Federal Register / Vol. 70, No.

129 / Thursday, July 7, 2005 / Notices 39267

making. This filing is considered a allows you to keep track of all formal Energy Regulatory Commission, 888
‘‘Comment on Filing.’’ issuances and submittals in specific First Street, NE., Washington DC 20426.
When Sonora submits its application dockets. This can reduce the amount of Please include the project number (P–
for authorization to construct and time you spend researching proceedings 2192–022) on any comments or motions
operate the Burgos Hub Expansion by automatically providing you with filed. Comments, protests, and
Project, the Commission will publish a notification of these filings, document interventions may be filed electronically
Notice of Application in the Federal summaries, and direct links to the via the internet in lieu of paper. See 18
Register and will establish a deadline documents. To register for this service, CFR 385.2001(a)(1)(iii) and the
for interested persons to intervene in the go to http://www.ferc.gov/ instructions on the Commission’s Web
proceeding. Because the Commission’s esubscribenow.htm. site at http://www.ferc.gov under the ‘‘e-
Pre-filing Process occurs before an Public meetings or site visits will be Filing’’ link. The Commission strongly
application to begin a proceeding is posted on the Commission’s calendar encourages e-filings.
officially filed, petitions to intervene located at http://www.ferc.gov/ l. Description of Request: The licensee
during this process are premature and EventCalendar/EventsList.aspx along filed a request, pursuant to articles 408,
will not be accepted by the Commission. with other related information. 409, 410, and 412 of its license, to
You can also contact Mr. James exchange approximately 3.14 acres of
Site Visit licensee-owned lands with 3,000 linear
Blackwell, Sonora Representative by
On July 14, 2005, the OEP staff will phone at (512) 930–2044 or by e-mail at feet of shoreline along the Biron
conduct a pre-certification site visit of jimblackwell@bnceng.com with your flowage, for three different parcels of
the planned Burgos Hub Export/Import specific concerns or comments land totaling approximately 205.213
Project. regarding this project. total acres. The first parcel has 830
We will view the proposed route and linear feet of river shoreline and
variations that are being considered for Magalie R. Salas, consists of 47.546 acres. The second
the planned pipeline. Examination will Secretary. parcel has 126 linear feet of river
be by automobile and on foot. [FR Doc. E5–3568 Filed 7–6–05; 8:45 am] shoreline and consists of 2.960 acres,
Representatives of Sonora will be BILLING CODE 6717–01–P abutting an existing licensee-owned
accompanying the OEP staff. boat launch. The third parcel consists of
All interested parties may attend. islands in the river, peninsulas, and a
Those planning to attend must provide DEPARTMENT OF ENERGY roadside access totaling 154.84 acres
their own transportation. Those (48.82 acres above water). These island
interested in attending the site visit Federal Energy Regulatory perimeters, peninsulas, and the roadside
should meet at 9 a.m. in parking lot of Commission access total 33,749 linear feet of
the Renaissance Casa De Palmas Hotel, waterfront. The licensee intends to
101 N. Main Street McAllen, Texas. You Notice of Application for Amendment
retain flowage rights over any
may have also been notified by Sonora of License and Soliciting Comments,
transferred lands and to retain said
that it plans on holding an Open House Motions To Intervene, and Protests
lands within the project boundary.
that evening, at the Renaissance Casa De June 29, 2005. m. Location of the Application: This
Palmas Hotel in McAllen, Texas at 6:30 Take notice that the following filing is available for review at the
p.m. application has been filed with the Commission in the Public Reference
For additional information, please Commission and is available for public Room 888 First Street, NE, Room 2A,
contact the Commission’s Office of inspection: Washington, DC 20426 or may be
External Affairs at 1–866–208–FERC a. Application Type: Change in viewed on the Commission’s Web site at
(3372). Project Boundary, Transfer of Project http://www.ferc.gov using the ‘‘E-
Lands, and Acquisition of Lands. Library’’ link. Enter the docket number
Availability of Additional Information
b. Project No.: 2192–022. excluding the last three digits in the
Additional information about the c. Date Filed: May 24, 2005. docket number field to access the
project is available from the d. Applicant: Consolidated Water document. For assistance, call toll-free
Commission’s Office of External Affairs Power Company. 1–866–208–3676 or e-mail
at 1–866–208 FERC (3372) or on the e. Name of Project: Biron. FERCOnlineSupport@ferc.gov. For TTY,
FERC Internet Web site (http:// f. Location: The project is located on call (202) 502–8659. A copy is also
www.ferc.gov). Using the ‘‘eLibrary’’ the Wisconsin River in Wood County, available for inspection and
link, select ‘‘General Search’’ from the Wisconsin. reproduction at the address in item h
eLibrary menu, enter the selected date g. Filed Pursuant to: Federal Power above.
