Вы находитесь на странице: 1из 799

City of Los Angeles

Department of City Planning Environmental Analysis Section


City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012

DRAFT ENVIRONMENTAL IMPACT REPORT


BRENTWOODPACIFIC PALISADES COMMUNITY PLAN AREA
Volume 7
Appendix P (Continued)

Archer Forward: Campus Preservation and Improvement Plan

Case Number: ENV-2011-2689-EIR


State Clearinghouse Number: 2012011001
Project Location: 11725 West Sunset Boulevard / 11728 West Chaparal Street / 141 North Barrington

Avenue, Los Angeles, California, 90049


Council District: 11

Project Description: The Project consists of improvements to the existing Archer campus totaling

75,930 square feet of net new floor area, including the replacement of the existing 30,071-square-foot North
Wing of the Main Building with a 39,071-square-foot renovated North Wing, and the development of an
approximately 41,400-square-foot Multipurpose Facility, a 22,600-square-foot Performing Arts Center, a
7,400-square-foot Visual Arts Center, and an Aquatics Center with a 2,300-square-foot support facility.
The existing outdoor athletic fields would be improved and would include regulation-size soccer and softball
fields. Parking would be provided in a new underground parking structure, located below the athletic
fields, to accommodate approximately 212 cars. The two adjacent properties currently owned by Archer
would be incorporated into the Archer campus and the existing residences on those properties would be
removed to accommodate the Project.
The Project would require various approvals and may include, but would not be limited to, the following:
Vesting Conditional Use Permit for private schools; modification of height and area regulations; Zoning
Administrator Adjustment to permit fences/gates/walls up to eight feet in height; Site Plan Review; Haul
Route Permit; Board of Police Commissioners permit for extended construction hours; grading, excavation,
demolition, and building permits; and any additional actions as may be deemed necessary.

APPLICANT:
The Archer School for Girls

PREPARED BY:

ON BEHALF OF:

Matrix Environmental, LLC

The City of Los Angeles


Department of City Planning
Environmental Analysis Section

FEBRUARY 2014

Appendix P-1 (Continued)


Transportation Analysis Report

CUMULATIVE BASE PLUS PROJECT WITH MITIGATION AND PHYSICAL


IMPROVEMENT CONDITIONS (TYPICAL SCHOOL DAY 70% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

24

73

19
28

30
6

10
1146
23

37
1071
31

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

71

19

71

19

28

28

73

73

73

73

109

30

109

30

10

10

10

10

585

1146

585

1146

23

23

23

23

37

37

37

37

551

1071

551

1071

31

31

31

31

144
622
766

144
622
766

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

24

19

28

73

30

10

1146

23

37

1071

31

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

24

19

28

73

30

10

1146

23

37

1071

31

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.538

0.538

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.538

0.538

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

145

250

162
112

207
104

64
1149
177

182
1106
230

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

145

145

145

145

162

162

162

162

112

112

1
0
1
0
1
0
0

250

250

250

250

207

207

207

207

72

104

72

104

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

64

64

64

64

575

1149

575

1149

105

177

105

177

182

182

182

182

668

1106

668

1106

230

230

230

230

412
757
1169

North-South:
East-West:
SUM:

412
757
1169

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

145

162

112

250

207

104

64

1149

177

182

1106

230

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

145

162

112

0
0
0
0
0
0
0

250

207

104

0
0
0
0
0
0
0

64

1149

177

0
0
0
0
0
0
0

0
0
0
0
0
0
0

182

1106

230

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.850

0.850

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.750

0.750

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

17

46

32
63

16
11

12
1132
11

106
1642
106

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

17

17

17

17

95

32

95

32

63

63

1
0
0
1
0
0
0

46

46

46

46

27

16

27

16

11

11

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
0
0
0

12

12

12

12

572

1132

572

1132

11

11

11

11

106

106

106

106

874

1642

874

1642

106

106

106

106

141
886
1027

141
886
1027

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

32

63

46

16

11

12

1132

11

106

1642

106

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

32

63

0
0
0
0
0
0
0

46

16

11

0
0
0
0
0
0
0

12

1132

11

0
0
0
0
0
0
0

0
0
0
0
0
0
0

106

1642

106

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.685

0.685

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.585

0.585

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

8
41
15

55
12
75

37
830
4

31
1928
126

No. of
Lanes

Lane
Volume

0
1
0
0
1
0
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

41

49

41

15

15

55

55

55

55

142

12

142

12

75

75

37

37

37

37

417

830

417

830

31

31

31

31

964

1928

964

1928

126

126

126

126

150
1001
1151

North-South:
East-West:
SUM:

150
1001
1151

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

41

15

55

12

75

37

830

31

1928

126

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

41

15

0
0
0
0
0
0
0

55

12

75

0
0
0
0
0
0
0

37

830

0
0
0
0
0
0
0

31

1928

126

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:12 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

164

179

16
235

57
10

6
1589
190

268
2235
121

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

164

164

164

164

126

16

126

16

235

235

1
0
0
0
0
1
0

123

179

123

179

123

57

123

57

10

10

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

795

1589

795

1589

108

190

108

190

268

268

268

268

1178

2235

1178

2235

121

121

121

121

287
1184
1471

287
1184
1471

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

164

16

235

0
0
0
0
0
0
0

179

57

10

0
0
0
0
0
0
0

1589

190

0
0
0
0
0
0
0

268

2235

121

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

164

16

235

179

57

10

1589

190

268

2235

121

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.070

1.070

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.970

0.970

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

59
0
420

0
0
0

0
906
87

379
2497
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

59

59

59

59

420

420

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

497

906

497

906

87

87

87

87

379

379

379

379

1249

2497

1249

2497

59
1249
1308

North-South:
East-West:
SUM:

59
1249
1308

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

59

420

0
0
0
0
0
0
0

0
0
0
0
0
0
0

906

87

0
0
0
0
0
0
0

379

2497

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

59

420

0
0
0
0
0
0
0

0
0
0
0
0
0
0

906

87

0
0
0
0
0
0
0

379

2497

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.918

0.918

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.818

0.818

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

160

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

258
347

670
0

6
15

1568
0
33

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

129

258

129

258

347

347

160

160

160

160

335

670

335

670

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

29

29

15

15

801

1568

801

1568

801

33

801

33

335
830
1165

335
830
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

258

347

160

670

15

1568

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

258

347

0
0
0
0
0
0
0

160

670

0
0
0
0
0
0
0

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1568

33

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.777

0.777

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.677

0.677

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

33

644

4
87

176
1458

80
1724
57

12
1066
266

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

10

33

10

33

81

87

81

87

1
1
0
0
2
0
0

410

644

410

644

410

176

410

176

758

1458

758

1458

2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

44

80

44

80

445

1724

445

1724

57

57

57

57

12

12

12

12

533

1066

533

1066

266

266

839
577
1416

North-South:
East-West:
SUM:

839
577
1416

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

33

87

644

176

1458

80

1724

57

12

1066

266

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

33

87

0
0
0
0
0
0
0

644

176

1458

0
0
0
0
0
0
0

80

1724

57

0
0
0
0
0
0
0

12

1066

266

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.030

1.030

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.930

0.930

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

844

0
618

0
0

0
1186
805

0
859
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

844

844

844

844

340

618

340

618

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

593

1186

593

1186

805

805

286

859

286

859

844
593
1437

844
593
1437

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

844

618

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1186

805

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

844

618

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1186

805

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.958

0.958

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.858

0.858

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

35
0
404

0
0
0

0
1152
152

492
891
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

35

35

35

35

404

404

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

652

1152

652

1152

152

152

152

152

492

492

492

492

446

891

446

891

35
1144
1179

North-South:
East-West:
SUM:

35
1144
1179

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

35

404

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1152

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

492

891

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

35

404

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1152

152

0
0
0
0
0
0
0

492

891

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.827

0.827

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.727

0.727

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

448

0
0

0
236

187
1053
0

0
1058
368

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

246

448

246

448

49

236

49

236

1
0
2
0
0
0
0

187

187

187

187

527

1053

527

1053

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

529

1058

529

1058

122

368

122

368

246
716
962

North-South:
East-West:
SUM:

246
716
962

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

448

236

0
0
0
0
0
0
0

187

1053

1058

368

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

448

236

0
0
0
0
0
0
0

187

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1058

368

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.675

0.675

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.575

0.575

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

199

WESTBOUND

38

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

131

CRITICAL VOLUMES

246
127

23
162
135

922
9

824
22

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

187

246

187

246

127

127

127

127

23

23

23

23

81

162

81

162

135

135

135

135

1
0
1
0
1
0
0

199

199

199

199

922

922

922

922

1
0
1
0
1
0
0

131

131

131

131

824

824

824

824

22

22

22

22

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

210
1053
1263

North-South:
East-West:
SUM:

210
1053
1263

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

38

246

127

23

162

135

199

922

131

824

22

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

38

246

127

0
0
0
0
0
0
0

23

162

135

0
0
0
0
0
0
0

199

922

0
0
0
0
0
0
0

131

824

22

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.886

0.886

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.786

0.786

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

15

382
4

81
355
230

127
38

55
76

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

395

382

395

382

81

81

81

81

374

355

374

355

374

230

374

230

1
0
0
1
0
0
0

285

285

285

285

165

127

165

127

38

38

1
0
1
1
0
0
0

15

15

15

15

55

55

55

55

76

76

76

76

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

476
361
837

476
361
837

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

382

81

355

230

0
0
0
0
0
0
0

285

127

38

0
0
0
0
0
0
0

15

55

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

382

0
0
0
0
0
0
0

81

355

230

0
0
0
0
0
0
0

285

127

38

0
0
0
0
0
0
0

0
0
0
0
0
0
0

15

55

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.587

0.587

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.487

0.487

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

112

116

208
39

200
23

96
983
84

12
913
83

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

112

112

112

112

359

208

359

208

39

39

0
1
0
1
0
0
0

116

116

116

116

170

200

170

200

170

23

170

23

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

96

96

96

96

356

983

356

983

84

84

84

84

12

12

12

12

498

913

498

913

83

83

83

83

475
594
1069

North-South:
East-West:
SUM:

475
594
1069

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

112

208

39

116

200

23

96

983

84

12

913

83

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

208

39

116

200

23

0
0
0
0
0
0
0

96

983

84

0
0
0
0
0
0
0

12

913

83

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.777

0.777

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.677

0.677

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

118

246

416
151

443
81

75
1376
89

84
1524
36

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

118

118

118

118

208

416

208

416

109

151

109

151

1
0
1
1
0
0
0

246

246

246

246

262

443

262

443

81

81

81

81

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

75

75

75

75

688

1376

688

1376

30

89

30

89

84

84

84

84

762

1524

762

1524

36

36

454
837
1291

454
837
1291

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

118

416

151

246

443

81

75

1376

89

84

1524

36

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

118

416

151

246

443

81

0
0
0
0
0
0
0

75

1376

89

0
0
0
0
0
0
0

84

1524

36

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.861

0.861

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.761

0.761

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

69
181
116

1174
144
17

64
1594
43

60
1707
1062

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

69

69

69

69

91

181

91

181

116

116

116

116

411

1174

411

1174

161

144

161

144

17

17

17

17

64

64

64

64

546

1594

546

1594

43

43

43

43

60

60

60

60

569

1707

569

1707

1062

1062

527
633
1160

North-South:
East-West:
SUM:

527
633
1160

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

69

181

116

1174

144

17

64

1594

43

60

1707

1062

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

69

181

116

1174

144

17

0
0
0
0
0
0
0

64

1594

43

0
0
0
0
0
0
0

60

1707

1062

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.844

0.844

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.744

0.744

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

495

0
69

0
0

0
1094
407

68
907
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

282

495

282

495

282

69

282

69

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

547

1094

547

1094

125

407

125

407

68

68

68

68

454

907

454

907

282
615
897

282
615
897

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

495

69

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1094

407

0
0
0
0
0
0
0

0
0
0
0
0
0
0

68

907

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

495

69

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1094

407

68

907

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.629

0.629

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.529

0.529

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

69

33
27

35
9

6
976
10

50
868
23

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

79

33

79

33

27

27

69

69

69

69

113

35

113

35

493

976

493

976

10

10

10

10

50

50

50

50

446

868

446

868

23

23

23

23

148
543
691

North-South:
East-West:
SUM:

148
543
691

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

33

27

69

35

976

10

50

868

23

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

33

27

0
0
0
0
0
0
0

69

35

0
0
0
0
0
0
0

976

10

50

868

23

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.485

0.485

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

166

163

271
81

437
113

59
638
338

295
890
159

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

166

166

166

166

271

271

271

271

81

81

1
0
1
0
1
0
0

163

163

163

163

437

437

437

437

84

113

84

113

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

59

59

59

59

319

638

319

638

255

338

255

338

295

295

295

295

525

890

525

890

159

159

159

159

603
614
1217

603
614
1217

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

166

271

81

0
0
0
0
0
0
0

163

437

113

0
0
0
0
0
0
0
0
0
0
0
0
0
0

59

638

338

295

890

159

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

166

271

81

163

437

113

59

638

338

295

890

159

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.885

0.885

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.785

0.785

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

27

98

46
79

84
92

19
873
31

191
1748
57

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

27

27

27

27

125

46

125

46

79

79

98

98

98

98

176

84

176

84

92

92

19

19

19

19

452

873

452

873

31

31

31

31

191

191

191

191

903

1748

903

1748

57

57

57

57

223
922
1145

North-South:
East-West:
SUM:

223
922
1145

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

27

46

79

98

84

92

19

873

31

191

1748

57

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

27

46

79

98

84

92

19

873

31

191

1748

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.272

1.272

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.172

1.172

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

8
45
49

21
5
44

44
1491
9

45
1759
42

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
1
0
0
1
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

45

53

45

27

49

27

49

21

21

21

21

70

70

44

44

44

44

44

44

750

1491

750

1491

45

45

45

45

880

1759

880

1759

42

42

42

42

78
924
1002

78
924
1002

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

45

49

21

44

44

1491

45

1759

42

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

45

49

21

44

44

1491

45

1759

42

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.113

1.113

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.013

1.013

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:12 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

219

170

54
400

60
5

2
1441
161

332
1798
91

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

219

219

219

219

227

54

227

54

400

400

1
0
0
0
0
1
0

118

170

118

170

118

60

118

60

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

721

1441

721

1441

52

161

52

161

332

332

332

332

945

1798

945

1798

91

91

91

91

345
1053
1398

North-South:
East-West:
SUM:

345
1053
1398

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

219

54

400

0
0
0
0
0
0
0

170

60

0
0
0
0
0
0
0

1441

161

0
0
0
0
0
0
0

332

1798

91

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

219

54

400

170

60

1441

161

332

1798

91

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.553

1.553

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.453

1.453

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

80
0
646

0
0
0

60

80

80

80

22

646

22

646

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

333
2179

Added
Volume

Total
Volume

80

0
0
1
1
0
0
0

0
1468

Lane
Volume

1
0
0
0
2
0
0

764

1468

764

1468

60

60

60

60

333

333

333

333

1090

2179

1090

2179

80
1097
1177

80
1097
1177

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2179

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2179

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.070

1.070

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.970

0.970

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1675

CRITICAL VOLUMES

695
315

72
300
0

7
21

2
86

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

348

695

348

695

315

315

72

72

72

72

150

300

150

300

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

881

1675

881

1675

881

86

881

86

North-South:
East-West:
SUM:

420
920
1340

North-South:
East-West:
SUM:

420
920
1340

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

695

315

72

300

11

21

1675

86

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

695

315

72

300

11

21

1675

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.893

0.893

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.793

0.793

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

101

586

No. of
Lanes

12
71

195
1101

201
1321
29

306

Total
Volume

Lane
Volume

101

31

101

12

12

12

12

63

71

63

71

1
1
0
0
2
0
0

391

586

391

586

391

195

391

195

495

1101

495

1101

2
0
3
1
0
0
0

111

201

111

201

338

1321

338

1321

29

29

29

29

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

31

1
0
2
0
2
0
0

16
1099

Lane
Volume

2
0
1
1
0
0
0

16

16

16

16

550

1099

550

1099

306

306

558
661
1219

558
661
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

101

12

71

0
0
0
0
0
0
0

586

195

1101

0
0
0
0
0
0
0

201

1321

29

0
0
0
0
0
0
0

16

1099

306

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

101

12

71

0
0
0
0
0
0
0

586

195

1101

0
0
0
0
0
0
0

201

1321

29

16

1099

306

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.887

0.887

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.787

0.787

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

303

0
221

0
0

0
1330
956

0
1862
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

303

303

303

303

122

221

122

221

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

665

1330

665

1330

223

956

223

956

621

1862

621

1862

303
665
968

North-South:
East-West:
SUM:

303
665
968

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

303

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

1862

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

303

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1862

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.645

0.645

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.545

0.545

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

226

0
562

0
0

0
890
149

536
1422
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

226

226

226

226

26

562

26

562

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

520

890

520

890

149

149

149

149

536

536

536

536

711

1422

711

1422

226
1056
1282

226
1056
1282

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

226

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

536

1422

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

226

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

0
0
0
0
0
0
0

536

1422

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.900

0.900

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.800

0.800

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

771

0
0

0
175

248
1011
0

0
880
540

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

424

771

424

771

175

175

1
0
2
0
0
0
0

248

248

248

248

506

1011

506

1011

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

440

880

440

880

116

540

116

540

424
688
1112

North-South:
East-West:
SUM:

424
688
1112

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

771

175

0
0
0
0
0
0
0

248

1011

880

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

771

175

248

1011

880

540

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.780

0.780

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.680

0.680

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

65
454
178

42
202
202

249
1077
33

164
802
60

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

316

454

316

454

178

178

178

178

42

42

42

42

101

202

101

202

202

202

202

202

249

249

249

249

1077

1077

1077

1077

33

33

33

33

164

164

164

164

802

802

802

802

60

60

60

60

358
1241
1599

358
1241
1599

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

65

454

178

42

202

202

0
0
0
0
0
0
0

249

1077

33

0
0
0
0
0
0
0

164

802

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

65

454

178

0
0
0
0
0
0
0

42

202

202

0
0
0
0
0
0
0

249

1077

33

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

802

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.122

1.122

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.022

1.022

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

373

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

576
18

88
441
232

175
49

68
181

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

626

576

626

576

18

18

88

88

88

88

425

441

425

441

425

232

425

232

1
0
0
1
0
0
0

373

373

373

373

224

175

224

175

49

49

1
0
1
1
0
0
0

19

19

19

19

68

68

68

68

181

181

181

181

North-South:
East-West:
SUM:

714
554
1268

North-South:
East-West:
SUM:

714
554
1268

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

576

18

88

441

232

0
0
0
0
0
0
0

373

175

49

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

576

18

0
0
0
0
0
0
0

88

441

232

0
0
0
0
0
0
0

373

175

49

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.890

0.890

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.790

0.790

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95
289
48

92
326
25

172
984
143

68
767
118

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

95

95

95

95

432

289

432

289

48

48

92

92

92

92

268

326

268

326

268

25

268

25

172

172

172

172

376

984

376

984

143

143

143

143

68

68

68

68

443

767

443

767

118

118

118

118

524
615
1139

524
615
1139

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

95

289

48

92

326

25

0
0
0
0
0
0
0

172

984

143

0
0
0
0
0
0
0

68

767

118

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

289

48

0
0
0
0
0
0
0

92

326

25

0
0
0
0
0
0
0

172

984

143

68

767

118

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.828

0.828

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.728

0.728

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

150

305

679
150

750
125

110
1537
68

106
1174
80

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

150

150

150

150

340

679

340

679

97

150

97

150

1
0
1
1
0
0
0

305

305

305

305

438

750

438

750

125

125

125

125

1
0
2
0
1
0
0

110

110

110

110

769

1537

769

1537

68

68

1
0
2
0
1
0
0

106

106

106

106

587

1174

587

1174

80

80

North-South:
East-West:
SUM:

645
875
1520

North-South:
East-West:
SUM:

645
875
1520

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

679

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

110

1537

68

0
0
0
0
0
0
0

106

1174

80

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

679

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

110

1537

68

0
0
0
0
0
0
0

0
0
0
0
0
0
0

106

1174

80

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.689

1.689

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.589

1.589

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

65
308
229

945
318
16

22
1303
35

127
1437
920

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

154

308

154

308

229

229

229

229

331

945

331

945

334

318

334

318

16

16

16

16

22

22

22

22

446

1303

446

1303

35

35

35

35

127

127

127

127

479

1437

479

1437

920

920

563
573
1136

563
573
1136

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

65

308

229

945

318

16

22

1303

35

127

1437

920

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

308

229

0
0
0
0
0
0
0

945

318

16

22

1303

35

0
0
0
0
0
0
0
0
0
0
0
0
0
0

127

1437

920

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.262

1.262

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.162

1.162

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

574

0
182

0
0

0
1148
635

177
883
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

378

574

378

574

378

182

378

182

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

574

1148

574

1148

257

635

257

635

177

177

177

177

442

883

442

883

378
751
1129

North-South:
East-West:
SUM:

378
751
1129

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

574

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

0
0
0
0
0
0
0

177

883

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

574

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

0
0
0
0
0
0
0

177

883

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

21

43

29
16

25
8

3
705
9

36
815
20

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

43

43

43

43

76

25

76

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

357

705

357

705

36

36

36

36

418

815

418

815

20

20

20

20

109
421
530

109
421
530

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

29

16

43

25

705

36

815

20

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

43

25

0
0
0
0
0
0
0

705

0
0
0
0
0
0
0

36

815

20

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.372

0.372

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.372

0.372

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

180
306
94

33
284
39

25
257
188

335
751
106

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

94

94

33

33

33

33

284

284

284

284

27

39

27

39

25

25

25

25

129

257

129

257

98

188

98

188

1
0
1
1
0
0
0

335

335

335

335

429

751

429

751

106

106

106

106

North-South:
East-West:
SUM:

464
464
928

North-South:
East-West:
SUM:

464
464
928

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

180

306

94

33

284

39

25

257

188

335

751

106

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

94

0
0
0
0
0
0
0

33

284

39

0
0
0
0
0
0
0

25

257

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

335

751

106

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.675

0.675

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.575

0.575

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

30
86
118

40
54
32

16
465
29

171
1748
51

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

204

86

204

86

118

118

40

40

40

40

86

54

86

54

32

32

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

16

16

16

16

247

465

247

465

29

29

29

29

171

171

171

171

900

1748

900

1748

51

51

51

51

244
916
1160

244
916
1160

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

118

40

54

32

16

465

29

171

1748

51

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

118

40

54

32

16

465

29

171

1748

51

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.450

1.450

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.350

1.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
91
55

13
1
27

31
784
4

32
1727
18

No. of
Lanes

Lane
Volume

0
1
0
0
1
0
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

91

94

91

39

55

39

55

13

13

13

13

41

41

27

27

31

31

31

31

394

784

394

784

32

32

32

32

864

1727

864

1727

18

18

18

18

107
895
1002

North-South:
East-West:
SUM:

107
895
1002

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

91

55

13

27

31

784

32

1727

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

784

32

1727

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.253

1.253

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.153

1.153

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:13 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

175

20
300

53
13

3
1273
112

345
1601
62

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

154

154

154

154

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

637

1273

637

1273

35

112

35

112

345

345

345

345

832

1601

832

1601

62

62

62

62

281
982
1263

281
982
1263

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

154

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1273

112

0
0
0
0
0
0
0

345

1601

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

154

20

300

175

53

13

1273

112

345

1601

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.579

1.579

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.479

1.479

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

45
0
660

0
0
0

0
1298
30

330
2107
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

45

45

45

45

33

660

33

660

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

664

1298

664

1298

30

30

30

30

330

330

330

330

1054

2107

1054

2107

45
1054
1099

North-South:
East-West:
SUM:

45
1054
1099

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0

330

2107

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0
0
0
0
0
0
0
0

330

2107

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.099

1.099

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.999

0.999

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1807

850
242

76
301
0

7
21

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

936

1807

936

1807

936

64

936

64

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

501
975
1476

501
975
1476

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

21

1807

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

21

1807

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.984

0.984

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.884

0.884

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

149

700

24
96

211
1191

446
1880
39

49
1100
290

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

45

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

410

1191

410

1191

2
0
3
1
0
0
0

245

446

245

446

480

1880

480

1880

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

49

49

49

49

550

1100

550

1100

290

290

528
795
1323

North-South:
East-West:
SUM:

528
795
1323

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1191

0
0
0
0
0
0
0

446

1880

39

0
0
0
0
0
0
0

49

1100

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1191

0
0
0
0
0
0
0

446

1880

39

49

1100

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.962

0.962

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.862

0.862

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

256

0
204

0
0

0
1453
947

0
1613
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

256

256

256

256

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

727

1453

727

1453

265

947

265

947

538

1613

538

1613

256
727
983

256
727
983

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

256

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

1613

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

256

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1613

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.655

0.655

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.555

0.555

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

461

0
873

0
0

0
841
154

642
1227
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

461

461

461

461

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

498

841

498

841

154

154

154

154

642

642

642

642

614

1227

614

1227

461
1140
1601

North-South:
East-West:
SUM:

461
1140
1601

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

642

1227

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1227

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.124

1.124

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.024

1.024

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

627

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

320

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
223

813
0

0
982
569

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

345

627

345

627

223

223

1
0
2
0
0
0
0

320

320

320

320

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

491

982

491

982

224

569

224

569

345
811
1156

345
811
1156

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

627

223

0
0
0
0
0
0
0

320

813

982

569

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

627

223

320

813

982

569

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.811

0.811

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.711

0.711

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

CRITICAL VOLUMES

556
197

44
198
188

962
28

837
94

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

962

962

962

962

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

837

837

837

837

94

94

94

94

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

421
1138
1559

North-South:
East-West:
SUM:

421
1138
1559

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

52

556

197

44

198

188

0
0
0
0
0
0
0

301

962

28

0
0
0
0
0
0
0

175

837

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

962

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

175

837

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.094

1.094

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.994

0.994

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

15
431
0

57
360
218

163
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

446

431

446

431

57

57

57

57

346

360

346

360

346

218

346

218

163

163

163

163

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

503
477
980

North-South:
East-West:
SUM:

503
477
980

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

431

57

360

218

0
0
0
0
0
0
0

163

352

66

0
0
0
0
0
0
0

21

104

314

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

431

0
0
0
0
0
0
0

57

360

218

0
0
0
0
0
0
0

163

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.225

1.225

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.125

1.125

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

31
114
42

82
310
22

79
792
115

83
759
74

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

187

114

187

114

42

42

82

82

82

82

207

310

207

310

207

22

207

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

417

759

417

759

74

74

74

74

269
496
765

North-South:
East-West:
SUM:

269
496
765

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

31

114

42

82

310

22

79

792

115

83

759

74

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

31

114

42

82

310

22

79

792

115

83

759

74

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.556

0.556

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.456

0.456

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

244

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

115

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

709
247

822
145

988
52

103
1347
47

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

188

188

188

188

355

709

355

709

196

247

196

247

1
0
1
1
0
0
0

244

244

244

244

484

822

484

822

145

145

145

145

1
0
2
0
1
0
0

115

115

115

115

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

672
789
1461

672
789
1461

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

709

247

0
0
0
0
0
0
0

244

822

145

0
0
0
0
0
0
0

115

988

52

0
0
0
0
0
0
0

103

1347

47

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

188

709

247

244

822

145

115

988

52

103

1347

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.826

1.826

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.726

1.726

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

94
405
225

967
282
8

9
1269
17

134
1657
921

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

203

405

203

405

225

225

225

225

338

967

338

967

290

282

290

282

429

1269

429

1269

17

17

17

17

134

134

134

134

552

1657

552

1657

921

921

563
563
1126

North-South:
East-West:
SUM:

563
563
1126

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

405

225

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1657

921

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

405

225

0
0
0
0
0
0
0

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1657

921

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.408

1.408

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.308

1.308

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

595

0
151

0
0

0
967
471

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

373

595

373

595

373

151

373

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

98

471

98

471

158

158

158

158

490

980

490

980

373
642
1015

North-South:
East-West:
SUM:

373
642
1015

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.712

0.712

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.612

0.612

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM(5-6).xls

CUMULATIVE BASE PLUS PROJECT CONDITIONS (300 ATTENDEE


EVENT DAY 50% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

72

33
27

35
9

6
995
10

50
870
23

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

79

33

79

33

27

27

72

72

72

72

116

35

116

35

503

995

503

995

10

10

10

10

50

50

50

50

447

870

447

870

23

23

23

23

151
553
704

151
553
704

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

33

27

72

35

0
0
0
0
0
0
0

995

10

0
0
0
0
0
0
0

50

870

23

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

33

27

0
0
0
0
0
0
0

72

35

0
0
0
0
0
0
0

995

10

50

870

23

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.494

0.494

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.494

0.494

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

167

271
102

437
113

59
659
338

298
893
159

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

166

166

166

166

271

271

271

271

102

102

1
0
1
0
1
0
0

167

167

167

167

437

437

437

437

84

113

84

113

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

59

59

59

59

330

659

330

659

255

338

255

338

298

298

298

298

526

893

526

893

159

159

159

159

603
628
1231

North-South:
East-West:
SUM:

603
628
1231

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

166

271

102

167

437

113

59

659

338

298

893

159

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

166

271

102

0
0
0
0
0
0
0

167

437

113

0
0
0
0
0
0
0

59

659

338

0
0
0
0
0
0
0

0
0
0
0
0
0
0

298

893

159

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.895

0.895

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.795

0.795

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

102

46
82

84
92

19
919
31

191
1754
57

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

27

27

27

27

128

46

128

46

82

82

102

102

102

102

176

84

176

84

92

92

19

19

19

19

475

919

475

919

31

31

31

31

191

191

191

191

906

1754

906

1754

57

57

57

57

230
925
1155

230
925
1155

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

27

46

82

0
0
0
0
0
0
0

102

84

92

0
0
0
0
0
0
0
0
0
0
0
0
0
0

19

919

31

191

1754

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

27

46

82

102

84

92

19

919

31

191

1754

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.283

1.283

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.183

1.183

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

8
45
49

21
5
44

44
1544
9

45
1766
42

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

102

45

102

45

49

49

21

21

21

21

70

70

44

44

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

44

44

44

44

777

1544

777

1544

45

45

45

45

883

1766

883

1766

42

42

42

42

123
927
1050

North-South:
East-West:
SUM:

123
927
1050

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

45

49

21

44

44

1544

45

1766

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

49

0
0
0
0
0
0
0

21

44

0
0
0
0
0
0
0

44

1544

0
0
0
0
0
0
0

45

1766

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.167

1.167

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.067

1.067

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

259

170

54
400

60
5

2
1446
166

332
1838
91

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

259

259

259

259

227

54

227

54

400

400

1
0
0
0
0
1
0

118

170

118

170

118

60

118

60

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

723

1446

723

1446

37

166

37

166

332

332

332

332

965

1838

965

1838

91

91

91

91

377
1055
1432

377
1055
1432

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

259

54

400

0
0
0
0
0
0
0

170

60

0
0
0
0
0
0
0

1446

166

0
0
0
0
0
0
0

332

1838

91

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

259

54

400

170

60

1446

166

332

1838

91

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.591

1.591

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.491

1.491

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

80
0
646

0
0
0

0
1473
60

333
2219
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

80

80

80

80

22

646

22

646

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

767

1473

767

1473

60

60

60

60

333

333

333

333

1110

2219

1110

2219

80
1110
1190

North-South:
East-West:
SUM:

80
1110
1190

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1473

60

0
0
0
0
0
0
0

333

2219

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1473

60

0
0
0
0
0
0
0

333

2219

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.082

1.082

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.982

0.982

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1691

695
315

72
300
0

7
21

2
86

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

348

695

348

695

315

315

72

72

72

72

150

300

150

300

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

889

1691

889

1691

889

86

889

86

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

420
928
1348

420
928
1348

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

695

315

72

300

11

21

1691

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

695

315

0
0
0
0
0
0
0

72

300

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1691

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.899

0.899

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.799

0.799

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

101

586

12
71

195
1117

201
1326
29

16
1123
306

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

31

101

31

101

12

12

12

12

63

71

63

71

1
1
0
0
2
0
0

391

586

391

586

391

195

391

195

503

1117

503

1117

2
0
3
1
0
0
0

111

201

111

201

339

1326

339

1326

29

29

29

29

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

16

16

16

16

562

1123

562

1123

306

306

566
673
1239

North-South:
East-West:
SUM:

566
673
1239

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

101

12

71

0
0
0
0
0
0
0

586

195

1117

0
0
0
0
0
0
0

201

1326

29

0
0
0
0
0
0
0

16

1123

306

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

101

12

71

0
0
0
0
0
0
0

586

195

1117

0
0
0
0
0
0
0

201

1326

29

16

1123

306

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.901

0.901

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.801

0.801

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

309

0
221

0
0

0
1332
958

0
1881
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

309

309

309

309

122

221

122

221

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

666

1332

666

1332

218

958

218

958

627

1881

627

1881

309
666
975

309
666
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

309

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1332

958

0
0
0
0
0
0
0

1881

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

309

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1332

958

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1881

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.650

0.650

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.550

0.550

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

229

0
562

0
0

0
892
149

536
1437
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

229

229

229

229

26

562

26

562

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

521

892

521

892

149

149

149

149

536

536

536

536

719

1437

719

1437

229
1057
1286

North-South:
East-West:
SUM:

229
1057
1286

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

229

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

892

149

0
0
0
0
0
0
0

536

1437

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

229

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

892

149

0
0
0
0
0
0
0

0
0
0
0
0
0
0

536

1437

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.902

0.902

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.802

0.802

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

772

0
0

0
176

256
1011
0

0
880
553

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

425

772

425

772

176

176

1
0
2
0
0
0
0

256

256

256

256

506

1011

506

1011

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

440

880

440

880

128

553

128

553

425
696
1121

425
696
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

772

176

0
0
0
0
0
0
0

256

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

553

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

772

176

0
0
0
0
0
0
0

256

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

553

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.787

0.787

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.687

0.687

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
454
178

42
202
202

249
1081
33

164
802
60

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

316

454

316

454

178

178

178

178

42

42

42

42

101

202

101

202

202

202

202

202

249

249

249

249

1081

1081

1081

1081

33

33

33

33

164

164

164

164

802

802

802

802

60

60

60

60

358
1245
1603

North-South:
East-West:
SUM:

358
1245
1603

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

454

178

42

202

202

249

1081

33

164

802

60

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

454

178

0
0
0
0
0
0
0

42

202

202

0
0
0
0
0
0
0

249

1081

33

0
0
0
0
0
0
0

164

802

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.125

1.125

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.025

1.025

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

377

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

611
18

88
445
232

175
49

68
181

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

661

611

661

611

18

18

88

88

88

88

515

445

515

445

515

232

515

232

1
0
0
1
0
0
0

377

377

377

377

224

175

224

175

49

49

1
0
1
1
0
0
0

19

19

19

19

68

68

68

68

181

181

181

181

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

749
558
1307

749
558
1307

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

611

18

88

445

232

0
0
0
0
0
0
0

377

175

49

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

611

18

0
0
0
0
0
0
0

88

445

232

0
0
0
0
0
0
0

377

175

49

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.917

0.917

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.817

0.817

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

95
308
48

94
328
25

172
984
143

68
767
135

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

95

95

95

95

451

308

451

308

48

48

94

94

94

94

271

328

271

328

271

25

271

25

172

172

172

172

376

984

376

984

143

143

143

143

68

68

68

68

451

767

451

767

135

135

135

135

545
623
1168

North-South:
East-West:
SUM:

545
623
1168

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

95

308

48

94

328

25

172

984

143

68

767

135

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

308

48

0
0
0
0
0
0
0

94

328

25

0
0
0
0
0
0
0

172

984

143

0
0
0
0
0
0
0

68

767

135

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.849

0.849

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.749

0.749

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

150

305

692
150

751
125

113
1537
68

106
1174
83

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

150

150

150

150

346

692

346

692

97

150

97

150

1
0
1
1
0
0
0

305

305

305

305

438

751

438

751

125

125

125

125

1
0
2
0
1
0
0

113

113

113

113

769

1537

769

1537

68

68

1
0
2
0
1
0
0

106

106

106

106

587

1174

587

1174

83

83

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

651
875
1526

651
875
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

692

150

0
0
0
0
0
0
0

305

751

125

0
0
0
0
0
0
0

113

1537

68

0
0
0
0
0
0
0

106

1174

83

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

692

150

0
0
0
0
0
0
0

305

751

125

0
0
0
0
0
0
0

113

1537

68

0
0
0
0
0
0
0

0
0
0
0
0
0
0

106

1174

83

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.696

1.696

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.596

1.596

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
318
229

946
319
16

22
1303
35

127
1440
926

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

159

318

159

318

229

229

229

229

331

946

331

946

335

319

335

319

16

16

16

16

22

22

22

22

446

1303

446

1303

35

35

35

35

127

127

127

127

480

1440

480

1440

926

926

564
573
1137

North-South:
East-West:
SUM:

564
573
1137

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

318

229

946

319

16

22

1303

35

127

1440

926

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

318

229

0
0
0
0
0
0
0

946

319

16

22

1303

35

0
0
0
0
0
0
0
0
0
0
0
0
0
0

127

1440

926

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.263

1.263

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.163

1.163

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

587

0
182

0
0

0
1148
636

177
883
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

385

587

385

587

385

182

385

182

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

574

1148

574

1148

251

636

251

636

177

177

177

177

442

883

442

883

385
751
1136

385
751
1136

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

587

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

636

0
0
0
0
0
0
0

177

883

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

587

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

636

0
0
0
0
0
0
0

0
0
0
0
0
0
0

177

883

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.797

0.797

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.697

0.697

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

17

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

21

44

29
16

25
8

3
708
9

36
834
22

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

44

44

44

44

77

25

77

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

359

708

359

708

36

36

36

36

428

834

428

834

22

22

22

22

110
431
541

North-South:
East-West:
SUM:

110
431
541

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

21

29

16

44

25

708

36

834

22

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

44

25

0
0
0
0
0
0
0

708

0
0
0
0
0
0
0

36

834

22

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.380

0.380

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.380

0.380

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180
306
96

34
284
39

25
259
188

357
773
110

CRITICAL VOLUMES

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

96

96

34

34

34

34

284

284

284

284

27

39

27

39

25

25

25

25

130

259

130

259

98

188

98

188

1
0
1
1
0
0
0

357

357

357

357

442

773

442

773

110

110

110

110

North-South:
East-West:
SUM:

464
487
951

North-South:
East-West:
SUM:

464
487
951

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

306

96

34

284

39

25

259

188

357

773

110

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

96

0
0
0
0
0
0
0

34

284

39

0
0
0
0
0
0
0

25

259

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

357

773

110

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.692

0.692

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.592

0.592

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
86
119

41
54
32

16
470
29

173
1796
55

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

30

30

30

205

86

205

86

119

119

41

41

41

41

86

54

86

54

32

32

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

16

16

16

16

250

470

250

470

29

29

29

29

173

173

173

173

926

1796

926

1796

55

55

55

55

246
942
1188

North-South:
East-West:
SUM:

246
942
1188

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

86

119

41

54

32

16

470

29

173

1796

55

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

119

41

54

32

16

470

29

173

1796

55

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.485

1.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.385

1.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

3
91
55

13
1
27

31
790
4

32
1782
18

No. of
Lanes

0
0
0
0
0
1
0

1
0
1
1
0
0
0
1
0
2
0
1
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

91

149

91

55

55

13

13

13

13

41

41

27

27

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

31

31

31

31

397

790

397

790

32

32

32

32

891

1782

891

1782

18

18

18

18

162
922
1084

162
922
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

790

32

1782

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

790

32

1782

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.355

1.355

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.255

1.255

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

159

175

20
300

53
13

3
1314
153

345
1606
62

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

159

159

159

159

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

657

1314

657

1314

74

153

74

153

345

345

345

345

834

1606

834

1606

62

62

62

62

281
1002
1283

North-South:
East-West:
SUM:

281
1002
1283

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1314

153

0
0
0
0
0
0
0

345

1606

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

20

300

175

53

13

1314

153

345

1606

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.604

1.604

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.504

1.504

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

45
0
660

0
0
0

30

45

45

45

33

660

33

660

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

330
2112

Added
Volume

Total
Volume

45

0
0
1
1
0
0
0

0
1339

Lane
Volume

1
0
0
0
2
0
0

685

1339

685

1339

30

30

30

30

330

330

330

330

1056

2112

1056

2112

45
1056
1101

45
1056
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1339

30

0
0
0
0
0
0
0

330

2112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

1339

30

0
0
0
0
0
0
0
0
0
0
0
0
0
0

330

2112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.101

1.101

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.001

1.001

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1809

CRITICAL VOLUMES

850
242

76
301
0

7
21

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

937

1809

937

1809

937

64

937

64

North-South:
East-West:
SUM:

501
976
1477

North-South:
East-West:
SUM:

501
976
1477

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

850

242

76

301

11

21

1809

64

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

21

1809

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.985

0.985

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.885

0.885

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

700

No. of
Lanes

24
96

211
1193

446
1921
39

290

Total
Volume

Lane
Volume

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

411

1193

411

1193

2
0
3
1
0
0
0

245

446

245

446

490

1921

490

1921

39

39

39

39

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

45

1
0
2
0
2
0
0

49
1103

Lane
Volume

2
0
1
1
0
0
0

49

49

49

49

552

1103

552

1103

290

290

528
797
1325

528
797
1325

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1193

0
0
0
0
0
0
0

446

1921

39

0
0
0
0
0
0
0

49

1103

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1193

0
0
0
0
0
0
0

446

1921

39

49

1103

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.964

0.964

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.864

0.864

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

257

0
204

0
0

0
1472
963

0
1616
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

257

257

257

257

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

736

1472

736

1472

273

963

273

963

539

1616

539

1616

257
736
993

North-South:
East-West:
SUM:

257
736
993

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

257

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1472

963

0
0
0
0
0
0
0

1616

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

257

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1472

963

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1616

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.662

0.662

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.562

0.562

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

462

0
873

0
0

0
856
157

642
1229
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

462

462

462

462

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

507

856

507

856

157

157

157

157

642

642

642

642

615

1229

615

1229

462
1149
1611

462
1149
1611

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

462

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

856

157

0
0
0
0
0
0
0

642

1229

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

462

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

856

157

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1229

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.131

1.131

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.031

1.031

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

10

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

640

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

321

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
231

813
0

0
982
571

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

352

640

352

640

231

231

1
0
2
0
0
0
0

321

321

321

321

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

491

982

491

982

219

571

219

571

352
812
1164

North-South:
East-West:
SUM:

352
812
1164

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

640

231

0
0
0
0
0
0
0

321

813

982

571

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

640

231

321

813

982

571

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.817

0.817

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.717

0.717

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

556
197

44
198
188

963
28

841
94

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

963

963

963

963

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

841

841

841

841

94

94

94

94

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

52

1
0
1
1
0
0
0

421
1142
1563

421
1142
1563

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

52

556

197

44

198

188

0
0
0
0
0
0
0

301

963

28

0
0
0
0
0
0
0

175

841

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

963

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

175

841

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.097

1.097

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.997

0.997

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

12

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

15
435
0

57
397
222

164
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

450

435

450

435

57

57

57

57

367

397

367

397

367

222

367

222

164

164

164

164

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

507
478
985

North-South:
East-West:
SUM:

507
478
985

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

435

57

397

222

0
0
0
0
0
0
0

164

352

66

0
0
0
0
0
0
0

21

104

314

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

435

0
0
0
0
0
0
0

57

397

222

0
0
0
0
0
0
0

164

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.231

1.231

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.131

1.131

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

31
117
42

100
329
22

79
792
115

83
759
76

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

190

117

190

117

42

42

100

100

100

100

226

329

226

329

226

22

226

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

418

759

418

759

76

76

76

76

290
497
787

290
497
787

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

31

117

42

0
0
0
0
0
0
0

100

329

22

0
0
0
0
0
0
0
0
0
0
0
0
0
0

79

792

115

83

759

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

31

117

42

0
0
0
0
0
0
0

100

329

22

79

792

115

83

759

76

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.572

0.572

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.472

0.472

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

14

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

246

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

116

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

711
247

835
147

988
52

103
1347
48

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

188

188

188

188

356

711

356

711

196

247

196

247

1
0
1
1
0
0
0

246

246

246

246

491

835

491

835

147

147

147

147

1
0
2
0
1
0
0

116

116

116

116

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

48

48

North-South:
East-West:
SUM:

679
790
1469

North-South:
East-West:
SUM:

679
790
1469

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

711

247

0
0
0
0
0
0
0

246

835

147

0
0
0
0
0
0
0

116

988

52

0
0
0
0
0
0
0

103

1347

48

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

188

711

247

246

835

147

116

988

52

103

1347

48

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.836

1.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.736

1.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
406
225

974
293
8

9
1272
17

134
1658
921

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

203

406

203

406

225

225

225

225

341

974

341

974

301

293

301

293

430

1272

430

1272

17

17

17

17

134

134

134

134

553

1658

553

1658

921

921

566
564
1130

566
564
1130

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

406

225

974

293

0
0
0
0
0
0
0

1272

17

0
0
0
0
0
0
0

134

1658

921

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

406

225

0
0
0
0
0
0
0

974

293

0
0
0
0
0
0
0

1272

17

0
0
0
0
0
0
0

134

1658

921

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.413

1.413

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.313

1.313

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

16

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

597

0
151

0
0

0
967
484

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

374

597

374

597

374

151

374

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

110

484

110

484

158

158

158

158

490

980

490

980

374
642
1016

North-South:
East-West:
SUM:

374
642
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

597

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

484

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

597

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

484

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

39

23
14

13
3

3
667
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

39

39

39

39

55

13

55

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

336

667

336

667

26

26

26

26

438

861

438

861

15

15

15

15

94
441
535

94
441
535

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

39

13

0
0
0
0
0
0
0

667

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

39

13

0
0
0
0
0
0
0

667

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195
282
147

99
182
59

48
505
152

272
780
133

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

195

195

195

195

282

282

282

282

147

147

99

99

99

99

182

182

182

182

35

59

35

59

48

48

48

48

253

505

253

505

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

381
525
906

North-South:
East-West:
SUM:

381
525
906

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

147

99

182

59

48

505

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

195

282

147

0
0
0
0
0
0
0

99

182

59

0
0
0
0
0
0
0

48

505

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

272

780

133

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.659

0.659

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.559

0.559

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

19

96
52

31
17

33
667
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

148

96

148

96

52

52

19

19

19

19

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

369

667

369

667

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

167
590
757

167
590
757

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

52

19

31

17

33

667

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

52

0
0
0
0
0
0
0

19

31

17

0
0
0
0
0
0
0

33

667

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.009

1.009

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.909

0.909

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
584
22

24
1114
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

177

137

177

137

23

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

303

584

303

584

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

178
682
860

North-South:
East-West:
SUM:

178
682
860

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

584

22

0
0
0
0
0
0
0

24

1114

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

584

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.147

1.147

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.047

1.047

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

126

346

16
219

67
14

2
739
62

231
1177
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

126

126

126

126

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

624

1177

624

1177

71

71

71

71

North-South:
East-West:
SUM:

340
626
966

340
626
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

126

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1177

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

126

16

219

346

67

14

739

62

231

1177

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.288

1.288

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.188

1.188

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

267
1439
0

No. of
Lanes

1
0
0
0
2
0
0

Lane
Volume

1
0
2
0
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

39

39

39

137

735

137

735

0
0
0
0
0
0
0
0
0
1
1
0
0
0

Added
Volume

Total
Volume

39

653

1290

653

1290

15

15

15

15

267

267

267

267

720

1439

720

1439

137
920
1057

North-South:
East-West:
SUM:

137
920
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1192

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

626

1192

626

1192

626

59

626

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
665
1115

450
665
1115

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1192

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1192

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.743

0.743

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.643

0.643

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
756

348
1628
21

0
860
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

225

756

225

756

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

430

860

430

860

500

500

419
621
1040

North-South:
East-West:
SUM:

419
621
1040

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.756

0.756

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.656

0.656

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

183

0
86

0
0

0
880
1053

0
1180
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

183

183

183

183

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

396

1053

396

1053

393

1180

393

1180

183
440
623

183
440
623

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1180

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1180

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.415

0.415

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.315

0.315

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

234

0
582

0
0

0
1004
165

325
1264
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

234

234

234

234

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

632

1264

632

1264

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1264

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1264

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

253

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
518

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

253

253

253

253

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

232

518

232

518

286
762
1048

286
762
1048

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

1018

518

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

518

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.735

0.735

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.635

0.635

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

926
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

926

926

926

926

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1151
1526

North-South:
East-West:
SUM:

375
1151
1526

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

926

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

926

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

325

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

530
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

564

530

564

530

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

325

325

325

325

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

628
605
1233

628
605
1233

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

530

10

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

530

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.865

0.865

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.765

0.765

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
235
42

95
289
26

133
824
139

93
863
125

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

330

235

330

235

42

42

95

95

95

95

205

289

205

289

205

26

205

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

494

863

494

863

125

125

125

125

425
627
1052

North-South:
East-West:
SUM:

425
627
1052

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

235

42

95

289

26

133

824

139

93

863

125

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

235

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

125

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.765

0.765

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.665

0.665

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

104

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460
103

479
108

805
63

122
1447
157

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

230

460

230

460

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

104

104

104

104

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

96

157

96

157

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
828
1262

434
828
1262

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

122

1447

157

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

157

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.683

1.683

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.583

1.583

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
362
214

691
282
37

14
1140
27

103
1648
976

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

181

362

181

362

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

549

1648

549

1648

976

976

533
563
1096

North-South:
East-West:
SUM:

533
563
1096

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

362

214

691

282

37

14

1140

27

103

1648

976

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

362

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1648

976

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.461

1.461

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.361

1.361

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

603

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

386

603

386

603

386

168

386

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

58

444

58

444

151

151

151

151

493

985

493

985

386
663
1049

386
663
1049

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:


Fully mitigated?

