons filing comments in opposition
LTD–1 customers under section 4 of the and Exchange Agreement). Grant PUD
NGA. The terms and conditions of the to the project provide copies of their asserts that approval of the submitted
proposed ISQ service are set forth in pro protests only to the applicant. However, contract is in the public interest.
forma tariff sheets modifying Rate the non-party commentors will not Comments and the request for
Schedule LTD–1 in Exhibit P to the receive copies of all documents filed by approval of the power sales contract or
application. Cove Point LNG is also other parties or issued by the motions to intervene may be filed with
proposing that an off-peak firm Commission (except for the mailing of the Commission no later than August
transportation service (OTS) on the environmental documents issued by the 15, 2005, and replies to comments no
Cove Point LNG natural gas pipeline be Commission) and will not have the right later than August 21, 2005. The
approved by the Commission under to seek court review of the Commission’s Rules of Practice require
section 4 of the NGA. The terms and Commission’s final order. all intervenors filing documents with
conditions of the proposed OTS service The Commission strongly encourages the Commission to serve a copy of that
are also set forth in pro forma tariff electronic filings of comments, protests, document on each person on the official
sheets in Exhibit P to the application. and interventions via the internet in lieu service list for the project. Further, if an
Cove Point LNG requests that the of paper. See 18 CFR 385.2001(a)(1)(iii) intervenor files comments or documents
Commission grant the requested with the Commission relating to the
and the instructions on the
authorization at the earliest practicable merits of an issue that may affect the
Commission’s Web site (http://
date, in order to ensure an in-service responsibilities of a particular resource
www.ferc.gov) under the ‘‘e-Filing’’ link.
date on the earlier of : (i) the earliest agency, they must also serve a copy of
practicable date, or (ii) the later of (a) Comment Date: 5 p.m. eastern time on the document on that resource agency.
May 24, 2006, or (b) six months August 26, 2005. All documents (an original and eight
following issuance of the requested copies) must be filed with: Magalie R.
Magalie R. Salas,
authorizations. Salas, Secretary, Federal Energy
There are two ways to become Secretary. Regulatory Commission, 888 First
involved in the Commission’s review of [FR Doc. E5–4365 Filed 8–11–05; 8:45 am] Street, NE., Washington, DC 20426.
this project. First, any person wishing to BILLING CODE 6717–01–P Please put the project name ‘‘Priest

VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 PO 00000 Frm 00021 Fmt 4703 Sfmt 4703 E:\FR\FM\12AUN1.SGM 12AUN1
Federal Register / Vol. 70, No. 155 / Friday, August 12, 2005 / Notices 47189

