Projects

Moniruzzaman Moni, MASc.


Unit: 406, 120 McIntosh Road, V1X7E8
Kelowna, British Columbia, Canada.

Email: moni98ce@gmail.com
Cellular: 2503005033

Project summary:

Design Engineer

Public Works Department

Dhaka, Bangladesh

June 2011 July 2015

For this organization I have designed near about 50 reinforced concrete Buildings. A very few of them are given below:
Project title: Construction of 15 storied plus single basement Reinforced Concrete Building for 500 Bed Gazipur
Sadar Hospital, Gazipur, Bangladesh
Responsibilities:

Preliminary design to support the architect.


Cost estimation and preparation of bill of quantity
Wind load calculation as per ASCE 7-05 using finite element software ETABS.
Seismic analysis of this building as per IBC 2003 using finite element software ETABS.
Technical notes for this building.
Design of 1400mm thick Mat Foundation by using finite element software SAFE.
Design of superstructure (Column, beam and slab).
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: Construction of 14 storied plus double basement Reinforced Concrete Building for National Institute of
Laboratory Medicine, Sher E Baglanagar, Dhaka, Bangladesh
Responsibilities:

Preliminary design to support the architect.


Cost estimation and prepare bill of quantity.
Design of precast test pile.
Supervise pile load test.
Wind Load calculation as per ASCE 7-05 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Technical specification for this building.
Design of Mat Foundation with pile caps.
Design of superstructure (Ramp, Column, beam and slab).
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: Seismic assessment and retrofitting design of 6 storied reinforced garments Factory Building, Dhaka,
Bangladesh
Responsibilities:
Prepare as built architectural drawing and structural drawing.
Perform non destructive ultra sonic pulse velocity test to get information about the concrete.
Perform destructive test (core test).
Perform carbonation test.
Seismic assessment of the building by using spread sheet.
Retrofitting design of the garment building including foundation, column jacketing, and shear wall by using spread
sheet.
Supervise to prepare the preliminary drawing.
Project title: Construction of 8 storied plus double basement Reinforced Concrete Building for Doctor Dormitory at
BSMMU, Dhaka, Bangladesh
Responsibilities:
Preliminary design to support the architect.
Cost estimation and prepare bill of quantity.

Page 2 of 6

Moniruzzaman Moni, MASc.

Wind Load calculation as per ASCE 7-05 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of 1050mm thick Mat Foundation.
Design of superstructure (Ramp, Column, beam and slab).
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: Construction of 10 storied residential reinforced concrete building for Doctor Dormitory at Mohakhali,
Dhaka, Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation (isolated and combined).
Design for soft-story
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Project title: Construction of sheikh fazilatunnesa mujib Eye Hospital at Gopalganj, Dhaka, Bangladesh
Responsibilities:

24 nos 6-storied reinforced concrete building has been designed in this project.
Preliminary design to support the architect.
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation (isolated and combined).
Design of super structure including column, beam, deck slab and floor slab
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.
Supervise the site time to time and provide guideline when difficulties arise.
Ensure quality control of the construction.

Project title: Project for capacity development on natural disaster resistant techniques of construction and
retrofitting for public building
Responsibilities:
Worked as a team member of working team-2.
Assist to write Seismic Design Manual for new Building in Bangladesh, Seismic Assessment and Design Manual
for Existing Building in Bangladesh with Japan International Cooperation Agency (JICA).
Project title: Construction of 8 storied reinforced concrete hospital building funded by World Bank at Madaripur,
Bangladesh
Responsibilities:
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of joint precast pile foundation.
Design of superstructure including column, beam and slab.
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.
Project title: Construction of 8 storied reinforced concrete hospital building funded by World Bank at Madaripur, and
Kurigram Bangladesh
Responsibilities:
Wind Load calculation as per ASCE 7-05 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of joint precast pile foundation.
Design of superstructure including column, beam and slab.
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Page 3 of 6

Moniruzzaman Moni, MASc.