range and ‘‘Docket Number’’ (i.e., PF05– Act, 16 U.S.C. 791(a), 825(r) and 799 n. Individuals desiring to be included
15–000), and follow the instructions. and 801. on the Commission’s mailing list should
Searches may also be done using the h. Applicant Contact: Mr. Mike so indicate by writing to the Secretary
phrase ‘‘Burgos Hub Export/Import’’ in Scheirer, Consolidated Water Power of the Commission.
the ‘‘Text Search’’ field. For assistance Company, PO Box 8050, Wisconsin o. Comments, Protests, or Motions to
with access to eLibrary, the helpline can Rapids, Wisconsin 54495–8050. Phone: Intervene: Anyone may submit
be reached at 1–866–208–3676, TTY 715/422–3927. comments, a protest, or a motion to
(202) 502–8659, or at i. FERC Contact: Any questions on intervene in accordance with the
FERCOnlineSupport@ferc.gov. The this notice should be addressed to Mrs. requirements of Rules of Practice and
eLibrary link on the FERC Internet Web Patricia Grant at 312–596–4435, or e- Procedure, 18 CFR 385.210, 385.211,
site also provides access to the texts of mail address: patricia.grant@ferc.gov. 385.214. In determining the appropriate
formal documents issued by the j. Deadline for filing comments and or action to take, the Commission will
Commission, such as orders, notices, motions: July 29, 2005. consider all protests or other comments
and rule makings. k. All documents (original and eight filed, but only those who file a motion
In addition, the FERC now offers a copies) should be filed with: Ms. to intervene in accordance with the
free service called eSubscription that Magalie R. Salas, Secretary, Federal Commission’s Rules may become a

VerDate jul<14>2003 19:31 Jul 06, 2005 Jkt 205001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\07JYN1.SGM 07JYN1
39268 Federal Register / Vol. 70, No. 129 / Thursday, July 7, 2005 / Notices

party to the proceeding. Any comments, 241 Ralpy McGill Boulevard NE, Bin capital letters the title ‘‘COMMENTS’’,
protests, or motions to intervene must 10151, Atlanta, GA 30308. ‘‘RECOMMENDATIONS FOR TERMS
be received on or before the specified i. FERC Contact: Any questions on AND CONDITIONS’’, ‘‘PROTEST’’, OR
comment date for the particular this notice should be addressed to Mr. ‘‘MOTION TO INTERVENE’’, as
application. John K. Novak at (202) 502–6076, or e- applicable, and the Project Number of
p. Filing and Service of Responsive mail address: john.novak@ferc.gov. the particular application to which the
Documents: Any filings must bear in all j. Deadline for filing comments and or filing refers (P–2354–087). All
capital letters the title ‘‘COMMENTS’’, motions: 30 days from date of issuance documents (original and eight copies)
‘‘RECOMMENDATIONS FOR TERMS of this notice. should be filed with: Magalie R. Salas,
AND CONDITIONS’’, ‘‘PROTEST’’, OR k. Description of Request: Georgia Secretary, Federal Energy Regulatory
‘‘MOTION TO INTERVENE’’, as Power Company is requesting Commission, 888 First Street, NE.,
applicable, and the Project Number of Commission authorization to permit the Washington DC 20426. A copy of any
the particular application to which the Authority to increase its water motion to intervene must also be served
filing refers. A copy of any motion to withdrawal from Lake Rabun from 2.0 upon each representative of the
intervene must also be served upon each mgd to 3.5 mgd to accommodate Applicant specified in the particular
representative of the Applicant expected growth in the Authority’s application.
specified in the particular application. service area. The proposal would p. Agency Comments: Federal, state,
q. Agency Comments: Federal, state, involve the replacement of the existing and local agencies are invited to file
and local agencies are invited to file 10-inch piping from the intake pumps to comments on the described application.