Rapids Project 2114’’ on the first page of may be entered into upon the joint esubscription.asp to be notified via e-
all documents. approval of the Commission and the mail of new filings and issuances
Comments may be filed electronically appropriate State public service related to this project or other pending
via the Internet in lieu of paper. The commission or other similar authority in projects. For assistance, contact FERC
Commission strongly encourages the State in which the sale or delivery Online Support.
electronic filings. See 18 CFR of power is made. Grant PUD has
Magalie R. Salas,
385.2001(a)(1)(iii) and the instructions submitted for Commission approval two
on the Commission’s Web site http:// contracts for the sale of power from the Secretary.
www.ferc.gov under the ‘‘e-Filing’’ link. project, pursuant to section 22 and the [FR Doc. E5–4368 Filed 8–11–05; 8:45 am]
A copy of the application is available Commission’s orders in Kootenai BILLING CODE 6717–01–P
for review in the Commission’s Public Electric Cooperative, et al. v. P.U.D. No.
Reference Room or may be viewed on 2 of Grant County, Washington, 82
the Commission’s Web site http:// FERC ¶ 61,112 (1998), reh’g denied, 83 DEPARTMENT OF ENERGY
www.ferc.gov using the ‘‘eLibrary’’ link. FERC ¶ 61,289 (1998), which would
extend beyond the term of the existing Federal Energy Regulatory
Enter the docket number excluding the
license (Open-Market Sale Contract and Commission
last three digits in the docket number
field to access the document. For Meaningful Priority Sale Contract). Combined Notice of Filings #2
assistance, contact FERC Online Grant PUD asserts that approval of the
Support at submitted contract is in the public August 8, 2005.
FERCOnlineSupport@ferc.gov or toll- interest. Take notice that the Commission
free at 1–866–208–3676, or for TTY, Comments and the request for received the following electric rate
(202) 502–8659. A copy is also available approval of the power sales contract or filings:
for inspection and reproduction at the motions to intervene may be filed with Docket Numbers: ER00–1250–001.
address in item h above. the Commission no later than August Applicants: Tacoma Energy Recovery
You may also register online at 15, 2005, and replies to comments no Company.
http://www.ferc.gov/docs-filing/ later than August 21, 2005. The Description: Tacoma Energy Recovery
esubscription.asp to be notified via e- Commission’s Rules of Practice require Company (Tacoma) submits its triennial
mail of new filings and issuances all intervenors filing documents with review updated market power study and
related to this project or other pending the Commission to serve a copy of that revised tariff sheets to include the
projects. For assistance, contact FERC document on each person on the official change in status reporting requirements
Online Support. service list for the project. Further, if an and its Market Behavior Rules.
intervenor files comments or documents Filed Date: 7/29/2005.
Magalie R. Salas, with the Commission relating to the Accession Number: 20050804–0024.
Secretary. merits of an issue that may affect the Comment Date: 5 p.m. eastern time on
[FR Doc. E5–4367 Filed 8–11–05; 8:45 am] responsibilities of a particular resource Friday, August 19, 2005.
BILLING CODE 6717–01–P agency, they must also serve a copy of Docket Numbers: ER00–2392–002.
the document on that resource agency. Applicants: Fresno Cogeneration
All documents (an original and eight Partners, L.P.
DEPARTMENT OF ENERGY copies) must be filed with: Magalie R. Description: Fresno Cogeneration
Salas, Secretary, Federal Energy Partners, L.P. submits its triennial
Federal Energy Regulatory Regulatory Commission, 888 First updated market power analysis and
Commission Street, NE., Washington, DC 20426. revisions to its market-based rate tariff
[Project No. 2114–127] Please put the project name ‘‘Priest to incorporate the change in status
Rapids Project 2114’’ on the first page of reporting requirements and its Market
Public Utility District No. 2 of Grant all documents. Behavior Rules.
County, WA; Notice of Application for Comments may be filed electronically Filed Date: 7/29/2005.
Approval of Contracts for the Sale of via the Internet in lieu of paper. The Accession Number: 20050804–0023.
Power for a Period Extending Beyond Commission strongly encourages Comment Date: 5 p.m. eastern time on
the Term of the License electronic filings. See 18 CFR Friday, August 19, 2005.
385.2001(a)(1)(iii) and the instructions Docket Numbers: ER00–2823–001.
August 5, 2005. on the Commission’s Web site http:// Applicants: American Cooperative
Take notice that on July 8, 2005, www.ferc.gov under the ‘‘e-Filing’’ link. Services, Inc.
Public Utility District No. 2 of Grant A copy of the application is available Description: American Cooperative
County, Washington (Grant PUD) filed for review in the Commission’s Public Services, Inc. submits its updated
with the Commission an application for Reference Room or may be viewed on market analysis.
approval of contracts for the sale of the Commission’s Web site http:// Filed Date: 7/29/2005.
power from its licensed Priest Rapids www.ferc.gov using the ‘‘eLibrary’’ link. Accession Number: 20050804–0114.
Project No. 2114, for a period from the Enter the docket number excluding the Comment Date: 5 p.m. eastern time on
expiration of its existing license on last three digits in the docket number Friday, August 19, 2005.
October 31, 2005 through the term of field to access the document. For Docket Numbers: ER00–774–002.
any new license issued to it for the assistance, contact FERC Online Applicants: Nordic Marketing LLC.
project. The project is located on the Support at Description: Nordic Marketing, LLC
Columbia River in Chelan, Douglas, FERCOnlineSupport@ferc.gov or toll- submits its triennial updated market
Kittitas, Grant, Yakima, and Benton free at 1–866–208–3676, or for TTY, analysis in support of its market-based
Counties, Washington. (202) 502–8659. A copy is also available rate authority and to report that there
Section 22 of the FPA, 16 U.S.C. 815, for inspection and reproduction at the have not been any changes in status in
provides that contracts for the sale and address in item h above. compliance with the Commission’s
delivery of power for periods extending You may also register online at order issued 5/31/05, 111 FERC 61,295
beyond the termination date of a license http://www.ferc.gov/docs-filing/ (2005).

VerDate jul<14>2003 17:14 Aug 11, 2005 Jkt 205001 PO 00000 Frm 00022 Fmt 4703 Sfmt 4703 E:\FR\FM\12AUN1.SGM 12AUN1