Project title: Construction of 6 nos 8 storied reinforced concrete hospital building at Naogan, Vola, Borguna,
Hobiganj, Nilfamari, Tongi Bangladesh
Responsibilities:
Wind Load calculation as per UBC 1994/ASCE 7-05 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of different types foundation for different building depending on the soil investigation reports.
Design of superstructure including column, beam and slab.
Check for joint shear and strong column weak beam.
Supervise cad technologists to prepare the working drawing and submitted to the supervisor.

Principal Structural

Prudential Consultants

Dhaka, Bangladesh

August 2006 July

As a proprietor and principal structural design engineer of this company, I designed different types of structures including
residential and commercial reinforced concrete buildings, steel buildings and heavy machine foundation, Analysis and design of
self supported communication towers and poles and guyed masts as per BS 8100, EIA 222 F and TIA 222 G. I also reviewed
geotechnical reports and design different types foundation for different types of structures and Performed seismic assessment
and retrofitting design for reinforced concrete buildings. I have participated negotiation meeting with the clients to get projects
as team leader as well as team members in different projects. Some of my notable jobs are described in below:
Project title: Construction of 6 storied industrial steel building at Gazipur for Insignia Studio, Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts.
Design of steel beam and column as well as beam column joints as per AISC LRFD 99.
Supervise the cad technologists to prepare the tender drawing.

Project title: Construction of 2 storied industrial steel building at Gazipur for hatim Industry, Bangladesh
Responsibilities:
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts.
Design of steel beam, bracing and column as well as beam column joints as per AISC LRFD 99.
Supervise the cad technologists to prepare the tender drawing.
Project title: Construction of 2 storied Commercial steel building at Uattara Dhaka for Insignia Studio, Bangladesh
Responsibilities:
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts.
Design of steel beam and column as well as beam column joints as per AISC LRFD 99.
Supervise the cad technologists to prepare the tender drawing.
Project title: Construction of 2 storied Commercial steel building at Uattara Dhaka for Insignia Studio, Bangladesh
Responsibilities:
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of shallow foundation, pedestal columns, grade beam, base plate and anchor bolts.
Design of steel beam and column as well as beam column joints as per AISC LRFD 99.
Supervise the cad technologists to prepare the tender drawing.
Project title: Construction of self supported communication steel tower for operator Grameenphone, ROBI, Teletalk
and vendor Mizan Construction Company, Bangladesh
Responsibilities:

Page 4 of 6

Moniruzzaman Moni, MASc.


Design of roof top (12m, 15m, 18m and 20m) and green field tower (25m, 32m, 37m, 41m, 42m, 52m, 62m) as per BS
8100, EIA 222 F and TIA 222 G.
Design of base plate and holding down bolts.
Preparation of line drawings.
Preparation of design reports.
Preparation of cost estimate
Supervise the cad technologists to prepare the erection and fabrication drawing.
Project title: Construction of braced communication pole for operator Grameenphone, ROBI, Teletalk and vendor
Mizan Construction Company, Bangladesh
Responsibilities:
Design of roof top braced pole (6m, 9m, 12m) as per EIA 222 F and TIA 222 G.
Design of base plate and holding down bolts.
Preparation of line drawings.
Preparation of design reports.
Preparation of cost estimate
Supervise the cad technologists to prepare the erection and fabrication drawing.
Project title: Construction of guyed mast for operator ROBI, Teletalk and vendor Mizan Construction Company,
Bangladesh
Responsibilities:
Design of guyed mast (25m, 35m, 50m and 75m) as per BS 8100, and TIA 222 G.
Design of base plate and holding down bolts.
Preparation of line drawings.
Preparation of design reports.
Preparation of cost estimate
Supervise the cad technologists to prepare the erection and fabrication drawing.
Project title: Construction of 10 storied residential reinforced concrete building at Gazipur for Insignia Studio,
Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of Shallow foundation (Isolated and combined footing).
Design for soft-story
Check for joint shear and strong column weak beam.
Supervise the cad technologists to prepare the working drawing.