comments on the described application. the distribution main with 16-inch A copy of the application may be
A copy of the application may be piping. No significant construction obtained by agencies directly from the
obtained by agencies directly from the activity would be required within the Applicant. If an agency does not file
Applicant. If an agency does not file project boundary. comments within the time specified for
comments within the time specified for l. Locations of the Application: A
filing comments, it will be presumed to
filing comments, it will be presumed to copy of the application is available for
have no comments. One copy of an
have no comments. One copy of an inspection and reproduction at the
agency’s comments must also be sent to
agency’s comments must also be sent to Commission’s Public Reference Room,
the Applicant’s representatives.
the Applicant’s representatives. located at 888 First Street, NE., Room
q. Comments, protests and
2A, Washington, DC 20426, or by calling
Magalie R. Salas, interventions may be filed electronically
(202) 502–8371. This filing may also be
Secretary. via the Internet in lieu of paper. See, 18
viewed on the Commission’s Web site at
[FR Doc. E5–3565 Filed 7–6–05; 8:45 am]
CFR 385.2001(a)(1)(iii) and the
http://www.ferc.gov using the
instructions on the Commission’s Web
BILLING CODE 6717–01–P ‘‘eLibrary’’ link. Enter the docket
site at http://www.ferc.gov under the ‘‘e-
number excluding the last three digits in
Filing’’ link.
the docket number field to access the
DEPARTMENT OF ENERGY document. You may also register online Magalie R. Salas,
at http://www.ferc.gov/docs-filing/ Secretary.
Federal Energy Regulatory esubscription.asp to be notified via [FR Doc. E5–3567 Filed 7–6–05; 8:45 am]
Commission e-mail of new filings and issuances BILLING CODE 6717–01–P
[Project No. 2354–087] related to this or other pending projects.
For assistance, call 1–866–208–3676 or
Georgia Power Company; Notice of e-mail FERCOnlineSupport@ferc.gov, DEPARTMENT OF ENERGY
Application for Amendment of License for TTY, call (202) 502–8659. A copy is
and Soliciting Comments, Motions To also available for inspection and Federal Energy Regulatory
Intervene, and Protests reproduction at the address in item (h) Commission
June 29, 2005. above. [Docket No. RM98–1–000]
m. Individuals desiring to be included
Take notice that the following
on the Commission’s mailing list should Records Governing Off-the Record
application has been filed with the
so indicate by writing to the Secretary Communications; Public Notice
Commission and is available for public
of the Commission.
inspection. n. Comments, Protests, or Motions to June 29, 2005.
a. Type of Application: Amendment
Intervene: Anyone may submit This constitutes notice, in accordance
of license that would allow the Clayton-
comments, a protest, or a motion to with 18 CFR 385.2201(b), of the receipt
Rabun County Water and Sewer
intervene in accordance with the of prohibited and exempt off-the-record
Authority (Authority) to increase its
requirements of Rules of Practice and communications.
water withdrawal from Lake Rabun for
Procedure, 18 CFR 385.210, 385.211, Order No. 607 (64 FR 51222,
municipal water supply from 2.0
385.214. In determining the appropriate September 22, 1999) requires
million gallons per (mgd) to 3.5 mgd.
b. Project Number: P–2354–087. action to take, the Commission will Commission decisional employees, who
c. Date Filed: June 2, 2005. consider all protests or other comments make or receive a prohibited or exempt
d. Applicant: Georgia Power filed, but only those who file a motion off-the-record communication relevant
Company. to intervene in accordance with the to the merits of a contested proceeding,
e. Name of Project: North Georgia Commission’s Rules may become a to deliver to the Secretary, a copy of the
Project (FERC No. 2354). party to the proceeding. Any comments, communication, if written, or a
f. Location: Lake Rabun on the protests, or motions to intervene must summary of the substance of any oral
Tallulah River, Rabun County, Georgia. be received on or before the specified communication.
g. Filed Pursuant to: Federal Power comment date for the particular Prohibited communications are
Act, 16 U.S.C. 791(a), 825(r). application. included in a public, non-decisional file
h. Applicant Contact: Mr. Scott o. Filing and Service of Responsive associated with, but not a part of, the
Hendricks, Georgia Power Company, Documents: Any filings must bear in all decisional record of the proceeding.