NO

17

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

38

21
24

15
9

6
826
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

38

38

38

38

62

15

62

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

417

826

417

826

29

29

29

29

449

880

449

880

17

17

17

17

106
455
561

North-South:
East-West:
SUM:

106
455
561

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

21

24

38

15

0
0
0
0
0
0
0

826

0
0
0
0
0
0
0

29

880

17

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

38

15

0
0
0
0
0
0
0

826

29

880

17

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.394

0.394

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.394

0.394

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

159

243
152

237
42

67
906
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

152

152

1
0
1
0
1
0
0

159

159

159

159

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

453

906

453

906

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
690
1109

419
690
1109

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.807

0.807

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.707

0.707

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

46

56
58

24
15

33
963
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

114

56

114

56

58

58

46

46

46

46

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

552

963

552

963

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

160
614
774

North-South:
East-West:
SUM:

160
614
774

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

58

46

24

15

33

963

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

58

0
0
0
0
0
0
0

46

24

15

0
0
0
0
0
0
0

33

963

141

0
0
0
0
0
0
0

62

1097

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.516

0.516

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.416

0.416

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1063
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

22

22

14

14

10

10

46

46

46

46

543

1063

543

1063

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

27
607
634

27
607
634

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

22

10

46

1063

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1063

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.423

0.423

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.323

0.323

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

193

160

52
215

89
14

10
824
256

195
1098
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

193

193

193

193

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

160

256

160

256

1
0
1
1
0
0
0

195

195

195

195

579

1098

579

1098

60

60

60

60

North-South:
East-West:
SUM:

325
607
932

North-South:
East-West:
SUM:

325
607
932

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

193

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

193

52

215

160

89

14

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

645

1290

645

1290

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1290
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

919

CRITICAL VOLUMES

436
322

234
0

1
4

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

489

919

489

919

489

58

489

58

North-South:
East-West:
SUM:

431
496
927

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
496
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

436

322

213

234

919

58

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

919

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.618

0.618

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.518

0.518

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
725

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

285

725

285

725

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
765

Lane
Volume

2
0
1
1
0
0
0

383

765

383

765

80

530

80

530

336
497
833

336
497
833

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

725

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

765

530

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

725

207

1324

36

765

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.606

0.606

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

201

0
237

0
0

0
840
630

15
1088
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

201

201

201

201

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

146

630

146

630

15

15

363

1088

363

1088

201
420
621

North-South:
East-West:
SUM:

201
420
621

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

15

1088

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

15

1088

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.414

0.414

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.314

0.314

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

127

0
240

0
0

0
979
108

227
1074
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

127

127

127

127

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

537

1074

537

1074

North-South:
East-West:
SUM:

127
771
898

127
771
898

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1074

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1074

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.630

0.630

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.530

0.530

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

217

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
482

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

217

217

217

217

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

229

482

229

482

253
693
946

North-South:
East-West:
SUM:

253
693
946

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.664

0.664

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.564

0.564

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

966
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

966

966

966

966

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1205
1499

294
1205
1499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

78

248

185

77

230

143

288

966

37

239

827

49

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

966

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.052

1.052

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.952

0.952

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

556
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

663

556

663

556

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

329

329

329

329

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

760
482
1242

North-South:
East-West:
SUM:

760
482
1242

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

556

49

97

498

315

0
0
0
0
0
0
0

329

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

556

49

97

498

315

329

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.872

0.872

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.772

0.772

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
285
71

134
355
19

126
1059
160

98
754
191

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

450

285

450

285

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

473

754

473

754

191

191

191

191

584
599
1183

584
599
1183

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

0
0
0
0
0
0
0

98

754

191

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

191

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.860

0.860

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.760

0.760

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

418
78

435
143

158
1264
145

83
1368
138

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

209

418

209

418

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

158

158

158

158

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

35

138

35

138

415
842
1257

North-South:
East-West:
SUM:

415
842
1257

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.838

0.838

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.738

0.738

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
204
124

1228
312
75

37
1403
108

96
1553
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

102

204

102

204

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

518

1553

518

1553

876

876

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

445

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

319

445

319

445

319

193

319

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

319
737
1056

North-South:
East-West:
SUM:

319
737
1056

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.741

0.741

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.641

0.641

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

21

46

29
16

25
8

3
728
9

36
817
20

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

46

46

46

46

79

25

79

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

369

728

369

728

36

36

36

36

419

817

419

817

20

20

20

20

112
422
534

112
422
534

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

21

29

16

46

25

0
0
0
0
0
0
0

728

0
0
0
0
0
0
0

36

817

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

46

25

0
0
0
0
0
0
0

728

36

817

20

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

180
306
120

38
284
39

25
283
188

338
754
106

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

120

120

38

38

38

38

284

284

284

284

27

39

27

39

25

25

25

25

142

283

142

283

98

188

98

188

1
0
1
1
0
0
0

338

338

338

338

430

754

430

754

106

106

106

106

North-South:
East-West:
SUM:

464
480
944

North-South:
East-West:
SUM:

464
480
944

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

180

306

120

38

284

39

25

283

188

338

754

106

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

120

0
0
0
0
0
0
0

38

284

39

0
0
0
0
0
0
0

25

283

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

338

754

106

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.687

0.687

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.587

0.587

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

30
86
121

45
54
32

16
522
29

171
1754
51

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

207

86

207

86

121

121

45

45

45

45

86

54

86

54

32

32

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

16

16

16

16

276

522

276

522

29

29

29

29

171

171

171

171

903

1754

903

1754

51

51

51

51

252
919
1171

252
919
1171

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

121

45

54

32

16

522

29

171

1754

51

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

86

121

0
0
0
0
0
0
0

45

54

32

0
0
0
0
0
0
0

16

522

29

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

1754

51

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.464

1.464

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.364

1.364

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
91
55

13
1
27

31
850
4

32
1734
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

149

91

149

91

55

55

13

13

13

13

41

41

27

27

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

31

31

31

31

427

850

427

850

32

32

32

32

867

1734

867

1734

18

18

18

18

162
898
1060

North-South:
East-West:
SUM:

162
898
1060

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

91

55

13

27

31

850

32

1734

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

55

0
0
0
0
0
0
0

13

27

0
0
0
0
0
0
0

31

850

0
0
0
0
0
0
0

32

1734

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.325

1.325

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.225

1.225

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

175

20
300

53
13

3
1278
117

345
1650
62

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

203

203

203

203

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

639

1278

639

1278

16

117

16

117

345

345

345

345

856

1650

856

1650

62

62

62

62

324
984
1308

324
984
1308

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

203

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1278

117

0
0
0
0
0
0
0

345

1650

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

203

20

300

175

53

13

1278

117

345

1650

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.635

1.635

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.535

1.535

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

45
0
660

0
0
0

0
1303
30

330
2156
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

45

45

45

45

33

660

33

660

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

667

1303

667

1303

30

30

30

30

330

330

330

330

1078

2156

1078

2156

45
1078
1123

North-South:
East-West:
SUM:

45
1078
1123

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1303

30

0
0
0
0
0
0
0

330

2156

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1303

30

0
0
0
0
0
0
0

330

2156

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.123

1.123

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.023

1.023

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1827

850
242

76
301
0

6
19

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

36

36

19

19

1
0
0
0
0
0
1

946

1827

946

1827

946

64

946

64

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

501
982
1483

501
982
1483

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

19

1827

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

850

242

0
0
0
0
0
0
0

76

301

0
0
0
0
0
0
0

11

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1827

64

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.989

0.989

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.889

0.889

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

149

700

24
96

211
1211

446
1885
39

49
1129
290

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

45

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

421

1211

421

1211

2
0
3
1
0
0
0

245

446

245

446

481

1885

481

1885

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

49

49

49

49

565

1129

565

1129

290

290

528
810
1338

North-South:
East-West:
SUM:

528
810
1338

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1211

0
0
0
0
0
0
0

446

1885

39

0
0
0
0
0
0
0

49

1129

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1211

0
0
0
0
0
0
0

446

1885

39

49

1129

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.973

0.973

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.873

0.873

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

263

0
204

0
0

0
1455
949

0
1636
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

263

263

263

263

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

728

1455

728

1455

259

949

259

949

545

1636

545

1636

263
728
991

263
728
991

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1455

949

0
0
0
0
0
0
0

1636

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1455

949

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1636

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.661

0.661

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.561

0.561

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

464

0
873

0
0

0
843
155

642
1245
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

464

464

464

464

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

499

843

499

843

155

155

155

155

642

642

642

642

623

1245

623

1245

464
1141
1605

North-South:
East-West:
SUM:

464
1141
1605

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

843

155

0
0
0
0
0
0
0

642

1245

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

843

155

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1245

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.126

1.126

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.026

1.026

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

628

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
224

813
0

0
982
585

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

345

628

345

628

224

224

1
0
2
0
0
0
0

329

329

329

329

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

491

982

491

982

240

585

240

585

345
820
1165

345
820
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

628

224

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

585

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

628

224

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

585

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.818

0.818

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.718

0.718

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

CRITICAL VOLUMES

556
197

44
198
188

967
28

837
94

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

967

967

967

967

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

837

837

837

837

94

94

94

94

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

421
1142
1563

North-South:
East-West:
SUM:

421
1142
1563

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

52

556

197

44

198

188

301

967

28

175

837

94

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

967

28

0
0
0
0
0
0
0

175

837

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.097

1.097

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.997

0.997

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

15
475
0

57
364
218

168
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

490

475

490

475

57

57

57

57

348

364

348

364

348

218

348

218

168

168

168

168

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

547
482
1029

547
482
1029

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

15

475

57

364

218

168

352

66

21

104

314

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

475

0
0
0
0
0
0
0

57

364

218

0
0
0
0
0
0
0

168

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.286

1.286

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.186

1.186

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

31
137
42

84
312
22

79
792
115

83
759
96

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

210

137

210

137

42

42

84

84

84

84

209

312

209

312

209

22

209

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

428

759

428

759

96

96

96

96

294
507
801

North-South:
East-West:
SUM:

294
507
801

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

31

137

42

84

312

22

79

792

115

83

759

96

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

137

42

0
0
0
0
0
0
0

84

312

22

0
0
0
0
0
0
0

79

792

115

0
0
0
0
0
0
0

83

759

96

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.583

0.583

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.483

0.483

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

244

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

118

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

725
247

823
145

988
52

103
1347
50

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

188

188

188

188

363

725

363

725

196

247

196

247

1
0
1
1
0
0
0

244

244

244

244

484

823

484

823

145

145

145

145

1
0
2
0
1
0
0

118

118

118

118

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

50

50

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

672
792
1464

672
792
1464

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

725

247

0
0
0
0
0
0
0

244

823

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

103

1347

50

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

725

247

0
0
0
0
0
0
0

244

823

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1347

50

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.830

1.830

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.730

1.730

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

94
418
225

968
283
8

9
1270
17

134
1660
929

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

209

418

209

418

225

225

225

225

339

968

339

968

291

283

291

283

429

1270

429

1270

17

17

17

17

134

134

134

134

553

1660

553

1660

929

929

564
563
1127

North-South:
East-West:
SUM:

564
563
1127

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

418

225

968

283

0
0
0
0
0
0
0

1270

17

0
0
0
0
0
0
0

134

1660

929

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

418

225

0
0
0
0
0
0
0

968

283

0
0
0
0
0
0
0

1270

17

0
0
0
0
0
0
0

134

1660

929

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.409

1.409

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.309

1.309

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

611

0
151

0
0

0
967
472

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

381

611

381

611

381

151

381

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

91

472

91

472

158

158

158

158

490

980

490

980

381
642
1023

North-South:
East-West:
SUM:

381
642
1023

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

611

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

472

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

611

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

472

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.718

0.718

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.618

0.618

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:08 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_50_CalcaDB_PM_Event_Inbound(5-6).xls

CUMULATIVE BASE PLUS PROJECT WITH MITIGATION CONDITIONS


(300 ATTENDEE EVENT DAY 70% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

72

33
27

35
9

6
993
10

50
868
23

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

79

33

79

33

27

27

72

72

72

72

116

35

116

35

502

993

502

993

10

10

10

10

50

50

50

50

446

868

446

868

23

23

23

23

151
552
703

151
552
703

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

33

27

72

35

0
0
0
0
0
0
0

993

10

0
0
0
0
0
0
0

50

868

23

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

33

27

0
0
0
0
0
0
0

72

35

0
0
0
0
0
0
0

993

10

50

868

23

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.493

0.493

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.493

0.493

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

167

271
100

437
113

59
657
338

295
890
159

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

166

166

166

166

271

271

271

271

100

100

1
0
1
0
1
0
0

167

167

167

167

437

437

437

437

84

113

84

113

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

59

59

59

59

329

657

329

657

255

338

255

338

295

295

295

295

525

890

525

890

159

159

159

159

603
624
1227

North-South:
East-West:
SUM:

603
624
1227

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

166

271

100

167

437

113

59

657

338

295

890

159

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

166

271

100

0
0
0
0
0
0
0

167

437

113

0
0
0
0
0
0
0

59

657

338

0
0
0
0
0
0
0

0
0
0
0
0
0
0

295

890

159

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.892

0.892

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.792

0.792

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

102

46
82

84
92

19
915
31

191
1748
57

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

27

27

27

27

128

46

128

46

82

82

102

102

102

102

176

84

176

84

92

92

19

19

19

19

473

915

473

915

31

31

31

31

191

191

191

191

903

1748

903

1748

57

57

57

57

230
922
1152

230
922
1152

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

27

46

82

0
0
0
0
0
0
0

102

84

92

0
0
0
0
0
0
0
0
0
0
0
0
0
0

19

915

31

191

1748

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

27

46

82

102

84

92

19

915

31

191

1748

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.280

1.280

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.180

1.180

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

8
45
49

21
5
44

44
1539
9

45
1759
42

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

102

45

102

45

49

49

21

21

21

21

70

70

44

44

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

44

44

44

44

774

1539

774

1539

45

45

45

45

880

1759

880

1759

42

42

42

42

123
924
1047

North-South:
East-West:
SUM:

123
924
1047

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

45

49

21

44

44

1539

45

1759

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

49

0
0
0
0
0
0
0

21

44

0
0
0
0
0
0
0

44

1539

0
0
0
0
0
0
0

45

1759

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.163

1.163

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.063

1.063

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

255

170

54
400

60
5

2
1441
161

332
1834
91

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

255

255

255

255

227

54

227

54

400

400

1
0
0
0
0
1
0

118

170

118

170

118

60

118

60

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

721

1441

721

1441

34

161

34

161

332

332

332

332

963

1834

963

1834

91

91

91

91

373
1053
1426

373
1053
1426

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

255

54

400

0
0
0
0
0
0
0

170

60

0
0
0
0
0
0
0

1441

161

0
0
0
0
0
0
0

332

1834

91

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

255

54

400

170

60

1441

161

332

1834

91

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.584

1.584

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.484

1.484

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

80
0
646

0
0
0

0
1468
60

333
2215
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

80

80

80

80

22

646

22

646

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

764

1468

764

1468

60

60

60

60

333

333

333

333

1108

2215

1108

2215

80
1108
1188

North-South:
East-West:
SUM:

80
1108
1188

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2215

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2215

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.080

1.080

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.980

0.980

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1690

695
315

72
300
0

7
21

2
86

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

348

695

348

695

315

315

72

72

72

72

150

300

150

300

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

888

1690

888

1690

888

86

888

86

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

420
927
1347

420
927
1347

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

695

315

72

300

11

21

1690

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

695

315

0
0
0
0
0
0
0

72

300

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1690

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.898

0.898

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.798

0.798

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

101

586

12
71

195
1116

201
1321
29

16
1120
306

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

31

101

31

101

12

12

12

12

63

71

63

71

1
1
0
0
2
0
0

391

586

391

586

391

195

391

195

503

1116

503

1116

2
0
3
1
0
0
0

111

201

111

201

338

1321

338

1321

29

29

29

29

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

16

16

16

16

560

1120

560

1120

306

306

566
671
1237

North-South:
East-West:
SUM:

566
671
1237

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

101

12

71

0
0
0
0
0
0
0

586

195

1116

0
0
0
0
0
0
0

201

1321

29

0
0
0
0
0
0
0

16

1120

306

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

101

12

71

0
0
0
0
0
0
0

586

195

1116

0
0
0
0
0
0
0

201

1321

29

16

1120

306

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.900

0.900

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.800

0.800

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

308

0
221

0
0

0
1330
956

0
1879
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

308

308

308

308

122

221

122

221

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

665

1330

665

1330

218

956

218

956

626

1879

626

1879

308
665
973

308
665
973

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

308

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

1879

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

308

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1879

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

229

0
562

0
0

0
890
149

536
1435
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

229

229

229

229

26

562

26

562

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

520

890

520

890

149

149

149

149

536

536

536

536

718

1435

718

1435

229
1056
1285

North-South:
East-West:
SUM:

229
1056
1285

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

229

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

536

1435

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

229

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

0
0
0
0
0
0
0

536

1435

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.902

0.902

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.802

0.802

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

771

0
0

0
175

255
1011
0

0
880
552

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

424

771

424

771

175

175

1
0
2
0
0
0
0

255

255

255

255

506

1011

506

1011

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

440

880

440

880

128

552

128

552

424
695
1119

424
695
1119

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

771

175

0
0
0
0
0
0
0

255

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

552

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

771

175

0
0
0
0
0
0
0

255

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

552

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.785

0.785

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.685

0.685

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
454
178

42
202
202

249
1081
33

164
802
60

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

316

454

316

454

178

178

178

178

42

42

42

42

101

202

101

202

202

202

202

202

249

249

249

249

1081

1081

1081

1081

33

33

33

33

164

164

164

164

802

802

802

802

60

60

60

60

358
1245
1603

North-South:
East-West:
SUM:

358
1245
1603

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

454

178

42

202

202

249

1081

33

164

802

60

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

454

178

0
0
0
0
0
0
0

42

202

202

0
0
0
0
0
0
0

249

1081

33

0
0
0
0
0
0
0

164

802

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.125

1.125

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.025

1.025

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

377

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

608
18

88
441
232

175
49

68
181

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

658

608

658

608

18

18

88

88

88

88

513

441

513

441

513

232

513

232

1
0
0
1
0
0
0

377

377

377

377

224

175

224

175

49

49

1
0
1
1
0
0
0

19

19

19

19

68

68

68

68

181

181

181

181

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

746
558
1304

746
558
1304

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

608

18

88

441

232

0
0
0
0
0
0
0

377

175

49

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

608

18

0
0
0
0
0
0
0

88

441

232

0
0
0
0
0
0
0

377

175

49

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.915

0.915

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.815

0.815

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

95
306
48

92
326
25

172
984
143

68
767
134

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

95

95

95

95

449

306

449

306

48

48

92

92

92

92

268

326

268

326

268

25

268

25

172

172

172

172

376

984

376

984

143

143

143

143

68

68

68

68

451

767

451

767

134

134

134

134

541
623
1164

North-South:
East-West:
SUM:

541
623
1164

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

95

306

48

92

326

25

172

984

143

68

767

134

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

306

48

0
0
0
0
0
0
0

92

326

25

0
0
0
0
0
0
0

172

984

143

0
0
0
0
0
0
0

68

767

134

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

150

305

691
150

750
125

113
1537
68

106
1174
83

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

150

150

150

150

346

691

346

691

97

150

97

150

1
0
1
1
0
0
0

305

305

305

305

438

750

438

750

125

125

125

125

1
0
2
0
1
0
0

113

113

113

113

769

1537

769

1537

68

68

1
0
2
0
1
0
0

106

106

106

106

587

1174

587

1174

83

83

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

651
875
1526

651
875
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

691

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

113

1537

68

0
0
0
0
0
0
0

106

1174

83

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

691

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

113

1537

68

0
0
0
0
0
0
0

0
0
0
0
0
0
0

106

1174

83

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.696

1.696

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.596

1.596

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
317
229

945
318
16

22
1303
35

127
1440
926

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

159

317

159

317

229

229

229

229

331

945

331

945

334

318

334

318

16

16

16

16

22

22

22

22

446

1303

446

1303

35

35

35

35

127

127

127

127

480

1440

480

1440

926

926

563
573
1136

North-South:
East-West:
SUM:

563
573
1136

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

317

229

945

318

16

22

1303

35

127

1440

926

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

317

229

0
0
0
0
0
0
0

945

318

16

22

1303

35

0
0
0
0
0
0
0
0
0
0
0
0
0
0

127

1440

926

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.262

1.262

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.162

1.162

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

586

0
182

0
0

0
1148
635

177
883
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

384

586

384

586

384

182

384

182

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

574

1148

574

1148

251

635

251

635

177

177

177

177

442

883

442

883

384
751
1135

384
751
1135

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

586

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

177

883

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

586

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

0
0
0
0
0
0
0

177

883

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.796

0.796

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.696

0.696

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

21

43

29
16

25
8

3
706
9

36
831
22

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

43

43

43

43

76

25

76

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

358

706

358

706

36

36

36

36

427

831

427

831

22

22

22

22

109
430
539

North-South:
East-West:
SUM:

109
430
539

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

21

29

16

43

25

0
0
0
0
0
0
0

706

0
0
0
0
0
0
0

36

831

22

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

43

25

0
0
0
0
0
0
0

706

36

831

22

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.378

0.378

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.378

0.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180
306
94

33
284
39

25
257
188

354
770
109

CRITICAL VOLUMES

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

94

94

33

33

33

33

284

284

284

284

27

39

27

39

25

25

25

25

129

257

129

257

98

188

98

188

1
0
1
1
0
0
0

354

354

354

354

440

770

440

770

109

109

109

109

North-South:
East-West:
SUM:

464
483
947

North-South:
East-West:
SUM:

464
483
947

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

306

94

33

284

39

25

257

188

354

770

109

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

94

0
0
0
0
0
0
0

33

284

39

0
0
0
0
0
0
0

25

257

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

354

770

109

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.689

0.689

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.589

0.589

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
86
118

40
54
32

16
466
29

173
1790
54

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

30

30

30

204

86

204

86

118

118

40

40

40

40

86

54

86

54

32

32

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

16

16

16

16

248

466

248

466

29

29

29

29

173

173

173

173

922

1790

922

1790

54

54

54

54

244
938
1182

North-South:
East-West:
SUM:

244
938
1182

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

86

118

40

54

32

16

466

29

173

1790

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

86

118

0
0
0
0
0
0
0

40

54

32

0
0
0
0
0
0
0

16

466

29

0
0
0
0
0
0
0

0
0
0
0
0
0
0

173

1790

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.478

1.478

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.378

1.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

3
91
55

13
1
27

31
786
4

32
1775
18

No. of
Lanes

0
0
0
0
0
1
0

1
0
1
1
0
0
0
1
0
2
0
1
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

91

149

91

55

55

13

13

13

13

41

41

27

27

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

31

31

31

31

395

786

395

786

32

32

32

32

888

1775

888

1775

18

18

18

18

162
919
1081

162
919
1081

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

786

32

1775

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

55

0
0
0
0
0
0
0

13

27

0
0
0
0
0
0
0

31

786

0
0
0
0
0
0
0

32

1775

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.351

1.351

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.251

1.251

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

156

175

20
300

53
13

3
1309
148

345
1603
62

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

156

156

156

156

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

655

1309

655

1309

70

148

70

148

345

345

345

345

833

1603

833

1603

62

62

62

62

281
1000
1281

North-South:
East-West:
SUM:

281
1000
1281

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

156

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1309

148

0
0
0
0
0
0
0

345

1603

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

156

20

300

175

53

13

1309

148

345

1603

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.601

1.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.501

1.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

45
0
660

0
0
0

30

45

45

45

33

660

33

660

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

330
2109

Added
Volume

Total
Volume

45

0
0
1
1
0
0
0

0
1334

Lane
Volume

1
0
0
0
2
0
0

682

1334

682

1334

30

30

30

30

330

330

330

330

1055

2109

1055

2109

45
1055
1100

45
1055
1100

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1334

30

0
0
0
0
0
0
0

330

2109

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1334

30

0
0
0
0
0
0
0

330

2109

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.100

1.100

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.000

1.000

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1808

CRITICAL VOLUMES

850
242

76
301
0

7
21

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

936

1808

936

1808

936

64

936

64

North-South:
East-West:
SUM:

501
975
1476

North-South:
East-West:
SUM:

501
975
1476

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

850

242

76

301

11

21

1808

64

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

850

242

0
0
0
0
0
0
0

76

301

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1808

64

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.984

0.984

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.884

0.884

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

700

No. of
Lanes

24
96

211
1192

446
1916
39

290

Total
Volume

Lane
Volume

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

411

1192

411

1192

2
0
3
1
0
0
0

245

446

245

446

489

1916

489

1916

39

39

39

39

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

45

1
0
2
0
2
0
0

49
1101

Lane
Volume

2
0
1
1
0
0
0

49

49

49

49

551

1101

551

1101

290

290

528
796
1324

528
796
1324

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1192

0
0
0
0
0
0
0

446

1916

39

0
0
0
0
0
0
0

49

1101

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1192

0
0
0
0
0
0
0

446

1916

39

49

1101

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.963

0.963

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.863

0.863

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

257

0
204

0
0

0
1469
961

0
1614
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

257

257

257

257

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

735

1469

735

1469

272

961

272

961

538

1614

538

1614

257
735
992

North-South:
East-West:
SUM:

257
735
992

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

257

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1469

961

0
0
0
0
0
0
0

1614

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

257

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1469

961

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1614

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.661

0.661

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.561

0.561

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

461

0
873

0
0

0
854
157

642
1228
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

461

461

461

461

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

506

854

506

854

157

157

157

157

642

642

642

642

614

1228

614

1228

461
1148
1609

461
1148
1609

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

854

157

0
0
0
0
0
0
0

642

1228

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

854

157

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1228

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.129

1.129

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.029

1.029

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

639

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

320

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
230

813
0

0
982
569

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

351

639

351

639

230

230

1
0
2
0
0
0
0

320

320

320

320

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

491

982

491

982

218

569

218

569

351
811
1162

North-South:
East-West:
SUM:

351
811
1162

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

639

230

0
0
0
0
0
0
0

320

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

569

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

639

230

0
0
0
0
0
0
0

320

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

569

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.815

0.815

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.715

0.715

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

556
197

44
198
188

962
28

840
94

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

962

962

962

962

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

840

840

840

840

94

94

94

94

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

52

1
0
1
1
0
0
0

421
1141
1562

421
1141
1562

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

52

556

197

44

198

188

301

962

28

175

840

94

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

962

28

0
0
0
0
0
0
0

175

840

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.096

1.096

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.996

0.996

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

15
432
0

57
392
221

163
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

447

432

447

432

57

57

57

57

364

392

364

392

364

221

364

221

163

163

163

163

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

504
477
981

North-South:
East-West:
SUM:

504
477
981

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

15

432

57

392

221

163

352

66

21

104

314

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

432

0
0
0
0
0
0
0

57

392

221

0
0
0
0
0
0
0

163

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.226

1.226

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.126

1.126

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

31
115
42

98
326
22

79
792
115

83
759
75

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

188

115

188

115

42

42

98

98

98

98

223

326

223

326

223

22

223

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

417

759

417

759

75

75

75

75

286
496
782

286
496
782

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

31

115

42

98

326

22

79

792

115

83

759

75

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

115

42

0
0
0
0
0
0
0

98

326

22

0
0
0
0
0
0
0

79

792

115

0
0
0
0
0
0
0

83

759

75

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.569

0.569

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.469

0.469

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

246

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

115

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

710
247

834
147

988
52

103
1347
47

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

188

188

188

188

355

710

355

710

196

247

196

247

1
0
1
1
0
0
0

246

246

246

246

491

834

491

834

147

147

147

147

1
0
2
0
1
0
0

115

115

115

115

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

47

47

North-South:
East-West:
SUM:

679
789
1468

North-South:
East-West:
SUM:

679
789
1468

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

710

247

0
0
0
0
0
0
0

246

834

147

0
0
0
0
0
0
0

115

988

52

0
0
0
0
0
0
0

103

1347

47

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

710

247

0
0
0
0
0
0
0

246

834

147

0
0
0
0
0
0
0

115

988

52

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1347

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.835

1.835

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.735

1.735

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
405
225

973
292
8

9
1272
17

134
1657
921

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

203

405

203

405

225

225

225

225

341

973

341

973

300

292

300

292

430

1272

430

1272

17

17

17

17

134

134

134

134

552

1657

552

1657

921

921

566
564
1130

566
564
1130

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

405

225

973

292

0
0
0
0
0
0
0

1272

17

0
0
0
0
0
0
0

134

1657

921

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

405

225

0
0
0
0
0
0
0

973

292

0
0
0
0
0
0
0

1272

17

0
0
0
0
0
0
0

134

1657

921

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.413

1.413

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.313

1.313

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

595

0
151

0
0

0
967
483

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

373

595

373

595

373

151

373

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

110

483

110

483

158

158

158

158

490

980

490

980

373
642
1015

North-South:
East-West:
SUM:

373
642
1015

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

483

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

483

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.712

0.712

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.612

0.612

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

39

23
14

13
3

3
667
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

39

39

39

39

55

13

55

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

336

667

336

667

26

26

26

26

438

861

438

861

15

15

15

15

94
441
535

94
441
535

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

39

13

0
0
0
0
0
0
0

667

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

39

13

0
0
0
0
0
0
0

667

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195
282
147

99
182
59

48
505
152

272
780
133

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

195

195

195

195

282

282

282

282

147

147

99

99

99

99

182

182

182

182

35

59

35

59

48

48

48

48

253

505

253

505

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

381
525
906

North-South:
East-West:
SUM:

381
525
906

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

147

99

182

59

48

505

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

195

282

147

0
0
0
0
0
0
0

99

182

59

0
0
0
0
0
0
0

48

505

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

272

780

133

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.659

0.659

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.559

0.559

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

19

96
52

31
17

33
667
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

148

96

148

96

52

52

19

19

19

19

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

369

667

369

667

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

167
590
757

167
590
757

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

52

19

31

17

33

667

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

52

0
0
0
0
0
0
0

19

31

17

0
0
0
0
0
0
0

33

667

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.009

1.009

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.909

0.909

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
584
22

24
1114
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

177

137

177

137

23

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

303

584

303

584

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

178
682
860

North-South:
East-West:
SUM:

178
682
860

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

584

22

0
0
0
0
0
0
0

24

1114

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

584

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.147

1.147

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.047

1.047

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

126

346

16
219

67
14

2
739
62

231
1177
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

126

126

126

126

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

624

1177

624

1177

71

71

71

71

North-South:
East-West:
SUM:

340
626
966

340
626
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

126

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1177

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

126

16

219

346

67

14

739

62

231

1177

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.288

1.288

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.188

1.188

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

267
1439
0

No. of
Lanes

1
0
0
0
2
0
0

Lane
Volume

1
0
2
0
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

39

39

39

137

735

137

735

0
0
0
0
0
0
0
0
0
1
1
0
0
0

Added
Volume

Total
Volume

39

653

1290

653

1290

15

15

15

15

267

267

267

267

720

1439

720

1439

137
920
1057

North-South:
East-West:
SUM:

137
920
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1192

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

626

1192

626

1192

626

59

626

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
665
1115

450
665
1115

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1192

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1192

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.743

0.743

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.643

0.643

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
756

348
1628
21

0
860
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

225

756

225

756

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

430

860

430

860

500

500

419
621
1040

North-South:
East-West:
SUM:

419
621
1040

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.756

0.756

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.656

0.656

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

183

0
86

0
0

0
880
1053

0
1180
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

183

183

183

183

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

396

1053

396

1053

393

1180

393

1180

183
440
623

183
440
623

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1180

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1180

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.415

0.415

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.315

0.315

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

234

0
582

0
0

0
1004
165

325
1264
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

234

234

234

234

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

632

1264

632

1264

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1264

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1264

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

253

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
518

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

253

253

253

253

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

232

518

232

518

286
762
1048

286
762
1048

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

1018

518

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

518

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.735

0.735

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.635

0.635

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

926
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

926

926

926

926

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1151
1526

North-South:
East-West:
SUM:

375
1151
1526

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

926

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

926

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

325

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

530
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

564

530

564

530

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

325

325

325

325

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

628
605
1233

628
605
1233

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

530

10

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

530

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.865

0.865

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.765

0.765

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
235
42

95
289
26

133
824
139

93
863
125

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

330

235

330

235

42

42

95

95

95

95

205

289

205

289

205

26

205

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

494

863

494

863

125

125

125

125

425
627
1052

North-South:
East-West:
SUM:

425
627
1052

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

235

42

95

289

26

133

824

139

93

863

125

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

235

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

125

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.765

0.765

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.665

0.665

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

104

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460
103

479
108

805
63

122
1447
157

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

230

460

230

460

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

104

104

104

104

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

96

157

96

157

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
828
1262

434
828
1262

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

122

1447

157

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

157

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.683

1.683

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.583

1.583

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
362
214

691
282
37

14
1140
27

103
1648
976

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

181

362

181

362

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

549

1648

549

1648

976

976

533
563
1096

North-South:
East-West:
SUM:

533
563
1096

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

362

214

691

282

37

14

1140

27

103

1648

976

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

362

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1648

976

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.461

1.461

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.361

1.361

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

603

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

386

603

386

603

386

168

386

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

58

444

58

444

151

151

151

151

493

985

493

985

386
663
1049

386
663
1049

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:


Fully mitigated?

NO

17

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

38

21
24

15
9

6
826
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

38

38

38

38

62

15

62

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

417

826

417

826

29

29

29

29

449

880

449

880

17

17

17

17

106
455
561

North-South:
East-West:
SUM:

106
455
561

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

21

24

38

15

0
0
0
0
0
0
0

826

0
0
0
0
0
0
0

29

880

17

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

38

15

0
0
0
0
0
0
0

826

29

880

17

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.394

0.394

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.394

0.394

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

159

243
152

237
42

67
906
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

152

152

1
0
1
0
1
0
0

159

159

159

159

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

453

906

453

906

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
690
1109

419
690
1109

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.807

0.807

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.707

0.707

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

46

56
58

24
15

33
963
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

114

56

114

56

58

58

46

46

46

46

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

552

963

552

963

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

160
614
774

North-South:
East-West:
SUM:

160
614
774

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

58

46

24

15

33

963

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

58

0
0
0
0
0
0
0

46

24

15

0
0
0
0
0
0
0

33

963

141

0
0
0
0
0
0
0

62

1097

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.516

0.516

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.416

0.416

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1063
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

22

22

14

14

10

10

46

46

46

46

543

1063

543

1063

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

27
607
634

27
607
634

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

22

10

46

1063

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1063

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.423

0.423

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.323

0.323

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

193

160

52
215

89
14

10
824
256

195
1098
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

193

193

193

193

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

160

256

160

256

1
0
1
1
0
0
0

195

195

195

195

579

1098

579

1098

60

60

60

60

North-South:
East-West:
SUM:

325
607
932

North-South:
East-West:
SUM:

325
607
932

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

193

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

193

52

215

160

89

14

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

645

1290

645

1290

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1290
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

919

CRITICAL VOLUMES

436
322

234
0

1
4

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

489

919

489

919

489

58

489

58

North-South:
East-West:
SUM:

431
496
927

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
496
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

436

322

213

234

919

58

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

919

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.618

0.618

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.518

0.518

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
725

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

285

725

285

725

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
765

Lane
Volume

2
0
1
1
0
0
0

383

765

383

765

80

530

80

530

336
497
833

336
497
833

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

725

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

765

530

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

725

207

1324

36

765

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.606

0.606

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

201

0
237

0
0

0
840
630

15
1088
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

201

201

201

201

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

146

630

146

630

15

15

363

1088

363

1088

201
420
621

North-South:
East-West:
SUM:

201
420
621

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

15

1088

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

15

1088

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.414

0.414

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.314

0.314

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

127

0
240

0
0

0
979
108

227
1074
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

127

127

127

127

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

537

1074

537

1074

North-South:
East-West:
SUM:

127
771
898

127
771
898

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1074

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1074

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.630

0.630

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.530

0.530

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

217

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
482

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

217

217

217

217

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

229

482

229

482

253
693
946

North-South:
East-West:
SUM:

253
693
946

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.664

0.664

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.564

0.564

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

966
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

966

966

966

966

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1205
1499

294
1205
1499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

78

248

185

77

230

143

288

966

37

239

827

49

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

966

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.052

1.052

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.952

0.952

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

556
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

663

556

663

556

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

329

329

329

329

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

760
482
1242

North-South:
East-West:
SUM:

760
482
1242

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

556

49

97

498

315

0
0
0
0
0
0
0

329

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

556

49

97

498

315

329

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.872

0.872

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.772

0.772

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
285
71

134
355
19

126
1059
160

98
754
191

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

450

285

450

285

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

473

754

473

754

191

191

191

191

584
599
1183

584
599
1183

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

0
0
0
0
0
0
0

98

754

191

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

191

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.860

0.860

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.760

0.760

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

418
78

435
143

158
1264
145

83
1368
138

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

209

418

209

418

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

158

158

158

158

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

35

138

35

138

415
842
1257

North-South:
East-West:
SUM:

415
842
1257

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.838

0.838

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.738

0.738

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
204
124

1228
312
75

37
1403
108

96
1553
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

102

204

102

204

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

518

1553

518

1553

876

876

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

445

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

319

445

319

445

319

193

319

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

319
737
1056

North-South:
East-West:
SUM:

319
737
1056

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.741

0.741

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.641

0.641

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

21

46

29
16

25
8

3
727
9

36
815
20

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

46

46

46

46

79

25

79

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

368

727

368

727

36

36

36

36

418

815

418

815

20

20

20

20

112
421
533

112
421
533

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

21

29

16

46

25

0
0
0
0
0
0
0

727

0
0
0
0
0
0
0

36

815

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

46

25

0
0
0
0
0
0
0

727

36

815

20

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.374

0.374

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.374

0.374

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

180
306
118

38
284
39

25
281
188

335
751
106

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

118

118

38

38

38

38

284

284

284

284

27

39

27

39

25

25

25

25

141

281

141

281

98

188

98

188

1
0
1
1
0
0
0

335

335

335

335

429

751

429

751

106

106

106

106

North-South:
East-West:
SUM:

464
476
940

North-South:
East-West:
SUM:

464
476
940

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

180

306

118

38

284

39

25

281

188

335

751

106

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

118

0
0
0
0
0
0
0

38

284

39

0
0
0
0
0
0
0

25

281

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

335

751

106

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

30
86
121

45
54
32

16
518
29

171
1748
51

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

207

86

207

86

121

121

45

45

45

45

86

54

86

54

32

32

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

16

16

16

16

274

518

274

518

29

29

29

29

171

171

171

171

900

1748

900

1748

51

51

51

51

252
916
1168

252
916
1168

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

121

45

54

32

16

518

29

171

1748

51

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

86

121

0
0
0
0
0
0
0

45

54

32

0
0
0
0
0
0
0

16

518

29

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

1748

51

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.460

1.460

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.360

1.360

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
91
55

13
1
27

31
845
4

32
1727
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

149

91

149

91

55

55

13

13

13

13

41

41

27

27

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

31

31

31

31

425

845

425

845

32

32

32

32

864

1727

864

1727

18

18

18

18

162
895
1057

North-South:
East-West:
SUM:

162
895
1057

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

91

55

13

27

31

845

32

1727

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

55

0
0
0
0
0
0
0

13

27

0
0
0
0
0
0
0

31

845

0
0
0
0
0
0
0

32

1727

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.321

1.321

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.221

1.221

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

200

175

20
300

53
13

3
1273
112

345
1647
62

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

200

200

200

200

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

637

1273

637

1273

12

112

12

112

345

345

345

345

855

1647

855

1647

62

62

62

62

321
982
1303

321
982
1303

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

200

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1273

112

0
0
0
0
0
0
0

345

1647

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

200

20

300

175

53

13

1273

112

345

1647

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.629

1.629

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.529

1.529

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

45
0
660

0
0
0

0
1298
30

330
2153
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

45

45

45

45

33

660

33

660

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

664

1298

664

1298

30

30

30

30

330

330

330

330

1077

2153

1077

2153

45
1077
1122

North-South:
East-West:
SUM:

45
1077
1122

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0

330

2153

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0

330

2153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.122

1.122

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.022

1.022

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1826

850
242

76
301
0

6
19

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

36

36

19

19

1
0
0
0
0
0
1

945

1826

945

1826

945

64

945

64

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

501
981
1482

501
981
1482

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

19

1826

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

850

242

0
0
0
0
0
0
0

76

301

0
0
0
0
0
0
0

11

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1826

64

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

149

700

24
96

211
1210

446
1880
39

49
1127
290

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

45

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

421

1210

421

1210

2
0
3
1
0
0
0

245

446

245

446

480

1880

480

1880

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

49

49

49

49

564

1127

564

1127

290

290

528
809
1337

North-South:
East-West:
SUM:

528
809
1337

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1210

0
0
0
0
0
0
0

446

1880

39

0
0
0
0
0
0
0

49

1127

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1210

0
0
0
0
0
0
0

446

1880

39

49

1127

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.972

0.972

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.872

0.872

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

263

0
204

0
0

0
1453
947

0
1635
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

263

263

263

263

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

727

1453

727

1453

258

947

258

947

545

1635

545

1635

263
727
990

263
727
990

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

1635

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1635

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.660

0.660

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.560

0.560

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

464

0
873

0
0

0
841
154

642
1244
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

464

464

464

464

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

498

841

498

841

154

154

154

154

642

642

642

642

622

1244

622

1244

464
1140
1604

North-South:
East-West:
SUM:

464
1140
1604

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

642

1244

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1244

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.126

1.126

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.026

1.026

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

627

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
223

813
0

0
982
584

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

345

627

345

627

223

223

1
0
2
0
0
0
0

329

329

329

329

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

491

982

491

982

239

584

239

584

345
820
1165

345
820
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

627

223

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

584

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

627

223

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

584

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.818

0.818

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.718

0.718

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

CRITICAL VOLUMES

556
197

44
198
188

967
28

837
94

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

967

967

967

967

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

837

837

837

837

94

94

94

94

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

421
1142
1563

North-South:
East-West:
SUM:

421
1142
1563

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

52

556

197

44

198

188

301

967

28

175

837

94

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

967

28

0
0
0
0
0
0
0

175

837

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.097

1.097

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.997

0.997

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

15
472
0

57
360
218

168
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

487

472

487

472

57

57

57

57

346

360

346

360

346

218

346

218

168

168

168

168

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

544
482
1026

544
482
1026

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

15

472

57

360

218

168

352

66

21

104

314

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

472

0
0
0
0
0
0
0

57

360

218

0
0
0
0
0
0
0

168

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.283

1.283

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.183

1.183

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

31
136
42

82
310
22

79
792
115

83
759
94

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

209

136

209

136

42

42

82

82

82

82

207

310

207

310

207

22

207

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

427

759

427

759

94

94

94

94

291
506
797

North-South:
East-West:
SUM:

291
506
797

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

31

136

42

82

310

22

79

792

115

83

759

94

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

136

42

0
0
0
0
0
0
0

82

310

22

0
0
0
0
0
0
0

79

792

115

0
0
0
0
0
0
0

83

759

94

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.580

0.580

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.480

0.480

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

244

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

118

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

724
247

822
145

988
52

103
1347
50

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

188

188

188

188

362

724

362

724

196

247

196

247

1
0
1
1
0
0
0

244

244

244

244

484

822

484

822

145

145

145

145

1
0
2
0
1
0
0

118

118

118

118

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

50

50

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

672
792
1464

672
792
1464

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

724

247

0
0
0
0
0
0
0

244

822

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

103

1347

50

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

724

247

0
0
0
0
0
0
0

244

822

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1347

50

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.830

1.830

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.730

1.730

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

94
417
225

967
282
8

9
1269
17

134
1660
928

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

209

417

209

417

225

225

225

225

338

967

338

967

290

282

290

282

429

1269

429

1269

17

17

17

17

134

134

134

134

553

1660

553

1660

928

928

563
563
1126

North-South:
East-West:
SUM:

563
563
1126

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

417

225

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1660

928

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

417

225

0
0
0
0
0
0
0

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1660

928

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.408

1.408

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.308

1.308

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

610

0
151

0
0

0
967
471

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

381

610

381

610

381

151

381

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

90

471

90

471

158

158

158

158

490

980

490

980

381
642
1023

North-South:
East-West:
SUM:

381
642
1023

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

610

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

610

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.718

0.718

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.618

0.618

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

CUMULATIVE BASE PLUS PROJECT WITH MITIGATION AND PHYSICAL


IMPROVEMENT CONDITIONS (300 EVENT DAY 70% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

70

33
27

35
9

6
981
10

50
868
23

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

79

33

79

33

27

27

70

70

70

70

114

35

114

35

496

981

496

981

10

10

10

10

50

50

50

50

446

868

446

868

23

23

23

23

149
546
695

149
546
695

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

33

27

70

35

0
0
0
0
0
0
0

981

10

0
0
0
0
0
0
0

50

868

23

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

33

27

0
0
0
0
0
0
0

70

35

0
0
0
0
0
0
0

981

10

50

868

23

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.488

0.488

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.488

0.488

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

164

271
87

437
113

59
644
338

295
890
159

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

166

166

166

166

271

271

271

271

87

87

1
0
1
0
1
0
0

164

164

164

164

437

437

437

437

84

113

84

113

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

59

59

59

59

322

644

322

644

255

338

255

338

295

295

295

295

525

890

525

890

159

159

159

159

603
617
1220

North-South:
East-West:
SUM:

603
617
1220

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

166

271

87

164

437

113

59

644

338

295

890

159

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

166

271

87

0
0
0
0
0
0
0

164

437

113

0
0
0
0
0
0
0

59

644

338

0
0
0
0
0
0
0

0
0
0
0
0
0
0

295

890

159

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.887

0.887

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.787

0.787

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

99

46
80

84
92

19
887
31

191
1748
57

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

27

27

27

27

126

46

126

46

80

80

99

99

99

99

176

84

176

84

92

92

19

19

19

19

459

887

459

887

31

31

31

31

191

191

191

191

903

1748

903

1748

57

57

57

57

225
922
1147

225
922
1147

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

27

46

80

99

84

92

19

887

31

191

1748

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

27

46

80

0
0
0
0
0
0
0

99

84

92

0
0
0
0
0
0
0

19

887

31

0
0
0
0
0
0
0

0
0
0
0
0
0
0

191

1748

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.274

1.274

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.174

1.174

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

8
45
49

21
5
44

44
1507
9

45
1759
42

No. of
Lanes

Lane
Volume

0
1
0
0
1
0
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

45

53

45

27

49

27

49

21

21

21

21

70

70

44

44

44

44

44

44

758

1507

758

1507

45

45

45

45

880

1759

880

1759

42

42

42

42

78
924
1002

North-South:
East-West:
SUM:

78
924
1002

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

45

49

21

44

44

1507

45

1759

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

45

49

21

44

44

1507

45

1759

42

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.113

1.113

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.013

1.013

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

170

54
400

60
5

2
1441
161

332
1810
91

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

231

231

231

231

227

54

227

54

400

400

1
0
0
0
0
1
0

118

170

118

170

118

60

118

60

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

721

1441

721

1441

46

161

46

161

332

332

332

332

951

1810

951

1810

91

91

91

91

349
1053
1402

349
1053
1402

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

231

54

400

0
0
0
0
0
0
0

170

60

0
0
0
0
0
0
0

1441

161

0
0
0
0
0
0
0

332

1810

91

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

231

54

400

170

60

1441

161

332

1810

91

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.558

1.558

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.458

1.458

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

80
0
646

0
0
0

0
1468
60

333
2191
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

80

80

80

80

22

646

22

646

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

764

1468

764

1468

60

60

60

60

333

333

333

333

1096

2191

1096

2191

80
1097
1177

North-South:
East-West:
SUM:

80
1097
1177

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2191

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

80

646

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1468

60

0
0
0
0
0
0
0

333

2191

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.070

1.070

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.970

0.970

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1680

695
315

72
300
0

7
21

2
86

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

348

695

348

695

315

315

72

72

72

72

150

300

150

300

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

883

1680

883

1680

883

86

883

86

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

420
922
1342

420
922
1342

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

695

315

72

300

11

21

1680

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

695

315

0
0
0
0
0
0
0

72

300

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1680

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.895

0.895

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.795

0.795

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

101

586

12
71

195
1106

201
1321
29

16
1106
306

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

31

101

31

101

12

12

12

12

63

71

63

71

1
1
0
0
2
0
0

391

586

391

586

391

195

391

195

497

1106

497

1106

2
0
3
1
0
0
0

111

201

111

201

338

1321

338

1321

29

29

29

29

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

16

16

16

16

553

1106

553

1106

306

306

560
664
1224

North-South:
East-West:
SUM:

560
664
1224

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

101

12

71

0
0
0
0
0
0
0

586

195

1106

0
0
0
0
0
0
0

201

1321

29

0
0
0
0
0
0
0

16

1106

306

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

101

12

71

0
0
0
0
0
0
0

586

195

1106

0
0
0
0
0
0
0

201

1321

29

16

1106

306

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.890

0.890

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.790

0.790

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

305

0
221

0
0

0
1330
956

0
1867
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

305

305

305

305

122

221

122

221

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

665

1330

665

1330

221

956

221

956

622

1867

622

1867

305
665
970

305
665
970

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

305

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

1867

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

305

221

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1330

956

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1867

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.647

0.647

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.547

0.547

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

227

0
562

0
0

0
890
149

536
1426
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

227

227

227

227

26

562

26

562

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

520

890

520

890

149

149

149

149

536

536

536

536

713

1426

713

1426

227
1056
1283

North-South:
East-West:
SUM:

227
1056
1283

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

227

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

536

1426

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

227

562

0
0
0
0
0
0
0

0
0
0
0
0
0
0

890

149

0
0
0
0
0
0
0

0
0
0
0
0
0
0

536

1426

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.900

0.900

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.800

0.800

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

771

0
0

0
175

250
1011
0

0
880
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

424

771

424

771

175

175

1
0
2
0
0
0
0

250

250

250

250

506

1011

506

1011

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

440

880

440

880

120

544

120

544

424
690
1114

424
690
1114

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

771

175

0
0
0
0
0
0
0

250

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

771

175

0
0
0
0
0
0
0

250

1011

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
454
178

42
202
202

249
1078
33

164
802
60

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

316

454

316

454

178

178

178

178

42

42

42

42

101

202

101

202

202

202

202

202

249

249

249

249

1078

1078

1078

1078

33

33

33

33

164

164

164

164

802

802

802

802

60

60

60

60

358
1242
1600

North-South:
East-West:
SUM:

358
1242
1600

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

454

178

42

202

202

249

1078

33

164

802

60

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

454

178

0
0
0
0
0
0
0

42

202

202

0
0
0
0
0
0
0

249

1078

33

0
0
0
0
0
0
0

164

802

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.123

1.123

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.023

1.023

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

374

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

587
18

88
441
232

175
49

68
181

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

637

587

637

587

18

18

88

88

88

88

513

441

513

441

513

232

513

232

1
0
0
1
0
0
0

374

374

374

374

224

175

224

175

49

49

1
0
1
1
0
0
0

19

19

19

19

68

68

68

68

181

181

181

181

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

725
555
1280

725
555
1280

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

587

18

88

441

232

0
0
0
0
0
0
0

374

175

49

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

587

18

0
0
0
0
0
0
0

88

441

232

0
0
0
0
0
0
0

374

175

49

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

68

181

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.898

0.898

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.798

0.798

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

95
294
48

92
326
25

172
984
143

68
767
123

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

95

95

95

95

437

294

437

294

48

48

92

92

92

92

268

326

268

326

268

25

268

25

172

172

172

172

376

984

376

984

143

143

143

143

68

68

68

68

445

767

445

767

123

123

123

123

529
617
1146

North-South:
East-West:
SUM:

529
617
1146

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

95

294

48

92

326

25

172

984

143

68

767

123

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

294

48

0
0
0
0
0
0
0

92

326

25

0
0
0
0
0
0
0

172

984

143

0
0
0
0
0
0
0

68

767

123

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.833

0.833

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.733

0.733

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

150

305

683
150

750
125

111
1537
68

106
1174
81

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

150

150

150

150

342

683

342

683

97

150

97

150

1
0
1
1
0
0
0

305

305

305

305

438

750

438

750

125

125

125

125

1
0
2
0
1
0
0

111

111

111

111

769

1537

769

1537

68

68

1
0
2
0
1
0
0

106

106

106

106

587

1174

587

1174

81

81

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

647
875
1522

647
875
1522

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

683

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

111

1537

68

0
0
0
0
0
0
0

106

1174

81

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

150

683

150

0
0
0
0
0
0
0

305

750

125

0
0
0
0
0
0
0

111

1537

68

0
0
0
0
0
0
0

0
0
0
0
0
0
0

106

1174

81

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.691

1.691

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.591

1.591

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
311
229

945
318
16

22
1303
35

127
1438
922

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

156

311

156

311

229

229

229

229

331

945

331

945

334

318

334

318

16

16

16

16

22

22

22

22

446

1303

446

1303

35

35

35

35

127

127

127

127

479

1438

479

1438

922

922

563
573
1136

North-South:
East-West:
SUM:

563
573
1136

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

311

229

945

318

16

22

1303

35

127

1438

922

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

311

229

0
0
0
0
0
0
0

945

318

16

22

1303

35

0
0
0
0
0
0
0
0
0
0
0
0
0
0

127

1438

922

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.262

1.262

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.162

1.162

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

578

0
182

0
0

0
1148
635

177
883
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

380

578

380

578

380

182

380

182

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

574

1148

574

1148

255

635

255

635

177

177

177

177

442

883

442

883

380
751
1131

380
751
1131

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

578

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

177

883

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

578

182

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1148

635

0
0
0
0
0
0
0

0
0
0
0
0
0
0

177

883

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.794

0.794

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.694

0.694

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:15 PM

17

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

21

43

29
16

25
8

3
705
9

36
820
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

43

43

43

43

76

25

76

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

357

705

357

705

36

36

36

36

421

820

421

820

21

21

21

21

109
424
533

North-South:
East-West:
SUM:

109
424
533

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

21

29

16

43

25

0
0
0
0
0
0
0

705

0
0
0
0
0
0
0

36

820

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

43

25

0
0
0
0
0
0
0

705

36

820

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.374

0.374

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.374

0.374

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180
306
94

33
284
39

25
257
188

341
757
107

CRITICAL VOLUMES

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

94

94

33

33

33

33

284

284

284

284

27

39

27

39

25

25

25

25

129

257

129

257

98

188

98

188

1
0
1
1
0
0
0

341

341

341

341

432

757

432

757

107

107

107

107

North-South:
East-West:
SUM:

464
470
934

North-South:
East-West:
SUM:

464
470
934

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

306

94

33

284

39

25

257

188

341

757

107

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

94

0
0
0
0
0
0
0

33

284

39

0
0
0
0
0
0
0

25

257

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

341

757

107

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.679

0.679

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.579

0.579

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
86
118

40
54
32

16
465
29

172
1762
52

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

30

30

30

204

86

204

86

118

118

40

40

40

40

86

54

86

54

32

32

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

16

16

16

16

247

465

247

465

29

29

29

29

172

172

172

172

907

1762

907

1762

52

52

52

52

244
923
1167

North-South:
East-West:
SUM:

244
923
1167

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

86

118

40

54

32

16

465

29

172

1762

52

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

86

118

0
0
0
0
0
0
0

40

54

32

0
0
0
0
0
0
0

16

465

29

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

1762

52

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.459

1.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.359

1.359

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

3
91
55

13
1
27

31
784
4

32
1743
18

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
1
0
0
1
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

91

94

91

39

55

39

55

13

13

13

13

41

41

27

27

31

31

31

31

394

784

394

784

32

32

32

32

872

1743

872

1743

18

18

18

18

107
903
1010

107
903
1010

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

784

32

1743

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

784

32

1743

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.263

1.263

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.163

1.163

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

154

175

20
300

53
13

3
1285
124

345
1601
62

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

154

154

154

154

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

643

1285

643

1285

47

124

47

124

345

345

345

345

832

1601

832

1601

62

62

62

62

281
988
1269

North-South:
East-West:
SUM:

281
988
1269

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

154

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1285

124

0
0
0
0
0
0
0

345

1601

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

154

20

300

175

53

13

1285

124

345

1601

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.586

1.586

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.486

1.486

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

45
0
660

0
0
0

30

45

45

45

33

660

33

660

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

330
2107

Added
Volume

Total
Volume

45

0
0
1
1
0
0
0

0
1310

Lane
Volume

1
0
0
0
2
0
0

670

1310

670

1310

30

30

30

30

330

330

330

330

1054

2107

1054

2107

45
1054
1099

45
1054
1099

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1310

30

0
0
0
0
0
0
0

330

2107

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1310

30

0
0
0
0
0
0
0

330

2107

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.099

1.099

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.999

0.999

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1807

CRITICAL VOLUMES

850
242

76
301
0

7
21

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

936

1807

936

1807

936

64

936

64

North-South:
East-West:
SUM:

501
975
1476

North-South:
East-West:
SUM:

501
975
1476

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

850

242

76

301

11

21

1807

64

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

850

242

0
0
0
0
0
0
0

76

301

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1807

64

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.984

0.984

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.884

0.884

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

700

No. of
Lanes

24
96

211
1191

446
1892
39

290

Total
Volume

Lane
Volume

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

410

1191

410

1191

2
0
3
1
0
0
0

245

446

245

446

483

1892

483

1892

39

39

39

39

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

45

1
0
2
0
2
0
0

49
1100

Lane
Volume

2
0
1
1
0
0
0

49

49

49

49

550

1100

550

1100

290

290

528
795
1323

528
795
1323

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1191

0
0
0
0
0
0
0

446

1892

39

0
0
0
0
0
0
0

49

1100

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1191

0
0
0
0
0
0
0

446

1892

39

49

1100

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.962

0.962

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.862

0.862

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

256

0
204

0
0

0
1458
952

0
1613
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

256

256

256

256

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

729

1458

729

1458

268

952

268

952

538

1613

538

1613

256
729
985

North-South:
East-West:
SUM:

256
729
985

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

256

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1458

952

0
0
0
0
0
0
0

1613

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

256

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1458

952

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1613

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.657

0.657

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.557

0.557

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

461

0
873

0
0

0
845
155

642
1227
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

461

461

461

461

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

500

845

500

845

155

155

155

155

642

642

642

642

614

1227

614

1227

461
1142
1603

461
1142
1603

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

845

155

0
0
0
0
0
0
0

642

1227

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

461

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

845

155

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1227

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.125

1.125

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.025

1.025

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

10

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

631

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

320

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
225

813
0

0
982
569

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

347

631

347

631

225

225

1
0
2
0
0
0
0

320

320

320

320

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

491

982

491

982

222

569

222

569

347
811
1158

North-South:
East-West:
SUM:

347
811
1158

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

631

225

0
0
0
0
0
0
0

320

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

569

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

631

225

0
0
0
0
0
0
0

320

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

569

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.813

0.813

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.713

0.713

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

556
197

44
198
188

962
28

838
94

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

962

962

962

962

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

838

838

838

838

94

94

94

94

1
0
2
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

52

1
0
1
1
0
0
0

421
1139
1560

421
1139
1560

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

52

556

197

44

198

188

301

962

28

175

838

94

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

962

28

0
0
0
0
0
0
0

175

838

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.095

1.095

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.995

0.995

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

12

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

15
431
0

57
371
219

163
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

446

431

446

431

57

57

57

57

352

371

352

371

352

219

352

219

163

163

163

163

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

503
477
980

North-South:
East-West:
SUM:

503
477
980

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

15

431

57

371

219

163

352

66

21

104

314

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

431

0
0
0
0
0
0
0

57

371

219

0
0
0
0
0
0
0

163

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.225

1.225

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.125

1.125

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

31
114
42

87
315
22

79
792
115

83
759
74

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

187

114

187

114

42

42

87

87

87

87

212

315

212

315

212

22

212

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

417

759

417

759

74

74

74

74

274
496
770

274
496
770

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

31

114

42

87

315

22

79

792

115

83

759

74

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

114

42

0
0
0
0
0
0
0

87

315

22

0
0
0
0
0
0
0

79

792

115

0
0
0
0
0
0
0

83

759

74

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.560

0.560

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.460

0.460

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

14

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

245

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

115

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

709
247

826
146

988
52

103
1347
47

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

188

188

188

188

355

709

355

709

196

247

196

247

1
0
1
1
0
0
0

245

245

245

245

486

826

486

826

146

146

146

146

1
0
2
0
1
0
0

115

115

115

115

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

47

47

North-South:
East-West:
SUM:

674
789
1463

North-South:
East-West:
SUM:

674
789
1463

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

709

247

0
0
0
0
0
0
0

245

826

146

0
0
0
0
0
0
0

115

988

52

0
0
0
0
0
0
0

103

1347

47

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

709

247

0
0
0
0
0
0
0

245

826

146

0
0
0
0
0
0
0

115

988

52

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1347

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.829

1.829

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.729

1.729

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
405
225

969
285
8

9
1270
17

134
1657
921

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

203

405

203

405

225

225

225

225

339

969

339

969

293

285

293

285

429

1270

429

1270

17

17

17

17

134

134

134

134

552

1657

552

1657

921

921

564
563
1127

564
563
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

405

225

969

285

0
0
0
0
0
0
0

1270

17

0
0
0
0
0
0
0

134

1657

921

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

405

225

0
0
0
0
0
0
0

969

285

0
0
0
0
0
0
0

1270

17

0
0
0
0
0
0
0

134

1657

921

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.409

1.409

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.309

1.309

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

16

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

595

0
151

0
0

0
967
475

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

373

595

373

595

373

151

373

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

102

475

102

475

158

158

158

158

490

980

490

980

373
642
1015

North-South:
East-West:
SUM:

373
642
1015

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

475

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

595

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

475

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.712

0.712

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.612

0.612

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:16 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

39

23
14

13
3

3
667
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

39

39

39

39

55

13

55

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

336

667

336

667

26

26

26

26

438

861

438

861

15

15

15

15

94
441
535

94
441
535

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

39

13

0
0
0
0
0
0
0

667

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

39

13

0
0
0
0
0
0
0

667

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195
282
147

99
182
59

48
505
152

272
780
133

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

195

195

195

195

282

282

282

282

147

147

99

99

99

99

182

182

182

182

35

59

35

59

48

48

48

48

253

505

253

505

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

381
525
906

North-South:
East-West:
SUM:

381
525
906

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

147

99

182

59

48

505

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

195

282

147

0
0
0
0
0
0
0

99

182

59

0
0
0
0
0
0
0

48

505

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

272

780

133

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.659

0.659

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.559

0.559

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

19

96
52

31
17

33
667
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

148

96

148

96

52

52

19

19

19

19

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

369

667

369

667

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

167
590
757

167
590
757

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

52

19

31

17

33

667

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

52

0
0
0
0
0
0
0

19

31

17

0
0
0
0
0
0
0

33

667

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.009

1.009

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.909

0.909

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
584
22

24
1114
17

No. of
Lanes

0
1
0
0
1
0
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

154

137

154

137

11

23

11

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

303

584

303

584

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

155
682
837

North-South:
East-West:
SUM:

155
682
837

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

584

22

0
0
0
0
0
0
0

24

1114

17

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

584

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.116

1.116

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.016

1.016

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:20 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

126

346

16
219

67
14

2
739
62

231
1177
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

126

126

126

126

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

624

1177

624

1177

71

71

71

71

North-South:
East-West:
SUM:

340
626
966

340
626
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

126

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1177

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

126

16

219

346

67

14

739

62

231

1177

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.288

1.288

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.188

1.188

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

267
1439
0

No. of
Lanes

1
0
0
0
2
0
0

Lane
Volume

1
0
2
0
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

39

39

39

137

735

137

735

0
0
0
0
0
0
0
0
0
1
1
0
0
0

Added
Volume

Total
Volume

39

653

1290

653

1290

15

15

15

15

267

267

267

267

720

1439

720

1439

137
920
1057

North-South:
East-West:
SUM:

137
920
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

267

1439

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1192

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

626

1192

626

1192

626

59

626

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
665
1115

450
665
1115

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1192

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1192

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.743

0.743

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.643

0.643

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
756

348
1628
21

0
860
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

225

756

225

756

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

430

860

430

860

500

500

419
621
1040

North-South:
East-West:
SUM:

419
621
1040

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

756

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

860

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.756

0.756

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.656

0.656

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

183

0
86

0
0

0
880
1053

0
1180
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

183

183

183

183

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

396

1053

396

1053

393

1180

393

1180

183
440
623

183
440
623

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1180

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

183

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1180

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.415

0.415

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.315

0.315

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

234

0
582

0
0

0
1004
165

325
1264
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

234

234

234

234

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

632

1264

632

1264

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1264

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

234

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1264

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

253

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
518

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

253

253

253

253

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

232

518

232

518

286
762
1048

286
762
1048

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

1018

518

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

253

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

518

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.735

0.735

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.635

0.635

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

926
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

926

926

926

926

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1151
1526

North-South:
East-West:
SUM:

375
1151
1526

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

926

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

926

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

325

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

530
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

564

530

564

530

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

325

325

325

325

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

628
605
1233

628
605
1233

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

530

10

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

530

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

325

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.865

0.865

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.765

0.765

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
235
42

95
289
26

133
824
139

93
863
125

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

330

235

330

235

42

42

95

95

95

95

205

289

205

289

205

26

205

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

494

863

494

863

125

125

125

125

425
627
1052

North-South:
East-West:
SUM:

425
627
1052

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

235

42

95

289

26

133

824

139

93

863

125

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

235

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

125

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.765

0.765

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.665

0.665

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

104

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460
103

479
108

805
63

122
1447
157

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

230

460

230

460

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

104

104

104

104

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

96

157

96

157

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
828
1262

434
828
1262

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

122

1447

157

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

460

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

104

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

157

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.683

1.683

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.583

1.583

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
362
214

691
282
37

14
1140
27

103
1648
976

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

181

362

181

362

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

549

1648

549

1648

976

976

533
563
1096

North-South:
East-West:
SUM:

533
563
1096

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

362

214

691

282

37

14

1140

27

103

1648

976

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

362

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1648

976

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.461

1.461

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.361

1.361

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

603

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

386

603

386

603

386

168

386

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

58

444

58

444

151

151

151

151

493

985

493

985

386
663
1049

386
663
1049

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

603

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:


Fully mitigated?

NO

17

0.000
N/A

2511_CBPP_CalcaDB_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

38

21
24

15
9

6
826
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

38

38

38

38

62

15

62

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

417

826

417

826

29

29

29

29

449

880

449

880

17

17

17

17

106
455
561

North-South:
East-West:
SUM:

106
455
561

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

21

24

38

15

0
0
0
0
0
0
0

826

0
0
0
0
0
0
0

29

880

17

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

38

15

0
0
0
0
0
0
0

826

29

880

17

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.394

0.394

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.394

0.394

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

159

243
152

237
42

67
906
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

152

152

1
0
1
0
1
0
0

159

159

159

159

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

453

906

453

906

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
690
1109

419
690
1109

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

152

159

237

42

67

906

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.807

0.807

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.707

0.707

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

46

56
58

24
15

33
963
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

114

56

114

56

58

58

46

46

46

46

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

552

963

552

963

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

160
614
774

North-South:
East-West:
SUM:

160
614
774

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

58

46

24

15

33

963

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

58

0
0
0
0
0
0
0

46

24

15

0
0
0
0
0
0
0

33

963

141

0
0
0
0
0
0
0

62

1097

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.516

0.516

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.416

0.416

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1063
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

22

22

14

14

10

10

46

46

46

46

543

1063

543

1063

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

27
607
634

27
607
634

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

22

10

46

1063

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1063

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.423

0.423

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.323

0.323

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

193

160

52
215

89
14

10
824
256

195
1098
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

193

193

193

193

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

160

256

160

256

1
0
1
1
0
0
0

195

195

195

195

579

1098

579

1098

60

60

60

60

North-South:
East-West:
SUM:

325
607
932

North-South:
East-West:
SUM:

325
607
932

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

193

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

193

52

215

160

89

14

10

824

256

195

1098

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

645

1290

645

1290

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1290
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

919

CRITICAL VOLUMES

436
322

234
0

1
4

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

489

919

489

919

489

58

489

58

North-South:
East-West:
SUM:

431
496
927

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
496
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

436

322

213

234

919

58

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

919

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.618

0.618

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.518

0.518

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
725

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

285

725

285

725

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
765

Lane
Volume

2
0
1
1
0
0
0

383

765

383

765

80

530

80

530

336
497
833

336
497
833

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

725

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

765

530

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

725

207

1324

36

765

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.606

0.606

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

201

0
237

0
0

0
840
630

15
1088
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

201

201

201

201

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

146

630

146

630

15

15

363

1088

363

1088

201
420
621

North-South:
East-West:
SUM:

201
420
621

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

15

1088

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

201

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

15

1088

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.414

0.414

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.314

0.314

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

127

0
240

0
0

0
979
108

227
1074
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

127

127

127

127

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

537

1074

537

1074

North-South:
East-West:
SUM:

127
771
898

127
771
898

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1074

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

127

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1074

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.630

0.630

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.530

0.530

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

217

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
482

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

217

217

217

217

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

229

482

229

482

253
693
946

North-South:
East-West:
SUM:

253
693
946

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

217

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

482

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.664

0.664

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.564

0.564

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

966
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

966

966

966

966

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1205
1499

294
1205
1499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

78

248

185

77

230

143

288

966

37

239

827

49

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

966

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.052

1.052

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.952

0.952

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

556
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

663

556

663

556

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

329

329

329

329

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

760
482
1242

North-South:
East-West:
SUM:

760
482
1242

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

556

49

97

498

315

0
0
0
0
0
0
0

329

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

556

49

97

498

315

329

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.872

0.872

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.772

0.772

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
285
71

134
355
19

126
1059
160

98
754
191

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

450

285

450

285

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

473

754

473

754

191

191

191

191

584
599
1183

584
599
1183

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

0
0
0
0
0
0
0

98

754

191

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

285

71

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

191

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.860

0.860

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.760

0.760

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

418
78

435
143

158
1264
145

83
1368
138

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

209

418

209

418

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

158

158

158

158

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

35

138

35

138

415
842
1257

North-South:
East-West:
SUM:

415
842
1257

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

418

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

158

1264

145

0
0
0
0
0
0
0

83

1368

138

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.838

0.838

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.738

0.738

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
204
124

1228
312
75

37
1403
108

96
1553
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

102

204

102

204

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

518

1553

518

1553

876

876

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

204

124

1228

312

75

37

1403

108

96

1553

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

445

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

319

445

319

445

319

193

319

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

319
737
1056

North-South:
East-West:
SUM:

319
737
1056

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

445

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.741

0.741

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.641

0.641

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

21

46

29
16

25
8

3
727
9

36
815
20

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

21

21

21

21

66

29

66

29

16

16

0
0
0
0
0
1
0

46

46

46

46

79

25

79

25

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

368

727

368

727

36

36

36

36

418

815

418

815

20

20

20

20

112
421
533

112
421
533

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

21

29

16

46

25

0
0
0
0
0
0
0

727

0
0
0
0
0
0
0

36

815

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

29

16

0
0
0
0
0
0
0

46

25

0
0
0
0
0
0
0

727

36

815

20

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.374

0.374

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.374

0.374

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

180
306
118

38
284
39

25
281
188

335
751
106

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

306

306

306

306

118

118

38

38

38

38

284

284

284

284

27

39

27

39

25

25

25

25

141

281

141

281

98

188

98

188

1
0
1
1
0
0
0

335

335

335

335

429

751

429

751

106

106

106

106

North-South:
East-West:
SUM:

464
476
940

North-South:
East-West:
SUM:

464
476
940

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

180

306

118

38

284

39

25

281

188

335

751

106

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

306

118

0
0
0
0
0
0
0

38

284

39

0
0
0
0
0
0
0

25

281

188

0
0
0
0
0
0
0

0
0
0
0
0
0
0

335

751

106

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

30
86
121

45
54
32

16
518
29

171
1748
51

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

207

86

207

86

121

121

45

45

45

45

86

54

86

54

32

32

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

16

16

16

16

274

518

274

518

29

29

29

29

171

171

171

171

900

1748

900

1748

51

51

51

51

252
916
1168

252
916
1168

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

86

121

45

54

32

16

518

29

171

1748

51

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

86

121

0
0
0
0
0
0
0

45

54

32

0
0
0
0
0
0
0

16

518

29

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

1748

51

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.460

1.460

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.360

1.360

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
91
55

13
1
27

31
845
4

32
1727
18

No. of
Lanes

Lane
Volume

0
1
0
0
1
0
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

91

94

91

39

55

39

55

13

13

13

13

41

41

27

27

31

31

31

31

425

845

425

845

32

32

32

32

864

1727

864

1727

18

18

18

18

107
895
1002

North-South:
East-West:
SUM:

107
895
1002

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

91

55

13

27

31

845

32

1727

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

55

13

27

31

845

32

1727

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.253

1.253

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.153

1.153

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:13 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

200

175

20
300

53
13

3
1273
112

345
1647
62

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

200

200

200

200

160

20

160

20

300

300

1
0
0
0
0
1
0

121

175

121

175

121

53

121

53

13

13

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

637

1273

637

1273

12

112

12

112

345

345

345

345

855

1647

855

1647

62

62

62

62

321
982
1303

321
982
1303

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

200

20

300

0
0
0
0
0
0
0

175

53

13

0
0
0
0
0
0
0

1273

112

0
0
0
0
0
0
0

345

1647

62

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

200

20

300

175

53

13

1273

112

345

1647

62

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.629

1.629

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.529

1.529

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

45
0
660

0
0
0

0
1298
30

330
2153
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

45

45

45

45

33

660

33

660

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

664

1298

664

1298

30

30

30

30

330

330

330

330

1077

2153

1077

2153

45
1077
1122

North-South:
East-West:
SUM:

45
1077
1122

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0

330

2153

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

45

660

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1298

30

0
0
0
0
0
0
0

330

2153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.122

1.122

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.022

1.022

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1826

850
242

76
301
0

6
19

0
64

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

425

850

425

850

242

242

76

76

76

76

151

301

151

301

0
0
0
0
0
1
0

11

11

11

11

36

36

19

19

1
0
0
0
0
0
1

945

1826

945

1826

945

64

945

64

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

501
981
1482

501
981
1482

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

850

242

76

301

11

19

1826

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

850

242

0
0
0
0
0
0
0

76

301

0
0
0
0
0
0
0

11

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1826

64

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

149

700

24
96

211
1210

446
1880
39

49
1127
290

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

45

149

45

149

24

24

24

24

72

96

72

96

1
1
0
0
2
0
0

456

700

456

700

456

211

456

211

421

1210

421

1210

2
0
3
1
0
0
0

245

446

245

446

480

1880

480

1880

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

49

49

49

49

564

1127

564

1127

290

290

528
809
1337

North-South:
East-West:
SUM:

528
809
1337

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

24

96

0
0
0
0
0
0
0

700

211

1210

0
0
0
0
0
0
0

446

1880

39

0
0
0
0
0
0
0

49

1127

290

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

149

24

96

0
0
0
0
0
0
0

700

211

1210

0
0
0
0
0
0
0

446

1880

39

49

1127

290

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.972

0.972

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.872

0.872

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

263

0
204

0
0

0
1453
947

0
1635
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

263

263

263

263

112

204

112

204

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

727

1453

727

1453

258

947

258

947

545

1635

545

1635

263
727
990

263
727
990

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

1635

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

263

204

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1453

947

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1635

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.660

0.660

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.560

0.560

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

464

0
873

0
0

0
841
154

642
1244
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

464

464

464

464

231

873

231

873

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

498

841

498

841

154

154

154

154

642

642

642

642

622

1244

622

1244

464
1140
1604

North-South:
East-West:
SUM:

464
1140
1604

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

642

1244

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

873

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

154

0
0
0
0
0
0
0

0
0
0
0
0
0
0

642

1244

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.126

1.126

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.026

1.026

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

627

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

329

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
223

813
0

0
982
584

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

345

627

345

627

223

223

1
0
2
0
0
0
0

329

329

329

329

407

813

407

813

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

491

982

491

982

239

584

239

584

345
820
1165

345
820
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

627

223

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

584

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

627

223

0
0
0
0
0
0
0

329

813

0
0
0
0
0
0
0

0
0
0
0
0
0
0

982

584

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.818

0.818

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.718

0.718

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

52

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

CRITICAL VOLUMES

556
197

44
198
188

967
28

837
94

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

52

52

52

52

377

556

377

556

197

197

197

197

44

44

44

44

99

198

99

198

188

188

188

188

1
0
1
0
1
0
0

301

301

301

301

967

967

967

967

28

28

28

28

1
0
1
0
1
0
0

175

175

175

175

837

837

837

837

94

94

94

94

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

421
1142
1563

North-South:
East-West:
SUM:

421
1142
1563

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

52

556

197

44

198

188

301

967

28

175

837

94

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

52

556

197

0
0
0
0
0
0
0

44

198

188

0
0
0
0
0
0
0

301

967

28

0
0
0
0
0
0
0

175

837

94

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.097

1.097

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.997

0.997

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

15
472
0

57
360
218

168
352
66

21
104
314

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

487

472

487

472

57

57

57

57

346

360

346

360

346

218

346

218

168

168

168

168

418

352

418

352

66

66

21

21

21

21

104

104

104

104

314

314

314

314

544
482
1026

544
482
1026

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

15

472

57

360

218

168

352

66

21

104

314

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

472

0
0
0
0
0
0
0

57

360

218

0
0
0
0
0
0
0

168

352

66

21

104

314

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.283

1.283

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.183

1.183

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

31
136
42

82
310
22

79
792
115

83
759
94

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

209

136

209

136

42

42

82

82

82

82

207

310

207

310

207

22

207

22

79

79

79

79

302

792

302

792

115

115

115

115

83

83

83

83

427

759

427

759

94

94

94

94

291
506
797

North-South:
East-West:
SUM:

291
506
797

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

31

136

42

82

310

22

79

792

115

83

759

94

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

136

42

0
0
0
0
0
0
0

82

310

22

0
0
0
0
0
0
0

79

792

115

0
0
0
0
0
0
0

83

759

94

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.580

0.580

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.480

0.480

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

244

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

118

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

724
247

822
145

988
52

103
1347
50

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

188

188

188

188

362

724

362

724

196

247

196

247

1
0
1
1
0
0
0

244

244

244

244

484

822

484

822

145

145

145

145

1
0
2
0
1
0
0

118

118

118

118

494

988

494

988

52

52

1
0
2
0
1
0
0

103

103

103

103

674

1347

674

1347

50

50

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

672
792
1464

672
792
1464

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

724

247

0
0
0
0
0
0
0

244

822

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

103

1347

50

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

724

247

0
0
0
0
0
0
0

244

822

145

0
0
0
0
0
0
0

118

988

52

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1347

50

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.830

1.830

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.730

1.730

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

94
417
225

967
282
8

9
1269
17

134
1660
928

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

94

209

417

209

417

225

225

225

225

338

967

338

967

290

282

290

282

429

1269

429

1269

17

17

17

17

134

134

134

134

553

1660

553

1660

928

928

563
563
1126

North-South:
East-West:
SUM:

563
563
1126

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

417

225

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1660

928

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

417

225

0
0
0
0
0
0
0

967

282

0
0
0
0
0
0
0

1269

17

0
0
0
0
0
0
0

134

1660

928

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.408

1.408

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.308

1.308

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

610

0
151

0
0

0
967
471

158
980
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

381

610

381

610

381

151

381

151

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

484

967

484

967

90

471

90

471

158

158

158

158

490

980

490

980

381
642
1023

North-South:
East-West:
SUM:

381
642
1023

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

610

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

158

980

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

610

151

0
0
0
0
0
0
0

0
0
0
0
0
0
0

967

471

0
0
0
0
0
0
0

0
0
0
0
0
0
0

158

980

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.718

0.718

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.618

0.618

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:11 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_70_CalcaDB_PM_Event_Inbound(5-6).xls

CUMULATIVE BASE PLUS PROJECT CONDITIONS (650 ATTENDEE


EVENT DAY 50% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

43

23
14

13
3

3
695
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

43

43

43

43

59

13

59

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

350

695

350

695

26

26

26

26

438

861

438

861

15

15

15

15

98
441
539

98
441
539

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

43

13

0
0
0
0
0
0
0

695

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

43

13

0
0
0
0
0
0
0

695

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.378

0.378

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.378

0.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195

105

282
178

182
59

48
536
152

272
780
133

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

195

195

195

195

282

282

282

282

178

178

1
0
1
0
1
0
0

105

105

105

105

182

182

182

182

35

59

35

59

1
0
2
0
1
0
0

48

48

48

48

268

536

268

536

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

387
540
927

North-South:
East-West:
SUM:

387
540
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.674

0.674

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.574

0.574

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

25

96
56

31
17

33
736
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

152

96

152

96

56

56

25

25

25

25

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

403

736

403

736

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

177
590
767

177
590
767

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

56

25

31

17

33

736

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

56

0
0
0
0
0
0
0

25

31

17

0
0
0
0
0
0
0

33

736

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.023

1.023

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.923

0.923

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
664
22

24
1114
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

177

137

177

137

23

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

343

664

343

664

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

178
682
860

North-South:
East-West:
SUM:

178
682
860

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

664

22

0
0
0
0
0
0
0

24

1114

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

664

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.147

1.147

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.047

1.047

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

128

346

16
219

67
14

2
739
62

231
1191
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

128

128

128

128

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

631

1191

631

1191

71

71

71

71

North-South:
East-West:
SUM:

342
633
975

342
633
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

128

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1191

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

128

16

219

346

67

14

739

62

231

1191

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.300

1.300

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.200

1.200

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

312
1453
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

39

39

39

39

92

735

92

735

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

653

1290

653

1290

15

15

15

15

312

312

312

312

727

1453

727

1453

92
965
1057

North-South:
East-West:
SUM:

92
965
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1216

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

638

1216

638

1216

638

59

638

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
677
1127

450
677
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1216

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1216

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.751

0.751

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.651

0.651

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
780

348
1628
21

0
896
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

238

780

238

780

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

448

896

448

896

500

500

419
639
1058

North-South:
East-West:
SUM:

419
639
1058

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

191

0
86

0
0

0
880
1053

0
1208
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

191

191

191

191

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

388

1053

388

1053

403

1208

403

1208

191
440
631

191
440
631

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1208

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1208

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.421

0.421

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.321

0.321

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

238

0
582

0
0

0
1004
165

325
1286
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

238

238

238

238

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

643

1286

643

1286

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1286

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1286

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

265

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
537

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

265

265

265

265

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

251

537

251

537

286
774
1060

286
774
1060

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

1018

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

537

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.744

0.744

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.644

0.644

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

932
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

932

932

932

932

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1157
1532

North-South:
East-West:
SUM:

375
1157
1532

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

932

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

932

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.075

1.075

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.975

0.975

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

331

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

584
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

618

584

618

584

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

331

331

331

331

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

682
611
1293

682
611
1293

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

584

10

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

584

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.907

0.907

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.807

0.807

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
263
42

95
289
26

133
824
139

93
863
151

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

358

263

358

263

42

42

95

95

95

95

253

289

253

289

253

26

253

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

507

863

507

863

151

151

151

151

453
640
1093

North-South:
East-West:
SUM:

453
640
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

263

42

95

289

26

133

824

139

93

863

151

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

263

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

151

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.795

0.795

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.695

0.695

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

108

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

479
103

479
108

805
63

122
1447
161

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

240

479

240

479

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

108

108

108

108

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

100

161

100

161

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
832
1266

434
832
1266

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

122

1447

161

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

161

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.688

1.688

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.588

1.588

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
378
214

691
282
37

14
1140
27

103
1652
986

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

189

378

189

378

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

551

1652

551

1652

986

986

533
565
1098

North-South:
East-West:
SUM:

533
565
1098

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

378

214

691

282

37

14

1140

27

103

1652

986

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

378

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1652

986

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.464

1.464

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.364

1.364

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

622

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

395

622

395

622

395

168

395

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

49

444

49

444

151

151

151

151

493

985

493

985

395
663
1058

395
663
1058

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.742

0.742

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.642

0.642

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

17

0.000

v/c after mitigation:


Fully mitigated?

NO

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

41

21
24

15
9

6
847
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

41

41

41

41

65

15

65

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

428

847

428

847

29

29

29

29

449

880

449

880

17

17

17

17

109
457
566

North-South:
East-West:
SUM:

109
457
566

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

23

21

24

41

15

847

29

880

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

41

15

0
0
0
0
0
0
0

847

0
0
0
0
0
0
0

29

880

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.397

0.397

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.397

0.397

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

163

243
176

237
42

67
930
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

176

176

1
0
1
0
1
0
0

163

163

163

163

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

465

930

465

930

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
702
1121

419
702
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

176

163

237

42

67

930

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

176

163

237

42

67

930

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.815

0.815

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.715

0.715

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

50

56
61

24
15

33
1016
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

117

56

117

56

61

61

50

50

50

50

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

579

1016

579

1016

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

167
641
808

North-South:
East-West:
SUM:

167
641
808

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

61

50

24

15

33

1016

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

61

0
0
0
0
0
0
0

50

24

15

0
0
0
0
0
0
0

33

1016

141

62

1097

42

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.539

0.539

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.439

0.439

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1122
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

22

22

14

14

10

10

46

46

46

46

573

1122

573

1122

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

27
607
634

27
607
634

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

22

0
0
0
0
0
0
0

10

0
0
0
0
0
0
0
0
0
0
0
0
0
0

46

1122

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1122

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.423

0.423

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.323

0.323

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

238

160

52
215

89
14

10
824
256

195
1143
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

238

238

238

238

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

137

256

137

256

1
0
1
1
0
0
0

195

195

195

195

602

1143

602

1143

60

60

60

60

North-South:
East-West:
SUM:

370
612
982

North-South:
East-West:
SUM:

370
612
982

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

238

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1143

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

238

52

215

160

89

14

10

824

256

195

1143

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.714

0.714

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.614

0.614

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

668

1335

668

1335

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1335
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1335

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1335

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

937

CRITICAL VOLUMES

436
322

234
0

1
4

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

498

937

498

937

498

58

498

58

North-South:
East-West:
SUM:

431
505
936

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
505
936

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

937

58

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

937

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.624

0.624

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.524

0.524

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
743

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

295

743

295

743

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
791

Lane
Volume

2
0
1
1
0
0
0

396

791

396

791

80

530

80

530

346
510
856

346
510
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

743

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

791

530

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

743

207

1324

36

791

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.623

0.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.523

0.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

207

0
237

0
0

0
840
630

15
1109
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

207

207

207

207

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

140

630

140

630

15

15

370

1109

370

1109

207
420
627

North-South:
East-West:
SUM:

207
420
627

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

207

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

15

1109

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

207

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

15

1109

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.418

0.418

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.318

0.318

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

130

0
240

0
0

0
979
108

227
1090
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

130

130

130

130

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

545

1090

545

1090

North-South:
East-West:
SUM:

130
771
901

130
771
901

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1090

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1090

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.632

0.632

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.532

0.532

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

226

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
497

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

226

226

226

226

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

244

497

244

497

253
702
955

North-South:
East-West:
SUM:

253
702
955

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

226

973

951

497

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

460

217

226

973

951

497

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.670

0.670

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.570

0.570

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

970
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

970

970

970

970

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1209
1503

294
1209
1503

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

78

248

185

77

230

143

0
0
0
0
0
0
0

288

970

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

970

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.055

1.055

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.955

0.955

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

333

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

597
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

704

597

704

597

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

333

333

333

333

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

801
486
1287

North-South:
East-West:
SUM:

801
486
1287

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

597

49

97

498

315

0
0
0
0
0
0
0

333

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

597

49

97

498

315

333

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.903

0.903

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.803

0.803

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
306
71

134
355
19

126
1059
160

98
754
211

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

471

306

471

306

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

483

754

483

754

211

211

211

211

605
609
1214

605
609
1214

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

306

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

211

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

306

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

98

754

211

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.883

0.883

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.783

0.783

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

433
78

435
143

161
1264
145

83
1368
141

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

217

433

217

433

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

161

161

161

161

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

38

141

38

141

423
845
1268

North-South:
East-West:
SUM:

423
845
1268

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

123

433

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

161

1264

145

0
0
0
0
0
0
0

83

1368

141

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

123

433

78

206

435

143

161

1264

145

83

1368

141

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.845

0.845

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.745

0.745

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
216
124

1228
312
75

37
1403
108

96
1556
884

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

108

216

108

216

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

519

1556

519

1556

884

884

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

216

124

1228

312

75

37

1403

108

96

1556

884

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

80

216

124

0
0
0
0
0
0
0

1228

312

75

0
0
0
0
0
0
0

37

1403

108

0
0
0
0
0
0
0

96

1556

884

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

460

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

327

460

327

460

327

193

327

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

327
737
1064

North-South:
East-West:
SUM:

327
737
1064

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

460

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

460

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.747

0.747

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.647

0.647

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

CUMULATIVE BASE PLUS PROJECT WITH MITIGATION CONDITIONS


(650 ATTENDEE EVENT DAY 70% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

43

23
14

13
3

3
695
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

43

43

43

43

59

13

59

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

350

695

350

695

26

26

26

26

438

861

438

861

15

15

15

15

98
441
539

98
441
539

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

43

13

0
0
0
0
0
0
0

695

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

43

13

0
0
0
0
0
0
0

695

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.378

0.378

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.378

0.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195

105

282
178

182
59

48
536
152

272
780
133

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

195

195

195

195

282

282

282

282

178

178

1
0
1
0
1
0
0

105

105

105

105

182

182

182

182

35

59

35

59

1
0
2
0
1
0
0

48

48

48

48

268

536

268

536

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

387
540
927

North-South:
East-West:
SUM:

387
540
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.674

0.674

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.574

0.574

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

25

96
56

31
17

33
736
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

152

96

152

96

56

56

25

25

25

25

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

403

736

403

736

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

177
590
767

177
590
767

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

56

25

31

17

33

736

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

56

0
0
0
0
0
0
0

25

31

17

0
0
0
0
0
0
0

33

736

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.023

1.023

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.923

0.923

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
664
22

24
1114
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

177

137

177

137

23

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

343

664

343

664

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

178
682
860

North-South:
East-West:
SUM:

178
682
860

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

664

22

0
0
0
0
0
0
0

24

1114

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

664

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.147

1.147

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.047

1.047

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

128

346

16
219

67
14

2
739
62

231
1191
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

128

128

128

128

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

631

1191

631

1191

71

71

71

71

North-South:
East-West:
SUM:

342
633
975

342
633
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

128

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1191

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

128

16

219

346

67

14

739

62

231

1191

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.300

1.300

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.200

1.200

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

312
1453
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

39

39

39

39

92

735

92

735

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

653

1290

653

1290

15

15

15

15

312

312

312

312

727

1453

727

1453

92
965
1057

North-South:
East-West:
SUM:

92
965
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1216

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

638

1216

638

1216

638

59

638

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
677
1127

450
677
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1216

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1216

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.751

0.751

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.651

0.651

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
780

348
1628
21

0
896
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

238

780

238

780

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

448

896

448

896

500

500

419
639
1058

North-South:
East-West:
SUM:

419
639
1058

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

191

0
86

0
0

0
880
1053

0
1208
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

191

191

191

191

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

388

1053

388

1053

403

1208

403

1208

191
440
631

191
440
631

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1208

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1208

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.421

0.421

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.321

0.321

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

238

0
582

0
0

0
1004
165

325
1286
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

238

238

238

238

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

643

1286

643

1286

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1286

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1286

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

265

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
537

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

265

265

265

265

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

251

537

251

537

286
774
1060

286
774
1060

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

1018

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

537

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.744

0.744

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.644

0.644

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

932
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

932

932

932

932

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1157
1532

North-South:
East-West:
SUM:

375
1157
1532

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

932

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

932

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.075

1.075

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.975

0.975

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

331

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

584
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

618

584

618

584

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

331

331

331

331

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

682
611
1293

682
611
1293

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

584

10

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

584

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.907

0.907

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.807

0.807

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
263
42

95
289
26

133
824
139

93
863
151

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

358

263

358

263

42

42

95

95

95

95

253

289

253

289

253

26

253

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

507

863

507

863

151

151

151

151

453
640
1093

North-South:
East-West:
SUM:

453
640
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

263

42

95

289

26

133

824

139

93

863

151

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

263

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

151

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.795

0.795

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.695

0.695

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

108

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

479
103

479
108

805
63

122
1447
161

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

240

479

240

479

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

108

108

108

108

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

100

161

100

161

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
832
1266

434
832
1266

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

122

1447

161

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

161

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.688

1.688

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.588

1.588

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
378
214

691
282
37

14
1140
27

103
1652
986

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

189

378

189

378

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

551

1652

551

1652

986

986

533
565
1098

North-South:
East-West:
SUM:

533
565
1098

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

378

214

691

282

37

14

1140

27

103

1652

986

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

378

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1652

986

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.464

1.464

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.364

1.364

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

622

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

395

622

395

622

395

168

395

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

49

444

49

444

151

151

151

151

493

985

493

985

395
663
1058

395
663
1058

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.742

0.742

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.642

0.642

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

17

0.000

v/c after mitigation:


Fully mitigated?