Project title: Construction of 9 storied residential reinforced concrete building at Uattara Dhaka for Cubeinside,
Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of Mat foundation.
Design for soft-story
Check for joint shear and strong column weak beam.
Supervise the cad technologists to prepare the working drawing.

Project title: Construction of 9 storied residential reinforced concrete building at Uattara Dhaka for Cubeinside,
Bangladesh
Responsibilities:
Preliminary design to support the architect.
Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.

Page 5 of 6

Moniruzzaman Moni, MASc.

Design of Mat foundation.


Design for soft-story
Check for joint shear and strong column weak beam.
Supervise the cad technologists to prepare the working drawing.

Project title: Construction of 4 Nos. 9 storied residential reinforced concrete building at Uattara Dhaka for SBDL,
Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per IBC 2003 using finite element software ETABS.
Design of different foundation depending on sub soil investigation report.
Design for soft-story
Check for joint shear and strong column weak beam.
Supervise the cad technologists to prepare the working drawing.

Project title: Seismic assessment and retrofitting design of 8 storied reinforced commercial Building, Dhaka,
Bangladesh
Responsibilities:
Prepare as built architectural drawing and structural drawing.
Perform non destructive ultra sonic pulse velocity test to get information about the concrete.
Perform destructive test (core test).
Perform carbonation test.
Seismic assessment of the building by using spread sheet.
Retrofitting design of the garment building including foundation, column jacketing, and shear wall by using spread
sheet.
Supervise to prepare the preliminary drawing.

Research Assistant and


Teaching Assistant

The University of British

Okanagan, Canada

September 09-May 11

Columbia

Contributed in different projects related to risk assessment.


Design 4, 6 and 8 storied reinforced concrete building as per CSA A23.3 standard located in Vancouver for a research
project.
Design 4, 6 and 8 storied braced steel frame as per CSA S16-09 standard considering building is located in Vancouver
for a research project.
Seismic response modification factor, seismic vulnerability assessment, and progressive collapse analysis by using
smart material for reinforced concrete buildings.
Worked as a teaching assistant for different undergraduate courses.

Structural Design

Acumen Consulting

Dhaka, Bangladesh

May 2005 August

Project title: Construction of 366m long pre-stressed concrete girder bridge over the river surma at sylhet,
Bangladesh for roads and high ways department.
Responsibilities:

Dead load and live load calculation for 50m and 36m span pre-stressed girder.
Wind load and seismic load analysis for the bridge pier as per AASHTO LRFD 6th edition.
Design the sub-structure as an assistant of a senior engineer.
Supervise the cad technologists to prepare the working drawing.

Project title: Construction of 3100m long hybrid (RCC and Pre-stressed) intersection overpass at Kuril, Dhaka,
Bangladesh for roads and high ways department.
Responsibilities:
Work as an assistant to write the feasibility study reports.
Dead load and live load calculation for 60m rcc box girder by using SAP Bridge module.

Page 6 of 6

Moniruzzaman Moni, MASc.

Dead load and live load calculation for 30m pre-stressed girder by using spread sheet.
Wind load and seismic load analysis for the over pass pier as per AASHTO LRFD 6th edition.
Design the sub-structure as an assistant of a senior engineer.
Supervise the cad technologists to prepare the working drawing.

Project title: Construction of 4 storied reinforced concrete garments factory building at Gazipur, Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per UBC 1994 using finite element software ETABS.
Design of cast in situ pile foundation.

Project title: Construction of 12 storied plus two basement reinforced concrete commercial building at Dhaka,
Bangladesh
Responsibilities:

Preliminary design to support the architect.


Wind Load calculation as per UBC 1994 using finite element software ETABS.
Seismic Analysis of this building as per UBC 1994 using finite element software ETABS.
Design of mat foundation, ramp, basement wall.
.