Task/Activity: PILING
WORKS
Revision No.
Page No.
Job Steps
Hazards
General planning
1. Traffic problem.
Mobilization of rig.
2. Poor Access.
Mobilization ,
Unloading and
Assembly of rig
Effects
Risk Rating
Serious Illness
/ Injury Major
Damage
n
L
Controls
1. Traffic control by signalman
with
flag.
Fatality/
Permanent
Disability
12
2. Load unbalance.
Fatality/
Permanent
Disability
3. Plant overturn
Fatality/
Permanent
Disability
12
Serious Illness
/ Injury
Major
Damage
Effective Date
0
of
Responsible
Person
Revision No.
Page No.
Job Steps
Hazards
Effects
Risk Rating
Low
Controls
M
1.2 Pile to be driven only after it has
been well secured into the casing
and confirmed by responsible
person.
2. Obstruction free ground work
area.
2.1 Care in lifting and
maneuvering of
Pile. Usage of tag line to
control
the swinging of pile.
4.
Effective Date
6. Potential fire
3.
0
of
Responsible
Person
Revision No.
Page No.
Job Steps
driving
Hazards
Effects
Risk Rating
Controls
experienced.
5.
Personnel Protection
1. Personnel injury
6.
Monitor Compliance
7.
Records.
Effective Date
Qualifications and
experience required to
complete the task:
0
of
Responsible
Person
Revision No.
Page No.
0
of
Effective Date
2. JSA to be briefed to all workers involved in
the activity and recorded.
This SWMS/JSA has been developed through consultation with our employees and has been read & signed by all employees undertaking the works:
Print Names
RISK MATRIX.
Probability
Consequence
Minor illness /injury
Minor Damage
Signature
Practically
Impossible
1
Date
Print Names
Signature
Date
Know To Be A
Common Or
Repeating Occurrence
Revision No.
Page No.
0
of
Effective Date
10
12
15
Fatality/Permanent
Disability
12
16
20
Low ( L:1-3 )
Medium ( M:4-8 )
High ( H:9-20 )
Out patient / 4 days and less MC: repairable but limited workdays
Fatality/Permanent Disability