NO

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

41

21
24

15
9

6
847
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

41

41

41

41

65

15

65

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

428

847

428

847

29

29

29

29

449

880

449

880

17

17

17

17

109
457
566

North-South:
East-West:
SUM:

109
457
566

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

23

21

24

41

15

847

29

880

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

41

15

0
0
0
0
0
0
0

847

0
0
0
0
0
0
0

29

880

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.397

0.397

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.397

0.397

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

163

243
176

237
42

67
930
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

176

176

1
0
1
0
1
0
0

163

163

163

163

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

465

930

465

930

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
702
1121

419
702
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

176

163

237

42

67

930

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

176

163

237

42

67

930

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.815

0.815

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.715

0.715

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

50

56
61

24
15

33
1016
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

117

56

117

56

61

61

50

50

50

50

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

579

1016

579

1016

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

167
641
808

North-South:
East-West:
SUM:

167
641
808

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

61

50

24

15

33

1016

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

61

0
0
0
0
0
0
0

50

24

15

0
0
0
0
0
0
0

33

1016

141

62

1097

42

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.539

0.539

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.439

0.439

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1122
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

22

22

14

14

10

10

46

46

46

46

573

1122

573

1122

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

27
607
634

27
607
634

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

22

0
0
0
0
0
0
0

10

0
0
0
0
0
0
0
0
0
0
0
0
0
0

46

1122

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1122

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.423

0.423

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.323

0.323

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

238

160

52
215

89
14

10
824
256

195
1143
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

238

238

238

238

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

137

256

137

256

1
0
1
1
0
0
0

195

195

195

195

602

1143

602

1143

60

60

60

60

North-South:
East-West:
SUM:

370
612
982

North-South:
East-West:
SUM:

370
612
982

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

238

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1143

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

238

52

215

160

89

14

10

824

256

195

1143

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.714

0.714

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.614

0.614

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

668

1335

668

1335

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1335
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1335

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1335

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

937

CRITICAL VOLUMES

436
322

234
0

1
4

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

498

937

498

937

498

58

498

58

North-South:
East-West:
SUM:

431
505
936

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
505
936

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

937

58

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

937

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.624

0.624

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.524

0.524

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
743

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

295

743

295

743

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
791

Lane
Volume

2
0
1
1
0
0
0

396

791

396

791

80

530

80

530

346
510
856

346
510
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

743

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

791

530

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

743

207

1324

36

791

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.623

0.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.523

0.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

207

0
237

0
0

0
840
630

15
1109
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

207

207

207

207

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

140

630

140

630

15

15

370

1109

370

1109

207
420
627

North-South:
East-West:
SUM:

207
420
627

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

207

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

15

1109

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

207

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

15

1109

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.418

0.418

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.318

0.318

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

130

0
240

0
0

0
979
108

227
1090
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

130

130

130

130

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

545

1090

545

1090

North-South:
East-West:
SUM:

130
771
901

130
771
901

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1090

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1090

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.632

0.632

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.532

0.532

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

226

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
497

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

226

226

226

226

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

244

497

244

497

253
702
955

North-South:
East-West:
SUM:

253
702
955

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

226

973

951

497

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

460

217

226

973

951

497

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.670

0.670

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.570

0.570

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

970
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

970

970

970

970

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1209
1503

294
1209
1503

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

78

248

185

77

230

143

0
0
0
0
0
0
0

288

970

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

970

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.055

1.055

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.955

0.955

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

333

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

597
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

704

597

704

597

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

333

333

333

333

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

801
486
1287

North-South:
East-West:
SUM:

801
486
1287

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

597

49

97

498

315

0
0
0
0
0
0
0

333

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

597

49

97

498

315

333

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.903

0.903

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.803

0.803

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
306
71

134
355
19

126
1059
160

98
754
211

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

471

306

471

306

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

483

754

483

754

211

211

211

211

605
609
1214

605
609
1214

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

306

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

211

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

94

306

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

98

754

211

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.883

0.883

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.783

0.783

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

433
78

435
143

161
1264
145

83
1368
141

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

217

433

217

433

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

161

161

161

161

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

38

141

38

141

423
845
1268

North-South:
East-West:
SUM:

423
845
1268

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

123

433

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

161

1264

145

0
0
0
0
0
0
0

83

1368

141

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

123

433

78

206

435

143

161

1264

145

83

1368

141

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.845

0.845

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.745

0.745

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
216
124

1228
312
75

37
1403
108

96
1556
884

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

108

216

108

216

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

519

1556

519

1556

884

884

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

216

124

1228

312

75

37

1403

108

96

1556

884

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

80

216

124

0
0
0
0
0
0
0

1228

312

75

0
0
0
0
0
0
0

37

1403

108

0
0
0
0
0
0
0

96

1556

884

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

460

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

327

460

327

460

327

193

327

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

327
737
1064

North-South:
East-West:
SUM:

327
737
1064

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

460

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

460

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.747

0.747

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.647

0.647

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

CUMULATIVE BASE PLUS PROJECT WITH MITIGATION AND PHYSICAL


IMPROVEMENT CONDITIONS (650 EVENT DAY 70% BUSING)

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

43

23
14

13
3

3
695
5

26
861
15

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

55

23

55

23

14

14

0
0
0
0
0
1
0

43

43

43

43

59

13

59

13

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

350

695

350

695

26

26

26

26

438

861

438

861

15

15

15

15

98
441
539

98
441
539

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

23

14

43

13

0
0
0
0
0
0
0

695

0
0
0
0
0
0
0

26

861

15

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

23

14

0
0
0
0
0
0
0

43

13

0
0
0
0
0
0
0

695

26

861

15

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.378

0.378

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.378

0.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

195

105

282
178

182
59

48
536
152

272
780
133

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

195

195

195

195

282

282

282

282

178

178

1
0
1
0
1
0
0

105

105

105

105

182

182

182

182

35

59

35

59

1
0
2
0
1
0
0

48

48

48

48

268

536

268

536

55

152

55

152

1
0
1
1
0
0
0

272

272

272

272

457

780

457

780

133

133

133

133

North-South:
East-West:
SUM:

387
540
927

North-South:
East-West:
SUM:

387
540
927

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

195

282

178

105

182

59

48

536

152

272

780

133

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.674

0.674

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.574

0.574

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
2
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

25

96
56

31
17

33
736
70

75
1080
33

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

38

38

38

38

152

96

152

96

56

56

25

25

25

25

48

31

48

31

17

17

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

33

33

33

33

403

736

403

736

70

70

70

70

75

75

75

75

557

1080

557

1080

33

33

33

33

177
590
767

177
590
767

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

96

56

25

31

17

33

736

70

75

1080

33

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

96

56

0
0
0
0
0
0
0

25

31

17

0
0
0
0
0
0
0

33

736

70

0
0
0
0
0
0
0

75

1080

33

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.023

1.023

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.923

0.923

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

17
137
23

1
10
15

125
664
22

24
1114
17

No. of
Lanes

0
1
0
0
1
0
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

17

17

17

154

137

154

137

11

23

11

23

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

17

26

10

26

10

15

15

125

125

125

125

343

664

343

664

22

22

22

22

24

24

24

24

557

1114

557

1114

17

17

17

17

155
682
837

North-South:
East-West:
SUM:

155
682
837

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

17

137

23

0
0
0
0
0
0
0

10

15

0
0
0
0
0
0
0

125

664

22

0
0
0
0
0
0
0

24

1114

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

17

137

23

10

15

125

664

22

24

1114

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.116

1.116

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.016

1.016

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:20 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
750

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
750

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
1
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

128

346

16
219

67
14

2
739
62

231
1191
71

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

128

128

128

128

118

16

118

16

219

219

1
0
0
0
0
1
0

214

346

214

346

214

67

214

67

14

14

1
0
2
0
1
0
0

370

739

370

739

62

62

1
0
1
1
0
0
0

231

231

231

231

631

1191

631

1191

71

71

71

71

North-South:
East-West:
SUM:

342
633
975

342
633
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

128

16

219

0
0
0
0
0
0
0

346

67

14

0
0
0
0
0
0
0

739

62

0
0
0
0
0
0
0

231

1191

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

128

16

219

346

67

14

739

62

231

1191

71

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.300

1.300

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.200

1.200

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

39
0
735

0
0
0

0
1290
15

312
1453
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

39

39

39

39

92

735

92

735

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

653

1290

653

1290

15

15

15

15

312

312

312

312

727

1453

727

1453

92
965
1057

North-South:
East-West:
SUM:

92
965
1057

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

39

735

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1290

15

0
0
0
0
0
0
0

312

1453

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.174

1.174

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.074

1.074

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

135

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

11

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1216

629
291

170
2

7
21

0
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

315

629

315

629

291

291

1
0
2
0
0
0
0

135

135

135

135

85

170

85

170

0
0
0
0
0
1
0

11

11

11

11

39

39

21

21

1
0
0
0
0
0
1

638

1216

638

1216

638

59

638

59

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
2
0
2
0
0

450
677
1127

450
677
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

629

291

135

170

11

21

1216

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

629

291

0
0
0
0
0
0
0

135

170

0
0
0
0
0
0
0

11

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1216

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.751

0.751

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.651

0.651

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

60
71
110

507
110
780

348
1628
21

0
896
500

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

60

18

60

71

71

71

71

110

110

110

110

1
1
0
0
2
0
0

309

507

309

507

309

110

309

110

238

780

238

780

2
0
3
1
0
0
0

191

348

191

348

412

1628

412

1628

21

21

21

21

2
0
1
1
0
0
0

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

448

896

448

896

500

500

419
639
1058

North-South:
East-West:
SUM:

419
639
1058

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

71

110

0
0
0
0
0
0
0

507

110

780

0
0
0
0
0
0
0

348

1628

21

0
0
0
0
0
0
0

896

500

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

191

0
86

0
0

0
880
1053

0
1208
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

191

191

191

191

47

86

47

86

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

440

880

440

880

388

1053

388

1053

403

1208

403

1208

191
440
631

191
440
631

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

1208

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

191

86

0
0
0
0
0
0
0

0
0
0
0
0
0
0

880

1053

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1208

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.421

0.421

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.321

0.321

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

238

0
582

0
0

0
1004
165

325
1286
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

238

238

238

238

257

582

257

582

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

585

1004

585

1004

165

165

165

165

325

325

325

325

643

1286

643

1286

257
910
1167

North-South:
East-West:
SUM:

257
910
1167

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

325

1286

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

238

582

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1004

165

0
0
0
0
0
0
0

0
0
0
0
0
0
0

325

1286

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

520

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

265

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
244

946
0

0
1018
537

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

286

520

286

520

244

244

1
0
2
0
0
0
0

265

265

265

265

473

946

473

946

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

509

1018

509

1018

251

537

251

537

286
774
1060

286
774
1060

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

1018

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

520

244

0
0
0
0
0
0
0

265

946

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1018

537

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.744

0.744

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.644

0.644

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

11

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
6:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

294

WESTBOUND

66

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

225

CRITICAL VOLUMES

505
162

41
182
158

932
33

774
119

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

334

505

334

505

162

162

162

162

41

41

41

41

91

182

91

182

158

158

158

158

1
0
1
0
1
0
0

294

294

294

294

932

932

932

932

33

33

33

33

1
0
1
0
1
0
0

225

225

225

225

774

774

774

774

119

119

119

119

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

375
1157
1532

North-South:
East-West:
SUM:

375
1157
1532

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

505

162

41

182

158

294

932

33

225

774

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

505

162

0
0
0
0
0
0
0

41

182

158

0
0
0
0
0
0
0

294

932

33

0
0
0
0
0
0
0

225

774

119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.075

1.075

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.975

0.975

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

3
0
0
0
2

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

331

WESTBOUND

24

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

27

584
10

64
429
213

237
46

84
280

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

24

24

24

24

618

584

618

584

10

10

64

64

64

64

385

429

385

429

385

213

385

213

1
0
0
1
0
0
0

331

331

331

331

283

237

283

237

46

46

1
0
1
1
0
0
0

27

27

27

27

84

84

84

84

280

280

280

280

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

682
611
1293

682
611
1293

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

24

584

10

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

24

584

10

0
0
0
0
0
0
0

64

429

213

0
0
0
0
0
0
0

331

237

46

0
0
0
0
0
0
0

0
0
0
0
0
0
0

27

84

280

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.907

0.907

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.807

0.807

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

13

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

53
263
42

95
289
26

133
824
139

93
863
151

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

53

53

53

53

358

263

358

263

42

42

95

95

95

95

253

289

253

289

253

26

253

26

133

133

133

133

321

824

321

824

139

139

139

139

93

93

93

93

507

863

507

863

151

151

151

151

453
640
1093

North-South:
East-West:
SUM:

453
640
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

53

263

42

95

289

26

133

824

139

93

863

151

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

53

263

42

0
0
0
0
0
0
0

95

289

26

0
0
0
0
0
0
0

133

824

139

0
0
0
0
0
0
0

93

863

151

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.795

0.795

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.695

0.695

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
750

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
750

NB-EB--

0
0

SB-WB--

Conducted by:
6:00
0
0
0
0
2
750

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

140

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

122

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

108

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

479
103

479
108

805
63

122
1447
161

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

140

140

140

140

240

479

240

479

42

103

42

103

1
0
1
1
0
0
0

122

122

122

122

294

479

294

479

108

108

108

108

1
0
2
0
1
0
0

108

108

108

108

403

805

403

805

63

63

1
0
2
0
1
0
0

122

122

122

122

724

1447

724

1447

100

161

100

161

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

434
832
1266

434
832
1266

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

122

1447

161

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

479

103

0
0
0
0
0
0
0

122

479

108

0
0
0
0
0
0
0

108

805

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

122

1447

161

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.688

1.688

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.588

1.588

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

15

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
750

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
750

NB-EB--

2
0

SB-WB--

Conducted by:
6:00
0
1
0
1
2
750

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
750

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
750

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

82
378
214

691
282
37

14
1140
27

103
1652
986

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

82

82

82

82

189

378

189

378

214

214

214

214

242

691

242

691

319

282

319

282

37

37

37

37

14

14

14

14

389

1140

389

1140

27

27

27

27

103

103

103

103

551

1652

551

1652

986

986

533
565
1098

North-South:
East-West:
SUM:

533
565
1098

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

82

378

214

691

282

37

14

1140

27

103

1652

986

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

82

378

214

0
0
0
0
0
0
0

691

282

37

14

1140

27

0
0
0
0
0
0
0
0
0
0
0
0
0
0

103

1652

986

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.464

1.464

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.364

1.364

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
6:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

622

0
168

0
4

0
1023
444

151
985
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

395

622

395

622

395

168

395

168

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

512

1023

512

1023

49

444

49

444

151

151

151

151

493

985

493

985

395
663
1058

395
663
1058

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

151

985

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

622

168

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1023

444

0
0
0
0
0
0
0

0
0
0
0
0
0
0

151

985

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.742

0.742

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.642

0.642

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:18 PM

17

0.000

v/c after mitigation:


Fully mitigated?

NO

0.000
N/A

2511_CBPP_CalcaDB_650P_Evening(6-7).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

23

41

21
24

15
9

6
842
8

29
880
17

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

23

23

23

23

68

21

68

21

24

24

0
0
0
0
0
1
0

41

41

41

41

65

15

65

15

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

425

842

425

842

29

29

29

29

449

880

449

880

17

17

17

17

109
455
564

North-South:
East-West:
SUM:

109
455
564

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

21

24

41

15

0
0
0
0
0
0
0

842

0
0
0
0
0
0
0

29

880

17

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

21

24

0
0
0
0
0
0
0

41

15

0
0
0
0
0
0
0

842

29

880

17

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.396

0.396

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.396

0.396

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

182

162

243
171

237
42

67
925
161

237
766
143

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

182

182

182

182

243

243

243

243

171

171

1
0
1
0
1
0
0

162

162

162

162

237

237

237

237

42

42

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

67

67

67

67

463

925

463

925

70

161

70

161

237

237

237

237

455

766

455

766

143

143

143

143

419
700
1119

419
700
1119

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

171

162

237

42

67

925

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

182

243

171

162

237

42

67

925

161

237

766

143

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.814

0.814

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.714

0.714

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

13

49

56
61

24
15

33
1004
141

62
1097
42

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

13

13

13

117

56

117

56

61

61

49

49

49

49

39

24

39

24

15

15

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

13

33

33

33

33

573

1004

573

1004

141

141

141

141

62

62

62

62

570

1097

570

1097

42

42

42

42

166
635
801

North-South:
East-West:
SUM:

166
635
801

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

13

56

61

49

24

15

33

1004

141

62

1097

42

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

13

56

61

0
0
0
0
0
0
0

49

24

15

0
0
0
0
0
0
0

33

1004

141

0
0
0
0
0
0
0

62

1097

42

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.534

0.534

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.434

0.434

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
22

4
0
10

46
1109
23

17
1122
16

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
1
0
0
1
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

14

22

14

22

14

14

10

10

46

46

46

46

566

1109

566

1109

23

23

23

23

17

17

17

17

561

1122

561

1122

16

16

16

16

18
607
625

18
607
625

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

22

10

46

1109

23

17

1122

16

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

10

0
0
0
0
0
0
0

46

1109

23

0
0
0
0
0
0
0

17

1122

16

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.417

0.417

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.317

0.317

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:23 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

228

160

52
215

89
14

10
824
256

195
1133
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

228

228

228

228

134

52

134

52

215

215

1
0
0
0
0
1
0

132

160

132

160

132

89

132

89

14

14

1
0
2
0
1
0
0

10

10

10

10

412

824

412

824

142

256

142

256

1
0
1
1
0
0
0

195

195

195

195

597

1133

597

1133

60

60

60

60

North-South:
East-West:
SUM:

360
607
967

North-South:
East-West:
SUM:

360
607
967

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

228

52

215

0
0
0
0
0
0
0

160

89

14

0
0
0
0
0
0
0
0
0
0
0
0
0
0

10

824

256

195

1133

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

228

52

215

160

89

14

10

824

256

195

1133

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.703

0.703

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.603

0.603

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

66
0
553

0
0
0

Total
Volume

Lane
Volume

66

66

66

61

553

61

553

0
0
0
0
0
0
0

641

1227

641

1227

54

54

54

54

1
0
2
0
0
0
0

243

243

243

243

663

1325

663

1325

North-South:
East-West:
SUM:

66
884
950

1227
54

243
1325
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

66

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

66
884
950

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1325

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

553

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1227

54

0
0
0
0
0
0
0

243

1325

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

213

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

933

CRITICAL VOLUMES

436
322

234
0

1
5

0
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

218

436

218

436

322

322

1
0
2
0
0
0
0

213

213

213

213

117

234

117

234

0
0
0
0
0
1
0

1
0
0
0
0
0
1

496

933

496

933

496

58

496

58

North-South:
East-West:
SUM:

431
504
935

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

431
504
935

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

436

322

213

234

933

58

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

322

0
0
0
0
0
0
0

213

234

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

933

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.623

0.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.523

0.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

40

356

No. of
Lanes

5
51

68
739

207
1324
36

530

Total
Volume

Lane
Volume

40

12

40

51

51

51

51

1
1
0
0
2
0
0

212

356

212

356

212

68

212

68

292

739

292

739

2
0
3
1
0
0
0

114

207

114

207

340

1324

340

1324

36

36

36

36

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
785

Lane
Volume

2
0
1
1
0
0
0

393

785

393

785

80

530

80

530

343
507
850

343
507
850

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

40

51

0
0
0
0
0
0
0

356

68

739

0
0
0
0
0
0
0

207

1324

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

785

530

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

40

51

356

68

739

207

1324

36

785

530

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.618

0.618

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.518

0.518

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

205

0
237

0
0

0
840
630

0
1119
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

205

205

205

205

130

237

130

237

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

420

840

420

840

142

630

142

630

373

1119

373

1119

205
420
625

North-South:
East-West:
SUM:

205
420
625

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

205

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

1119

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

205

237

0
0
0
0
0
0
0

0
0
0
0
0
0
0

840

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1119

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.417

0.417

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.317

0.317

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

130

0
240

0
0

0
979
108

227
1087
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

130

130

130

130

13

240

13

240

0
0
0
0
0
0
0

0
0
1
1
0
0
0

544

979

544

979

108

108

108

108

1
0
2
0
0
0
0

227

227

227

227

544

1087

544

1087

North-South:
East-West:
SUM:

130
771
901

130
771
901

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

227

1087

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

130

240

0
0
0
0
0
0
0

0
0
0
0
0
0
0

979

108

0
0
0
0
0
0
0

0
0
0
0
0
0
0

227

1087

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.632

0.632

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.532

0.532

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

460

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

224

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
217

973
0

0
951
494

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

253

460

253

460

217

217

1
0
2
0
0
0
0

224

224

224

224

487

973

487

973

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

476

951

476

951

241

494

241

494

253
700
953

North-South:
East-West:
SUM:

253
700
953

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

224

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

494

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

460

217

0
0
0
0
0
0
0

224

973

0
0
0
0
0
0
0

0
0
0
0
0
0
0

951

494

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.669

0.669

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.569

0.569

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

288

WESTBOUND

78

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

239

248
185

77
230
143

969
37

827
49

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

78

78

78

78

217

248

217

248

185

185

185

185

77

77

77

77

115

230

115

230

143

143

143

143

1
0
1
0
1
0
0

288

288

288

288

969

969

969

969

37

37

37

37

1
0
1
0
1
0
0

239

239

239

239

827

827

827

827

49

49

49

49

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

294
1208
1502

294
1208
1502

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

78

248

185

77

230

143

288

969

37

239

827

49

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

78

248

185

0
0
0
0
0
0
0

77

230

143

0
0
0
0
0
0
0

288

969

37

0
0
0
0
0
0
0

239

827

49

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.054

1.054

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.954

0.954

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

332

WESTBOUND

58

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

588
49

97
498
315

77
68

48
153

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

58

58

58

58

695

588

695

588

49

49

97

97

97

97

601

498

601

498

601

315

601

315

1
0
0
1
0
0
0

332

332

332

332

145

77

145

77

68

68

1
0
1
1
0
0
0

18

18

18

18

48

48

48

48

153

153

153

153

North-South:
East-West:
SUM:

792
485
1277

North-South:
East-West:
SUM:

792
485
1277

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

58

588

49

97

498

315

0
0
0
0
0
0
0

332

77

68

0
0
0
0
0
0
0

18

48

153

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

58

588

49

97

498

315

332

77

68

18

48

153

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.896

0.896

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.796

0.796

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

94
301
71

134
355
19

126
1059
160

98
754
206

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

94

94

94

466

301

466

301

71

71

0
1
0
1
0
0
0

134

134

134

134

321

355

321

355

321

19

321

19

1
0
2
1
0
0
0

126

126

126

126

406

1059

406

1059

160

160

160

160

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

94

0
0
0
0
0
1
0

98

98

98

98

480

754

480

754

206

206

206

206

600
606
1206

600
606
1206

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

301

71

0
0
0
0
0
0
0

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

0
0
0
0
0
0
0

98

754

206

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

94

301

71

134

355

19

0
0
0
0
0
0
0

126

1059

160

0
0
0
0
0
0
0

98

754

206

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.877

0.877

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.777

0.777

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

123

206

430
78

435
143

161
1264
145

83
1368
141

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

123

123

123

123

215

430

215

430

37

78

37

78

1
0
1
1
0
0
0

206

206

206

206

289

435

289

435

143

143

143

143

1
0
2
0
1
0
0

161

161

161

161

632

1264

632

1264

84

145

84

145

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

83

83

83

83

684

1368

684

1368

38

141

38

141

421
845
1266

North-South:
East-West:
SUM:

421
845
1266

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

430

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

161

1264

145

0
0
0
0
0
0
0

83

1368

141

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

123

430

78

0
0
0
0
0
0
0

206

435

143

0
0
0
0
0
0
0

161

1264

145

0
0
0
0
0
0
0

83

1368

141

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.844

0.844

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.744

0.744

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

80
213
124

1228
312
75

37
1403
108

96
1556
882

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

80

80

80

80

107

213

107

213

124

124

124

124

430

1228

430

1228

387

312

387

312

75

75

75

75

37

37

37

37

504

1403

504

1403

108

108

108

108

96

96

96

96

519

1556

519

1556

882

882

554
600
1154

554
600
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

213

124

1228

312

75

37

1403

108

96

1556

882

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

80

213

124

1228

312

75

37

1403

108

96

1556

882

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

457

0
193

0
0

0
1103
318

185
1022
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

325

457

325

457

325

193

325

193

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

552

1103

552

1103

318

318

185

185

185

185

511

1022

511

1022

325
737
1062

North-South:
East-West:
SUM:

325
737
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

457

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

185

1022

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

457

193

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1103

318

0
0
0
0
0
0
0

0
0
0
0
0
0
0

185

1022

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/28/2014-8:22 PM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CBPP_CalcaDB_650P_SAT.xls

NORTH WING RENOVATION

BASE YEAR

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

68

18
27

29
6

9
1080
21

35
1010
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

22

22

67

18

67

18

27

27

68

68

68

68

103

29

103

29

551

1080

551

1080

21

21

21

21

35

35

35

35

520

1010

520

1010

30

30

30

30

135
586
721

135
586
721

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

18

27

68

29

0
0
0
0
0
0
0

1080

21

0
0
0
0
0
0
0

35

1010

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

18

27

0
0
0
0
0
0
0

68

29

0
0
0
0
0
0
0

1080

21

35

1010

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.506

0.506

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

138

236

154
103

196
98

60
1082
167

170
1042
216

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

138

138

138

138

154

154

154

154

103

103

1
0
1
0
1
0
0

236

236

236

236

196

196

196

196

68

98

68

98

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

60

60

60

60

541

1082

541

1082

98

167

98

167

170

170

170

170

629

1042

629

1042

216

216

216

216

390
711
1101

North-South:
East-West:
SUM:

390
711
1101

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1061
10

103
1545
99

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

536

1061

536

1061

10

10

10

10

1
0
1
1
0
0
0

103

103

103

103

822

1545

822

1545

99

99

99

99

North-South:
East-West:
SUM:

133
833
966

133
833
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1061

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1545

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

52
11
70

35
776
4

30
1814
119

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

52

52

52

52

133

11

133

11

70

70

35

35

35

35

390

776

390

776

30

30

30

30

907

1814

907

1814

119

119

119

119

140
942
1082

North-South:
East-West:
SUM:

140
942
1082

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

52

11

70

0
0
0
0
0
0
0

35

776

0
0
0
0
0
0
0

30

1814

119

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.721

0.721

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.621

0.621

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

148

169

15
222

54
9

6
1498
173

254
2107
114

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

148

148

148

148

119

15

119

15

222

222

1
0
0
0
0
1
0

116

169

116

169

116

54

116

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

749

1498

749

1498

99

173

99

173

254

254

254

254

1111

2107

1111

2107

114

114

114

114

264
1117
1381

264
1117
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

148

15

222

0
0
0
0
0
0
0

169

54

0
0
0
0
0
0
0

1498

173

0
0
0
0
0
0
0

254

2107

114

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

148

15

222

169

54

1498

173

254

2107

114

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.004

1.004

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.904

0.904

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
398

0
0
0

0
851
84

360
2354
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

398

398

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

468

851

468

851

84

84

84

84

360

360

360

360

1177

2354

1177

2354

57
1177
1234

North-South:
East-West:
SUM:

57
1177
1234

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2354

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2354

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.866

0.866

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.766

0.766

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

151

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

251
329

632
0

5
13

1479
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

251

126

251

329

329

151

151

151

151

316

632

316

632

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

756

1479

756

1479

756

32

756

32

316
781
1097

316
781
1097

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

251

329

151

632

13

1479

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

0
0
0
0
0
0
0

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1479

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.731

0.731

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.631

0.631

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

608

4
83

166
1375

77
1624
54

11
1008
258

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

387

608

387

608

387

166

387

166

714

1375

714

1375

2
0
1
1
0
0
0

42

77

42

77

420

1624

420

1624

54

54

54

54

11

11

11

11

504

1008

504

1008

258

258

792
546
1338

North-South:
East-West:
SUM:

792
546
1338

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

608

166

1375

77

1624

54

11

1008

258

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

608

166

1375

0
0
0
0
0
0
0

77

1624

54

0
0
0
0
0
0
0

11

1008

258

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.973

0.973

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.873

0.873

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

809

0
586

0
0

0
1118
759

0
807
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

809

809

809

809

322

586

322

586

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

559

1118

559

1118

759

759

269

807

269

807

809
559
1368

809
559
1368

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

809

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

807

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

809

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

807

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.912

0.912

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.812

0.812

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
381

0
0
0

0
1089
143

466
841
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

381

381

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

616

1089

616

1089

143

143

143

143

466

466

466

466

421

841

421

841

32
1082
1114

North-South:
East-West:
SUM:

32
1082
1114

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

0
0
0
0
0
0
0

466

841

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

841

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

425

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
222

997
0

0
999
345

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

234

425

234

425

47

222

47

222

1
0
2
0
0
0
0

175

175

175

175

499

997

499

997

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

500

999

500

999

111

345

111

345

234
675
909

North-South:
East-West:
SUM:

234
675
909

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

0
0
0
0
0
0
0

0
0
0
0
0
0
0

999

345

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

0
0
0
0
0
0
0

0
0
0
0
0
0
0

999

345

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.638

0.638

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.538

0.538

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

CRITICAL VOLUMES

233
120

21
153
127

870
8

777
20

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

177

233

177

233

120

120

120

120

21

21

21

21

77

153

77

153

127

127

127

127

1
0
1
0
1
0
0

188

188

188

188

870

870

870

870

1
0
1
0
1
0
0

123

123

123

123

777

777

777

777

20

20

20

20

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

198
993
1191

North-South:
East-West:
SUM:

198
993
1191

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

233

120

21

153

127

188

870

123

777

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

233

120

0
0
0
0
0
0
0

21

153

127

0
0
0
0
0
0
0

188

870

0
0
0
0
0
0
0

123

777

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

268

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

355
4

76
333
216

121
36

51
71

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

367

355

367

355

76

76

76

76

351

333

351

333

351

216

351

216

1
0
0
1
0
0
0

268

268

268

268

157

121

157

121

36

36

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

71

71

71

71

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

443
339
782

443
339
782

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

355

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

355

0
0
0
0
0
0
0

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.549

0.549

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.449

0.449

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

106

107

194
37

186
21

91
928
80

11
862
75

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

106

106

106

106

337

194

337

194

37

37

0
1
0
1
0
0
0

107

107

107

107

157

186

157

186

157

21

157

21

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

91

91

91

91

336

928

336

928

80

80

80

80

11

11

11

11

469

862

469

862

75

75

75

75

444
560
1004

North-South:
East-West:
SUM:

444
560
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

106

194

37

107

186

21

91

928

80

11

862

75

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

106

194

37

107

186

21

0
0
0
0
0
0
0

91

928

80

0
0
0
0
0
0
0

11

862

75

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.730

0.730

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.630

0.630

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

111

233

390
144

417
76

70
1301
84

80
1440
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

111

111

111

111

195

390

195

390

104

144

104

144

1
0
1
1
0
0
0

233

233

233

233

247

417

247

417

76

76

76

76

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

70

70

70

70

651

1301

651

1301

29

84

29

84

80

80

80

80

720

1440

720

1440

34

34

428
790
1218

428
790
1218

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

111

390

144

233

417

76

70

1301

84

80

1440

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

111

390

144

233

417

76

0
0
0
0
0
0
0

70

1301

84

0
0
0
0
0
0
0

80

1440

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
169
109

1108
135
16

60
1506
41

57
1615
1003

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

85

169

85

169

109

109

109

109

388

1108

388

1108

151

135

151

135

16

16

16

16

60

60

60

60

516

1506

516

1506

41

41

41

41

57

57

57

57

538

1615

538

1615

1003

1003

497
598
1095

North-South:
East-West:
SUM:

497
598
1095

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

169

109

1108

135

16

60

1506

41

57

1615

1003

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

65

169

109

1108

135

16

0
0
0
0
0
0
0

60

1506

41

0
0
0
0
0
0
0

57

1615

1003

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.796

0.796

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.696

0.696

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

464

0
66

0
0

0
1036
386

66
858
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

265

464

265

464

265

66

265

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

518

1036

518

1036

121

386

121

386

66

66

66

66

429

858

429

858

265
584
849

265
584
849

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

858

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

66

858

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.596

0.596

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.496

0.496

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

18

65

32
26

33
8

6
922
9

47
818
20

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

76

32

76

32

26

26

65

65

65

65

106

33

106

33

466

922

466

922

47

47

47

47

419

818

419

818

20

20

20

20

141
513
654

North-South:
East-West:
SUM:

141
513
654

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

32

26

65

33

0
0
0
0
0
0
0

922

0
0
0
0
0
0
0

47

818

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

32

26

0
0
0
0
0
0
0

65

33

0
0
0
0
0
0
0

922

47

818

20

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.459

0.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

158

154

257
75

414
107

56
601
320

276
837
149

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

158

158

158

158

257

257

257

257

75

75

1
0
1
0
1
0
0

154

154

154

154

414

414

414

414

79

107

79

107

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

56

56

56

56

301

601

301

601

241

320

241

320

276

276

276

276

493

837

493

837

149

149

149

149

572
577
1149

572
577
1149

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

158

257

75

154

414

107

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

158

257

75

0
0
0
0
0
0
0

154

414

107

0
0
0
0
0
0
0

56

601

320

0
0
0
0
0
0
0

0
0
0
0
0
0
0

276

837

149

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

93

44
75

80
87

18
822
30

182
1644
53

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

119

44

119

44

75

75

93

93

93

93

167

80

167

80

87

87

18

18

18

18

426

822

426

822

30

30

30

30

182

182

182

182

849

1644

849

1644

53

53

53

53

212
867
1079

North-South:
East-West:
SUM:

212
867
1079

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

75

0
0
0
0
0
0
0

93

80

87

0
0
0
0
0
0
0

18

822

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

182

1644

53

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.199

1.199

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.099

1.099

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

19
5
42

42
1406
8

43
1653
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

19

19

19

19

66

66

42

42

42

42

42

42

707

1406

707

1406

43

43

43

43

827

1653

827

1653

40

40

40

40

115
869
984

115
869
984

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

19

42

0
0
0
0
0
0
0

42

1406

0
0
0
0
0
0
0

43

1653

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.093

1.093

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.993

0.993

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

204

160

52
378

57
5

2
1355
145

314
1699
86

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

204

204

204

204

215

52

215

52

378

378

1
0
0
0
0
1
0

111

160

111

160

111

57

111

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

678

1355

678

1355

43

145

43

145

314

314

314

314

893

1699

893

1699

86

86

86

86

326
992
1318

North-South:
East-West:
SUM:

326
992
1318

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

204

52

378

0
0
0
0
0
0
0

160

57

0
0
0
0
0
0
0

1355

145

0
0
0
0
0
0
0

314

1699

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

204

52

378

160

57

1355

145

314

1699

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.464

1.464

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.364

1.364

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

76
0
611

0
0
0

58

76

76

76

21

611

21

611

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

315
2058

Added
Volume

Total
Volume

76

0
0
1
1
0
0
0

0
1380

Lane
Volume

1
0
0
0
2
0
0

719

1380

719

1380

58

58

58

58

315

315

315

315

1029

2058

1029

2058

76
1034
1110

76
1034
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1380

58

0
0
0
0
0
0
0

315

2058

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1380

58

0
0
0
0
0
0
0

315

2058

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.009

1.009

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.909

0.909

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1581

CRITICAL VOLUMES

660
298

68
284
0

6
18

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

330

660

330

660

298

298

68

68

68

68

142

284

142

284

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

832

1581

832

1581

832

82

832

82

North-South:
East-West:
SUM:

398
866
1264

North-South:
East-West:
SUM:

398
866
1264

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

660

298

0
0
0
0
0
0
0

68

284

0
0
0
0
0
0
0

10

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1581

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95

554

No. of
Lanes

11
67

185
1039

191
1241
28

293

Total
Volume

Lane
Volume

95

29

95

11

11

11

11

60

67

60

67

1
1
0
0
2
0
0

370

554

370

554

370

185

370

185

466

1039

466

1039

2
0
3
1
0
0
0

105

191

105

191

317

1241

317

1241

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1040

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

520

1040

520

1040

293

293

526
625
1151

526
625
1151

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1241

28

0
0
0
0
0
0
0

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1241

28

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.837

0.837

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.737

0.737

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

293

0
210

0
0

0
1253
901

0
1757
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

293

293

293

293

116

210

116

210

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

627

1253

627

1253

203

901

203

901

586

1757

586

1757

293
627
920

North-South:
East-West:
SUM:

293
627
920

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

901

0
0
0
0
0
0
0

1757

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1757

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.613

0.613

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.513

0.513

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

212

0
530

0
0

0
839
139

506
1343
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

212

212

212

212

24

530

24

530

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

489

839

489

839

139

139

139

139

506

506

506

506

672

1343

672

1343

212
995
1207

212
995
1207

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

506

1343

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

0
0
0
0
0
0
0

506

1343

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

730

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

234

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
163

958
0

0
833
511

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

402

730

402

730

163

163

1
0
2
0
0
0
0

234

234

234

234

479

958

479

958

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

417

833

417

833

109

511

109

511

402
651
1053

North-South:
East-West:
SUM:

402
651
1053

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

0
0
0
0
0
0
0

0
0
0
0
0
0
0

833

511

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

0
0
0
0
0
0
0

0
0
0
0
0
0
0

833

511

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
429
168

40
191
191

236
1017
32

155
757
57

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

299

429

299

429

168

168

168

168

40

40

40

40

96

191

96

191

191

191

191

191

236

236

236

236

1017

1017

1017

1017

32

32

32

32

155

155

155

155

757

757

757

757

57

57

57

57

339
1172
1511

339
1172
1511

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

429

168

40

191

191

236

1017

32

155

757

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

429

168

0
0
0
0
0
0
0

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.060

1.060

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.960

0.960

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

352

WESTBOUND

31

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

543
16

83
411
218

164
47

63
170

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

590

543

590

543

16

16

83

83

83

83

398

411

398

411

398

218

398

218

1
0
0
1
0
0
0

352

352

352

352

211

164

211

164

47

47

1
0
1
1
0
0
0

18

18

18

18

63

63

63

63

170

170

170

170

North-South:
East-West:
SUM:

673
522
1195

North-South:
East-West:
SUM:

673
522
1195

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

31

543

16

83

411

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

543

16

0
0
0
0
0
0
0

83

411

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

90
275
45

85
306
23

162
929
136

64
724
111

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

90

90

90

90

410

275

410

275

45

45

85

85

85

85

250

306

250

306

250

23

250

23

162

162

162

162

355

929

355

929

136

136

136

136

64

64

64

64

418

724

418

724

111

111

111

111

495
580
1075

495
580
1075

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

90

275

45

85

306

23

162

929

136

64

724

111

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

90

275

45

0
0
0
0
0
0
0

85

306

23

0
0
0
0
0
0
0

162

929

136

0
0
0
0
0
0
0

64

724

111

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

143

288

644
143

706
118

104
1451
63

101
1107
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

143

143

143

143

322

644

322

644

93

143

93

143

1
0
1
1
0
0
0

288

288

288

288

412

706

412

706

118

118

118

118

1
0
2
0
1
0
0

104

104

104

104

726

1451

726

1451

63

63

1
0
2
0
1
0
0

101

101

101

101

554

1107

554

1107

76

76

North-South:
East-West:
SUM:

610
827
1437

North-South:
East-West:
SUM:

610
827
1437

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

101

1107

76

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

101

1107

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.597

1.597

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.497

1.497

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

60
289
217

890
298
15

20
1236
33

120
1355
868

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

60

60

60

145

289

145

289

217

217

217

217

312

890

312

890

313

298

313

298

15

15

15

15

20

20

20

20

423

1236

423

1236

33

33

33

33

120

120

120

120

452

1355

452

1355

868

868

530
543
1073

530
543
1073

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

60

289

217

890

298

15

20

1236

33

120

1355

868

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

289

217

0
0
0
0
0
0
0

890

298

15

20

1236

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

120

1355

868

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.192

1.192

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.092

1.092

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

542

0
175

0
0

0
1089
601

171
839
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

359

542

359

542

359

175

359

175

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

545

1089

545

1089

242

601

242

601

171

171

171

171

420

839

420

839

359
716
1075

North-South:
East-West:
SUM:

359
716
1075

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

171

839

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.754

0.754

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.654

0.654

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

41

28
15

23
7

3
666
8

34
767
18

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

62

28

62

28

15

15

0
0
0
0
0
1
0

41

41

41

41

71

23

71

23

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

337

666

337

666

34

34

34

34

393

767

393

767

18

18

18

18

103
396
499

103
396
499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

28

15

41

23

0
0
0
0
0
0
0

666

0
0
0
0
0
0
0

34

767

18

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

28

15

0
0
0
0
0
0
0

41

23

0
0
0
0
0
0
0

666

34

767

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.350

0.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.350

0.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

171
290
87

32
269
37

23
241
178

313
706
99

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

171

171

171

171

290

290

290

290

87

87

32

32

32

32

269

269

269

269

26

37

26

37

23

23

23

23

121

241

121

241

93

178

93

178

1
0
1
1
0
0
0

313

313

313

313

403

706

403

706

99

99

99

99

North-South:
East-West:
SUM:

440
434
874

North-South:
East-West:
SUM:

440
434
874

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

171

290

87

32

269

37

23

241

178

313

706

99

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

171

290

87

0
0
0
0
0
0
0

32

269

37

0
0
0
0
0
0
0

23

241

178

0
0
0
0
0
0
0

0
0
0
0
0
0
0

313

706

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
112

38
51
31

15
436
28

162
1643
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

194

82

194

82

112

112

38

38

38

38

82

51

82

51

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

232

436

232

436

28

28

28

28

162

162

162

162

845

1643

845

1643

47

47

47

47

232
860
1092

232
860
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

112

0
0
0
0
0
0
0

38

51

31

0
0
0
0
0
0
0

15

436

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

162

1643

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.365

1.365

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.265

1.265

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
86
52

12
1
26

30
737
4

31
1622
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

141

86

141

86

52

52

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

371

737

371

737

31

31

31

31

811

1622

811

1622

17

17

17

17

153
841
994

North-South:
East-West:
SUM:

153
841
994

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

86

52

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

737

0
0
0
0
0
0
0

31

1622

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.243

1.243

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.143

1.143

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

143

165

19
284

51
12

3
1196
98

326
1513
58

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

143

143

143

143

152

19

152

19

284

284

1
0
0
0
0
1
0

114

165

114

165

114

51

114

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

598

1196

598

1196

27

98

27

98

326

326

326

326

786

1513

786

1513

58

58

58

58

266
924
1190

266
924
1190

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

143

19

284

0
0
0
0
0
0
0

165

51

12

0
0
0
0
0
0
0

1196

98

0
0
0
0
0
0
0

326

1513

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

143

19

284

165

51

12

1196

98

326

1513

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.488

1.488

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.388

1.388

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
624

0
0
0

0
1220
28

312
1990
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

31

624

31

624

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

624

1220

624

1220

28

28

28

28

312

312

312

312

995

1990

995

1990

43
995
1038

North-South:
East-West:
SUM:

43
995
1038

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1220

28

0
0
0
0
0
0
0

312

1990

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1220

28

0
0
0
0
0
0
0

312

1990

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.038

1.038

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.938

0.938

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1705

805
229

71
285
0

6
18

0
60

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

805

403

805

229

229

71

71

71

71

143

285

143

285

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

883

1705

883

1705

883

60

883

60

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
917
1391

474
917
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

805

229

0
0
0
0
0
0
0

71

285

0
0
0
0
0
0
0

10

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1705

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

140

661

22
91

199
1124

422
1768
37

46
1041
277

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

42

140

42

140

22

22

22

22

68

91

68

91

1
1
0
0
2
0
0

430

661

430

661

430

199

430

199

386

1124

386

1124

2
0
3
1
0
0
0

232

422

232

422

451

1768

451

1768

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

521

1041

521

1041

277

277

498
753
1251

North-South:
East-West:
SUM:

498
753
1251

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1768

37

0
0
0
0
0
0
0

46

1041

277

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1768

37

46

1041

277

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.910

0.910

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.810

0.810

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

248

0
194

0
0

0
1369
891

0
1523
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

248

248

248

248

107

194

107

194

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

685

1369

685

1369

242

891

242

891

508

1523

508

1523

248
685
933

248
685
933

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

891

0
0
0
0
0
0
0

1523

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

891

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.622

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.522

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

433

0
824

0
0

0
792
145

606
1158
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

433

433

433

433

218

824

218

824

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

469

792

469

792

145

145

145

145

606

606

606

606

579

1158

579

1158

433
1075
1508

North-South:
East-West:
SUM:

433
1075
1508

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

606

1158

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

0
0
0
0
0
0
0

606

1158

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.058

1.058

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.958

0.958

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

594

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
209

772
0

0
930
539

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

327

594

327

594

209

209

1
0
2
0
0
0
0

301

301

301

301

386

772

386

772

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

465

930

465

930

212

539

212

539

327
766
1093

327
766
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

0
0
0
0
0
0
0

0
0
0
0
0
0
0

930

539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

0
0
0
0
0
0
0

0
0
0
0
0
0
0

930

539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

165

CRITICAL VOLUMES

525
186

42
188
177

909
27

789
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

356

525

356

525

186

186

186

186

42

42

42

42

94

188

94

188

177

177

177

177

1
0
1
0
1
0
0

285

285

285

285

909

909

909

909

27

27

27

27

1
0
1
0
1
0
0

165

165

165

165

789

789

789

789

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

398
1074
1472

North-South:
East-West:
SUM:

398
1074
1472

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

525

186

42

188

177

285

909

27

165

789

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

525

186

0
0
0
0
0
0
0

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

406
0

53
335
205

331
63

98
295

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

421

406

421

406

53

53

53

53

323

335

323

335

323

205

323

205

1
0
0
1
0
0
0

154

154

154

154

394

331

394

331

63

63

1
0
1
1
0
0
0

19

19

19

19

98

98

98

98

295

295

295

295

474
449
923

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
449
923

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

406

53

335

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

406

0
0
0
0
0
0
0

53

335

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.154

1.154

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.054

1.054

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
108
40

74
291
20

74
748
109

79
717
69

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

178

108

178

108

40

40

74

74

74

74

193

291

193

291

193

20

193

20

74

74

74

74

286

748

286

748

109

109

109

109

79

79

79

79

393

717

393

717

69

69

69

69

252
467
719

North-South:
East-West:
SUM:

252
467
719

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

108

40

74

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

108

40

0
0
0
0
0
0
0

74

291

20

0
0
0
0
0
0
0

74

748

109

0
0
0
0
0
0
0

79

717

69

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.523

0.523

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.423

0.423

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

178

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

671
233

775
136

933
49

98
1270
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

178

178

178

178

336

671

336

671

184

233

184

233

1
0
1
1
0
0
0

231

231

231

231

456

775

456

775

136

136

136

136

1
0
2
0
1
0
0

109

109

109

109

467

933

467

933

49

49

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

98

98

98

98

635

1270

635

1270

45

45

634
744
1378

634
744
1378

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

0
0
0
0
0
0
0

98

1270

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

98

1270

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.723

1.723

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.623

1.623

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

88
380
213

911
263
7

8
1204
16

126
1562
869

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

88

88

88

88

190

380

190

380

213

213

213

213

319

911

319

911

270

263

270

263

407

1204

407

1204

16

16

16

16

126

126

126

126

521

1562

521

1562

869

869

532
533
1065

North-South:
East-West:
SUM:

532
533
1065

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

88

380

213

911

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

88

380

213

0
0
0
0
0
0
0

911

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.331

1.331

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.231

1.231

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

561

0
146

0
0

0
918
446

153
931
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

354

561

354

561

354

146

354

146

0
0
0
0
0
0
0

0
0
2
0
1
0
0

459

918

459

918

92

446

92

446

1
0
2
0
0
0
0

153

153

153

153

466

931

466

931

North-South:
East-West:
SUM:

354
612
966

North-South:
East-West:
SUM:

354
612
966

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:51 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION A PREFERRED HAUL ROUTE: SUNSET

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

68

18
27

29
6

9
1080
21

35
1010
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

22

22

67

18

67

18

27

27

68

68

68

68

103

29

103

29

551

1080

551

1080

21

21

21

21

35

35

35

35

520

1010

520

1010

30

30

30

30

135
586
721

135
586
721

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

18

27

68

29

0
0
0
0
0
0
0

1080

21

0
0
0
0
0
0
0

35

1010

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

18

27

0
0
0
0
0
0
0

68

29

0
0
0
0
0
0
0

1080

21

35

1010

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.506

0.506

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

138

236

154
103

196
98

60
1082
167

170
1042
216

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

138

138

138

138

154

154

154

154

103

103

1
0
1
0
1
0
0

236

236

236

236

196

196

196

196

68

98

68

98

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

60

60

60

60

541

1082

541

1082

98

167

98

167

170

170

170

170

629

1042

629

1042

216

216

216

216

390
711
1101

North-South:
East-West:
SUM:

390
711
1101

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1061
10

103
1545
99

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

536

1061

536

1061

10

10

10

10

1
0
1
1
0
0
0

103

103

103

103

822

1545

822

1545

99

99

99

99

North-South:
East-West:
SUM:

133
833
966

133
833
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

52
11
70

35
776
4

30
1814
119

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

52

52

52

52

133

11

133

11

70

70

35

35

35

35

390

776

390

776

30

30

30

30

907

1814

907

1814

119

119

119

119

140
942
1082

North-South:
East-West:
SUM:

140
942
1082

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.721

0.721

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.621

0.621

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

153

170

15
222

54
9

6
1514
173

254
2131
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

153

153

153

153

119

15

119

15

222

222

1
0
0
0
0
1
0

117

170

117

170

117

54

117

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

757

1514

757

1514

97

173

97

173

254

254

254

254

1123

2131

1123

2131

115

115

115

115

270
1129
1399

270
1129
1399

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

153

15

222

0
0
0
0
0
0
0

170

54

0
0
0
0
0
0
0

1514

173

0
0
0
0
0
0
0

254

2131

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

153

15

222

170

54

1514

173

254

2131

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.017

1.017

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.917

0.917

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
398

0
0
0

0
867
84

360
2378
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

398

398

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

476

867

476

867

84

84

84

84

360

360

360

360

1189

2378

1189

2378

57
1189
1246

North-South:
East-West:
SUM:

57
1189
1246

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

867

84

0
0
0
0
0
0
0

360

2378

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

398

0
0
0
0
0
0
0

867

84

0
0
0
0
0
0
0
0
0
0
0
0
0
0

360

2378

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.874

0.874

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.774

0.774

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

151

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

251
329

632
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

251

126

251

329

329

151

151

151

151

316

632

316

632

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

316
790
1106

316
790
1106

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1498

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

0
0
0
0
0
0
0

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.737

0.737

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.637

0.637

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

608

4
83

166
1394

77
1640
54

11
1013
258

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

387

608

387

608

387

166

387

166

725

1394

725

1394

2
0
1
1
0
0
0

42

77

42

77

424

1640

424

1640

54

54

54

54

11

11

11

11

507

1013

507

1013

258

258

803
549
1352

North-South:
East-West:
SUM:

803
549
1352

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

608

166

1394

77

1640

54

11

1013

258

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

608

166

1394

0
0
0
0
0
0
0

77

1640

54

0
0
0
0
0
0
0

11

1013

258

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.983

0.983

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.883

0.883

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

813

0
586

0
0

0
1118
773

0
808
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

813

813

813

813

322

586

322

586

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

559

1118

559

1118

773

773

269

808

269

808

813
559
1372

813
559
1372

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

813

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

773

0
0
0
0
0
0
0

808

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

813

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

773

0
0
0
0
0
0
0

0
0
0
0
0
0
0

808

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.915

0.915

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.815

0.815

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
381

0
0
0

0
1089
143

466
842
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

381

381

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

616

1089

616

1089

143

143

143

143

466

466

466

466

421

842

421

842

32
1082
1114

North-South:
East-West:
SUM:

32
1082
1114

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

425

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
222

997
0

0
999
345

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

234

425

234

425

47

222

47

222

1
0
2
0
0
0
0

175

175

175

175

499

997

499

997

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

500

999

500

999

111

345

111

345

234
675
909

North-South:
East-West:
SUM:

234
675
909

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

999

345

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

425

222

175

997

999

345

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.638

0.638

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.538

0.538

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

CRITICAL VOLUMES

233
120

21
153
127

870
8

777
20

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

177

233

177

233

120

120

120

120

21

21

21

21

77

153

77

153

127

127

127

127

1
0
1
0
1
0
0

188

188

188

188

870

870

870

870

1
0
1
0
1
0
0

123

123

123

123

777

777

777

777

20

20

20

20

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

198
993
1191

North-South:
East-West:
SUM:

198
993
1191

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

233

120

21

153

127

188

870

123

777

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

233

120

0
0
0
0
0
0
0

21

153

127

0
0
0
0
0
0
0

188

870

0
0
0
0
0
0
0

0
0
0
0
0
0
0

123

777

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

268

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

360
4

76
333
216

121
36

51
71

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

372

360

372

360

76

76

76

76

351

333

351

333

351

216

351

216

1
0
0
1
0
0
0

268

268

268

268

157

121

157

121

36

36

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

71

71

71

71

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

448
339
787

448
339
787

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

360

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

360

0
0
0
0
0
0
0

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.552

0.552

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.452

0.452

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

106

107

194
37

186
21

91
928
80

11
862
80

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

106

106

106

106

337

194

337

194

37

37

0
1
0
1
0
0
0

107

107

107

107

157

186

157

186

157

21

157

21

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

91

91

91

91

336

928

336

928

80

80

80

80

11

11

11

11

471

862

471

862

80

80

80

80

444
562
1006

North-South:
East-West:
SUM:

444
562
1006

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

106

194

37

0
0
0
0
0
0
0

107

186

21

0
0
0
0
0
0
0
0
0
0
0
0
0
0

91

928

80

11

862

80

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

106

194

37

107

186

21

0
0
0
0
0
0
0

91

928

80

0
0
0
0
0
0
0

11

862

80

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.732

0.732

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.632

0.632

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

111

233

390
144

417
76

70
1301
84

80
1440
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

111

111

111

111

195

390

195

390

104

144

104

144

1
0
1
1
0
0
0

233

233

233

233

247

417

247

417

76

76

76

76

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

70

70

70

70

651

1301

651

1301

29

84

29

84

80

80

80

80

720

1440

720

1440

34

34

428
790
1218

428
790
1218

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

111

390

144

233

417

76

70

1301

84

80

1440

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

111

390

144

233

417

76

0
0
0
0
0
0
0

70

1301

84

0
0
0
0
0
0
0

80

1440

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
169
109

1108
135
16

60
1506
41

57
1615
1008

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

85

169

85

169

109

109

109

109

388

1108

388

1108

151

135

151

135

16

16

16

16

60

60

60

60

516

1506

516

1506

41

41

41

41

57

57

57

57

538

1615

538

1615

1008

1008

497
598
1095

North-South:
East-West:
SUM:

497
598
1095

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

169

109

1108

135

16

60

1506

41

57

1615

1008

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

169

109

0
0
0
0
0
0
0

1108

135

16

0
0
0
0
0
0
0

60

1506

41

0
0
0
0
0
0
0

57

1615

1008

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.796

0.796

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.696

0.696

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

464

0
66

0
0

0
1036
386

66
858
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

265

464

265

464

265

66

265

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

518

1036

518

1036

121

386

121

386

66

66

66

66

429

858

429

858

265
584
849

265
584
849

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

0
0
0
0
0
0
0

66

858

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

66

858

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.596

0.596

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.496

0.496

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

18

65

32
26

33
8

6
922
9

47
818
20

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

76

32

76

32

26

26

65

65

65

65

106

33

106

33

466

922

466

922

47

47

47

47

419

818

419

818

20

20

20

20

141
513
654

North-South:
East-West:
SUM:

141
513
654

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

18

32

26

65

33

0
0
0
0
0
0
0

922

0
0
0
0
0
0
0

47

818

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

32

26

0
0
0
0
0
0
0

65

33

0
0
0
0
0
0
0

922

47

818

20

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.459

0.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

158

154

257
75

414
107

56
601
320

276
837
149

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

158

158

158

158

257

257

257

257

75

75

1
0
1
0
1
0
0

154

154

154

154

414

414

414

414

79

107

79

107

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

56

56

56

56

301

601

301

601

241

320

241

320

276

276

276

276

493

837

493

837

149

149

149

149

572
577
1149

572
577
1149

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

158

257

75

154

414

107

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

158

257

75

0
0
0
0
0
0
0

154

414

107

0
0
0
0
0
0
0

56

601

320

0
0
0
0
0
0
0

0
0
0
0
0
0
0

276

837

149

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

93

44
75

80
87

18
822
30

182
1644
53

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

119

44

119

44

75

75

93

93

93

93

167

80

167

80

87

87

18

18

18

18

426

822

426

822

30

30

30

30

182

182

182

182

849

1644

849

1644

53

53

53

53

212
867
1079

North-South:
East-West:
SUM:

212
867
1079

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

75

0
0
0
0
0
0
0

93

80

87

0
0
0
0
0
0
0

18

822

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

182

1644

53

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.199

1.199

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.099

1.099

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

19
5
42

42
1406
8

43
1653
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

19

19

19

19

66

66

42

42

42

42

42

42

707

1406

707

1406

43

43

43

43

827

1653

827

1653

40

40

40

40

115
869
984

115
869
984

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

19

42

0
0
0
0
0
0
0

42

1406

0
0
0
0
0
0
0

43

1653

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.093

1.093

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.993

0.993

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

204

160

52
378

57
5

2
1365
149

314
1699
86

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

204

204

204

204

215

52

215

52

378

378

1
0
0
0
0
1
0

111

160

111

160

111

57

111

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

683

1365

683

1365

47

149

47

149

314

314

314

314

893

1699

893

1699

86

86

86

86

326
997
1323

North-South:
East-West:
SUM:

326
997
1323

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

204

52

378

0
0
0
0
0
0
0

160

57

0
0
0
0
0
0
0

1365

149

0
0
0
0
0
0
0

314

1699

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

204

52

378

160

57

1365

149

314

1699

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.470

1.470

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.370

1.370

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

76
0
611

0
0
0

58

76

76

76

21

611

21

611

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

315
2058

Added
Volume

Total
Volume

76

0
0
1
1
0
0
0

0
1390

Lane
Volume

1
0
0
0
2
0
0

724

1390

724

1390

58

58

58

58

315

315

315

315

1029

2058

1029

2058

76
1039
1115

76
1039
1115

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1390

58

0
0
0
0
0
0
0

315

2058

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1390

58

0
0
0
0
0
0
0

315

2058

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.014

1.014

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.914

0.914

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1581

CRITICAL VOLUMES

660
298

68
284
0

6
18

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

330

660

330

660

298

298

68

68

68

68

142

284

142

284

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

832

1581

832

1581

832

82

832

82

North-South:
East-West:
SUM:

398
866
1264

North-South:
East-West:
SUM:

398
866
1264

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

660

298

0
0
0
0
0
0
0

68

284

0
0
0
0
0
0
0

10

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1581

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95

554

No. of
Lanes

11
67

185
1039

191
1251
28

293

Total
Volume

Lane
Volume

95

29

95

11

11

11

11

60

67

60

67

1
1
0
0
2
0
0

370

554

370

554

370

185

370

185

466

1039

466

1039

2
0
3
1
0
0
0

105

191

105

191

320

1251

320

1251

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1040

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

520

1040

520

1040

293

293

526
625
1151

526
625
1151

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1251

28

0
0
0
0
0
0
0

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1251

28

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.837

0.837

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.737

0.737

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

293

0
210

0
0

0
1253
909

0
1757
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

293

293

293

293

116

210

116

210

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

627

1253

627

1253

207

909

207

909

586

1757

586

1757

293
627
920

North-South:
East-West:
SUM:

293
627
920

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

909

0
0
0
0
0
0
0

1757

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

909

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1757

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.613

0.613

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.513

0.513

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

212

0
530

0
0

0
839
139

506
1343
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

212

212

212

212

24

530

24

530

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

489

839

489

839

139

139

139

139

506

506

506

506

672

1343

672

1343

212
995
1207

212
995
1207

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

506

1343

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

0
0
0
0
0
0
0

506

1343

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

730

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

234

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
163

958
0

0
833
511

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

402

730

402

730

163

163

1
0
2
0
0
0
0

234

234

234

234

479

958

479

958

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

417

833

417

833

109

511

109

511

402
651
1053

North-South:
East-West:
SUM:

402
651
1053

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

0
0
0
0
0
0
0

0
0
0
0
0
0
0

833

511

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

0
0
0
0
0
0
0

0
0
0
0
0
0
0

833

511

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
429
168

40
191
191

236
1017
32

155
757
57

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

299

429

299

429

168

168

168

168

40

40

40

40

96

191

96

191

191

191

191

191

236

236

236

236

1017

1017

1017

1017

32

32

32

32

155

155

155

155

757

757

757

757

57

57

57

57

339
1172
1511

339
1172
1511

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

429

168

40

191

191

236

1017

32

155

757

57

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

429

168

0
0
0
0
0
0
0

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.060

1.060

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.960

0.960

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

352

WESTBOUND

31

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

543
16

83
415
218

164
47

63
170

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

590

543

590

543

16

16

83

83

83

83

400

415

400

415

400

218

400

218

1
0
0
1
0
0
0

352

352

352

352

211

164

211

164

47

47

1
0
1
1
0
0
0

18

18

18

18

63

63

63

63

170

170

170

170

North-South:
East-West:
SUM:

673
522
1195

North-South:
East-West:
SUM:

673
522
1195

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

31

543

16

83

415

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

543

16

0
0
0
0
0
0
0

83

415

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

90
275
45

89
306
23

162
929
136

64
724
111

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

90

90

90

90

410

275

410

275

45

45

89

89

89

89

254

306

254

306

254

23

254

23

162

162

162

162

355

929

355

929

136

136

136

136

64

64

64

64

418

724

418

724

111

111

111

111

499
580
1079

499
580
1079

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

90

275

45

89

306

23

162

929

136

64

724

111

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

90

275

45

0
0
0
0
0
0
0

89

306

23

0
0
0
0
0
0
0

162

929

136

0
0
0
0
0
0
0

64

724

111

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.785

0.785

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.685

0.685

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

143

288

644
143

706
118

104
1451
63

101
1107
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

143

143

143

143

322

644

322

644

93

143

93

143

1
0
1
1
0
0
0

288

288

288

288

412

706

412

706

118

118

118

118

1
0
2
0
1
0
0

104

104

104

104

726

1451

726

1451

63

63

1
0
2
0
1
0
0

101

101

101

101

554

1107

554

1107

76

76

North-South:
East-West:
SUM:

610
827
1437

North-South:
East-West:
SUM:

610
827
1437

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

101

1107

76

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

101

1107

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.597

1.597

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.497

1.497

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

60
289
217

894
298
15

20
1236
33

120
1355
868

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

60

60

60

145

289

145

289

217

217

217

217

313

894

313

894

313

298

313

298

15

15

15

15

20

20

20

20

423

1236

423

1236

33

33

33

33

120

120

120

120

452

1355

452

1355

868

868

530
543
1073

530
543
1073

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

60

289

217

894

298

15

20

1236

33

120

1355

868

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

289

217

0
0
0
0
0
0
0

894

298

15

20

1236

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

120

1355

868

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.192

1.192

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.092

1.092

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

542

0
175

0
0

0
1089
601

171
839
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

359

542

359

542

359

175

359

175

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

545

1089

545

1089

242

601

242

601

171

171

171

171

420

839

420

839

359
716
1075

North-South:
East-West:
SUM:

359
716
1075

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

171

839

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.754

0.754

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.654

0.654

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

41

28
15

23
7

3
666
8

34
767
18

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

62

28

62

28

15

15

0
0
0
0
0
1
0

41

41

41

41

71

23

71

23

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

337

666

337

666

34

34

34

34

393

767

393

767

18

18

18

18

103
396
499

103
396
499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

28

15

41

23

0
0
0
0
0
0
0

666

0
0
0
0
0
0
0

34

767

18

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

28

15

0
0
0
0
0
0
0

41

23

0
0
0
0
0
0
0

666

34

767

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.350

0.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.350

0.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

171
290
87

32
269
37

23
241
178

313
706
99

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

171

171

171

171

290

290

290

290

87

87

32

32

32

32

269

269

269

269

26

37

26

37

23

23

23

23

121

241

121

241

93

178

93

178

1
0
1
1
0
0
0

313

313

313

313

403

706

403

706

99

99

99

99

North-South:
East-West:
SUM:

440
434
874

North-South:
East-West:
SUM:

440
434
874

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

171

290

87

32

269

37

23

241

178

313

706

99

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

171

290

87

0
0
0
0
0
0
0

32

269

37

0
0
0
0
0
0
0

23

241

178

0
0
0
0
0
0
0

0
0
0
0
0
0
0

313

706

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
112

38
51
31

15
436
28

162
1643
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

194

82

194

82

112

112

38

38

38

38

82

51

82

51

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

232

436

232

436

28

28

28

28

162

162

162

162

845

1643

845

1643

47

47

47

47

232
860
1092

232
860
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

112

0
0
0
0
0
0
0

38

51

31

0
0
0
0
0
0
0

15

436

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

162

1643

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.365

1.365

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.265

1.265

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
86
52

12
1
26

30
737
4

31
1622
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

141

86

141

86

52

52

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

371

737

371

737

31

31

31

31

811

1622

811

1622

17

17

17

17

153
841
994

North-South:
East-West:
SUM:

153
841
994

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

86

52

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

737

0
0
0
0
0
0
0

31

1622

17

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.243

1.243

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.143

1.143

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

143

165

19
284

51
12

3
1198
100

326
1513
58

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

143

143

143

143

152

19

152

19

284

284

1
0
0
0
0
1
0

114

165

114

165

114

51

114

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

599

1198

599

1198

29

100

29

100

326

326

326

326

786

1513

786

1513

58

58

58

58

266
925
1191

266
925
1191

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

143

19

284

0
0
0
0
0
0
0

165

51

12

0
0
0
0
0
0
0

1198

100

0
0
0
0
0
0
0

326

1513

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

143

19

284

165

51

12

1198

100

326

1513

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.489

1.489

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.389

1.389

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
624

0
0
0

0
1222
28

312
1990
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

31

624

31

624

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

625

1222

625

1222

28

28

28

28

312

312

312

312

995

1990

995

1990

43
995
1038

North-South:
East-West:
SUM:

43
995
1038

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0

312

1990

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0

312

1990

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.038

1.038

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.938

0.938

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1705

805
229

71
285
0

6
18

0
60

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

805

403

805

229

229

71

71

71

71

143

285

143

285

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

883

1705

883

1705

883

60

883

60

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
917
1391

474
917
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

805

229

0
0
0
0
0
0
0

71

285

0
0
0
0
0
0
0

10

18

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1705

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

140

661

22
91

199
1124

422
1770
37

46
1041
277

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

42

140

42

140

22

22

22

22

68

91

68

91

1
1
0
0
2
0
0

430

661

430

661

430

199

430

199

386

1124

386

1124

2
0
3
1
0
0
0

232

422

232

422

452

1770

452

1770

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

521

1041

521

1041

277

277

498
753
1251

North-South:
East-West:
SUM:

498
753
1251

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

0
0
0
0
0
0
0

46

1041

277

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

46

1041

277

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.910

0.910

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.810

0.810

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

248

0
194

0
0

0
1369
892

0
1523
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

248

248

248

248

107

194

107

194

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

685

1369

685

1369

243

892

243

892

508

1523

508

1523

248
685
933

248
685
933

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

1523

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.622

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.522

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

433

0
824

0
0

0
792
145

606
1158
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

433

433

433

433

218

824

218

824

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

469

792

469

792

145

145

145

145

606

606

606

606

579

1158

579

1158

433
1075
1508

North-South:
East-West:
SUM:

433
1075
1508

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

606

1158

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

0
0
0
0
0
0
0

606

1158

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.058

1.058

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.958

0.958

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

594

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
209

772
0

0
930
539

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

327

594

327

594

209

209

1
0
2
0
0
0
0

301

301

301

301

386

772

386

772

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

465

930

465

930

212

539

212

539

327
766
1093

327
766
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

0
0
0
0
0
0
0

0
0
0
0
0
0
0

930

539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

0
0
0
0
0
0
0

0
0
0
0
0
0
0

930

539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

165

CRITICAL VOLUMES

525
186

42
188
177

909
27

789
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

356

525

356

525

186

186

186

186

42

42

42

42

94

188

94

188

177

177

177

177

1
0
1
0
1
0
0

285

285

285

285

909

909

909

909

27

27

27

27

1
0
1
0
1
0
0

165

165

165

165

789

789

789

789

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

398
1074
1472

North-South:
East-West:
SUM:

398
1074
1472

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

525

186

42

188

177

285

909

27

165

789

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

525

186

0
0
0
0
0
0
0

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

406
0

53
337
205

331
63

98
295

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

421

406

421

406

53

53

53

53

324

337

324

337

324

205

324

205

1
0
0
1
0
0
0

154

154

154

154

394

331

394

331

63

63

1
0
1
1
0
0
0

19

19

19

19

98

98

98

98

295

295

295

295

474
449
923

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
449
923

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

406

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

406

0
0
0
0
0
0
0

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.154

1.154

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.054

1.054

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
108
40

76
291
20

74
748
109

79
717
69

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

178

108

178

108

40

40

76

76

76

76

194

291

194

291

194

20

194

20

74

74

74

74

286

748

286

748

109

109

109

109

79

79

79

79

393

717

393

717

69

69

69

69

254
467
721

North-South:
East-West:
SUM:

254
467
721

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

108

40

0
0
0
0
0
0
0

76

291

20

0
0
0
0
0
0
0

74

748

109

0
0
0
0
0
0
0

79

717

69

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.524

0.524

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.424

0.424

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

178

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

671
233

775
136

933
49

98
1270
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

178

178

178

178

336

671

336

671

184

233

184

233

1
0
1
1
0
0
0

231

231

231

231

456

775

456

775

136

136

136

136

1
0
2
0
1
0
0

109

109

109

109

467

933

467

933

49

49

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

98

98

98

98

635

1270

635

1270

45

45

634
744
1378

634
744
1378

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

0
0
0
0
0
0
0

98

1270

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

98

1270

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.723

1.723

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.623

1.623

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

88
380
213

913
263
7

8
1204
16

126
1562
869

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

88

88

88

88

190

380

190

380

213

213

213

213

320

913

320

913

270

263

270

263

407

1204

407

1204

16

16

16

16

126

126

126

126

521

1562

521

1562

869

869

533
533
1066

North-South:
East-West:
SUM:

533
533
1066

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

88

380

213

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

88

380

213

0
0
0
0
0
0
0

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.333

1.333

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.233

1.233

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

561

0
146

0
0

0
918
446

153
931
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

354

561

354

561

354

146

354

146

0
0
0
0
0
0
0

0
0
2
0
1
0
0

459

918

459

918

92

446

92

446

1
0
2
0
0
0
0

153

153

153

153

466

931

466

931

North-South:
East-West:
SUM:

354
612
966

North-South:
East-West:
SUM:

354
612
966

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:52 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION B: BARRINGTON-SAN VICENTE-WILSHRIE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

68

18
27

29
6

9
1080
21

35
1010
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

22

22

67

18

67

18

27

27

68

68

68

68

103

29

103

29

551

1080

551

1080

21

21

21

21

35

35

35

35

520

1010

520

1010

30

30

30

30

135
586
721

135
586
721

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

18

27

68

29

0
0
0
0
0
0
0

1080

21

0
0
0
0
0
0
0

35

1010

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

18

27

0
0
0
0
0
0
0

68

29

0
0
0
0
0
0
0

1080

21

35

1010

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.506

0.506

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

138

236

154
103

196
98

60
1082
167

170
1042
216

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

138

138

138

138

154

154

154

154

103

103

1
0
1
0
1
0
0

236

236

236

236

196

196

196

196

68

98

68

98

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

60

60

60

60

541

1082

541

1082

98

167

98

167

170

170

170

170

629

1042

629

1042

216

216

216

216

390
711
1101

North-South:
East-West:
SUM:

390
711
1101

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1061
10

103
1545
99

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

536

1061

536

1061

10

10

10

10

1
0
1
1
0
0
0

103

103

103

103

822

1545

822

1545

99

99

99

99

North-South:
East-West:
SUM:

133
833
966

133
833
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1061

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

103

1545

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

52
11
70

35
776
4

30
1814
119

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

52

52

52

52

133

11

133

11

70

70

35

35

35

35

390

776

390

776

30

30

30

30

907

1814

907

1814

119

119

119

119

140
942
1082

North-South:
East-West:
SUM:

140
942
1082

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

52

11

70

0
0
0
0
0
0
0

35

776

0
0
0
0
0
0
0

30

1814

119

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.721

0.721

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.621

0.621

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

169

169

16
222

55
9

6
1498
189

254
2115
114

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

169

169

169

169

119

16

119

16

222

222

1
0
0
0
0
1
0

117

169

117

169

117

55

117

55

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

749

1498

749

1498

105

189

105

189

254

254

254

254

1115

2115

1115

2115

114

114

114

114

286
1121
1407

286
1121
1407

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

169

16

222

0
0
0
0
0
0
0

169

55

0
0
0
0
0
0
0

1498

189

0
0
0
0
0
0
0

254

2115

114

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

169

16

222

169

55

1498

189

254

2115

114

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.023

1.023

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.923

0.923

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
398

0
0
0

0
851
84

360
2362
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

398

398

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

468

851

468

851

84

84

84

84

360

360

360

360

1181

2362

1181

2362

57
1181
1238

North-South:
East-West:
SUM:

57
1181
1238

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2362

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2362

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.869

0.869

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.769

0.769

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

151

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

251
329

632
0

5
13

1484
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

251

126

251

329

329

151

151

151

151

316

632

316

632

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

758

1484

758

1484

758

32

758

32

316
783
1099

316
783
1099

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

251

329

151

632

13

1484

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

0
0
0
0
0
0
0

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1484

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.733

0.733

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.633

0.633

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

608

4
83

166
1380

77
1624
54

11
1011
258

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

387

608

387

608

387

166

387

166

717

1380

717

1380

2
0
1
1
0
0
0

42

77

42

77

420

1624

420

1624

54

54

54

54

11

11

11

11

506

1011

506

1011

258

258

795
548
1343

North-South:
East-West:
SUM:

795
548
1343

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

608

166

1380

77

1624

54

11

1011

258

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

608

166

1380

0
0
0
0
0
0
0

77

1624

54

0
0
0
0
0
0
0

11

1011

258

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.977

0.977

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.877

0.877

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

811

0
586

0
0

0
1118
759

0
808
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

811

811

811

811

322

586

322

586

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

559

1118

559

1118

759

759

269

808

269

808

811
559
1370

811
559
1370

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

808

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

808

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.913

0.913

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.813

0.813

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
381

0
0
0

0
1089
143

466
842
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

381

381

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

616

1089

616

1089

143

143

143

143

466

466

466

466

421

842

421

842

32
1082
1114

North-South:
East-West:
SUM:

32
1082
1114

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

0
0
0
0
0
0
0

466

842

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

425

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
222

997
0

0
999
345

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

234

425

234

425

47

222

47

222

1
0
2
0
0
0
0

175

175

175

175

499

997

499

997

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

500

999

500

999

111

345

111

345

234
675
909

North-South:
East-West:
SUM:

234
675
909

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

0
0
0
0
0
0
0

0
0
0
0
0
0
0

999

345

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

0
0
0
0
0
0
0

0
0
0
0
0
0
0

999

345

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.638

0.638

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.538

0.538

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

CRITICAL VOLUMES

233
120

21
153
127

870
8

777
20

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

177

233

177

233

120

120

120

120

21

21

21

21

77

153

77

153

127

127

127

127

1
0
1
0
1
0
0

188

188

188

188

870

870

870

870

1
0
1
0
1
0
0

123

123

123

123

777

777

777

777

20

20

20

20

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

198
993
1191

North-South:
East-West:
SUM:

198
993
1191

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

233

120

21

153

127

188

870

123

777

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

233

120

0
0
0
0
0
0
0

21

153

127

0
0
0
0
0
0
0

188

870

0
0
0
0
0
0
0

123

777

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

268

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

376
4

76
349
216

121
36

51
71

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

388

376

388

376

76

76

76

76

359

349

359

349

359

216

359

216

1
0
0
1
0
0
0

268

268

268

268

157

121

157

121

36

36

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

71

71

71

71

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

464
339
803

464
339
803

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

376

76

349

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

376

0
0
0
0
0
0
0

76

349

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.564

0.564

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.464

0.464

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

106

123

194
37

186
21

91
928
80

11
862
96

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

106

106

106

106

337

194

337

194

37

37

0
1
0
1
0
0
0

123

123

123

123

165

186

165

186

165

21

165

21

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

91

91

91

91

336

928

336

928

80

80

80

80

11

11

11

11

479

862

479

862

96

96

96

96

460
570
1030

North-South:
East-West:
SUM:

460
570
1030

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

106

194

37

123

186

21

91

928

80

11

862

96

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

106

194

37

123

186

21

0
0
0
0
0
0
0

91

928

80

0
0
0
0
0
0
0

11

862

96

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

111

233

390
144

417
76

70
1301
84

80
1440
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

111

111

111

111

195

390

195

390

104

144

104

144

1
0
1
1
0
0
0

233

233

233

233

247

417

247

417

76

76

76

76

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

70

70

70

70

651

1301

651

1301

29

84

29

84

80

80

80

80

720

1440

720

1440

34

34

428
790
1218

428
790
1218

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

111

390

144

233

417

76

70

1301

84

80

1440

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

111

390

144

233

417

76

0
0
0
0
0
0
0

70

1301

84

0
0
0
0
0
0
0

80

1440

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
169
109

1124
135
16

60
1506
41

57
1615
1024

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

85

169

85

169

109

109

109

109

393

1124

393

1124

151

135

151

135

16

16

16

16

60

60

60

60

516

1506

516

1506

41

41

41

41

57

57

57

57

538

1615

538

1615

1024

1024

502
598
1100

North-South:
East-West:
SUM:

502
598
1100

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

169

109

1124

135

16

60

1506

41

57

1615

1024

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

65

169

109

1124

135

16

0
0
0
0
0
0
0

60

1506

41

0
0
0
0
0
0
0

57

1615

1024

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

464

0
66

0
0

0
1036
386

66
858
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

265

464

265

464

265

66

265

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

518

1036

518

1036

121

386

121

386

66

66

66

66

429

858

429

858

265
584
849

265
584
849

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

858

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

66

858

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.596

0.596

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.496

0.496

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

18

65

32
26

33
8

6
922
9

47
818
20

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

76

32

76

32

26

26

65

65

65

65

106

33

106

33

466

922

466

922

47

47

47

47

419

818

419

818

20

20

20

20

141
513
654

North-South:
East-West:
SUM:

141
513
654

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

18

32

26

65

33

922

47

818

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

32

26

0
0
0
0
0
0
0

65

33

0
0
0
0
0
0
0

922

0
0
0
0
0
0
0

47

818

20

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.459

0.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

158

154

257
75

414
107

56
601
320

276
837
149

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

158

158

158

158

257

257

257

257

75

75

1
0
1
0
1
0
0

154

154

154

154

414

414

414

414

79

107

79

107

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

56

56

56

56

301

601

301

601

241

320

241

320

276

276

276

276

493

837

493

837

149

149

149

149

572
577
1149

572
577
1149

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

158

257

75

0
0
0
0
0
0
0

154

414

107

0
0
0
0
0
0
0
0
0
0
0
0
0
0

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

158

257

75

154

414

107

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

93

44
75

80
87

18
822
30

182
1644
53

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

119

44

119

44

75

75

93

93

93

93

167

80

167

80

87

87

18

18

18

18

426

822

426

822

30

30

30

30

182

182

182

182

849

1644

849

1644

53

53

53

53

212
867
1079

North-South:
East-West:
SUM:

212
867
1079

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.199

1.199

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.099

1.099

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

19
5
42

42
1406
8

43
1653
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

19

19

19

19

66

66

42

42

42

42

42

42

707

1406

707

1406

43

43

43

43

827

1653

827

1653

40

40

40

40

115
869
984

115
869
984

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.093

1.093

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.993

0.993

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

204

160

52
378

57
5

2
1360
154

314
1699
86

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

204

204

204

204

215

52

215

52

378

378

1
0
0
0
0
1
0

111

160

111

160

111

57

111

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

680

1360

680

1360

52

154

52

154

314

314

314

314

893

1699

893

1699

86

86

86

86

326
994
1320

North-South:
East-West:
SUM:

326
994
1320

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

204

52

378

0
0
0
0
0
0
0

160

57

0
0
0
0
0
0
0

1360

154

0
0
0
0
0
0
0

314

1699

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

204

52

378

160

57

1360

154

314

1699

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.467

1.467

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.367

1.367

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

76
0
611

0
0
0

58

76

76

76

21

611

21

611

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

315
2058

Added
Volume

Total
Volume

76

0
0
1
1
0
0
0

0
1385

Lane
Volume

1
0
0
0
2
0
0

722

1385

722

1385

58

58

58

58

315

315

315

315

1029

2058

1029

2058

76
1037
1113

76
1037
1113

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.012

1.012

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.912

0.912

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1581

CRITICAL VOLUMES

660
298

68
284
0

6
18

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

330

660

330

660

298

298

68

68

68

68

142

284

142

284

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

832

1581

832

1581

832

82

832

82

North-South:
East-West:
SUM:

398
866
1264

North-South:
East-West:
SUM:

398
866
1264

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95

554

No. of
Lanes

11
67

185
1039

191
1246
28

293

Total
Volume

Lane
Volume

95

29

95

11

11

11

11

60

67

60

67

1
1
0
0
2
0
0

370

554

370

554

370

185

370

185

466

1039

466

1039

2
0
3
1
0
0
0

105

191

105

191

319

1246

319

1246

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1040

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

520

1040

520

1040

293

293

526
625
1151

526
625
1151

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

0
0
0
0
0
0
0

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.837

0.837

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.737

0.737

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

293

0
210

0
0

0
1253
904

0
1757
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

293

293

293

293

116

210

116

210

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

627

1253

627

1253

204

904

204

904

586

1757

586

1757

293
627
920

North-South:
East-West:
SUM:

293
627
920

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

1757

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1757

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.613

0.613

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.513

0.513

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

212

0
530

0
0

0
839
139

506
1343
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

212

212

212

212

24

530

24

530

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

489

839

489

839

139

139

139

139

506

506

506

506

672

1343

672

1343

212
995
1207

212
995
1207

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

506

1343

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

0
0
0
0
0
0
0

506

1343

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

730

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

234

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
163

958
0

0
833
511

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

402

730

402

730

163

163

1
0
2
0
0
0
0

234

234

234

234

479

958

479

958

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

417

833

417

833

109

511

109

511

402
651
1053

North-South:
East-West:
SUM:

402
651
1053

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

833

511

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

730

163

234

958

833

511

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
429
168

40
191
191

236
1017
32

155
757
57

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

299

429

299

429

168

168

168

168

40

40

40

40

96

191

96

191

191

191

191

191

236

236

236

236

1017

1017

1017

1017

32

32

32

32

155

155

155

155

757

757

757

757

57

57

57

57

339
1172
1511

339
1172
1511

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

61

429

168

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

61

429

168

0
0
0
0
0
0
0

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.060

1.060

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.960

0.960

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

352

WESTBOUND

31

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

543
16

83
420
218

164
47

63
170

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

590

543

590

543

16

16

83

83

83

83

402

420

402

420

402

218

402

218

1
0
0
1
0
0
0

352

352

352

352

211

164

211

164

47

47

1
0
1
1
0
0
0

18

18

18

18

63

63

63

63

170

170

170

170

North-South:
East-West:
SUM:

673
522
1195

North-South:
East-West:
SUM:

673
522
1195

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

31

543

16

83

420

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

543

16

0
0
0
0
0
0
0

83

420

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

90
275
45

94
306
23

162
929
136

64
724
111

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

90

90

90

90

410

275

410

275

45

45

94

94

94

94

259

306

259

306

259

23

259

23

162

162

162

162

355

929

355

929

136

136

136

136

64

64

64

64

418

724

418

724

111

111

111

111

504
580
1084

504
580
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

90

275

45

94

306

23

0
0
0
0
0
0
0

162

929

136

0
0
0
0
0
0
0

64

724

111

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

90

275

45

0
0
0
0
0
0
0

94

306

23

0
0
0
0
0
0
0

162

929

136

64

724

111

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.788

0.788

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.688

0.688

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

143

288

644
143

706
118

104
1451
63

101
1107
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

143

143

143

143

322

644

322

644

93

143

93

143

1
0
1
1
0
0
0

288

288

288

288

412

706

412

706

118

118

118

118

1
0
2
0
1
0
0

104

104

104

104

726

1451

726

1451

63

63

1
0
2
0
1
0
0

101

101

101

101

554

1107

554

1107

76

76

North-South:
East-West:
SUM:

610
827
1437

North-South:
East-West:
SUM:

610
827
1437

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

101

1107

76

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

101

1107

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.597

1.597

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.497

1.497

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

60
289
217

899
298
15

20
1236
33

120
1355
868

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

60

60

60

145

289

145

289

217

217

217

217

315

899

315

899

313

298

313

298

15

15

15

15

20

20

20

20

423

1236

423

1236

33

33

33

33

120

120

120

120

452

1355

452

1355

868

868

532
543
1075

532
543
1075

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

60

289

217

899

298

15

20

1236

33

120

1355

868

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

289

217

0
0
0
0
0
0
0

899

298

15

20

1236

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

120

1355

868

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.194

1.194

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.094

1.094

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

542

0
175

0
0

0
1089
601

171
839
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

359

542

359

542

359

175

359

175

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

545

1089

545

1089

242

601

242

601

171

171

171

171

420

839

420

839

359
716
1075

North-South:
East-West:
SUM:

359
716
1075

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.754

0.754

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.654

0.654

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:53 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

41

28
15

23
7

3
666
8

34
767
18

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

62

28

62

28

15

15

0
0
0
0
0
1
0

41

41

41

41

71

23

71

23

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

337

666

337

666

34

34

34

34

393

767

393

767

18

18

18

18

103
396
499

103
396
499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

19

28

15

41

23

666

34

767

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

28

15

0
0
0
0
0
0
0

41

23

0
0
0
0
0
0
0

666

0
0
0
0
0
0
0

34

767

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.350

0.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.350

0.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

171
290
87

32
269
37

23
241
178

313
706
99

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

171

171

171

171

290

290

290

290

87

87

32

32

32

32

269

269

269

269

26

37

26

37

23

23

23

23

121

241

121

241

93

178

93

178

1
0
1
1
0
0
0

313

313

313

313

403

706

403

706

99

99

99

99

North-South:
East-West:
SUM:

440
434
874

North-South:
East-West:
SUM:

440
434
874

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

171

290

87

32

269

37

23

241

178

313

706

99

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

171

290

87

0
0
0
0
0
0
0

32

269

37

0
0
0
0
0
0
0

23

241

178

0
0
0
0
0
0
0

0
0
0
0
0
0
0

313

706

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
112

38
51
31

15
436
28

162
1643
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

194

82

194

82

112

112

38

38

38

38

82

51

82

51

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

232

436

232

436

28

28

28

28

162

162

162

162

845

1643

845

1643

47

47

47

47

232
860
1092

232
860
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.365

1.365

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.265

1.265

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
86
52

12
1
26

30
737
4

31
1622
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

141

86

141

86

52

52

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

371

737

371

737

31

31

31

31

811

1622

811

1622

17

17

17

17

153
841
994

North-South:
East-West:
SUM:

153
841
994

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.243

1.243

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.143

1.143

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

143

165

19
284

51
12

3
1198
100

326
1513
58

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

143

143

143

143

152

19

152

19

284

284

1
0
0
0
0
1
0

114

165

114

165

114

51

114

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

599

1198

599

1198

29

100

29

100

326

326

326

326

786

1513

786

1513

58

58

58

58

266
925
1191

266
925
1191

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

143

19

284

0
0
0
0
0
0
0

165

51

12

0
0
0
0
0
0
0

1198

100

0
0
0
0
0
0
0

326

1513

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

143

19

284

165

51

12

1198

100

326

1513

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.489

1.489

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.389

1.389

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
624

0
0
0

0
1222
28

312
1990
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

31

624

31

624

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

625

1222

625

1222

28

28

28

28

312

312

312

312

995

1990

995

1990

43
995
1038

North-South:
East-West:
SUM:

43
995
1038

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0

312

1990

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

624

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0
0
0
0
0
0
0
0

312

1990

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.038

1.038

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.938

0.938

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1705

805
229

71
285
0

6
18

0
60

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

805

403

805

229

229

71

71

71

71

143

285

143

285

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

883

1705

883

1705

883

60

883

60

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
917
1391

474
917
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

140

661

22
91

199
1124

422
1770
37

46
1041
277

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

42

140

42

140

22

22

22

22

68

91

68

91

1
1
0
0
2
0
0

430

661

430

661

430

199

430

199

386

1124

386

1124

2
0
3
1
0
0
0

232

422

232

422

452

1770

452

1770

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

521

1041

521

1041

277

277

498
753
1251

North-South:
East-West:
SUM:

498
753
1251

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

0
0
0
0
0
0
0

46

1041

277

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

46

1041

277

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.910

0.910

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.810

0.810

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

248

0
194

0
0

0
1369
892

0
1523
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

248

248

248

248

107

194

107

194

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

685

1369

685

1369

243

892

243

892

508

1523

508

1523

248
685
933

248
685
933

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

1523

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.622

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.522

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

433

0
824

0
0

0
792
145

606
1158
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

433

433

433

433

218

824

218

824

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

469

792

469

792

145

145

145

145

606

606

606

606

579

1158

579

1158

433
1075
1508

North-South:
East-West:
SUM:

433
1075
1508

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

606

1158

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

0
0
0
0
0
0
0

606

1158

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.058

1.058

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.958

0.958

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

594

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
209

772
0

0
930
539

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

327

594

327

594

209

209

1
0
2
0
0
0
0

301

301

301

301

386

772

386

772

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

465

930

465

930

212

539

212

539

327
766
1093

327
766
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

930

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

594

209

301

772

930

539

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

165

CRITICAL VOLUMES

525
186

42
188
177

909
27

789
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

356

525

356

525

186

186

186

186

42

42

42

42

94

188

94

188

177

177

177

177

1
0
1
0
1
0
0

285

285

285

285

909

909

909

909

27

27

27

27

1
0
1
0
1
0
0

165

165

165

165

789

789

789

789

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

398
1074
1472

North-South:
East-West:
SUM:

398
1074
1472

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

525

186

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

525

186

0
0
0
0
0
0
0

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

406
0

53
337
205

331
63

98
295

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

421

406

421

406

53

53

53

53

324

337

324

337

324

205

324

205

1
0
0
1
0
0
0

154

154

154

154

394

331

394

331

63

63

1
0
1
1
0
0
0

19

19

19

19

98

98

98

98

295

295

295

295

474
449
923

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
449
923

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

406

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

406

0
0
0
0
0
0
0

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.154

1.154

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.054

1.054

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
108
40

76
291
20

74
748
109

79
717
69

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

178

108

178

108

40

40

76

76

76

76

194

291

194

291

194

20

194

20

74

74

74

74

286

748

286

748

109

109

109

109

79

79

79

79

393

717

393

717

69

69

69

69

254
467
721

North-South:
East-West:
SUM:

254
467
721

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.524

0.524

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.424

0.424

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

178

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

671
233

775
136

933
49

98
1270
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

178

178

178

178

336

671

336

671

184

233

184

233

1
0
1
1
0
0
0

231

231

231

231

456

775

456

775

136

136

136

136

1
0
2
0
1
0
0

109

109

109

109

467

933

467

933

49

49

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

98

98

98

98

635

1270

635

1270

45

45

634
744
1378

634
744
1378

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

0
0
0
0
0
0
0

98

1270

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

178

671

233

231

775

136

109

933

49

98

1270

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.723

1.723

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.623

1.623

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

88
380
213

913
263
7

8
1204
16

126
1562
869

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

88

88

88

88

190

380

190

380

213

213

213

213

320

913

320

913

270

263

270

263

407

1204

407

1204

16

16

16

16

126

126

126

126

521

1562

521

1562

869

869

533
533
1066

North-South:
East-West:
SUM:

533
533
1066

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

88

380

213

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

88

380

213

0
0
0
0
0
0
0

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.333

1.333

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.233

1.233

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

561

0
146

0
0

0
918
446

153
931
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

354

561

354

561

354

146

354

146

0
0
0
0
0
0
0

0
0
2
0
1
0
0

459

918

459

918

92

446

92

446

1
0
2
0
0
0
0

153

153

153

153

466

931

466

931

North-South:
East-West:
SUM:

354
612
966

North-South:
East-West:
SUM:

354
612
966

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

153

931

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION C: BARRINGTON-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

68

18
27

29
6

9
1080
21

35
1010
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

22

22

67

18

67

18

27

27

68

68

68

68

103

29

103

29

551

1080

551

1080

21

21

21

21

35

35

35

35

520

1010

520

1010

30

30

30

30

135
586
721

135
586
721

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

18

27

68

29

0
0
0
0
0
0
0

1080

21

0
0
0
0
0
0
0

35

1010

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

18

27

0
0
0
0
0
0
0

68

29

0
0
0
0
0
0
0

1080

21

35

1010

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.506

0.506

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

138

236

154
103

196
98

60
1082
167

170
1042
216

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

138

138

138

138

154

154

154

154

103

103

1
0
1
0
1
0
0

236

236

236

236

196

196

196

196

68

98

68

98

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

60

60

60

60

541

1082

541

1082

98

167

98

167

170

170

170

170

629

1042

629

1042

216

216

216

216

390
711
1101

North-South:
East-West:
SUM:

390
711
1101

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

138

154

103

236

196

98

60

1082

167

170

1042

216

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1061
10

103
1545
99

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

536

1061

536

1061

10

10

10

10

1
0
1
1
0
0
0

103

103

103

103

822

1545

822

1545

99

99

99

99

North-South:
East-West:
SUM:

133
833
966

133
833
966

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1061

10

103

1545

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

52
11
70

35
776
4

30
1814
119

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

52

52

52

52

133

11

133

11

70

70

35

35

35

35

390

776

390

776

30

30

30

30

907

1814

907

1814

119

119

119

119

140
942
1082

North-South:
East-West:
SUM:

140
942
1082

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

52

11

70

35

776

30

1814

119

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.721

0.721

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.621

0.621

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

169

169

16
222

55
9

6
1498
189

254
2115
114

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

169

169

169

169

119

16

119

16

222

222

1
0
0
0
0
1
0

117

169

117

169

117

55

117

55

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

749

1498

749

1498

105

189

105

189

254

254

254

254

1115

2115

1115

2115

114

114

114

114

286
1121
1407

286
1121
1407

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

169

16

222

0
0
0
0
0
0
0

169

55

0
0
0
0
0
0
0

1498

189

0
0
0
0
0
0
0

254

2115

114

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

169

16

222

169

55

1498

189

254

2115

114

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.023

1.023

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.923

0.923

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
398

0
0
0

0
851
84

360
2362
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

398

398

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

468

851

468

851

84

84

84

84

360

360

360

360

1181

2362

1181

2362

57
1181
1238

North-South:
East-West:
SUM:

57
1181
1238

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2362

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

398

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0
0
0
0
0
0
0
0

360

2362

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.869

0.869

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.769

0.769

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

151

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

251
329

632
0

5
13

1484
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

251

126

251

329

329

151

151

151

151

316

632

316

632

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

758

1484

758

1484

758

32

758

32

316
783
1099

316
783
1099

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1484

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

0
0
0
0
0
0
0

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1484

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.733

0.733

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.633

0.633

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

608

4
83

166
1380

77
1624
54

11
1011
258

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

387

608

387

608

387

166

387

166

717

1380

717

1380

2
0
1
1
0
0
0

42

77

42

77

420

1624

420

1624

54

54

54

54

11

11

11

11

506

1011

506

1011

258

258

795
548
1343

North-South:
East-West:
SUM:

795
548
1343

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

608

166

1380

77

1624

54

11

1011

258

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

608

166

1380

0
0
0
0
0
0
0

77

1624

54

0
0
0
0
0
0
0

11

1011

258

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.977

0.977

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.877

0.877

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

811

0
586

0
0

0
1118
759

0
808
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

811

811

811

811

322

586

322

586

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

559

1118

559

1118

759

759

269

808

269

808

811
559
1370

811
559
1370

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

808

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

808

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.913

0.913

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.813

0.813

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
381

0
0
0

0
1089
143

466
842
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

381

381

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

616

1089

616

1089

143

143

143

143

466

466

466

466

421

842

421

842

32
1082
1114

North-South:
East-West:
SUM:

32
1082
1114

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

425

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
222

997
0

0
999
345

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

234

425

234

425

47

222

47

222

1
0
2
0
0
0
0

175

175

175

175

499

997

499

997

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

500

999

500

999

111

345

111

345

234
675
909

North-South:
East-West:
SUM:

234
675
909

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

425

222

0
0
0
0
0
0
0

175

997

999

345

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

425

222

175

997

999

345

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.638

0.638

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.538

0.538

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

CRITICAL VOLUMES

233
120

21
153
127

870
8

777
20

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

177

233

177

233

120

120

120

120

21

21

21

21

77

153

77

153

127

127

127

127

1
0
1
0
1
0
0

188

188

188

188

870

870

870

870

1
0
1
0
1
0
0

123

123

123

123

777

777

777

777

20

20

20

20

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

198
993
1191

North-South:
East-West:
SUM:

198
993
1191

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

233

120

21

153

127

188

870

123

777

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

233

120

0
0
0
0
0
0
0

21

153

127

0
0
0
0
0
0
0

188

870

0
0
0
0
0
0
0

0
0
0
0
0
0
0

123

777

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

268

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

376
4

76
349
216

121
36

51
71

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

388

376

388

376

76

76

76

76

359

349

359

349

359

216

359

216

1
0
0
1
0
0
0

268

268

268

268

157

121

157

121

36

36

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

71

71

71

71

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

464
339
803

464
339
803

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

376

76

349

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

376

0
0
0
0
0
0
0

76

349

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.564

0.564

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.464

0.464

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

106

107

210
37

202
21

91
928
80

11
862
80

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

106

106

106

106

353

210

353

210

37

37

0
1
0
1
0
0
0

107

107

107

107

165

202

165

202

165

21

165

21

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

91

91

91

91

336

928

336

928

80

80

80

80

11

11

11

11

471

862

471

862

80

80

80

80

460
562
1022

North-South:
East-West:
SUM:

460
562
1022

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

106

210

37

0
0
0
0
0
0
0

107

202

21

0
0
0
0
0
0
0
0
0
0
0
0
0
0

91

928

80

11

862

80

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

106

210

37

107

202

21

0
0
0
0
0
0
0

91

928

80

0
0
0
0
0
0
0

11

862

80

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.743

0.743

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.643

0.643

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

111

249

390
144

417
76

70
1301
84

80
1440
50

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

111

111

111

111

195

390

195

390

104

144

104

144

1
0
1
1
0
0
0

249

249

249

249

247

417

247

417

76

76

76

76

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

70

70

70

70

651

1301

651

1301

29

84

29

84

80

80

80

80

720

1440

720

1440

50

50

444
790
1234

444
790
1234

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

111

390

144

249

417

76

70

1301

84

80

1440

50

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

111

390

144

249

417

76

0
0
0
0
0
0
0

70

1301

84

0
0
0
0
0
0
0

80

1440

50

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.823

0.823

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.723

0.723

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
169
109

1108
135
16

60
1522
41

57
1631
1008

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

85

169

85

169

109

109

109

109

388

1108

388

1108

151

135

151

135

16

16

16

16

60

60

60

60

521

1522

521

1522

41

41

41

41

57

57

57

57

544

1631

544

1631

1008

1008

497
604
1101

North-South:
East-West:
SUM:

497
604
1101

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

169

109

1108

135

16

60

1522

41

57

1631

1008

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

169

109

0
0
0
0
0
0
0

1108

135

16

0
0
0
0
0
0
0

60

1522

41

0
0
0
0
0
0
0

57

1631

1008

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

464

0
66

0
0

0
1036
386

66
858
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

265

464

265

464

265

66

265

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

518

1036

518

1036

121

386

121

386

66

66

66

66

429

858

429

858

265
584
849

265
584
849

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

0
0
0
0
0
0
0

66

858

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1036

386

66

858

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.596

0.596

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.496

0.496

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

18

65

32
26

33
8

6
922
9

47
818
20

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

76

32

76

32

26

26

65

65

65

65

106

33

106

33

466

922

466

922

47

47

47

47

419

818

419

818

20

20

20

20

141
513
654

North-South:
East-West:
SUM:

141
513
654

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

18

32

26

65

33

922

47

818

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

32

26

0
0
0
0
0
0
0

65

33

0
0
0
0
0
0
0

922

0
0
0
0
0
0
0

47

818

20

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.459

0.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

158

154

257
75

414
107

56
601
320

276
837
149

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

158

158

158

158

257

257

257

257

75

75

1
0
1
0
1
0
0

154

154

154

154

414

414

414

414

79

107

79

107

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

56

56

56

56

301

601

301

601

241

320

241

320

276

276

276

276

493

837

493

837

149

149

149

149

572
577
1149

572
577
1149

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

158

257

75

0
0
0
0
0
0
0

154

414

107

0
0
0
0
0
0
0
0
0
0
0
0
0
0

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

158

257

75

154

414

107

56

601

320

276

837

149

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.836

0.836

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.736

0.736

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

93

44
75

80
87

18
822
30

182
1644
53

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

119

44

119

44

75

75

93

93

93

93

167

80

167

80

87

87

18

18

18

18

426

822

426

822

30

30

30

30

182

182

182

182

849

1644

849

1644

53

53

53

53

212
867
1079

North-South:
East-West:
SUM:

212
867
1079

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

75

93

80

87

18

822

30

182

1644

53

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.199

1.199

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.099

1.099

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

19
5
42

42
1406
8

43
1653
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

19

19

19

19

66

66

42

42

42

42

42

42

707

1406

707

1406

43

43

43

43

827

1653

827

1653

40

40

40

40

115
869
984

115
869
984

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1653

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.093

1.093

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.993

0.993

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

204

160

52
378

57
5

2
1360
154

314
1699
86

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

204

204

204

204

215

52

215

52

378

378

1
0
0
0
0
1
0

111

160

111

160

111

57

111

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

680

1360

680

1360

52

154

52

154

314

314

314

314

893

1699

893

1699

86

86

86

86

326
994
1320

North-South:
East-West:
SUM:

326
994
1320

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

204

52

378

0
0
0
0
0
0
0

160

57

0
0
0
0
0
0
0

1360

154

0
0
0
0
0
0
0

314

1699

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

204

52

378

160

57

1360

154

314

1699

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.467

1.467

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.367

1.367

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

76
0
611

0
0
0

58

76

76

76

21

611

21

611

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

315
2058

Added
Volume

Total
Volume

76

0
0
1
1
0
0
0

0
1385

Lane
Volume

1
0
0
0
2
0
0

722

1385

722

1385

58

58

58

58

315

315

315

315

1029

2058

1029

2058

76
1037
1113

76
1037
1113

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.012

1.012

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.912

0.912

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1581

CRITICAL VOLUMES

660
298

68
284
0

6
18

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

330

660

330

660

298

298

68

68

68

68

142

284

142

284

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

832

1581

832

1581

832

82

832

82

North-South:
East-West:
SUM:

398
866
1264

North-South:
East-West:
SUM:

398
866
1264

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95

554

No. of
Lanes

11
67

185
1039

191
1246
28

293

Total
Volume

Lane
Volume

95

29

95

11

11

11

11

60

67

60

67

1
1
0
0
2
0
0

370

554

370

554

370

185

370

185

466

1039

466

1039

2
0
3
1
0
0
0

105

191

105

191

319

1246

319

1246

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1040

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

520

1040

520

1040

293

293

526
625
1151

526
625
1151

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

0
0
0
0
0
0
0

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.837

0.837

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.737

0.737

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

293

0
210

0
0

0
1253
904

0
1757
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

293

293

293

293

116

210

116

210

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

627

1253

627

1253

204

904

204

904

586

1757

586

1757

293
627
920

North-South:
East-West:
SUM:

293
627
920

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

1757

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1757

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.613

0.613

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.513

0.513

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

212

0
530

0
0

0
839
139

506
1343
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

212

212

212

212

24

530

24

530

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

489

839

489

839

139

139

139

139

506

506

506

506

672

1343

672

1343

212
995
1207

212
995
1207

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

506

1343

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

0
0
0
0
0
0
0

506

1343

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

730

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

234

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
163

958
0

0
833
511

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

402

730

402

730

163

163

1
0
2
0
0
0
0

234

234

234

234

479

958

479

958

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

417

833

417

833

109

511

109

511

402
651
1053

North-South:
East-West:
SUM:

402
651
1053

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

730

163

0
0
0
0
0
0
0

234

958

833

511

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

730

163

234

958

833

511

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
429
168

40
191
191

236
1017
32

155
757
57

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

299

429

299

429

168

168

168

168

40

40

40

40

96

191

96

191

191

191

191

191

236

236

236

236

1017

1017

1017

1017

32

32

32

32

155

155

155

155

757

757

757

757

57

57

57

57

339
1172
1511

339
1172
1511

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

61

429

168

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

61

429

168

0
0
0
0
0
0
0

40

191

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.060

1.060

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.960

0.960

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

352

WESTBOUND

31

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

543
16

83
420
218

164
47

63
170

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

590

543

590

543

16

16

83

83

83

83

402

420

402

420

402

218

402

218

1
0
0
1
0
0
0

352

352

352

352

211

164

211

164

47

47

1
0
1
1
0
0
0

18

18

18

18

63

63

63

63

170

170

170

170

North-South:
East-West:
SUM:

673
522
1195

North-South:
East-West:
SUM:

673
522
1195

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

31

543

16

83

420

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

543

16

0
0
0
0
0
0
0

83

420

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

90
275
45

89
311
23

162
929
136

64
724
111

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

90

90

90

90

410

275

410

275

45

45

89

89

89

89

256

311

256

311

256

23

256

23

162

162

162

162

355

929

355

929

136

136

136

136

64

64

64

64

418

724

418

724

111

111

111

111

499
580
1079

499
580
1079

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

90

275

45

89

311

23

0
0
0
0
0
0
0

162

929

136

0
0
0
0
0
0
0

64

724

111

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

90

275

45

0
0
0
0
0
0
0

89

311

23

0
0
0
0
0
0
0

162

929

136

64

724

111

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.785

0.785

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.685

0.685

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

143

293

644
143

706
118

104
1451
63

101
1107
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

143

143

143

143

322

644

322

644

93

143

93

143

1
0
1
1
0
0
0

293

293

293

293

412

706

412

706

118

118

118

118

1
0
2
0
1
0
0

104

104

104

104

726

1451

726

1451

63

63

1
0
2
0
1
0
0

101

101

101

101

554

1107

554

1107

76

76

North-South:
East-West:
SUM:

615
827
1442

North-South:
East-West:
SUM:

615
827
1442

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

293

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

101

1107

76

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

293

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

101

1107

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.602

1.602

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.502

1.502

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

60
289
217

894
298
15

20
1241
33

120
1355
868

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

60

60

60

145

289

145

289

217

217

217

217

313

894

313

894

313

298

313

298

15

15

15

15

20

20

20

20

425

1241

425

1241

33

33

33

33

120

120

120

120

452

1355

452

1355

868

868

530
545
1075

530
545
1075

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

60

289

217

894

298

15

20

1241

33

120

1355

868

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

289

217

0
0
0
0
0
0
0

894

298

15

20

1241

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

120

1355

868

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.194

1.194

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.094

1.094

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

542

0
175

0
0

0
1089
601

171
839
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

359

542

359

542

359

175

359

175

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

545

1089

545

1089

242

601

242

601

171

171

171

171

420

839

420

839

359
716
1075

North-South:
East-West:
SUM:

359
716
1075

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.754

0.754

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.654

0.654

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:54 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

41

28
15

23
7

3
666
8

34
767
18

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

62

28

62

28

15

15

0
0
0
0
0
1
0

41

41

41

41

71

23

71

23

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

337

666

337

666

34

34

34

34

393

767

393

767

18

18

18

18

103
396
499

103
396
499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

19

28

15

41

23

666

34

767

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

28

15

0
0
0
0
0
0
0

41

23

0
0
0
0
0
0
0

666

0
0
0
0
0
0
0

34

767

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.350

0.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.350

0.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

171
290
87

32
269
37

23
241
178

313
706
99

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

171

171

171

171

290

290

290

290

87

87

32

32

32

32

269

269

269

269

26

37

26

37

23

23

23

23

121

241

121

241

93

178

93

178

1
0
1
1
0
0
0

313

313

313

313

403

706

403

706

99

99

99

99

North-South:
East-West:
SUM:

440
434
874

North-South:
East-West:
SUM:

440
434
874

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

171

290

87

32

269

37

23

241

178

313

706

99

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

171

290

87

0
0
0
0
0
0
0

32

269

37

0
0
0
0
0
0
0

23

241

178

0
0
0
0
0
0
0

0
0
0
0
0
0
0

313

706

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
112

38
51
31

15
436
28

162
1643
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

194

82

194

82

112

112

38

38

38

38

82

51

82

51

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

232

436

232

436

28

28

28

28

162

162

162

162

845

1643

845

1643

47

47

47

47

232
860
1092

232
860
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.365

1.365

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.265

1.265

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
86
52

12
1
26

30
737
4

31
1622
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

141

86

141

86

52

52

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

371

737

371

737

31

31

31

31

811

1622

811

1622

17

17

17

17

153
841
994

North-South:
East-West:
SUM:

153
841
994

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.243

1.243

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.143

1.143

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

143

165

19
284

51
12

3
1198
100

326
1513
58

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

143

143

143

143

152

19

152

19

284

284

1
0
0
0
0
1
0

114

165

114

165

114

51

114

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

599

1198

599

1198

29

100

29

100

326

326

326

326

786

1513

786

1513

58

58

58

58

266
925
1191

266
925
1191

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

143

19

284

0
0
0
0
0
0
0

165

51

12

0
0
0
0
0
0
0

1198

100

0
0
0
0
0
0
0

326

1513

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

143

19

284

165

51

12

1198

100

326

1513

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.489

1.489

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.389

1.389

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
624

0
0
0

0
1222
28

312
1990
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

31

624

31

624

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

625

1222

625

1222

28

28

28

28

312

312

312

312

995

1990

995

1990

43
995
1038

North-South:
East-West:
SUM:

43
995
1038

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0

312

1990

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

624

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0
0
0
0
0
0
0
0

312

1990

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.038

1.038

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.938

0.938

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1705

805
229

71
285
0

6
18

0
60

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

805

403

805

229

229

71

71

71

71

143

285

143

285

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

883

1705

883

1705

883

60

883

60

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
917
1391

474
917
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

140

661

22
91

199
1124

422
1770
37

46
1041
277

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

42

140

42

140

22

22

22

22

68

91

68

91

1
1
0
0
2
0
0

430

661

430

661

430

199

430

199

386

1124

386

1124

2
0
3
1
0
0
0

232

422

232

422

452

1770

452

1770

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

521

1041

521

1041

277

277

498
753
1251

North-South:
East-West:
SUM:

498
753
1251

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

0
0
0
0
0
0
0

46

1041

277

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

46

1041

277

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.910

0.910

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.810

0.810

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

248

0
194

0
0

0
1369
892

0
1523
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

248

248

248

248

107

194

107

194

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

685

1369

685

1369

243

892

243

892

508

1523

508

1523

248
685
933

248
685
933

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

1523

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.622

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.522

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

433

0
824

0
0

0
792
145

606
1158
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

433

433

433

433

218

824

218

824

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

469

792

469

792

145

145

145

145

606

606

606

606

579

1158

579

1158

433
1075
1508

North-South:
East-West:
SUM:

433
1075
1508

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

606

1158

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

0
0
0
0
0
0
0

606

1158

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.058

1.058

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.958

0.958

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

594

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
209

772
0

0
930
539

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

327

594

327

594

209

209

1
0
2
0
0
0
0

301

301

301

301

386

772

386

772

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

465

930

465

930

212

539

212

539

327
766
1093

327
766
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

930

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

594

209

301

772

930

539

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

165

CRITICAL VOLUMES

525
186

42
188
177

909
27

789
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

356

525

356

525

186

186

186

186

42

42

42

42

94

188

94

188

177

177

177

177

1
0
1
0
1
0
0

285

285

285

285

909

909

909

909

27

27

27

27

1
0
1
0
1
0
0

165

165

165

165

789

789

789

789

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

398
1074
1472

North-South:
East-West:
SUM:

398
1074
1472

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

525

186

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

525

186

0
0
0
0
0
0
0

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

406
0

53
337
205

331
63

98
295

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

421

406

421

406

53

53

53

53

324

337

324

337

324

205

324

205

1
0
0
1
0
0
0

154

154

154

154

394

331

394

331

63

63

1
0
1
1
0
0
0

19

19

19

19

98

98

98

98

295

295

295

295

474
449
923

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
449
923

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

406

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

406

0
0
0
0
0
0
0

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.154

1.154

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.054

1.054

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
108
40

76
291
20

74
748
109

79
717
69

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

178

108

178

108

40

40

76

76

76

76

194

291

194

291

194

20

194

20

74

74

74

74

286

748

286

748

109

109

109

109

79

79

79

79

393

717

393

717

69

69

69

69

254
467
721

North-South:
East-West:
SUM:

254
467
721

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.524

0.524

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.424

0.424

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

178

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

671
233

775
136

933
49

98
1270
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

178

178

178

178

336

671

336

671

184

233

184

233

1
0
1
1
0
0
0

231

231

231

231

456

775

456

775

136

136

136

136

1
0
2
0
1
0
0

109

109

109

109

467

933

467

933

49

49

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

98

98

98

98

635

1270

635

1270

45

45

634
744
1378

634
744
1378

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

0
0
0
0
0
0
0

98

1270

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

178

671

233

231

775

136

109

933

49

98

1270

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.723

1.723

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.623

1.623

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

88
380
213

913
263
7

8
1204
16

126
1562
869

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

88

88

88

88

190

380

190

380

213

213

213

213

320

913

320

913

270

263

270

263

407

1204

407

1204

16

16

16

16

126

126

126

126

521

1562

521

1562

869

869

533
533
1066

North-South:
East-West:
SUM:

533
533
1066

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

88

380

213

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

88

380

213

0
0
0
0
0
0
0

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.333

1.333

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.233

1.233

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

561

0
146

0
0

0
918
446

153
931
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

354

561

354

561

354

146

354

146

0
0
0
0
0
0
0

0
0
2
0
1
0
0

459

918

459

918

92

446

92

446

1
0
2
0
0
0
0

153

153

153

153

466

931

466

931

North-South:
East-West:
SUM:

354
612
966

North-South:
East-West:
SUM:

354
612
966

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

153

931

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION D: BUNDY-SAN VICENTE-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

22

68

18
27

29
6

9
1080
21

35
1010
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

22

22

67

18

67

18

27

27

68

68

68

68

103

29

103

29

551

1080

551

1080

21

21

21

21

35

35

35

35

520

1010

520

1010

30

30

30

30

135
586
721

135
586
721

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

18

27

68

29

0
0
0
0
0
0
0

1080

21

0
0
0
0
0
0
0

35

1010

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

18

27

0
0
0
0
0
0
0

68

29

0
0
0
0
0
0
0

1080

21

35

1010

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.506

0.506

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.506

0.506

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

138

236

154
119

196
98

60
1082
167

186
1042
216

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

138

138

138

138

154

154

154

154

119

119

1
0
1
0
1
0
0

236

236

236

236

196

196

196

196

68

98

68

98

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

60

60

60

60

541

1082

541

1082

98

167

98

167

186

186

186

186

629

1042

629

1042

216

216

216

216

390
727
1117

North-South:
East-West:
SUM:

390
727
1117

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

138

154

119

236

196

98

60

1082

167

186

1042

216

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

138

154

119

236

196

98

60

1082

167

186

1042

216

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1077
10

103
1561
99

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

544

1077

544

1077

10

10

10

10

1
0
1
1
0
0
0

103

103

103

103

830

1561

830

1561

99

99

99

99

North-South:
East-West:
SUM:

133
841
974

133
841
974

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1077

10

103

1561

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1077

10

103

1561

99

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

52
11
70

35
792
4

30
1830
119

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

52

52

52

52

133

11

133

11

70

70

35

35

35

35

398

792

398

792

30

30

30

30

915

1830

915

1830

119

119

119

119

140
950
1090

North-South:
East-West:
SUM:

140
950
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

52

11

70

35

792

30

1830

119

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

52

11

70

35

792

30

1830

119

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.727

0.727

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.627

0.627

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

153

169

15
222

54
10

7
1498
173

254
2115
114

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

153

153

153

153

119

15

119

15

222

222

1
0
0
0
0
1
0

117

169

117

169

117

54

117

54

10

10

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

749

1498

749

1498

97

173

97

173

254

254

254

254

1115

2115

1115

2115

114

114

114

114

270
1122
1392

270
1122
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

153

15

222

0
0
0
0
0
0
0

169

54

10

0
0
0
0
0
0
0

1498

173

0
0
0
0
0
0
0

254

2115

114

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

153

15

222

169

54

10

1498

173

254

2115

114

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.012

1.012

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.912

0.912

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
398

0
0
0

0
851
84

360
2362
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

398

398

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

468

851

468

851

84

84

84

84

360

360

360

360

1181

2362

1181

2362

57
1181
1238

North-South:
East-West:
SUM:

57
1181
1238

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

398

0
0
0
0
0
0
0

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0

360

2362

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

398

0
0
0
0
0
0
0

851

84

0
0
0
0
0
0
0
0
0
0
0
0
0
0

360

2362

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.869

0.869

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.769

0.769

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

151

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

251
329

632
0

5
13

1484
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

251

126

251

329

329

151

151

151

151

316

632

316

632

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

758

1484

758

1484

758

32

758

32

316
783
1099

316
783
1099

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1484

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

251

329

0
0
0
0
0
0
0

151

632

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1484

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.733

0.733

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.633

0.633

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

608

4
83

166
1380

77
1624
54

11
1011
258

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

387

608

387

608

387

166

387

166

717

1380

717

1380

2
0
1
1
0
0
0

42

77

42

77

420

1624

420

1624

54

54

54

54

11

11

11

11

506

1011

506

1011

258

258

795
548
1343

North-South:
East-West:
SUM:

795
548
1343

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

608

166

1380

77

1624

54

11

1011

258

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

608

166

1380

0
0
0
0
0
0
0

77

1624

54

0
0
0
0
0
0
0

11

1011

258

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.977

0.977

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.877

0.877

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

811

0
586

0
0

0
1118
759

0
808
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

811

811

811

811

322

586

322

586

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

559

1118

559

1118

759

759

269

808

269

808

811
559
1370

811
559
1370

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

808

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

811

586

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1118

759

0
0
0
0
0
0
0

0
0
0
0
0
0
0

808

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.913

0.913

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.813

0.813

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
381

0
0
0

0
1089
143

466
842
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

381

381

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

616

1089

616

1089

143

143

143

143

466

466

466

466

421

842

421

842

32
1082
1114

North-South:
East-West:
SUM:

32
1082
1114

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

381

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1089

143

0
0
0
0
0
0
0

466

842

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.782

0.782

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.682

0.682

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

441

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

175

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
222

997
0

0
999
361

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

243

441

243

441

47

222

47

222

1
0
2
0
0
0
0

175

175

175

175

499

997

499

997

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

500

999

500

999

118

361

118

361

243
675
918

North-South:
East-West:
SUM:

243
675
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

441

222

0
0
0
0
0
0
0

175

997

999

361

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

441

222

175

997

999

361

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

188

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

123

CRITICAL VOLUMES

249
120

21
169
127

870
8

777
20

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

185

249

185

249

120

120

120

120

21

21

21

21

85

169

85

169

127

127

127

127

1
0
1
0
1
0
0

188

188

188

188

870

870

870

870

1
0
1
0
1
0
0

123

123

123

123

777

777

777

777

20

20

20

20

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

206
993
1199

North-South:
East-West:
SUM:

206
993
1199

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

249

120

21

169

127

188

870

123

777

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

249

120

0
0
0
0
0
0
0

21

169

127

0
0
0
0
0
0
0

188

870

0
0
0
0
0
0
0

0
0
0
0
0
0
0

123

777

20

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.841

0.841

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.741

0.741

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

268

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

360
4

76
333
216

121
36

51
71

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

372

360

372

360

76

76

76

76

351

333

351

333

351

216

351

216

1
0
0
1
0
0
0

268

268

268

268

157

121

157

121

36

36

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

71

71

71

71

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

448
339
787

448
339
787

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

360

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

360

0
0
0
0
0
0
0

76

333

216

0
0
0
0
0
0
0

268

121

36

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

71

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.552

0.552

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.452

0.452

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

106

107

194
37

186
21

91
944
80

11
878
80

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

106

106

106

106

337

194

337

194

37

37

0
1
0
1
0
0
0

107

107

107

107

157

186

157

186

157

21

157

21

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

91

91

91

91

341

944

341

944

80

80

80

80

11

11

11

11

479

878

479

878

80

80

80

80

444
570
1014

North-South:
East-West:
SUM:

444
570
1014

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

106

194

37

0
0
0
0
0
0
0

107

186

21

0
0
0
0
0
0
0
0
0
0
0
0
0
0

91

944

80

11

878

80

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

106

194

37

107

186

21

0
0
0
0
0
0
0

91

944

80

0
0
0
0
0
0
0

11

878

80

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.737

0.737

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.637

0.637

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

111

233

390
144

417
76

70
1301
84

80
1440
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

111

111

111

111

195

390

195

390

104

144

104

144

1
0
1
1
0
0
0

233

233

233

233

247

417

247

417

76

76

76

76

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

70

70

70

70

651

1301

651

1301

29

84

29

84

80

80

80

80

720

1440

720

1440

34

34

428
790
1218

428
790
1218

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

111

390

144

233

417

76

70

1301

84

80

1440

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

111

390

144

233

417

76

0
0
0
0
0
0
0

70

1301

84

0
0
0
0
0
0
0

80

1440

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

65
169
109

1124
135
16

60
1506
41

57
1615
1024

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

65

65

65

65

85

169

85

169

109

109

109

109

393

1124

393

1124

151

135

151

135

16

16

16

16

60

60

60

60

516

1506

516

1506

41

41

41

41

57

57

57

57

538

1615

538

1615

1024

1024

502
598
1100

North-South:
East-West:
SUM:

502
598
1100

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

65

169

109

1124

135

16

60

1506

41

57

1615

1024

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

65

169

109

0
0
0
0
0
0
0

1124

135

16

0
0
0
0
0
0
0

60

1506

41

0
0
0
0
0
0
0

57

1615

1024

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

464

0
66

0
0

0
1052
386

66
874
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

265

464

265

464

265

66

265

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

526

1052

526

1052

121

386

121

386

66

66

66

66

437

874

437

874

265
592
857

265
592
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1052

386

0
0
0
0
0
0
0

66

874

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

464

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1052

386

66

874

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

18

65

32
26

33
8

6
922
9

47
818
20

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

18

18

18

18

76

32

76

32

26

26

65

65

65

65

106

33

106

33

466

922

466

922

47

47

47

47

419

818

419

818

20

20

20

20

141
513
654

North-South:
East-West:
SUM:

141
513
654

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

18

32

26

65

33

922

47

818

20

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

18

32

26

0
0
0
0
0
0
0

65

33

0
0
0
0
0
0
0

922

0
0
0
0
0
0
0

47

818

20

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.459

0.459

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

158

154

257
75

414
107

56
601
320

281
837
149

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

158

158

158

158

257

257

257

257

75

75

1
0
1
0
1
0
0

154

154

154

154

414

414

414

414

79

107

79

107

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

56

56

56

56

301

601

301

601

241

320

241

320

281

281

281

281

493

837

493

837

149

149

149

149

572
582
1154

572
582
1154

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

158

257

75

0
0
0
0
0
0
0

154

414

107

0
0
0
0
0
0
0
0
0
0
0
0
0
0

56

601

320

281

837

149

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

158

257

75

154

414

107

56

601

320

281

837

149

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

93

44
75

80
87

18
822
30

182
1649
53

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

119

44

119

44

75

75

93

93

93

93

167

80

167

80

87

87

18

18

18

18

426

822

426

822

30

30

30

30

182

182

182

182

851

1649

851

1649

53

53

53

53

212
869
1081

North-South:
East-West:
SUM:

212
869
1081

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

75

93

80

87

18

822

30

182

1649

53

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

75

93

80

87

18

822

30

182

1649

53

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.201

1.201

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.101

1.101

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

19
5
42

42
1406
8

43
1658
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

19

19

19

19

66

66

42

42

42

42

42

42

707

1406

707

1406

43

43

43

43

829

1658

829

1658

40

40

40

40

115
871
986

115
871
986

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1658

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

19

42

42

1406

43

1658

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.096

1.096

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.996

0.996

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

204

160

52
378

57
5

2
1360
149

314
1699
86

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

204

204

204

204

215

52

215

52

378

378

1
0
0
0
0
1
0

111

160

111

160

111

57

111

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

680

1360

680

1360

47

149

47

149

314

314

314

314

893

1699

893

1699

86

86

86

86

326
994
1320

North-South:
East-West:
SUM:

326
994
1320

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

204

52

378

0
0
0
0
0
0
0

160

57

0
0
0
0
0
0
0

1360

149

0
0
0
0
0
0
0

314

1699

86

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

204

52

378

160

57

1360

149

314

1699

86

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.467

1.467

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.367

1.367

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

76
0
611

0
0
0

58

76

76

76

21

611

21

611

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

315
2058

Added
Volume

Total
Volume

76

0
0
1
1
0
0
0

0
1385

Lane
Volume

1
0
0
0
2
0
0

722

1385

722

1385

58

58

58

58

315

315

315

315

1029

2058

1029

2058

76
1037
1113

76
1037
1113

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

76

611

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1385

58

0
0
0
0
0
0
0

315

2058

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.012

1.012

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.912

0.912

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1581

CRITICAL VOLUMES

660
298

68
284
0

6
18

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

330

660

330

660

298

298

68

68

68

68

142

284

142

284

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

832

1581

832

1581

832

82

832

82

North-South:
East-West:
SUM:

398
866
1264

North-South:
East-West:
SUM:

398
866
1264

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

660

298

68

284

10

18

1581

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

95

554

No. of
Lanes

11
67

185
1039

191
1246
28

293

Total
Volume

Lane
Volume

95

29

95

11

11

11

11

60

67

60

67

1
1
0
0
2
0
0

370

554

370

554

370

185

370

185

466

1039

466

1039

2
0
3
1
0
0
0

105

191

105

191

319

1246

319

1246

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1040

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

520

1040

520

1040

293

293

526
625
1151

526
625
1151

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

0
0
0
0
0
0
0

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

95

11

67

0
0
0
0
0
0
0

554

185

1039

0
0
0
0
0
0
0

191

1246

28

15

1040

293

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.837

0.837

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.737

0.737

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

293

0
210

0
0

0
1253
904

0
1757
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

293

293

293

293

116

210

116

210

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

627

1253

627

1253

204

904

204

904

586

1757

586

1757

293
627
920

North-South:
East-West:
SUM:

293
627
920

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

1757

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

293

210

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1253

904

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1757

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.613

0.613

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.513

0.513

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

212

0
530

0
0

0
839
139

506
1343
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

212

212

212

212

24

530

24

530

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

489

839

489

839

139

139

139

139

506

506

506

506

672

1343

672

1343

212
995
1207

212
995
1207

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

506

1343

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

212

530

0
0
0
0
0
0
0

0
0
0
0
0
0
0

839

139

0
0
0
0
0
0
0

0
0
0
0
0
0
0

506

1343

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

735

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

234

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
163

958
0

0
833
511

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

404

735

404

735

163

163

1
0
2
0
0
0
0

234

234

234

234

479

958

479

958

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

417

833

417

833

107

511

107

511

404
651
1055

North-South:
East-West:
SUM:

404
651
1055

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

735

163

0
0
0
0
0
0
0

234

958

833

511

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

735

163

234

958

833

511

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
429
168

40
196
191

236
1017
32

155
757
57

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

299

429

299

429

168

168

168

168

40

40

40

40

98

196

98

196

191

191

191

191

236

236

236

236

1017

1017

1017

1017

32

32

32

32

155

155

155

155

757

757

757

757

57

57

57

57

339
1172
1511

339
1172
1511

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

61

429

168

40

196

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

61

429

168

0
0
0
0
0
0
0

40

196

191

0
0
0
0
0
0
0

236

1017

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

155

757

57

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.060

1.060

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.960

0.960

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

352

WESTBOUND

31

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

543
16

83
415
218

164
47

63
170

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

31

31

31

31

590

543

590

543

16

16

83

83

83

83

400

415

400

415

400

218

400

218

1
0
0
1
0
0
0

352

352

352

352

211

164

211

164

47

47

1
0
1
1
0
0
0

18

18

18

18

63

63

63

63

170

170

170

170

North-South:
East-West:
SUM:

673
522
1195

North-South:
East-West:
SUM:

673
522
1195

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

31

543

16

83

415

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

31

543

16

0
0
0
0
0
0
0

83

415

218

0
0
0
0
0
0
0

352

164

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

18

63

170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.839

0.839

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.739

0.739

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

90
275
45

89
306
23

162
934
136

64
724
111

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

90

90

90

90

410

275

410

275

45

45

89

89

89

89

254

306

254

306

254

23

254

23

162

162

162

162

357

934

357

934

136

136

136

136

64

64

64

64

418

724

418

724

111

111

111

111

499
580
1079

499
580
1079

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

90

275

45

89

306

23

0
0
0
0
0
0
0

162

934

136

0
0
0
0
0
0
0

64

724

111

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

90

275

45

0
0
0
0
0
0
0

89

306

23

0
0
0
0
0
0
0

162

934

136

64

724

111

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.785

0.785

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.685

0.685

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

143

288

644
143

706
118

104
1451
63

101
1107
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

143

143

143

143

322

644

322

644

93

143

93

143

1
0
1
1
0
0
0

288

288

288

288

412

706

412

706

118

118

118

118

1
0
2
0
1
0
0

104

104

104

104

726

1451

726

1451

63

63

1
0
2
0
1
0
0

101

101

101

101

554

1107

554

1107

76

76

North-South:
East-West:
SUM:

610
827
1437

North-South:
East-West:
SUM:

610
827
1437

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

101

1107

76

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

143

644

143

0
0
0
0
0
0
0

288

706

118

0
0
0
0
0
0
0

104

1451

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

101

1107

76

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.597

1.597

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.497

1.497

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

60
289
217

899
298
15

20
1236
33

120
1355
868

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

60

60

60

145

289

145

289

217

217

217

217

315

899

315

899

313

298

313

298

15

15

15

15

20

20

20

20

423

1236

423

1236

33

33

33

33

120

120

120

120

452

1355

452

1355

868

868

532
543
1075

532
543
1075

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

60

289

217

899

298

15

20

1236

33

120

1355

868

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

60

289

217

0
0
0
0
0
0
0

899

298

15

20

1236

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

120

1355

868

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.194

1.194

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.094

1.094

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

542

0
175

0
0

0
1094
601

171
839
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

359

542

359

542

359

175

359

175

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

547

1094

547

1094

242

601

242

601

171

171

171

171

420

839

420

839

359
718
1077

North-South:
East-West:
SUM:

359
718
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1094

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

542

175

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1094

601

0
0
0
0
0
0
0

0
0
0
0
0
0
0

171

839

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.756

0.756

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.656

0.656

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

41

28
15

23
7

3
666
8

34
767
18

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

62

28

62

28

15

15

0
0
0
0
0
1
0

41

41

41

41

71

23

71

23

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

337

666

337

666

34

34

34

34

393

767

393

767

18

18

18

18

103
396
499

103
396
499

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

19

28

15

41

23

666

34

767

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

28

15

0
0
0
0
0
0
0

41

23

0
0
0
0
0
0
0

666

0
0
0
0
0
0
0

34

767

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.350

0.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.350

0.350

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

171
290
87

32
269
37

23
241
178

313
706
99

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

171

171

171

171

290

290

290

290

87

87

32

32

32

32

269

269

269

269

26

37

26

37

23

23

23

23

121

241

121

241

93

178

93

178

1
0
1
1
0
0
0

313

313

313

313

403

706

403

706

99

99

99

99

North-South:
East-West:
SUM:

440
434
874

North-South:
East-West:
SUM:

440
434
874

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

171

290

87

32

269

37

23

241

178

313

706

99

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

171

290

87

0
0
0
0
0
0
0

32

269

37

0
0
0
0
0
0
0

23

241

178

0
0
0
0
0
0
0

0
0
0
0
0
0
0

313

706

99

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
112

38
51
31

15
436
28

162
1643
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

194

82

194

82

112

112

38

38

38

38

82

51

82

51

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

232

436

232

436

28

28

28

28

162

162

162

162

845

1643

845

1643

47

47

47

47

232
860
1092

232
860
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

112

38

51

31

15

436

28

162

1643

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.365

1.365

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.265

1.265

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
86
52

12
1
26

30
737
4

31
1622
17

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

141

86

141

86

52

52

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

371

737

371

737

31

31

31

31

811

1622

811

1622

17

17

17

17

153
841
994

North-South:
East-West:
SUM:

153
841
994

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

86

52

12

26

30

737

31

1622

17

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.243

1.243

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.143

1.143

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

143

165

19
284

51
12

3
1198
100

326
1513
58

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

143

143

143

143

152

19

152

19

284

284

1
0
0
0
0
1
0

114

165

114

165

114

51

114

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

599

1198

599

1198

29

100

29

100

326

326

326

326

786

1513

786

1513

58

58

58

58

266
925
1191

266
925
1191

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

143

19

284

0
0
0
0
0
0
0

165

51

12

0
0
0
0
0
0
0

1198

100

0
0
0
0
0
0
0

326

1513

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

143

19

284

165

51

12

1198

100

326

1513

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.489

1.489

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.389

1.389

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
624

0
0
0

0
1222
28

312
1990
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

31

624

31

624

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

625

1222

625

1222

28

28

28

28

312

312

312

312

995

1990

995

1990

43
995
1038

North-South:
East-West:
SUM:

43
995
1038

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

624

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0

312

1990

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

624

0
0
0
0
0
0
0

1222

28

0
0
0
0
0
0
0
0
0
0
0
0
0
0

312

1990

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.038

1.038

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.938

0.938

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1705

805
229

71
285
0

6
18

0
60

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

805

403

805

229

229

71

71

71

71

143

285

143

285

0
0
0
0
0
1
0

10

10

10

10

34

34

18

18

1
0
0
0
0
0
1

883

1705

883

1705

883

60

883

60

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
917
1391

474
917
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

805

229

71

285

10

18

1705

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

140

661

22
91

199
1124

422
1770
37

46
1041
277

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

42

140

42

140

22

22

22

22

68

91

68

91

1
1
0
0
2
0
0

430

661

430

661

430

199

430

199

386

1124

386

1124

2
0
3
1
0
0
0

232

422

232

422

452

1770

452

1770

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

521

1041

521

1041

277

277

498
753
1251

North-South:
East-West:
SUM:

498
753
1251

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

0
0
0
0
0
0
0

46

1041

277

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

140

22

91

0
0
0
0
0
0
0

661

199

1124

0
0
0
0
0
0
0

422

1770

37

46

1041

277

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.910

0.910

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.810

0.810

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

248

0
194

0
0

0
1369
892

0
1523
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

248

248

248

248

107

194

107

194

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

685

1369

685

1369

243

892

243

892

508

1523

508

1523

248
685
933

248
685
933

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

1523

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

248

194

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1369

892

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.622

0.622

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.522

0.522

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

433

0
824

0
0

0
792
145

606
1158
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

433

433

433

433

218

824

218

824

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

469

792

469

792

145

145

145

145

606

606

606

606

579

1158

579

1158

433
1075
1508

North-South:
East-West:
SUM:

433
1075
1508

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

606

1158

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

433

824

0
0
0
0
0
0
0

0
0
0
0
0
0
0

792

145

0
0
0
0
0
0
0

0
0
0
0
0
0
0

606

1158

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.058

1.058

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.958

0.958

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

594

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

301

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
209

772
0

0
930
539

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

327

594

327

594

209

209

1
0
2
0
0
0
0

301

301

301

301

386

772

386

772

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

465

930

465

930

212

539

212

539

327
766
1093

327
766
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

594

209

0
0
0
0
0
0
0

301

772

930

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

594

209

301

772

930

539

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.767

0.767

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.667

0.667

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

285

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

165

CRITICAL VOLUMES

525
186

42
188
177

909
27

789
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

356

525

356

525

186

186

186

186

42

42

42

42

94

188

94

188

177

177

177

177

1
0
1
0
1
0
0

285

285

285

285

909

909

909

909

27

27

27

27

1
0
1
0
1
0
0

165

165

165

165

789

789

789

789

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

398
1074
1472

North-South:
East-West:
SUM:

398
1074
1472

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

525

186

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

525

186

0
0
0
0
0
0
0

42

188

177

0
0
0
0
0
0
0

285

909

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

165

789

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

154

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

406
0

53
337
205

331
63

98
295

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

421

406

421

406

53

53

53

53

324

337

324

337

324

205

324

205

1
0
0
1
0
0
0

154

154

154

154

394

331

394

331

63

63

1
0
1
1
0
0
0

19

19

19

19

98

98

98

98

295

295

295

295

474
449
923

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

474
449
923

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

406

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

406

0
0
0
0
0
0
0

53

337

205

0
0
0
0
0
0
0

154

331

63

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

98

295

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.154

1.154

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.054

1.054

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
108
40

76
291
20

74
748
109

79
717
69

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

178

108

178

108

40

40

76

76

76

76

194

291

194

291

194

20

194

20

74

74

74

74

286

748

286

748

109

109

109

109

79

79

79

79

393

717

393

717

69

69

69

69

254
467
721

North-South:
East-West:
SUM:

254
467
721

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

108

40

76

291

20

74

748

109

79

717

69

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.524

0.524

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.424

0.424

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

178

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

231

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

109

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

671
233

775
136

933
49

98
1270
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

178

178

178

178

336

671

336

671

184

233

184

233

1
0
1
1
0
0
0

231

231

231

231

456

775

456

775

136

136

136

136

1
0
2
0
1
0
0

109

109

109

109

467

933

467

933

49

49

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

98

98

98

98

635

1270

635

1270

45

45

634
744
1378

634
744
1378

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

178

671

233

0
0
0
0
0
0
0

231

775

136

0
0
0
0
0
0
0

109

933

49

0
0
0
0
0
0
0

98

1270

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

178

671

233

231

775

136

109

933

49

98

1270

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.723

1.723

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.623

1.623

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

88
380
213

913
263
7

8
1204
16

126
1562
869

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

88

88

88

88

190

380

190

380

213

213

213

213

320

913

320

913

270

263

270

263

407

1204

407

1204

16

16

16

16

126

126

126

126

521

1562

521

1562

869

869

533
533
1066

North-South:
East-West:
SUM:

533
533
1066

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

88

380

213

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

88

380

213

0
0
0
0
0
0
0

913

263

0
0
0
0
0
0
0

1204

16

0
0
0
0
0
0
0

126

1562

869

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.333

1.333

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.233

1.233

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

561

0
146

0
0

0
918
446

153
931
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

354

561

354

561

354

146

354

146

0
0
0
0
0
0
0

0
0
2
0
1
0
0

459

918

459

918

92

446

92

446

1
0
2
0
0
0
0

153

153

153

153

466

931

466

931

North-South:
East-West:
SUM:

354
612
966

North-South:
East-West:
SUM:

354
612
966

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

153

931

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

561

146

0
0
0
0
0
0
0

0
0
0
0
0
0
0

918

446

0
0
0
0
0
0
0

0
0
0
0
0
0
0

153

931

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.678

0.678

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.578

0.578

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:55 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

PHASE 1 EXCAVATION AND HAUL

BASE YEAR

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

171

15
224

54
9

6
1512
175

256
2127
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

120

15

120

15

224

224

1
0
0
0
0
1
0

117

171

117

171

117

54

117

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

756

1512

756

1512

101

175

101

175

256

256

256

256

1121

2127

1121

2127

115

115

115

115

266
1127
1393

266
1127
1393

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

15

224

0
0
0
0
0
0
0

171

54

0
0
0
0
0
0
0

1512

175

0
0
0
0
0
0
0

256

2127

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

15

224

171

54

1512

175

256

2127

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.013

1.013

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.913

0.913

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
859
85

363
2376
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

472

859

472

859

85

85

85

85

363

363

363

363

1188

2376

1188

2376

57
1188
1245

North-South:
East-West:
SUM:

57
1188
1245

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.874

0.874

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.774

0.774

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1493
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

763

1493

763

1493

763

32

763

32

320
788
1108

320
788
1108

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1493

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1493

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1388

78
1639
55

11
1017
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

720

1388

720

1388

2
0
1
1
0
0
0

43

78

43

78

424

1639

424

1639

55

55

55

55

11

11

11

11

509

1017

509

1017

259

259

798
552
1350

North-South:
East-West:
SUM:

798
552
1350

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1388

78

1639

55

11

1017

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1388

0
0
0
0
0
0
0

78

1639

55

0
0
0
0
0
0
0

11

1017

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.982

0.982

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.882

0.882

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

814

0
591

0
0

0
1129
766

0
815
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

814

814

814

814

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

272

815

272

815

814
565
1379

814
565
1379

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

470
848
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

470

470

470

470

424

848

424

848

32
1092
1124

North-South:
East-West:
SUM:

32
1092
1124

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

358
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

370

358

370

358

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

447
343
790

447
343
790

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

358

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

358

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.554

0.554

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.454

0.454

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

473

870

473

870

76

76

76

76

447
565
1012

North-South:
East-West:
SUM:

447
565
1012

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

108

188

22

92

937

80

11

870

76

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

76

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1012

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1012

1012

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1012

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1012

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

162

52
382

57
5

2
1368
146

317
1715
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

112

162

112

162

112

57

112

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

684

1368

684

1368

43

146

43

146

317

317

317

317

901

1715

901

1715

87

87

87

87

329
1001
1330

North-South:
East-West:
SUM:

329
1001
1330

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

162

57

0
0
0
0
0
0
0

1368

146

0
0
0
0
0
0
0

317

1715

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

162

57

1368

146

317

1715

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.478

1.478

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.378

1.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2078

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1393

Lane
Volume

1
0
0
0
2
0
0

726

1393

726

1393

58

58

58

58

318

318

318

318

1039

2078

1039

2078

77
1044
1121

77
1044
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.019

1.019

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.919

0.919

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1253
28

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

320

1253

320

1253

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1049

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1049

525

1049

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

0
0
0
0
0
0
0

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1265
909

0
1775
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1265

633

1265

205

909

205

909

592

1775

592

1775

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

1775

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1775

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
536

0
0

0
847
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

25

536

25

536

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

847

494

847

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
415
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

402

415

402

415

402

220

402

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

85
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

85

85

85

85

252

309

252

309

252

24

252

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

498
586
1084

498
586
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

85

309

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

85

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.788

0.788

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.688

0.688

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

899
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

315

899

315

899

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
548
1084

536
548
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

899

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

899

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.204

1.204

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.104

1.104

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1208
99

329
1527
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

604

1208

604

1208

27

99

27

99

329

329

329

329

793

1527

793

1527

59

59

59

59

268
933
1201

268
933
1201

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1208

99

0
0
0
0
0
0
0

329

1527

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1208

99

329

1527

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.501

1.501

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.401

1.401

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1231
29

315
2009
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

630

1231

630

1231

29

29

29

29

315

315

315

315

1005

2009

1005

2009

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1786
37

46
1051
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

456

1786

456

1786

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1051

526

1051

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

0
0
0
0
0
0
0

46

1051

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

46

1051

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
900

0
1538
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

246

900

246

900

513

1538

513

1538

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

1538

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1538

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
338
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

327

338

327

338

327

207

327

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

75
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

75

75

75

75

195

293

195

293

195

21

195

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

254
472
726

North-South:
East-West:
SUM:

254
472
726

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

75

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

75

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.528

0.528

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.428

0.428

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

920
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

322

920

322

920

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

537
539
1076

North-South:
East-West:
SUM:

537
539
1076

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.345

1.345

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.245

1.245

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

566

0
147

0
0

0
927
449

154
939
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

357
618
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

22

35

20
23

14
8

6
781
7

28
841
16

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

22

22

22

22

65

20

65

20

23

23

0
0
0
0
0
1
0

35

35

35

35

57

14

57

14

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

394

781

394

781

28

28

28

28

429

841

429

841

16

16

16

16

100
435
535

North-South:
East-West:
SUM:

100
435
535

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

20

23

35

14

0
0
0
0
0
0
0

781

0
0
0
0
0
0
0

28

841

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

20

23

0
0
0
0
0
0
0

35

14

0
0
0
0
0
0
0

781

28

841

16

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

174

149

234
136

228
40

64
855
155

227
730
136

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

174

174

174

174

234

234

234

234

136

136

1
0
1
0
1
0
0

149

149

149

149

228

228

228

228

40

40

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

64

64

64

64

428

855

428

855

68

155

68

155

227

227

227

227

433

730

433

730

136

136

136

136

402
655
1057

402
655
1057

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

12

42

54
55

23
14

32
899
135

59
1047
40

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

12

12

12

109

54

109

54

55

55

42

42

42

42

37

23

37

23

14

14

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

12

32

32

32

32

517

899

517

899

135

135

135

135

59

59

59

59

544

1047

544

1047

40

40

40

40

151
576
727

North-South:
East-West:
SUM:

151
576
727

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

12

54

55

42

23

14

32

899

135

59

1047

40

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

12

54

55

0
0
0
0
0
0
0

42

23

14

0
0
0
0
0
0
0

32

899

135

0
0
0
0
0
0
0

59

1047

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.385

0.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
21

4
0
9

44
990
22

16
1071
15

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

21

21

13

13

44

44

44

44

506

990

506

990

22

22

22

22

16

16

16

16

536

1071

536

1071

15

15

15

15

26
580
606

26
580
606

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

44

990

22

16

1071

15

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

44

990

22

0
0
0
0
0
0
0

16

1071

15

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.404

0.404

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.304

0.304

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

152

50
205

85
13

9
786
244

186
1029
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

166

166

166

166

128

50

128

50

205

205

1
0
0
0
0
1
0

125

152

125

152

125

85

125

85

13

13

1
0
2
0
1
0
0

393

786

393

786

161

244

161

244

1
0
1
1
0
0
0

186

186

186

186

544

1029

544

1029

58

58

58

58

North-South:
East-West:
SUM:

291
579
870

North-South:
East-West:
SUM:

291
579
870

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

166

50

205

0
0
0
0
0
0
0

152

85

13

0
0
0
0
0
0
0

786

244

0
0
0
0
0
0
0

186

1029

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

166

50

205

152

85

13

786

244

186

1029

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

63
0
527

0
0
0

Total
Volume

Lane
Volume

63

63

63

58

527

58

527

0
0
0
0
0
0
0

612

1171

612

1171

52

52

52

52

1
0
2
0
0
0
0

232

232

232

232

607

1213

607

1213

North-South:
East-West:
SUM:

63
844
907

1171
52

232
1213
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

63

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

63
844
907

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

869

CRITICAL VOLUMES

416
307

224
0

1
4

0
56

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

208

416

208

416

307

307

1
0
2
0
0
0
0

203

203

203

203

112

224

112

224

0
0
0
0
0
1
0

1
0
0
0
0
0
1

463

869

463

869

463

56

463

56

North-South:
East-West:
SUM:

411
470
881

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

411
470
881

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

416

307

203

224

869

56

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

416

307

0
0
0
0
0
0
0

203

224

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

869

56

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.587

0.587

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.487

0.487

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

340

No. of
Lanes

5
48

65
684

198
1263
34

506

Total
Volume

Lane
Volume

38

12

38

48

48

48

48

1
1
0
0
2
0
0

203

340

203

340

203

65

203

65

267

684

267

684

2
0
3
1
0
0
0

109

198

109

198

324

1263

324

1263

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
718

Lane
Volume

2
0
1
1
0
0
0

359

718

359

718

75

506

75

506

315
468
783

315
468
783

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

48

0
0
0
0
0
0
0

340

65

684

0
0
0
0
0
0
0

198

1263

34

0
0
0
0
0
0
0

0
0
0
0
0
0
0

718

506

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

48

340

65

684

198

1263

34

718

506

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.569

0.569

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.469

0.469

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

188

0
226

0
0

0
802
600

14
1030
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

188

188

188

188

124

226

124

226

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

401

802

401

802

142

600

142

600

14

14

343

1030

343

1030

188
401
589

North-South:
East-West:
SUM:

188
401
589

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

0
0
0
0
0
0
0

14

1030

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

14

1030

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.393

0.393

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.293

0.293

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

0
229

0
0

0
934
103

216
1018
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

121

121

121

121

13

229

13

229

0
0
0
0
0
0
0

0
0
1
1
0
0
0

519

934

519

934

103

103

103

103

1
0
2
0
0
0
0

216

216

216

216

509

1018

509

1018

North-South:
East-West:
SUM:

121
735
856

121
735
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

216

1018

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

0
0
0
0
0
0
0

216

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

442

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
207

933
0

0
911
458

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

243

442

243

442

207

207

1
0
2
0
0
0
0

203

203

203

203

467

933

467

933

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

456

911

456

911

215

458

215

458

243
659
902

North-South:
East-West:
SUM:

243
659
902

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

275

WESTBOUND

74

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

228

237
176

74
219
137

920
35

789
47

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

74

74

74

74

207

237

207

237

176

176

176

176

74

74

74

74

110

219

110

219

137

137

137

137

1
0
1
0
1
0
0

275

275

275

275

920

920

920

920

35

35

35

35

1
0
1
0
1
0
0

228

228

228

228

789

789

789

789

47

47

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

281
1148
1429

281
1148
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

74

237

176

74

219

137

275

920

35

228

789

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

74

237

176

0
0
0
0
0
0
0

74

219

137

0
0
0
0
0
0
0

275

920

35

0
0
0
0
0
0
0

228

789

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.003

1.003

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.903

0.903

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

312

WESTBOUND

56

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

514
46

93
475
301

73
65

45
146

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

56

56

56

56

616

514

616

514

46

46

93

93

93

93

481

475

481

475

481

301

481

301

1
0
0
1
0
0
0

312

312

312

312

138

73

138

73

65

65

1
0
1
1
0
0
0

18

18

18

18

45

45

45

45

146

146

146

146

North-South:
East-West:
SUM:

709
458
1167

North-South:
East-West:
SUM:

709
458
1167

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

56

514

46

93

475

301

0
0
0
0
0
0
0

312

73

65

0
0
0
0
0
0
0

18

45

146

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

56

514

46

93

475

301

312

73

65

18

45

146

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

89
266
68

128
342
19

121
1010
152

94
719
175

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

423

266

423

266

68

68

0
1
0
1
0
0
0

128

128

128

128

309

342

309

342

309

19

309

19

1
0
2
1
0
0
0

121

121

121

121

387

1010

387

1010

152

152

152

152

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

89

0
0
0
0
0
1
0

94

94

94

94

447

719

447

719

175

175

175

175

551
568
1119

551
568
1119

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

0
0
0
0
0
0
0

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

94

719

175

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

94

719

175

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.814

0.814

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.714

0.714

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

117

198

394
75

416
137

151
1208
138

79
1307
132

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

117

117

117

117

197

394

197

394

36

75

36

75

1
0
1
1
0
0
0

198

198

198

198

277

416

277

416

137

137

137

137

1
0
2
0
1
0
0

151

151

151

151

604

1208

604

1208

80

138

80

138

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

79

79

79

79

654

1307

654

1307

33

132

33

132

395
805
1200

North-South:
East-West:
SUM:

395
805
1200

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

76
189
118

1171
298
71

35
1343
103

92
1486
832

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

76

76

76

76

95

189

95

189

118

118

118

118

410

1171

410

1171

369

298

369

298

71

71

71

71

35

35

35

35

482

1343

482

1343

103

103

103

103

92

92

92

92

495

1486

495

1486

832

832

528
574
1102

528
574
1102

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

420

0
189

0
0

0
1059
304

181
982
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

305

420

305

420

305

189

305

189

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

530

1059

530

1059

304

304

181

181

181

181

491

982

491

982

305
711
1016

North-South:
East-West:
SUM:

305
711
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-7:56 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

HAUL ROUTE OPTION A PREFERRED HAUL ROUTE: SUNSET

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

181

173

15
224

54
9

6
1560
175

256
2223
117

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

181

181

181

181

120

15

120

15

224

224

1
0
0
0
0
1
0

118

173

118

173

118

54

118

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

780

1560

780

1560

85

175

85

175

256

256

256

256

1170

2223

1170

2223

117

117

117

117

299
1176
1475

299
1176
1475

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

181

15

224

0
0
0
0
0
0
0

173

54

0
0
0
0
0
0
0

1560

175

0
0
0
0
0
0
0

256

2223

117

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

181

15

224

173

54

1560

175

256

2223

117

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.073

1.073

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.973

0.973

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
907
85

363
2472
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

496

907

496

907

85

85

85

85

363

363

363

363

1236

2472

1236

2472

57
1236
1293

North-South:
East-West:
SUM:

57
1236
1293

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

907

85

0
0
0
0
0
0
0

363

2472

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

907

85

0
0
0
0
0
0
0
0
0
0
0
0
0
0

363

2472

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.907

0.907

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.807

0.807

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1562
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

797

1562

797

1562

797

32

797

32

320
822
1142

320
822
1142

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1562

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1562

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1457

78
1685
57

11
1044
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

758

1457

758

1457

2
0
1
1
0
0
0

43

78

43

78

436

1685

436

1685

57

57

57

57

11

11

11

11

522

1044

522

1044

259

259

836
565
1401

North-South:
East-West:
SUM:

836
565
1401

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1457

78

1685

57

11

1044

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1457

0
0
0
0
0
0
0

78

1685

57

0
0
0
0
0
0
0

11

1044

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.019

1.019

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.919

0.919

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

831

0
591

0
0

0
1129
807

0
825
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

831

831

831

831

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

807

807

275

825

275

825

831
565
1396

831
565
1396

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

831

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

807

0
0
0
0
0
0
0

825

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

831

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

807

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.931

0.931

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.831

0.831

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

471
852
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

471

471

471

471

426

852

426

852

32
1093
1125

North-South:
East-West:
SUM:

32
1093
1125

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

429

224

177

1006

1009

349

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

390
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

402

390

402

390

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
343
822

479
343
822

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

390

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

390

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.577

0.577

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.477

0.477

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
108

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

489

870

489

870

108

108

108

108

447
581
1028

North-South:
East-West:
SUM:

447
581
1028

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

107

195

37

0
0
0
0
0
0
0

108

188

22

0
0
0
0
0
0
0
0
0
0
0
0
0
0

92

937

80

11

870

108

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.748

0.748

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.648

0.648

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1044

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1044

1044

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1044

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

171

110

0
0
0
0
0
0
0

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1044

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

32

26

66

33

931

47

825

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

163

52
382

57
5

2
1413
168

317
1716
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

113

163

113

163

113

57

113

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

707

1413

707

1413

65

168

65

168

317

317

317

317

902

1716

902

1716

87

87

87

87

330
1024
1354

North-South:
East-West:
SUM:

330
1024
1354

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

163

57

0
0
0
0
0
0
0

1413

168

0
0
0
0
0
0
0

317

1716

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

163

57

1413

168

317

1716

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.504

1.504

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.404

1.404

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2079

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1438

Lane
Volume

1
0
0
0
2
0
0

748

1438

748

1438

58

58

58

58

318

318

318

318

1040

2079

1040

2079

77
1066
1143

77
1066
1143

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1438

58

0
0
0
0
0
0
0

318

2079

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1438

58

0
0
0
0
0
0
0

318

2079

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.039

1.039

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.939

0.939

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1294
32

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

332

1294

332

1294

32

32

32

32

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1050

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1050

525

1050

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1294

32

0
0
0
0
0
0
0

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1294

32

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1268
938

0
1776
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

634

1268

634

1268

221

938

221

938

592

1776

592

1776

295
634
929

North-South:
East-West:
SUM:

295
634
929

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

938

0
0
0
0
0
0
0

1776

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

938

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1776

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
537

0
0

0
850
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

26

537

26

537

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

495

850

495

850

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1006
1220

214
1006
1220

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.856

0.856

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.756

0.756

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

841

516

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

736

165

236

967

841

516

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

62

434

170

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
437
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

413

437

413

437

413

220

413

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

437

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

437

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

107

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

164

WESTBOUND

91

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

277
45

309
24

938
137

65
731
112

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

413

277

413

277

45

45

0
1
0
1
0
0
0

107

107

107

107

274

309

274

309

274

24

274

24

1
0
2
1
0
0
0

164

164

164

164

358

938

358

938

137

137

137

137

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

91

0
0
0
0
0
1
0

65

65

65

65

422

731

422

731

112

112

112

112

520
586
1106

520
586
1106

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

309

24

0
0
0
0
0
0
0

164

938

137

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

921
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

322

921

322

921

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

541
548
1089

541
548
1089

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

921

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

921

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.210

1.210

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.110

1.110

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

20

28

15

41

24

672

34

774

19

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1223
109

329
1528
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

612

1223

612

1223

37

109

37

109

329

329

329

329

794

1528

794

1528

59

59

59

59

268
941
1209

268
941
1209

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1223

109

0
0
0
0
0
0
0

329

1528

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1223

109

329

1528

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.511

1.511

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.411

1.411

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1246
29

315
2010
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

638

1246

638

1246

29

29

29

29

315

315

315

315

1005

2010

1005

2010

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0
0
0
0
0
0
0
0

315

2010

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1799
39

46
1052
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

460

1799

460

1799

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1052

526

1052

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

0
0
0
0
0
0
0

46

1052

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

46

1052

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1383
908

0
1539
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

692

1383

692

1383

250

908

250

908

513

1539

513

1539

249
692
941

249
692
941

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

1539

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
801
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

801

474

801

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

939

544

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

599

211

304

779

939

544

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

530

187

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
348
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

332

348

332

348

332

207

332

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

410

0
0
0
0
0
0
0

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

85
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

85

85

85

85

200

293

200

293

200

21

200

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

264
472
736

North-South:
East-West:
SUM:

264
472
736

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.535

0.535

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.435

0.435

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

677

236

233

782

138

110

942

50

99

1283

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

930
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

326

930

326

930

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

541
539
1080

North-South:
East-West:
SUM:

541
539
1080

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.350

1.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.250

1.250

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

566

0
147

0
0

0
927
449

154
939
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

357
618
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

154

939

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:


Fully mitigated?

NO

17

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

22

35

20
23

14
8

6
781
7

28
841
16

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

22

22

22

22

65

20

65

20

23

23

0
0
0
0
0
1
0

35

35

35

35

57

14

57

14

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

394

781

394

781

28

28

28

28

429

841

429

841

16

16

16

16

100
435
535

North-South:
East-West:
SUM:

100
435
535

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

20

23

35

14

0
0
0
0
0
0
0

781

0
0
0
0
0
0
0

28

841

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

20

23

0
0
0
0
0
0
0

35

14

0
0
0
0
0
0
0

781

28

841

16

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

174

149

234
136

228
40

64
855
155

227
730
136

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

174

174

174

174

234

234

234

234

136

136

1
0
1
0
1
0
0

149

149

149

149

228

228

228

228

40

40

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

64

64

64

64

428

855

428

855

68

155

68

155

227

227

227

227

433

730

433

730

136

136

136

136

402
655
1057

402
655
1057

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

12

42

54
55

23
14

32
899
135

59
1047
40

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

12

12

12

109

54

109

54

55

55

42

42

42

42

37

23

37

23

14

14

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

12

32

32

32

32

517

899

517

899

135

135

135

135

59

59

59

59

544

1047

544

1047

40

40

40

40

151
576
727

North-South:
East-West:
SUM:

151
576
727

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

12

54

55

42

23

14

32

899

135

59

1047

40

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

12

54

55

0
0
0
0
0
0
0

42

23

14

0
0
0
0
0
0
0

32

899

135

0
0
0
0
0
0
0

59

1047

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.385

0.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
21

4
0
9

44
990
22

16
1071
15

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

21

21

13

13

44

44

44

44

506

990

506

990

22

22

22

22

16

16

16

16

536

1071

536

1071

15

15

15

15

26
580
606

26
580
606

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

44

990

22

16

1071

15

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

44

990

22

0
0
0
0
0
0
0

16

1071

15

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.404

0.404

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.304

0.304

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

154

50
205

85
13

9
832
244

186
1075
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

166

166

166

166

128

50

128

50

205

205

1
0
0
0
0
1
0

126

154

126

154

126

85

126

85

13

13

1
0
2
0
1
0
0

416

832

416

832

161

244

161

244

1
0
1
1
0
0
0

186

186

186

186

568

1075

568

1075

60

60

60

60

North-South:
East-West:
SUM:

292
602
894

North-South:
East-West:
SUM:

292
602
894

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

166

50

205

0
0
0
0
0
0
0

154

85

13

0
0
0
0
0
0
0

832

244

0
0
0
0
0
0
0

186

1075

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

166

50

205

154

85

13

832

244

186

1075

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.650

0.650

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.550

0.550

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

63
0
527

0
0
0

Total
Volume

Lane
Volume

63

63

63

58

527

58

527

0
0
0
0
0
0
0

635

1217

635

1217

52

52

52

52

1
0
2
0
0
0
0

232

232

232

232

630

1259

630

1259

North-South:
East-West:
SUM:

63
867
930

1217
52

232
1259
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

63

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

63
867
930

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1217

52

0
0
0
0
0
0
0

232

1259

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1217

52

0
0
0
0
0
0
0

232

1259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.653

0.653

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.553

0.553

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

910

CRITICAL VOLUMES

416
307

224
0

1
4

0
56

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

208

416

208

416

307

307

1
0
2
0
0
0
0

203

203

203

203

112

224

112

224

0
0
0
0
0
1
0

1
0
0
0
0
0
1

483

910

483

910

483

56

483

56

North-South:
East-West:
SUM:

411
490
901

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

411
490
901

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

416

307

203

224

910

56

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

416

307

0
0
0
0
0
0
0

203

224

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

910

56

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

340

No. of
Lanes

5
48

65
725

198
1309
34

506

Total
Volume

Lane
Volume

38

12

38

48

48

48

48

1
1
0
0
2
0
0

203

340

203

340

203

65

203

65

290

725

290

725

2
0
3
1
0
0
0

109

198

109

198

336

1309

336

1309

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
723

Lane
Volume

2
0
1
1
0
0
0

362

723

362

723

75

506

75

506

338
471
809

338
471
809

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

48

0
0
0
0
0
0
0

340

65

725

0
0
0
0
0
0
0

198

1309

34

0
0
0
0
0
0
0

0
0
0
0
0
0
0

723

506

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

48

340

65

725

198

1309

34

723

506

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.588

0.588

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.488

0.488

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

193

0
226

0
0

0
802
641

14
1030
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

193

193

193

193

124

226

124

226

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

401

802

401

802

160

641

160

641

14

14

343

1030

343

1030

193
401
594

North-South:
East-West:
SUM:

193
401
594

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

193

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

641

0
0
0
0
0
0
0

14

1030

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

193

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

641

14

1030

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.396

0.396

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.296

0.296

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

0
229

0
0

0
934
103

216
1018
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

121

121

121

121

13

229

13

229

0
0
0
0
0
0
0

0
0
1
1
0
0
0

519

934

519

934

103

103

103

103

1
0
2
0
0
0
0

216

216

216

216

509

1018

509

1018

North-South:
East-West:
SUM:

121
735
856

121
735
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

216

1018

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

0
0
0
0
0
0
0

216

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

442

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
207

933
0

0
911
458

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

243

442

243

442

207

207

1
0
2
0
0
0
0

203

203

203

203

467

933

467

933

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

456

911

456

911

215

458

215

458

243
659
902

North-South:
East-West:
SUM:

243
659
902

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

275

WESTBOUND

74

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

228

237
176

74
219
137

920
35

789
47

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

74

74

74

74

207

237

207

237

176

176

176

176

74

74

74

74

110

219

110

219

137

137

137

137

1
0
1
0
1
0
0

275

275

275

275

920

920

920

920

35

35

35

35

1
0
1
0
1
0
0

228

228

228

228

789

789

789

789

47

47

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

281
1148
1429

281
1148
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

74

237

176

74

219

137

275

920

35

228

789

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

74

237

176

0
0
0
0
0
0
0

74

219

137

0
0
0
0
0
0
0

275

920

35

0
0
0
0
0
0
0

228

789

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.003

1.003

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.903

0.903

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

312

WESTBOUND

56

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

514
46

93
475
301

73
65

45
146

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

56

56

56

56

616

514

616

514

46

46

93

93

93

93

481

475

481

475

481

301

481

301

1
0
0
1
0
0
0

312

312

312

312

138

73

138

73

65

65

1
0
1
1
0
0
0

18

18

18

18

45

45

45

45

146

146

146

146

North-South:
East-West:
SUM:

709
458
1167

North-South:
East-West:
SUM:

709
458
1167

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

56

514

46

93

475

301

0
0
0
0
0
0
0

312

73

65

0
0
0
0
0
0
0

18

45

146

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

56

514

46

93

475

301

312

73

65

18

45

146

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

89
266
68

128
342
19

121
1010
152

94
719
175

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

423

266

423

266

68

68

0
1
0
1
0
0
0

128

128

128

128

309

342

309

342

309

19

309

19

1
0
2
1
0
0
0

121

121

121

121

387

1010

387

1010

152

152

152

152

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

89

0
0
0
0
0
1
0

94

94

94

94

447

719

447

719

175

175

175

175

551
568
1119

551
568
1119

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

0
0
0
0
0
0
0

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

94

719

175

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

94

719

175

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.814

0.814

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.714

0.714

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

117

198

394
75

416
137

151
1208
138

79
1307
132

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

117

117

117

117

197

394

197

394

36

75

36

75

1
0
1
1
0
0
0

198

198

198

198

277

416

277

416

137

137

137

137

1
0
2
0
1
0
0

151

151

151

151

604

1208

604

1208

80

138

80

138

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

79

79

79

79

654

1307

654

1307

33

132

33

132

395
805
1200

North-South:
East-West:
SUM:

395
805
1200

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

76
189
118

1171
298
71

35
1343
103

92
1486
832

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

76

76

76

76

95

189

95

189

118

118

118

118

410

1171

410

1171

369

298

369

298

71

71

71

71

35

35

35

35

482

1343

482

1343

103

103

103

103

92

92

92

92

495

1486

495

1486

832

832

528
574
1102

528
574
1102

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

420

0
189

0
0

0
1059
304

181
982
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

305

420

305

420

305

189

305

189

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

530

1059

530

1059

304

304

181

181

181

181

491

982

491

982

305
711
1016

North-South:
East-West:
SUM:

305
711
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

HAUL ROUTE OPTION B: BARRINGTON-SAN VICENTE-WILSHRIE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

227

171

17
224

56
9

6
1514
221

256
2177
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

227

227

227

227

121

17

121

17

224

224

1
0
0
0
0
1
0

118

171

118

171

118

56

118

56

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

757

1514

757

1514

108

221

108

221

256

256

256

256

1146

2177

1146

2177

115

115

115

115

345
1152
1497

345
1152
1497

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

227

17

224

0
0
0
0
0
0
0

171

56

0
0
0
0
0
0
0

1514

221

0
0
0
0
0
0
0

256

2177

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

227

17

224

171

56

1514

221

256

2177

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.089

1.089

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.989

0.989

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
861
85

363
2426
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

473

861

473

861

85

85

85

85

363

363

363

363

1213

2426

1213

2426

57
1213
1270

North-South:
East-West:
SUM:

57
1213
1270

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

861

85

0
0
0
0
0
0
0

363

2426

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

861

85

0
0
0
0
0
0
0

363

2426

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.891

0.891

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.791

0.791

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1521
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

777

1521

777

1521

777

32

777

32

320
802
1122

320
802
1122

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1521

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1521

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.748

0.748

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.648

0.648

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1416

78
1639
57

11
1039
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

736

1416

736

1416

2
0
1
1
0
0
0

43

78

43

78

424

1639

424

1639

57

57

57

57

11

11

11

11

520

1039

520

1039

259

259

814
563
1377

North-South:
East-West:
SUM:

814
563
1377

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1416

78

1639

57

11

1039

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1416

0
0
0
0
0
0
0

78

1639

57

0
0
0
0
0
0
0

11

1039

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.001

1.001

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.901

0.901

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

826

0
591

0
0

0
1129
766

0
825
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

826

826

826

826

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

275

825

275

825

826
565
1391

826
565
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

826

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

826

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

471
852
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

471

471

471

471

426

852

426

852

32
1093
1125

North-South:
East-West:
SUM:

32
1093
1125

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

436
4

77
382
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

448

436

448

436

77

77

77

77

377

382

377

382

377

218

377

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

525
343
868

525
343
868

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

436

77

382

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

0
0
0
0
0
0
0

77

382

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.609

0.609

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.509

0.509

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

154

195
37

188
22

92
937
80

11
870
154

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

154

154

154

154

182

188

182

188

182

22

182

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

512

870

512

870

154

154

154

154

493
604
1097

North-South:
East-West:
SUM:

493
604
1097

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

154

188

22

92

937

80

11

870

154

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

154

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

154

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.798

0.798

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.698

0.698

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1165
136
16

61
1521
41

58
1630
1090

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

408

1165

408

1165

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1090

1090

518
604
1122

North-South:
East-West:
SUM:

518
604
1122

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1165

136

16

61

1521

41

58

1630

1090

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1165

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1090

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.816

0.816

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.716

0.716

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

162

52
382

58
5

2
1403
178

317
1716
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

113

162

113

162

113

58

113

58

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

702

1403

702

1403

75

178

75

178

317

317

317

317

902

1716

902

1716

87

87

87

87

330
1019
1349

North-South:
East-West:
SUM:

330
1019
1349

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

162

58

0
0
0
0
0
0
0

1403

178

0
0
0
0
0
0
0

317

1716

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

162

58

1403

178

317

1716

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.499

1.499

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.399

1.399

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2079

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1428

Lane
Volume

1
0
0
0
2
0
0

743

1428

743

1428

58

58

58

58

318

318

318

318

1040

2079

1040

2079

77
1061
1138

77
1061
1138

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1428

58

0
0
0
0
0
0
0

318

2079

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1428

58

0
0
0
0
0
0
0

318

2079

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.035

1.035

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.935

0.935

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1284
32

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

329

1284

329

1284

32

32

32

32

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1050

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1050

525

1050

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1284

32

0
0
0
0
0
0
0

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1284

32

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1268
929

0
1776
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

634

1268

634

1268

216

929

216

929

592

1776

592

1776

295
634
929

North-South:
East-West:
SUM:

295
634
929

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

929

0
0
0
0
0
0
0

1776

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

929

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1776

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
537

0
0

0
850
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

26

537

26

537

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

495

850

495

850

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1006
1220

214
1006
1220

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.856

0.856

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.756

0.756

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
447
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

418

447

418

447

418

220

418

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

447

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

447

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

117

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

164

WESTBOUND

91

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

277
45

309
24

938
137

65
731
112

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

413

277

413

277

45

45

0
1
0
1
0
0
0

117

117

117

117

284

309

284

309

284

24

284

24

1
0
2
1
0
0
0

164

164

164

164

358

938

358

938

137

137

137

137

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

91

0
0
0
0
0
1
0

65

65

65

65

422

731

422

731

112

112

112

112

530
586
1116

530
586
1116

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

117

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

117

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

931
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

326

931

326

931

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

545
548
1093

545
548
1093

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

931

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

931

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.214

1.214

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.114

1.114

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1223
109

329
1528
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

612

1223

612

1223

37

109

37

109

329

329

329

329

794

1528

794

1528

59

59

59

59

268
941
1209

268
941
1209

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1223

109

0
0
0
0
0
0
0

329

1528

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1223

109

329

1528

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.511

1.511

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.411

1.411

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1246
29

315
2010
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

638

1246

638

1246

29

29

29

29

315

315

315

315

1005

2010

1005

2010

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1799
39

46
1052
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

460

1799

460

1799

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1052

526

1052

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

0
0
0
0
0
0
0

46

1052

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

46

1052

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1383
908

0
1539
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

692

1383

692

1383

250

908

250

908

513

1539

513

1539

249
692
941

249
692
941

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

1539

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
801
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

801

474

801

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
348
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

332

348

332

348

332

207

332

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

85
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

85

85

85

85

200

293

200

293

200

21

200

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

264
472
736

North-South:
East-West:
SUM:

264
472
736

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

85

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.535

0.535

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.435

0.435

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

930
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

326

930

326

930

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

541
539
1080

North-South:
East-West:
SUM:

541
539
1080

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.350

1.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.250

1.250

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

566

0
147

0
0

0
927
449

154
939
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

357
618
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

22

35

20
23

14
8

6
781
7

28
841
16

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

22

22

22

22

65

20

65

20

23

23

0
0
0
0
0
1
0

35

35

35

35

57

14

57

14

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

394

781

394

781

28

28

28

28

429

841

429

841

16

16

16

16

100
435
535

North-South:
East-West:
SUM:

100
435
535

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

20

23

35

14

0
0
0
0
0
0
0

781

0
0
0
0
0
0
0

28

841

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

20

23

0
0
0
0
0
0
0

35

14

0
0
0
0
0
0
0

781

28

841

16

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

174

149

234
136

228
40

64
855
155

227
730
136

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

174

174

174

174

234

234

234

234

136

136

1
0
1
0
1
0
0

149

149

149

149

228

228

228

228

40

40

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

64

64

64

64

428

855

428

855

68

155

68

155

227

227

227

227

433

730

433

730

136

136

136

136

402
655
1057

402
655
1057

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

12

42

54
55

23
14

32
899
135

59
1047
40

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

12

12

12

109

54

109

54

55

55

42

42

42

42

37

23

37

23

14

14

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

12

32

32

32

32

517

899

517

899

135

135

135

135

59

59

59

59

544

1047

544

1047

40

40

40

40

151
576
727

North-South:
East-West:
SUM:

151
576
727

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

12

54

55

42

23

14

32

899

135

59

1047

40

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

12

54

55

0
0
0
0
0
0
0

42

23

14

0
0
0
0
0
0
0

32

899

135

0
0
0
0
0
0
0

59

1047

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.385

0.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
21

4
0
9

44
990
22

16
1071
15

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

21

21

13

13

44

44

44

44

506

990

506

990

22

22

22

22

16

16

16

16

536

1071

536

1071

15

15

15

15

26
580
606

26
580
606

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

44

990

22

16

1071

15

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

44

990

22

0
0
0
0
0
0
0

16

1071

15

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.404

0.404

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.304

0.304

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

212

152

52
205

87
13

9
786
290

186
1029
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

212

212

212

212

129

52

129

52

205

205

1
0
0
0
0
1
0

126

152

126

152

126

87

126

87

13

13

1
0
2
0
1
0
0

393

786

393

786

184

290

184

290

1
0
1
1
0
0
0

186

186

186

186

544

1029

544

1029

58

58

58

58

North-South:
East-West:
SUM:

338
579
917

North-South:
East-West:
SUM:

338
579
917

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

212

52

205

0
0
0
0
0
0
0

152

87

13

0
0
0
0
0
0
0

786

290

0
0
0
0
0
0
0

186

1029

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

212

52

205

152

87

13

786

290

186

1029

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

63
0
527

0
0
0

Total
Volume

Lane
Volume

63

63

63

58

527

58

527

0
0
0
0
0
0
0

612

1171

612

1171

52

52

52

52

1
0
2
0
0
0
0

232

232

232

232

607

1213

607

1213

North-South:
East-West:
SUM:

63
844
907

1171
52

232
1213
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

63

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

63
844
907

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

869

CRITICAL VOLUMES

416
307

224
0

1
4

0
56

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

208

416

208

416

307

307

1
0
2
0
0
0
0

203

203

203

203

112

224

112

224

0
0
0
0
0
1
0

1
0
0
0
0
0
1

463

869

463

869

463

56

463

56

North-South:
East-West:
SUM:

411
470
881

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

411
470
881

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

416

307

203

224

869

56

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

416

307

0
0
0
0
0
0
0

203

224

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

869

56

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.587

0.587

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.487

0.487

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

340

No. of
Lanes

5
48

65
684

198
1263
34

506

Total
Volume

Lane
Volume

38

12

38

48

48

48

48

1
1
0
0
2
0
0

203

340

203

340

203

65

203

65

267

684

267

684

2
0
3
1
0
0
0

109

198

109

198

324

1263

324

1263

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
718

Lane
Volume

2
0
1
1
0
0
0

359

718

359

718

75

506

75

506

315
468
783

315
468
783

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

48

0
0
0
0
0
0
0

340

65

684

0
0
0
0
0
0
0

198

1263

34

0
0
0
0
0
0
0

0
0
0
0
0
0
0

718

506

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

48

340

65

684

198

1263

34

718

506

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.569

0.569

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.469

0.469

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

188

0
226

0
0

0
802
600

14
1030
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

188

188

188

188

124

226

124

226

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

401

802

401

802

142

600

142

600

14

14

343

1030

343

1030

188
401
589

North-South:
East-West:
SUM:

188
401
589

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

0
0
0
0
0
0
0

14

1030

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

14

1030

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.393

0.393

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.293

0.293

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

0
229

0
0

0
934
103

216
1018
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

121

121

121

121

13

229

13

229

0
0
0
0
0
0
0

0
0
1
1
0
0
0

519

934

519

934

103

103

103

103

1
0
2
0
0
0
0

216

216

216

216

509

1018

509

1018

North-South:
East-West:
SUM:

121
735
856

121
735
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

216

1018

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

0
0
0
0
0
0
0

216

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

442

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
207

933
0

0
911
458

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

243

442

243

442

207

207

1
0
2
0
0
0
0

203

203

203

203

467

933

467

933

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

456

911

456

911

215

458

215

458

243
659
902

North-South:
East-West:
SUM:

243
659
902

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

275

WESTBOUND

74

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

228

237
176

74
219
137

920
35

789
47

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

74

74

74

74

207

237

207

237

176

176

176

176

74

74

74

74

110

219

110

219

137

137

137

137

1
0
1
0
1
0
0

275

275

275

275

920

920

920

920

35

35

35

35

1
0
1
0
1
0
0

228

228

228

228

789

789

789

789

47

47

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

281
1148
1429

281
1148
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

74

237

176

74

219

137

275

920

35

228

789

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

74

237

176

0
0
0
0
0
0
0

74

219

137

0
0
0
0
0
0
0

275

920

35

0
0
0
0
0
0
0

228

789

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.003

1.003

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.903

0.903

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

312

WESTBOUND

56

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

560
46

93
521
301

73
65

45
146

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

56

56

56

56

662

560

662

560

46

46

93

93

93

93

597

521

597

521

597

301

597

301

1
0
0
1
0
0
0

312

312

312

312

138

73

138

73

65

65

1
0
1
1
0
0
0

18

18

18

18

45

45

45

45

146

146

146

146

North-South:
East-West:
SUM:

755
458
1213

North-South:
East-West:
SUM:

755
458
1213

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

56

560

46

93

521

301

0
0
0
0
0
0
0

312

73

65

0
0
0
0
0
0
0

18

45

146

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

56

560

46

93

521

301

312

73

65

18

45

146

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

89
266
68

174
342
19

121
1010
152

94
719
221

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

423

266

423

266

68

68

0
1
0
1
0
0
0

174

174

174

174

355

342

355

342

355

19

355

19

1
0
2
1
0
0
0

121

121

121

121

387

1010

387

1010

152

152

152

152

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

89

0
0
0
0
0
1
0

94

94

94

94

470

719

470

719

221

221

221

221

597
591
1188

597
591
1188

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

0
0
0
0
0
0
0

174

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

94

719

221

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

174

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

94

719

221

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.864

0.864

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.764

0.764

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

117

198

394
75

416
137

151
1208
138

79
1307
132

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

117

117

117

117

197

394

197

394

36

75

36

75

1
0
1
1
0
0
0

198

198

198

198

277

416

277

416

137

137

137

137

1
0
2
0
1
0
0

151

151

151

151

604

1208

604

1208

80

138

80

138

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

79

79

79

79

654

1307

654

1307

33

132

33

132

395
805
1200

North-South:
East-West:
SUM:

395
805
1200

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

76
189
118

1217
298
71

35
1343
103

92
1486
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

76

76

76

76

95

189

95

189

118

118

118

118

426

1217

426

1217

369

298

369

298

71

71

71

71

35

35

35

35

482

1343

482

1343

103

103

103

103

92

92

92

92

495

1486

495

1486

878

878

544
574
1118

544
574
1118

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1217

298

71

35

1343

103

92

1486

878

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1217

298

71

35

1343

103

92

1486

878

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.813

0.813

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.713

0.713

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

420

0
189

0
0

0
1059
304

181
982
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

305

420

305

420

305

189

305

189

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

530

1059

530

1059

304

304

181

181

181

181

491

982

491

982

305
711
1016

North-South:
East-West:
SUM:

305
711
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

HAUL ROUTE OPTION C: BARRINGTON-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

227

171

17
224

56
9

6
1514
221

256
2177
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

227

227

227

227

121

17

121

17

224

224

1
0
0
0
0
1
0

118

171

118

171

118

56

118

56

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

757

1514

757

1514

108

221

108

221

256

256

256

256

1146

2177

1146

2177

115

115

115

115

345
1152
1497

345
1152
1497

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

227

17

224

0
0
0
0
0
0
0

171

56

0
0
0
0
0
0
0

1514

221

0
0
0
0
0
0
0

256

2177

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

227

17

224

171

56

1514

221

256

2177

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.089

1.089

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.989

0.989

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
861
85

363
2426
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

473

861

473

861

85

85

85

85

363

363

363

363

1213

2426

1213

2426

57
1213
1270

North-South:
East-West:
SUM:

57
1213
1270

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

861

85

0
0
0
0
0
0
0

363

2426

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

861

85

0
0
0
0
0
0
0

363

2426

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.891

0.891

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.791

0.791

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1521
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

777

1521

777

1521

777

32

777

32

320
802
1122

320
802
1122

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1521

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1521

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.748

0.748

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.648

0.648

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1416

78
1639
57

11
1039
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

736

1416

736

1416

2
0
1
1
0
0
0

43

78

43

78

424

1639

424

1639

57

57

57

57

11

11

11

11

520

1039

520

1039

259

259

814
563
1377

North-South:
East-West:
SUM:

814
563
1377

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1416

78

1639

57

11

1039

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1416

0
0
0
0
0
0
0

78

1639

57

0
0
0
0
0
0
0

11

1039

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.001

1.001

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.901

0.901

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

826

0
591

0
0

0
1129
766

0
825
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

826

826

826

826

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

275

825

275

825

826
565
1391

826
565
1391

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

826

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

826

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.927

0.927

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.827

0.827

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

471
852
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

471

471

471

471

426

852

426

852

32
1093
1125

North-South:
East-West:
SUM:

32
1093
1125

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

436
4

77
382
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

448

436

448

436

77

77

77

77

377

382

377

382

377

218

377

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

525
343
868

525
343
868

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

436

77

382

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

436

0
0
0
0
0
0
0

77

382

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.609

0.609

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.509

0.509

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

241
37

234
22

92
937
80

11
870
108

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

385

241

385

241

37

37

0
1
0
1
0
0
0

108

108

108

108

182

234

182

234

182

22

182

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

489

870

489

870

108

108

108

108

493
581
1074

North-South:
East-West:
SUM:

493
581
1074

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

241

37

108

234

22

92

937

80

11

870

108

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

241

37

108

234

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.781

0.781

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.681

0.681

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

281

394
145

421
77

71
1313
84

80
1454
80

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

281

281

281

281

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

80

80

478
798
1276

478
798
1276

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

281

421

77

71

1313

84

80

1454

80

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

281

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

80

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1567
41

58
1676
1044

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

536

1567

536

1567

41

41

41

41

58

58

58

58

559

1676

559

1676

1044

1044

502
620
1122

North-South:
East-West:
SUM:

502
620
1122

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1567

41

58

1676

1044

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1567

41

0
0
0
0
0
0
0

58

1676

1044

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.816

0.816

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.716

0.716

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

32

26

66

33

931

47

825

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

162

52
382

58
5

2
1403
178

317
1716
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

113

162

113

162

113

58

113

58

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

702

1403

702

1403

75

178

75

178

317

317

317

317

902

1716

902

1716

87

87

87

87

330
1019
1349

North-South:
East-West:
SUM:

330
1019
1349

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

162

58

0
0
0
0
0
0
0

1403

178

0
0
0
0
0
0
0

317

1716

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

162

58

1403

178

317

1716

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.499

1.499

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.399

1.399

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2079

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1428

Lane
Volume

1
0
0
0
2
0
0

743

1428

743

1428

58

58

58

58

318

318

318

318

1040

2079

1040

2079

77
1061
1138

77
1061
1138

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1428

58

0
0
0
0
0
0
0

318

2079

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1428

58

0
0
0
0
0
0
0

318

2079

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.035

1.035

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.935

0.935

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1284
32

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

329

1284

329

1284

32

32

32

32

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1050

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1050

525

1050

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1284

32

0
0
0
0
0
0
0

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1284

32

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1268
929

0
1776
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

634

1268

634

1268

216

929

216

929

592

1776

592

1776

295
634
929

North-South:
East-West:
SUM:

295
634
929

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

929

0
0
0
0
0
0
0

1776

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

929

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1776

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
537

0
0

0
850
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

26

537

26

537

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

495

850

495

850

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1006
1220

214
1006
1220

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.856

0.856

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.756

0.756

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

841

516

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

736

165

236

967

841

516

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

62

434

170

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
447
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

418

447

418

447

418

220

418

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

447

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

447

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

107

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

164

WESTBOUND

91

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

277
45

319
24

938
137

65
731
112

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

413

277

413

277

45

45

0
1
0
1
0
0
0

107

107

107

107

279

319

279

319

279

24

279

24

1
0
2
1
0
0
0

164

164

164

164

358

938

358

938

137

137

137

137

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

91

0
0
0
0
0
1
0

65

65

65

65

422

731

422

731

112

112

112

112

520
586
1106

520
586
1106

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

319

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

319

24

0
0
0
0
0
0
0

164

938

137

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

301

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

301

301

301

301

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

626
835
1461

North-South:
East-West:
SUM:

626
835
1461

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.623

1.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.523

1.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

921
301
16

21
1257
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

322

921

322

921

317

301

317

301

16

16

16

16

21

21

21

21

430

1257

430

1257

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

541
551
1092

541
551
1092

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

921

301

16

21

1257

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

921

301

16

21

1257

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.213

1.213

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.113

1.113

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1223
109

329
1528
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

612

1223

612

1223

37

109

37

109

329

329

329

329

794

1528

794

1528

59

59

59

59

268
941
1209

268
941
1209

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1223

109

0
0
0
0
0
0
0

329

1528

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1223

109

329

1528

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.511

1.511

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.411

1.411

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1246
29

315
2010
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

638

1246

638

1246

29

29

29

29

315

315

315

315

1005

2010

1005

2010

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1799
39

46
1052
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

460

1799

460

1799

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1052

526

1052

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

0
0
0
0
0
0
0

46

1052

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

46

1052

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1383
908

0
1539
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

692

1383

692

1383

250

908

250

908

513

1539

513

1539

249
692
941

249
692
941

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

1539

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
801
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

801

474

801

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
348
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

332

348

332

348

332

207

332

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

85
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

85

85

85

85

200

293

200

293

200

21

200

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

264
472
736

North-South:
East-West:
SUM:

264
472
736

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

85

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.535

0.535

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.435

0.435

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

930
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

326

930

326

930

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

541
539
1080

North-South:
East-West:
SUM:

541
539
1080

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.350

1.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.250

1.250

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

566

0
147

0
0

0
927
449

154
939
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

357
618
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

22

35

20
23

14
8

6
781
7

28
841
16

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

22

22

22

22

65

20

65

20

23

23

0
0
0
0
0
1
0

35

35

35

35

57

14

57

14

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

394

781

394

781

28

28

28

28

429

841

429

841

16

16

16

16

100
435
535

North-South:
East-West:
SUM:

100
435
535

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

20

23

35

14

0
0
0
0
0
0
0

781

0
0
0
0
0
0
0

28

841

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

20

23

0
0
0
0
0
0
0

35

14

0
0
0
0
0
0
0

781

28

841

16

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

174

149

234
136

228
40

64
855
155

227
730
136

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

174

174

174

174

234

234

234

234

136

136

1
0
1
0
1
0
0

149

149

149

149

228

228

228

228

40

40

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

64

64

64

64

428

855

428

855

68

155

68

155

227

227

227

227

433

730

433

730

136

136

136

136

402
655
1057

402
655
1057

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

12

42

54
55

23
14

32
899
135

59
1047
40

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

12

12

12

109

54

109

54

55

55

42

42

42

42

37

23

37

23

14

14

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

12

32

32

32

32

517

899

517

899

135

135

135

135

59

59

59

59

544

1047

544

1047

40

40

40

40

151
576
727

North-South:
East-West:
SUM:

151
576
727

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

12

54

55

42

23

14

32

899

135

59

1047

40

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

12

54

55

0
0
0
0
0
0
0

42

23

14

0
0
0
0
0
0
0

32

899

135

0
0
0
0
0
0
0

59

1047

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.385

0.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
21

4
0
9

44
990
22

16
1071
15

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

21

21

13

13

44

44

44

44

506

990

506

990

22

22

22

22

16

16

16

16

536

1071

536

1071

15

15

15

15

26
580
606

26
580
606

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

44

990

22

16

1071

15

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

44

990

22

0
0
0
0
0
0
0

16

1071

15

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.404

0.404

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.304

0.304

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

212

152

52
205

87
13

9
786
290

186
1029
58

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

212

212

212

212

129

52

129

52

205

205

1
0
0
0
0
1
0

126

152

126

152

126

87

126

87

13

13

1
0
2
0
1
0
0

393

786

393

786

184

290

184

290

1
0
1
1
0
0
0

186

186

186

186

544

1029

544

1029

58

58

58

58

North-South:
East-West:
SUM:

338
579
917

North-South:
East-West:
SUM:

338
579
917

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

212

52

205

0
0
0
0
0
0
0

152

87

13

0
0
0
0
0
0
0

786

290

0
0
0
0
0
0
0

186

1029

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

212

52

205

152

87

13

786

290

186

1029

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.667

0.667

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.567

0.567

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

63
0
527

0
0
0

Total
Volume

Lane
Volume

63

63

63

58

527

58

527

0
0
0
0
0
0
0

612

1171

612

1171

52

52

52

52

1
0
2
0
0
0
0

232

232

232

232

607

1213

607

1213

North-South:
East-West:
SUM:

63
844
907

1171
52

232
1213
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

63

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

63
844
907

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1171

52

0
0
0
0
0
0
0

232

1213

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.636

0.636

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.536

0.536

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

869

CRITICAL VOLUMES

416
307

224
0

1
4

0
56

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

208

416

208

416

307

307

1
0
2
0
0
0
0

203

203

203

203

112

224

112

224

0
0
0
0
0
1
0

1
0
0
0
0
0
1

463

869

463

869

463

56

463

56

North-South:
East-West:
SUM:

411
470
881

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

411
470
881

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

416

307

203

224

869

56

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

416

307

0
0
0
0
0
0
0

203

224

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

869

56

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.587

0.587

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.487

0.487

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

340

No. of
Lanes

5
48

65
684

198
1263
34

506

Total
Volume

Lane
Volume

38

12

38

48

48

48

48

1
1
0
0
2
0
0

203

340

203

340

203

65

203

65

267

684

267

684

2
0
3
1
0
0
0

109

198

109

198

324

1263

324

1263

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
718

Lane
Volume

2
0
1
1
0
0
0

359

718

359

718

75

506

75

506

315
468
783

315
468
783

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

48

0
0
0
0
0
0
0

340

65

684

0
0
0
0
0
0
0

198

1263

34

0
0
0
0
0
0
0

0
0
0
0
0
0
0

718

506

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

48

340

65

684

198

1263

34

718

506

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.569

0.569

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.469

0.469

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

188

0
226

0
0

0
802
600

14
1030
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

188

188

188

188

124

226

124

226

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

401

802

401

802

142

600

142

600

14

14

343

1030

343

1030

188
401
589

North-South:
East-West:
SUM:

188
401
589

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

0
0
0
0
0
0
0

14

1030

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

188

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

600

14

1030

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.393

0.393

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.293

0.293

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

0
229

0
0

0
934
103

216
1018
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

121

121

121

121

13

229

13

229

0
0
0
0
0
0
0

0
0
1
1
0
0
0

519

934

519

934

103

103

103

103

1
0
2
0
0
0
0

216

216

216

216

509

1018

509

1018

North-South:
East-West:
SUM:

121
735
856

121
735
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

216

1018

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

0
0
0
0
0
0
0

216

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

442

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
207

933
0

0
911
458

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

243

442

243

442

207

207

1
0
2
0
0
0
0

203

203

203

203

467

933

467

933

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

456

911

456

911

215

458

215

458

243
659
902

North-South:
East-West:
SUM:

243
659
902

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

275

WESTBOUND

74

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

228

237
176

74
219
137

920
35

789
47

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

74

74

74

74

207

237

207

237

176

176

176

176

74

74

74

74

110

219

110

219

137

137

137

137

1
0
1
0
1
0
0

275

275

275

275

920

920

920

920

35

35

35

35

1
0
1
0
1
0
0

228

228

228

228

789

789

789

789

47

47

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

281
1148
1429

281
1148
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

74

237

176

74

219

137

275

920

35

228

789

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

74

237

176

0
0
0
0
0
0
0

74

219

137

0
0
0
0
0
0
0

275

920

35

0
0
0
0
0
0
0

228

789

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.003

1.003

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.903

0.903

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

312

WESTBOUND

56

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

560
46

93
521
301

73
65

45
146

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

56

56

56

56

662

560

662

560

46

46

93

93

93

93

597

521

597

521

597

301

597

301

1
0
0
1
0
0
0

312

312

312

312

138

73

138

73

65

65

1
0
1
1
0
0
0

18

18

18

18

45

45

45

45

146

146

146

146

North-South:
East-West:
SUM:

755
458
1213

North-South:
East-West:
SUM:

755
458
1213

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

56

560

46

93

521

301

0
0
0
0
0
0
0

312

73

65

0
0
0
0
0
0
0

18

45

146

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

56

560

46

93

521

301

312

73

65

18

45

146

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

89
312
68

128
388
19

121
1010
152

94
719
175

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

469

312

469

312

68

68

0
1
0
1
0
0
0

128

128

128

128

332

388

332

388

332

19

332

19

1
0
2
1
0
0
0

121

121

121

121

387

1010

387

1010

152

152

152

152

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

89

0
0
0
0
0
1
0

94

94

94

94

447

719

447

719

175

175

175

175

597
568
1165

597
568
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

312

68

0
0
0
0
0
0
0

128

388

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

94

719

175

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

312

68

128

388

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

94

719

175

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

117

244

394
75

416
137

151
1208
138

79
1307
178

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

117

117

117

117

197

394

197

394

36

75

36

75

1
0
1
1
0
0
0

244

244

244

244

277

416

277

416

137

137

137

137

1
0
2
0
1
0
0

151

151

151

151

604

1208

604

1208

80

138

80

138

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

79

79

79

79

654

1307

654

1307

56

178

56

178

441
805
1246

North-South:
East-West:
SUM:

441
805
1246

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

244

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

178

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

244

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

178

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.831

0.831

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.731

0.731

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

76
189
118

1171
298
71

35
1389
103

92
1532
832

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

76

76

76

76

95

189

95

189

118

118

118

118

410

1171

410

1171

369

298

369

298

71

71

71

71

35

35

35

35

497

1389

497

1389

103

103

103

103

92

92

92

92

511

1532

511

1532

832

832

528
589
1117

528
589
1117

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1389

103

92

1532

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1389

103

92

1532

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

420

0
189

0
0

0
1059
304

181
982
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

305

420

305

420

305

189

305

189

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

530

1059

530

1059

304

304

181

181

181

181

491

982

491

982

305
711
1016

North-South:
East-West:
SUM:

305
711
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:03 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

HAUL ROUTE OPTION D: BUNDY-SAN VICENTE-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

181

173

15
224

54
9

6
1560
175

256
2223
117

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

181

181

181

181

120

15

120

15

224

224

1
0
0
0
0
1
0

118

173

118

173

118

54

118

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

780

1560

780

1560

85

175

85

175

256

256

256

256

1170

2223

1170

2223

117

117

117

117

299
1176
1475

299
1176
1475

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

181

15

224

0
0
0
0
0
0
0

173

54

0
0
0
0
0
0
0

1560

175

0
0
0
0
0
0
0

256

2223

117

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

181

15

224

173

54

1560

175

256

2223

117

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.073

1.073

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.973

0.973

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
907
85

363
2472
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

496

907

496

907

85

85

85

85

363

363

363

363

1236

2472

1236

2472

57
1236
1293

North-South:
East-West:
SUM:

57
1236
1293

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

907

85

0
0
0
0
0
0
0

363

2472

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

907

85

0
0
0
0
0
0
0
0
0
0
0
0
0
0

363

2472

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.907

0.907

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.807

0.807

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1562
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

797

1562

797

1562

797

32

797

32

320
822
1142

320
822
1142

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1562

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1562

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1457

78
1685
57

11
1044
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

758

1457

758

1457

2
0
1
1
0
0
0

43

78

43

78

436

1685

436

1685

57

57

57

57

11

11

11

11

522

1044

522

1044

259

259

836
565
1401

North-South:
East-West:
SUM:

836
565
1401

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1457

78

1685

57

11

1044

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1457

0
0
0
0
0
0
0

78

1685

57

0
0
0
0
0
0
0

11

1044

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.019

1.019

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.919

0.919

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

831

0
591

0
0

0
1129
807

0
825
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

831

831

831

831

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

807

807

275

825

275

825

831
565
1396

831
565
1396

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

831

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

807

0
0
0
0
0
0
0

825

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

831

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

807

0
0
0
0
0
0
0

0
0
0
0
0
0
0

825

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.931

0.931

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.831

0.831

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

471
852
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

471

471

471

471

426

852

426

852

32
1093
1125

North-South:
East-West:
SUM:

32
1093
1125

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

471

852

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

429

224

177

1006

1009

349

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

390
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

402

390

402

390

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
343
822

479
343
822

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

390

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

390

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.577

0.577

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.477

0.477

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
108

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

489

870

489

870

108

108

108

108

447
581
1028

North-South:
East-West:
SUM:

447
581
1028

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

107

195

37

0
0
0
0
0
0
0

108

188

22

0
0
0
0
0
0
0
0
0
0
0
0
0
0

92

937

80

11

870

108

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.748

0.748

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.648

0.648

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1044

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1044

1044

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1044

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

171

110

0
0
0
0
0
0
0

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1044

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:01 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

32

26

66

33

931

47

825

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

163

52
382

57
5

2
1413
168

317
1716
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

113

163

113

163

113

57

113

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

707

1413

707

1413

65

168

65

168

317

317

317

317

902

1716

902

1716

87

87

87

87

330
1024
1354

North-South:
East-West:
SUM:

330
1024
1354

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

163

57

0
0
0
0
0
0
0

1413

168

0
0
0
0
0
0
0

317

1716

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

163

57

1413

168

317

1716

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.504

1.504

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.404

1.404

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2079

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1438

Lane
Volume

1
0
0
0
2
0
0

748

1438

748

1438

58

58

58

58

318

318

318

318

1040

2079

1040

2079

77
1066
1143

77
1066
1143

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1438

58

0
0
0
0
0
0
0

318

2079

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1438

58

0
0
0
0
0
0
0

318

2079

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.039

1.039

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.939

0.939

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1294
32

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

332

1294

332

1294

32

32

32

32

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1050

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1050

525

1050

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1294

32

0
0
0
0
0
0
0

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1294

32

15

1050

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1268
938

0
1776
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

634

1268

634

1268

221

938

221

938

592

1776

592

1776

295
634
929

North-South:
East-West:
SUM:

295
634
929

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

938

0
0
0
0
0
0
0

1776

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1268

938

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1776

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
537

0
0

0
850
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

26

537

26

537

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

495

850

495

850

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1006
1220

214
1006
1220

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

537

0
0
0
0
0
0
0

0
0
0
0
0
0
0

850

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.856

0.856

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.756

0.756

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

841

516

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

736

165

236

967

841

516

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

62

434

170

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
437
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

413

437

413

437

413

220

413

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

437

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

437

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

107

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

164

WESTBOUND

91

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

277
45

309
24

938
137

65
731
112

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

413

277

413

277

45

45

0
1
0
1
0
0
0

107

107

107

107

274

309

274

309

274

24

274

24

1
0
2
1
0
0
0

164

164

164

164

358

938

358

938

137

137

137

137

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

91

0
0
0
0
0
1
0

65

65

65

65

422

731

422

731

112

112

112

112

520
586
1106

520
586
1106

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

91

277

45

0
0
0
0
0
0
0

107

309

24

0
0
0
0
0
0
0

164

938

137

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

921
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

322

921

322

921

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

541
548
1089

541
548
1089

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

921

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

921

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.210

1.210

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.110

1.110

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

20

28

15

41

24

672

34

774

19

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1223
109

329
1528
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

612

1223

612

1223

37

109

37

109

329

329

329

329

794

1528

794

1528

59

59

59

59

268
941
1209

268
941
1209

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1223

109

0
0
0
0
0
0
0

329

1528

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1223

109

329

1528

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.511

1.511

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.411

1.411

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1246
29

315
2010
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

638

1246

638

1246

29

29

29

29

315

315

315

315

1005

2010

1005

2010

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0

315

2010

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

1246

29

0
0
0
0
0
0
0
0
0
0
0
0
0
0

315

2010

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1799
39

46
1052
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

460

1799

460

1799

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1052

526

1052

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

0
0
0
0
0
0
0

46

1052

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1799

39

46

1052

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1383
908

0
1539
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

692

1383

692

1383

250

908

250

908

513

1539

513

1539

249
692
941

249
692
941

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

1539

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1383

908

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1539

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
801
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

801

474

801

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

801

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

939

544

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

599

211

304

779

939

544

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

530

187

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
348
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

332

348

332

348

332

207

332

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

410

0
0
0
0
0
0
0

54

348

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

85
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

85

85

85

85

200

293

200

293

200

21

200

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

264
472
736

North-South:
East-West:
SUM:

264
472
736

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

109

40

85

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.535

0.535

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.435

0.435

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

677

236

233

782

138

110

942

50

99

1283

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

930
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

326

930

326

930

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

541
539
1080

North-South:
East-West:
SUM:

541
539
1080

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

930

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.350

1.350

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.250

1.250

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

566

0
147

0
0

0
927
449

154
939
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

357
618
975

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

154

939

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:


Fully mitigated?

NO

17

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

22

35

20
23

14
8

6
781
7

28
841
16

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

22

22

22

22

65

20

65

20

23

23

0
0
0
0
0
1
0

35

35

35

35

57

14

57

14

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

394

781

394

781

28

28

28

28

429

841

429

841

16

16

16

16

100
435
535

North-South:
East-West:
SUM:

100
435
535

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

22

20

23

35

14

0
0
0
0
0
0
0

781

0
0
0
0
0
0
0

28

841

16

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

22

20

23

0
0
0
0
0
0
0

35

14

0
0
0
0
0
0
0

781

28

841

16

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.375

0.375

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.375

0.375

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

174

149

234
136

228
40

64
855
155

227
730
136

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

174

174

174

174

234

234

234

234

136

136

1
0
1
0
1
0
0

149

149

149

149

228

228

228

228

40

40

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

64

64

64

64

428

855

428

855

68

155

68

155

227

227

227

227

433

730

433

730

136

136

136

136

402
655
1057

402
655
1057

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

174

234

136

149

228

40

64

855

155

227

730

136

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.769

0.769

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.669

0.669

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
2
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

12

42

54
55

23
14

32
899
135

59
1047
40

No. of
Lanes

1
0
0
1
0
0
0

Lane
Volume

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

12

12

12

109

54

109

54

55

55

42

42

42

42

37

23

37

23

14

14

1
0
0
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

12

32

32

32

32

517

899

517

899

135

135

135

135

59

59

59

59

544

1047

544

1047

40

40

40

40

151
576
727

North-South:
East-West:
SUM:

151
576
727

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

12

54

55

42

23

14

32

899

135

59

1047

40

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

12

54

55

0
0
0
0
0
0
0

42

23

14

0
0
0
0
0
0
0

32

899

135

0
0
0
0
0
0
0

59

1047

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.485

0.485

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.385

0.385

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

NB-EB--

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
1
21

4
0
9

44
990
22

16
1071
15

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

22

22

21

21

13

13

44

44

44

44

506

990

506

990

22

22

22

22

16

16

16

16

536

1071

536

1071

15

15

15

15

26
580
606

26
580
606

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

21

44

990

22

16

1071

15

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

44

990

22

0
0
0
0
0
0
0

16

1071

15

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.404

0.404

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.304

0.304

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
4
1
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

166

154

50
205

85
13

9
832
244

186
1075
60

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

166

166

166

166

128

50

128

50

205

205

1
0
0
0
0
1
0

126

154

126

154

126

85

126

85

13

13

1
0
2
0
1
0
0

416

832

416

832

161

244

161

244

1
0
1
1
0
0
0

186

186

186

186

568

1075

568

1075

60

60

60

60

North-South:
East-West:
SUM:

292
602
894

North-South:
East-West:
SUM:

292
602
894

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

166

50

205

0
0
0
0
0
0
0

154

85

13

0
0
0
0
0
0
0

832

244

0
0
0
0
0
0
0

186

1075

60

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

166

50

205

154

85

13

832

244

186

1075

60

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.650

0.650

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.550

0.550

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

63
0
527

0
0
0

Total
Volume

Lane
Volume

63

63

63

58

527

58

527

0
0
0
0
0
0
0

635

1217

635

1217

52

52

52

52

1
0
2
0
0
0
0

232

232

232

232

630

1259

630

1259

North-South:
East-West:
SUM:

63
867
930

1217
52

232
1259
0

CRITICAL VOLUMES

Added
Volume

Total
Volume

63

0
0
1
1
0
0
0

Lane
Volume

1
0
0
0
2
0
0

63
867
930

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1217

52

0
0
0
0
0
0
0

232

1259

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

63

527

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1217

52

0
0
0
0
0
0
0

232

1259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.653

0.653

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.553

0.553

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

910

CRITICAL VOLUMES

416
307

224
0

1
4

0
56

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

208

416

208

416

307

307

1
0
2
0
0
0
0

203

203

203

203

112

224

112

224

0
0
0
0
0
1
0

1
0
0
0
0
0
1

483

910

483

910

483

56

483

56

North-South:
East-West:
SUM:

411
490
901

North-South:
East-West:
SUM:

0
0
2
0
2
0
0

411
490
901

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

416

307

203

224

910

56

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

416

307

0
0
0
0
0
0
0

203

224

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

910

56

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

38

340

No. of
Lanes

5
48

65
725

198
1309
34

506

Total
Volume

Lane
Volume

38

12

38

48

48

48

48

1
1
0
0
2
0
0

203

340

203

340

203

65

203

65

290

725

290

725

2
0
3
1
0
0
0

109

198

109

198

336

1309

336

1309

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

12

1
0
2
0
2
0
0

0
723

Lane
Volume

2
0
1
1
0
0
0

362

723

362

723

75

506

75

506

338
471
809

338
471
809

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

38

48

0
0
0
0
0
0
0

340

65

725

0
0
0
0
0
0
0

198

1309

34

0
0
0
0
0
0
0

0
0
0
0
0
0
0

723

506

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

38

48

340

65

725

198

1309

34

723

506

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.588

0.588

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.488

0.488

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

193

0
226

0
0

0
802
641

14
1030
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

193

193

193

193

124

226

124

226

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

401

802

401

802

160

641

160

641

14

14

343

1030

343

1030

193
401
594

North-South:
East-West:
SUM:

193
401
594

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

193

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

641

0
0
0
0
0
0
0

14

1030

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

193

226

0
0
0
0
0
0
0

0
0
0
0
0
0
0

802

641

14

1030

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.396

0.396

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.296

0.296

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

121

0
229

0
0

0
934
103

216
1018
0

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

121

121

121

121

13

229

13

229

0
0
0
0
0
0
0

0
0
1
1
0
0
0

519

934

519

934

103

103

103

103

1
0
2
0
0
0
0

216

216

216

216

509

1018

509

1018

North-South:
East-West:
SUM:

121
735
856

121
735
856

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

216

1018

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

121

229

0
0
0
0
0
0
0

0
0
0
0
0
0
0

934

103

0
0
0
0
0
0
0

0
0
0
0
0
0
0

216

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

442

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

203

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
207

933
0

0
911
458

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

243

442

243

442

207

207

1
0
2
0
0
0
0

203

203

203

203

467

933

467

933

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

456

911

456

911

215

458

215

458

243
659
902

North-South:
East-West:
SUM:

243
659
902

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

442

207

0
0
0
0
0
0
0

203

933

0
0
0
0
0
0
0

0
0
0
0
0
0
0

911

458

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.633

0.633

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.533

0.533

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
1:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

275

WESTBOUND

74

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

228

237
176

74
219
137

920
35

789
47

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

74

74

74

74

207

237

207

237

176

176

176

176

74

74

74

74

110

219

110

219

137

137

137

137

1
0
1
0
1
0
0

275

275

275

275

920

920

920

920

35

35

35

35

1
0
1
0
1
0
0

228

228

228

228

789

789

789

789

47

47

47

47

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

281
1148
1429

281
1148
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

74

237

176

74

219

137

275

920

35

228

789

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

74

237

176

0
0
0
0
0
0
0

74

219

137

0
0
0
0
0
0
0

275

920

35

0
0
0
0
0
0
0

228

789

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.003

1.003

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.903

0.903

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

312

WESTBOUND

56

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

18

CRITICAL VOLUMES

514
46

93
475
301

73
65

45
146

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

56

56

56

56

616

514

616

514

46

46

93

93

93

93

481

475

481

475

481

301

481

301

1
0
0
1
0
0
0

312

312

312

312

138

73

138

73

65

65

1
0
1
1
0
0
0

18

18

18

18

45

45

45

45

146

146

146

146

North-South:
East-West:
SUM:

709
458
1167

North-South:
East-West:
SUM:

709
458
1167

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

56

514

46

93

475

301

0
0
0
0
0
0
0

312

73

65

0
0
0
0
0
0
0

18

45

146

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

56

514

46

93

475

301

312

73

65

18

45

146

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.819

0.819

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.719

0.719

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

89
266
68

128
342
19

121
1010
152

94
719
175

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

423

266

423

266

68

68

0
1
0
1
0
0
0

128

128

128

128

309

342

309

342

309

19

309

19

1
0
2
1
0
0
0

121

121

121

121

387

1010

387

1010

152

152

152

152

1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

89

0
0
0
0
0
1
0

94

94

94

94

447

719

447

719

175

175

175

175

551
568
1119

551
568
1119

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

0
0
0
0
0
0
0

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

0
0
0
0
0
0
0

94

719

175

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

266

68

128

342

19

0
0
0
0
0
0
0

121

1010

152

0
0
0
0
0
0
0

94

719

175

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.814

0.814

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.714

0.714

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Wilshire Blvd

East-West Street:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
1:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

117

198

394
75

416
137

151
1208
138

79
1307
132

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

117

117

117

117

197

394

197

394

36

75

36

75

1
0
1
1
0
0
0

198

198

198

198

277

416

277

416

137

137

137

137

1
0
2
0
1
0
0

151

151

151

151

604

1208

604

1208

80

138

80

138

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

79

79

79

79

654

1307

654

1307

33

132

33

132

395
805
1200

North-South:
East-West:
SUM:

395
805
1200

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

117

394

75

0
0
0
0
0
0
0

198

416

137

0
0
0
0
0
0
0

151

1208

138

0
0
0
0
0
0
0

79

1307

132

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.800

0.800

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.700

0.700

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

2
0

NB-EB--

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
1:00
4
1
0
1
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

76
189
118

1171
298
71

35
1343
103

92
1486
832

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

76

76

76

76

95

189

95

189

118

118

118

118

410

1171

410

1171

369

298

369

298

71

71

71

71

35

35

35

35

482

1343

482

1343

103

103

103

103

92

92

92

92

495

1486

495

1486

832

832

528
574
1102

528
574
1102

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

76

189

118

1171

298

71

35

1343

103

92

1486

832

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.801

0.801

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.701

0.701

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
1:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/O PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

420

0
189

0
0

0
1059
304

181
982
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

305

420

305

420

305

189

305

189

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

530

1059

530

1059

304

304

181

181

181

181

491

982

491

982

305
711
1016

North-South:
East-West:
SUM:

305
711
1016

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

420

189

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1059

304

0
0
0
0
0
0
0

0
0
0
0
0
0
0

181

982

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.713

0.713

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.613

0.613

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:02 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_SAT.xls

PHASE 1A CONSTRUCTION AFTER EXCAVATION

BASE YEAR

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

171

15
224

54
9

6
1512
175

256
2127
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

120

15

120

15

224

224

1
0
0
0
0
1
0

117

171

117

171

117

54

117

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

756

1512

756

1512

101

175

101

175

256

256

256

256

1121

2127

1121

2127

115

115

115

115

266
1127
1393

266
1127
1393

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

15

224

0
0
0
0
0
0
0

171

54

0
0
0
0
0
0
0

1512

175

0
0
0
0
0
0
0

256

2127

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

15

224

171

54

1512

175

256

2127

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.013

1.013

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.913

0.913

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
859
85

363
2376
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

472

859

472

859

85

85

85

85

363

363

363

363

1188

2376

1188

2376

57
1188
1245

North-South:
East-West:
SUM:

57
1188
1245

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.874

0.874

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.774

0.774

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1493
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

763

1493

763

1493

763

32

763

32

320
788
1108

320
788
1108

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1493

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1493

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1388

78
1639
55

11
1017
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

720

1388

720

1388

2
0
1
1
0
0
0

43

78

43

78

424

1639

424

1639

55

55

55

55

11

11

11

11

509

1017

509

1017

259

259

798
552
1350

North-South:
East-West:
SUM:

798
552
1350

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1388

78

1639

55

11

1017

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1388

0
0
0
0
0
0
0

78

1639

55

0
0
0
0
0
0
0

11

1017

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.982

0.982

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.882

0.882

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

814

0
591

0
0

0
1129
766

0
815
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

814

814

814

814

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

272

815

272

815

814
565
1379

814
565
1379

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

470
848
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

470

470

470

470

424

848

424

848

32
1092
1124

North-South:
East-West:
SUM:

32
1092
1124

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

358
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

370

358

370

358

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

447
343
790

447
343
790

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

358

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

358

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.554

0.554

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.454

0.454

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

473

870

473

870

76

76

76

76

447
565
1012

North-South:
East-West:
SUM:

447
565
1012

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

108

188

22

92

937

80

11

870

76

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

76

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1012

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1012

1012

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1012

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1012

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:13 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

162

52
382

57
5

2
1368
146

317
1715
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

112

162

112

162

112

57

112

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

684

1368

684

1368

43

146

43

146

317

317

317

317

901

1715

901

1715

87

87

87

87

329
1001
1330

North-South:
East-West:
SUM:

329
1001
1330

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

162

57

0
0
0
0
0
0
0

1368

146

0
0
0
0
0
0
0

317

1715

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

162

57

1368

146

317

1715

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.478

1.478

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.378

1.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2078

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1393

Lane
Volume

1
0
0
0
2
0
0

726

1393

726

1393

58

58

58

58

318

318

318

318

1039

2078

1039

2078

77
1044
1121

77
1044
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.019

1.019

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.919

0.919

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1253
28

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

320

1253

320

1253

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1049

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1049

525

1049

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

0
0
0
0
0
0
0

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1265
909

0
1775
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1265

633

1265

205

909

205

909

592

1775

592

1775

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

1775

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1775

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
536

0
0

0
847
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

25

536

25

536

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

847

494

847

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
415
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

402

415

402

415

402

220

402

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

85
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

85

85

85

85

252

309

252

309

252

24

252

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

498
586
1084

498
586
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

85

309

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

85

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.788

0.788

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.688

0.688

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

899
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

315

899

315

899

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
548
1084

536
548
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

899

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

899

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.204

1.204

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.104

1.104

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1208
99

329
1527
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

604

1208

604

1208

27

99

27

99

329

329

329

329

793

1527

793

1527

59

59

59

59

268
933
1201

268
933
1201

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1208

99

0
0
0
0
0
0
0

329

1527

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1208

99

329

1527

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.501

1.501

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.401

1.401

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1231
29

315
2009
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

630

1231

630

1231

29

29

29

29

315

315

315

315

1005

2009

1005

2009

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1786
37

46
1051
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

456

1786

456

1786

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1051

526

1051

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

0
0
0
0
0
0
0

46

1051

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

46

1051

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
900

0
1538
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

246

900

246

900

513

1538

513

1538

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

1538

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1538

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
338
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

327

338

327

338

327

207

327

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

75
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

75

75

75

75

195

293

195

293

195

21

195

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

254
472
726

North-South:
East-West:
SUM:

254
472
726

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

75

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

75

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.528

0.528

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.428

0.428

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

920
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

322

920

322

920

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

537
539
1076

North-South:
East-West:
SUM:

537
539
1076

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.345

1.345

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.245

1.245

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION A PREFERRED HAUL ROUTE: SUNSET

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

173

21
224

54
9

6
1548
175

256
2163
126

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

123

21

123

21

224

224

1
0
0
0
0
1
0

118

173

118

173

118

54

118

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

774

1548

774

1548

101

175

101

175

256

256

256

256

1145

2163

1145

2163

126

126

126

126

267
1151
1418

267
1151
1418

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

21

224

0
0
0
0
0
0
0

173

54

0
0
0
0
0
0
0

1548

175

0
0
0
0
0
0
0

256

2163

126

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

21

224

173

54

1548

175

256

2163

126

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.031

1.031

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.931

0.931

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
895
85

363
2421
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

490

895

490

895

85

85

85

85

363

363

363

363

1211

2421

1211

2421

57
1211
1268

North-South:
East-West:
SUM:

57
1211
1268

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

895

85

0
0
0
0
0
0
0

363

2421

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

895

85

0
0
0
0
0
0
0
0
0
0
0
0
0
0

363

2421

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.890

0.890

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.790

0.790

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1525
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

779

1525

779

1525

779

32

779

32

320
804
1124

320
804
1124

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1525

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1525

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1420

78
1669
61

11
1030
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

738

1420

738

1420

2
0
1
1
0
0
0

43

78

43

78

433

1669

433

1669

61

61

61

61

11

11

11

11

515

1030

515

1030

259

259

816
558
1374

North-South:
East-West:
SUM:

816
558
1374

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1420

78

1669

61

11

1030

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1420

0
0
0
0
0
0
0

78

1669

61

0
0
0
0
0
0
0

11

1030

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.999

0.999

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.899

0.899

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

819

0
591

0
0

0
1129
793

0
823
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

819

819

819

819

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

793

793

274

823

274

823

819
565
1384

819
565
1384

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

819

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

793

0
0
0
0
0
0
0

823

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

819

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

793

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.923

0.923

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.823

0.823

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

474
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

474

474

474

474

425

849

425

849

32
1096
1128

North-South:
East-West:
SUM:

32
1096
1128

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

474

849

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

429

224

177

1006

1009

349

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

364
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

376

364

376

364

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

453
343
796

453
343
796

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

364

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

364

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.559

0.559

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

476

870

476

870

82

82

82

82

447
568
1015

North-South:
East-West:
SUM:

447
568
1015

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

107

195

37

0
0
0
0
0
0
0

108

188

22

0
0
0
0
0
0
0
0
0
0
0
0
0
0

92

937

80

11

870

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.738

0.738

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.638

0.638

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1018

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1018

1018

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1018

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

171

110

0
0
0
0
0
0
0

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

32

26

66

33

931

47

825

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

170

52
382

61
5

2
1382
146

317
1719
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

170

118

170

118

61

118

61

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

691

1382

691

1382

43

146

43

146

317

317

317

317

903

1719

903

1719

87

87

87

87

335
1008
1343

North-South:
East-West:
SUM:

335
1008
1343

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

170

61

0
0
0
0
0
0
0

1382

146

0
0
0
0
0
0
0

317

1719

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

170

61

1382

146

317

1719

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.492

1.492

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.392

1.392

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2082

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1414

Lane
Volume

1
0
0
0
2
0
0

736

1414

736

1414

58

58

58

58

318

318

318

318

1041

2082

1041

2082

77
1054
1131

77
1054
1131

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1414

58

0
0
0
0
0
0
0

318

2082

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1414

58

0
0
0
0
0
0
0

318

2082

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.028

1.028

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.928

0.928

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1269
33

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

326

1269

326

1269

33

33

33

33

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1053

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1053

527

1053

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1269

33

0
0
0
0
0
0
0

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1269

33

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
922

0
1779
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

212

922

212

922

593

1779

593

1779

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

922

0
0
0
0
0
0
0

1779

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

922

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1779

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
539

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

28

539

28

539

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

841

516

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

736

165

236

967

841

516

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

62

434

170

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
419
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

404

419

404

419

404

220

404

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

256

309

256

309

256

24

256

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

91

277

45

89

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

309

24

0
0
0
0
0
0
0

164

938

137

65

731

112

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

903
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

316

903

316

903

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
548
1084

536
548
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

903

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

903

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.204

1.204

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.104

1.104

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

20

28

15

41

24

672

34

774

19

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0
0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
833

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

221

833

221

833

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

939

544

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

599

211

304

779

939

544

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

530

187

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

677

236

233

782

138

110

942

50

99

1283

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

154

939

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:14 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION B: BARRINGTON-SAN VICENTE-WILSHRIE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

179

171

23
224

56
9

6
1518
205

256
2133
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

179

179

179

179

124

23

124

23

224

224

1
0
0
0
0
1
0

118

171

118

171

118

56

118

56

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

759

1518

759

1518

116

205

116

205

256

256

256

256

1129

2133

1129

2133

124

124

124

124

297
1135
1432

297
1135
1432

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

179

23

224

0
0
0
0
0
0
0

171

56

0
0
0
0
0
0
0

1518

205

0
0
0
0
0
0
0

256

2133

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

179

23

224

171

56

1518

205

256

2133

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.041

1.041

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.941

0.941

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
865
85

363
2391
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

475

865

475

865

85

85

85

85

363

363

363

363

1196

2391

1196

2391

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
61

11
1027
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

61

61

61

61

11

11

11

11

514

1027

514

1027

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

61

11

1027

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

61

0
0
0
0
0
0
0

11

1027

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
823
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

274

823

274

823

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

474
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

474

474

474

474

425

849

425

849

32
1096
1128

North-South:
East-West:
SUM:

32
1096
1128

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

394
4

77
366
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

394

406

394

77

77

77

77

369

366

369

366

369

218

369

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

483
343
826

483
343
826

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

394

77

366

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

394

0
0
0
0
0
0
0

77

366

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.580

0.580

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.480

0.480

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

138

195
37

188
22

92
937
80

11
870
112

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

138

138

138

138

174

188

174

188

174

22

174

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

491

870

491

870

112

112

112

112

477
583
1060

North-South:
East-West:
SUM:

477
583
1060

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

138

188

22

92

937

80

11

870

112

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

138

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

112

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.771

0.771

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.671

0.671

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1149
136
16

61
1521
41

58
1630
1048

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

402

1149

402

1149

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1048

1048

512
604
1116

North-South:
East-West:
SUM:

512
604
1116

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1149

136

16

61

1521

41

58

1630

1048

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1149

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1048

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

62
5

2
1372
156

317
1719
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

62

118

62

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

686

1372

686

1372

53

156

53

156

317

317

317

317

903

1719

903

1719

87

87

87

87

335
1003
1338

North-South:
East-West:
SUM:

335
1003
1338

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

62

0
0
0
0
0
0
0

1372

156

0
0
0
0
0
0
0

317

1719

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

62

1372

156

317

1719

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.487

1.487

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.387

1.387

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2082

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1404

Lane
Volume

1
0
0
0
2
0
0

731

1404

731

1404

58

58

58

58

318

318

318

318

1041

2082

1041

2082

77
1049
1126

77
1049
1126

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.024

1.024

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.924

0.924

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
33

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

33

33

33

33

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1053

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1053

527

1053

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

0
0
0
0
0
0
0

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1779
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1779

593

1779

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1779

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1779

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
539

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

28

539

28

539

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
429
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

409

429

409

429

409

220

409

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

99
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

99

99

99

99

266

309

266

309

266

24

266

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

512
586
1098

512
586
1098

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

99

309

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

99

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.799

0.799

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.699

0.699

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

913
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

320

913

320

913

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

539
548
1087

539
548
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

913

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

913

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
833

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

221

833

221

833

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:15 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION C: BARRINGTON-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

179

171

23
224

56
9

6
1518
205

256
2133
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

179

179

179

179

124

23

124

23

224

224

1
0
0
0
0
1
0

118

171

118

171

118

56

118

56

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

759

1518

759

1518

116

205

116

205

256

256

256

256

1129

2133

1129

2133

124

124

124

124

297
1135
1432

297
1135
1432

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

179

23

224

0
0
0
0
0
0
0

171

56

0
0
0
0
0
0
0

1518

205

0
0
0
0
0
0
0

256

2133

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

179

23

224

171

56

1518

205

256

2133

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.041

1.041

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.941

0.941

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
865
85

363
2391
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

475

865

475

865

85

85

85

85

363

363

363

363

1196

2391

1196

2391

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
61

11
1027
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

61

61

61

61

11

11

11

11

514

1027

514

1027

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

61

11

1027

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

61

0
0
0
0
0
0
0

11

1027

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
823
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

274

823

274

823

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

474
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

474

474

474

474

425

849

425

849

32
1096
1128

North-South:
East-West:
SUM:

32
1096
1128

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

394
4

77
366
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

394

406

394

77

77

77

77

369

366

369

366

369

218

369

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

483
343
826

483
343
826

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

394

77

366

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

394

0
0
0
0
0
0
0

77

366

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.580

0.580

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.480

0.480

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

225
37

218
22

92
937
80

11
870
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

369

225

369

225

37

37

0
1
0
1
0
0
0

108

108

108

108

174

218

174

218

174

22

174

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

476

870

476

870

82

82

82

82

477
568
1045

North-South:
East-West:
SUM:

477
568
1045

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

225

37

108

218

22

92

937

80

11

870

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

225

37

108

218

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.760

0.760

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.660

0.660

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

265

394
145

421
77

71
1313
84

80
1454
64

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

265

265

265

265

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

64

64

462
798
1260

462
798
1260

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

265

421

77

71

1313

84

80

1454

64

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

265

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

64

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.840

0.840

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.740

0.740

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1551
41

58
1660
1018

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

531

1551

531

1551

41

41

41

41

58

58

58

58

553

1660

553

1660

1018

1018

502
614
1116

North-South:
East-West:
SUM:

502
614
1116

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1551

41

58

1660

1018

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1551

41

0
0
0
0
0
0
0

58

1660

1018

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

62
5

2
1372
156

317
1719
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

62

118

62

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

686

1372

686

1372

53

156

53

156

317

317

317

317

903

1719

903

1719

87

87

87

87

335
1003
1338

North-South:
East-West:
SUM:

335
1003
1338

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

62

0
0
0
0
0
0
0

1372

156

0
0
0
0
0
0
0

317

1719

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

62

1372

156

317

1719

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.487

1.487

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.387

1.387

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2082

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1404

Lane
Volume

1
0
0
0
2
0
0

731

1404

731

1404

58

58

58

58

318

318

318

318

1041

2082

1041

2082

77
1049
1126

77
1049
1126

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.024

1.024

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.924

0.924

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
33

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

33

33

33

33

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1053

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1053

527

1053

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

0
0
0
0
0
0
0

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1779
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1779

593

1779

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1779

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1779

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
539

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

28

539

28

539

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
429
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

409

429

409

429

409

220

409

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
319
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

261

319

261

319

261

24

261

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

89

319

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

319

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

301

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

301

301

301

301

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

626
835
1461

North-South:
East-West:
SUM:

626
835
1461

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.623

1.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.523

1.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

903
301
16

21
1257
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

316

903

316

903

317

301

317

301

16

16

16

16

21

21

21

21

430

1257

430

1257

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
551
1087

536
551
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

903

301

16

21

1257

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

903

301

16

21

1257

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
833

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

221

833

221

833

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:16 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION D: BUNDY-SAN VICENTE-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
134

197
99

61
1092
169

202
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

134

134

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

202

202

202

202

635

1052

635

1052

218

218

218

218

393
748
1141

North-South:
East-West:
SUM:

393
748
1141

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

134

238

197

99

61

1092

169

202

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

134

238

197

99

61

1092

169

202

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.830

0.830

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.730

0.730

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1101
10

104
1590
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

556

1101

556

1101

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

845

1590

845

1590

100

100

100

100

North-South:
East-West:
SUM:

133
856
989

North-South:
East-West:
SUM:

133
856
989

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1101

10

104

1590

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1101

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1590

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.659

0.659

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.559

0.559

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
813
4

30
1862
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

409

813

409

813

30

30

30

30

931

1862

931

1862

121

121

121

121

142
966
1108

North-South:
East-West:
SUM:

142
966
1108

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

813

30

1862

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

813

0
0
0
0
0
0
0

30

1862

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

171

21
224

54
11

8
1518
175

256
2133
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

123

21

123

21

224

224

1
0
0
0
0
1
0

118

171

118

171

118

54

118

54

11

11

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

759

1518

759

1518

101

175

101

175

256

256

256

256

1129

2133

1129

2133

124

124

124

124

267
1137
1404

267
1137
1404

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

21

224

0
0
0
0
0
0
0

171

54

11

0
0
0
0
0
0
0

1518

175

0
0
0
0
0
0
0

256

2133

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

21

224

171

54

11

1518

175

256

2133

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.021

1.021

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.921

0.921

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
865
85

363
2391
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

475

865

475

865

85

85

85

85

363

363

363

363

1196

2391

1196

2391

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

865

85

0
0
0
0
0
0
0

363

2391

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
61

11
1027
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

61

61

61

61

11

11

11

11

514

1027

514

1027

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

61

11

1027

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

61

0
0
0
0
0
0
0

11

1027

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
823
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

274

823

274

823

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

823

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

474
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

474

474

474

474

425

849

425

849

32
1096
1128

North-South:
East-West:
SUM:

32
1096
1128

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

474

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

459

0
0

0
224

177
1006
0

0
1009
379

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

252

459

252

459

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

127

379

127

379

252
682
934

North-South:
East-West:
SUM:

252
682
934

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

459

224

0
0
0
0
0
0
0

177

1006

1009

379

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

459

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

379

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.655

0.655

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.555

0.555

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

265
122

22
184
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

194

265

194

265

122

122

122

122

22

22

22

22

92

184

92

184

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

216
1004
1220

North-South:
East-West:
SUM:

216
1004
1220

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

265

122

22

184

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

265

122

0
0
0
0
0
0
0

22

184

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.856

0.856

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.756

0.756

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

364
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

376

364

376

364

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

453
343
796

453
343
796

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

364

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

364

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.559

0.559

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
967
80

11
900
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

349

967

349

967

80

80

80

80

11

11

11

11

491

900

491

900

82

82

82

82

447
583
1030

North-South:
East-West:
SUM:

447
583
1030

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

108

188

22

92

967

80

11

900

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

967

80

0
0
0
0
0
0
0

11

900

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1149
136
16

61
1521
41

58
1630
1048

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

402

1149

402

1149

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1048

1048

512
604
1116

North-South:
East-West:
SUM:

512
604
1116

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1149

136

16

61

1521

41

58

1630

1048

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1149

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1048

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.812

0.812

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.712

0.712

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1075
389

66
896
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

538

1075

538

1075

121

389

121

389

66

66

66

66

448

896

448

896

268
604
872

268
604
872

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1075

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

896

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1075

389

66

896

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.612

0.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

289
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

289

289

289

289

498

845

498

845

150

150

150

150

577
592
1169

577
592
1169

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

289

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

289

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.850

0.850

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.750

0.750

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1670
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

862

1670

862

1670

54

54

54

54

214
881
1095

North-South:
East-West:
SUM:

214
881
1095

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1670

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1670

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.217

1.217

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.117

1.117

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1679
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

840

1679

840

1679

40

40

40

40

116
882
998

116
882
998

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1679

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1679

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.109

1.109

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.009

1.009

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

61
6

2
1372
146

317
1719
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

61

118

61

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

686

1372

686

1372

43

146

43

146

317

317

317

317

903

1719

903

1719

87

87

87

87

335
1003
1338

North-South:
East-West:
SUM:

335
1003
1338

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

61

0
0
0
0
0
0
0

1372

146

0
0
0
0
0
0
0

317

1719

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

61

1372

146

317

1719

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.487

1.487

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.387

1.387

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2082

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1404

Lane
Volume

1
0
0
0
2
0
0

731

1404

731

1404

58

58

58

58

318

318

318

318

1041

2082

1041

2082

77
1049
1126

77
1049
1126

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1404

58

0
0
0
0
0
0
0

318

2082

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.024

1.024

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.924

0.924

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
33

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

33

33

33

33

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1053

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1053

527

1053

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

0
0
0
0
0
0
0

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

33

15

1053

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1779
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1779

593

1779

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1779

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1779

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
539

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

28

539

28

539

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

539

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

746

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

410

746

410

746

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

106

516

106

516

410
657
1067

North-South:
East-West:
SUM:

410
657
1067

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

746

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

746

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
203
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

102

203

102

203

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

203

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

203

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
419
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

404

419

404

419

404

220

404

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
309
24

164
948
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

256

309

256

309

256

24

256

24

164

164

164

164

362

948

362

948

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

89

309

24

164

948

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

309

24

0
0
0
0
0
0
0

164

948

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

913
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

320

913

320

913

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

539
548
1087

539
548
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

913

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

913

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1109
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

555

1109

555

1109

244

606

244

606

172

172

172

172

423

846

423

846

362
727
1089

North-South:
East-West:
SUM:

362
727
1089

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1109

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1109

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.764

0.764

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.664

0.664

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
833

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

221

833

221

833

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

833

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:18 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

REMAINDER OF PHASE 1B

BASE YEAR

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

171

15
224

54
9

6
1512
175

256
2127
115

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

120

15

120

15

224

224

1
0
0
0
0
1
0

117

171

117

171

117

54

117

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

756

1512

756

1512

101

175

101

175

256

256

256

256

1121

2127

1121

2127

115

115

115

115

266
1127
1393

266
1127
1393

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

15

224

0
0
0
0
0
0
0

171

54

0
0
0
0
0
0
0

1512

175

0
0
0
0
0
0
0

256

2127

115

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

15

224

171

54

1512

175

256

2127

115

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.013

1.013

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.913

0.913

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
859
85

363
2376
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

472

859

472

859

85

85

85

85

363

363

363

363

1188

2376

1188

2376

57
1188
1245

North-South:
East-West:
SUM:

57
1188
1245

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

859

85

0
0
0
0
0
0
0

363

2376

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.874

0.874

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.774

0.774

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1493
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

763

1493

763

1493

763

32

763

32

320
788
1108

320
788
1108

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1493

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1493

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.739

0.739

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.639

0.639

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1388

78
1639
55

11
1017
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

720

1388

720

1388

2
0
1
1
0
0
0

43

78

43

78

424

1639

424

1639

55

55

55

55

11

11

11

11

509

1017

509

1017

259

259

798
552
1350

North-South:
East-West:
SUM:

798
552
1350

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1388

78

1639

55

11

1017

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1388

0
0
0
0
0
0
0

78

1639

55

0
0
0
0
0
0
0

11

1017

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.982

0.982

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.882

0.882

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

814

0
591

0
0

0
1129
766

0
815
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

814

814

814

814

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

272

815

272

815

814
565
1379

814
565
1379

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

814

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

815

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

470
848
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

470

470

470

470

424

848

424

848

32
1092
1124

North-South:
East-West:
SUM:

32
1092
1124

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

470

848

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.789

0.789

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.689

0.689

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

358
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

370

358

370

358

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

447
343
790

447
343
790

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

358

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

358

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.554

0.554

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.454

0.454

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
76

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

473

870

473

870

76

76

76

76

447
565
1012

North-South:
East-West:
SUM:

447
565
1012

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

108

188

22

92

937

80

11

870

76

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

76

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.736

0.736

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.636

0.636

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1012

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1012

1012

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1012

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1012

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

162

52
382

57
5

2
1368
146

317
1715
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

112

162

112

162

112

57

112

57

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

684

1368

684

1368

43

146

43

146

317

317

317

317

901

1715

901

1715

87

87

87

87

329
1001
1330

North-South:
East-West:
SUM:

329
1001
1330

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

162

57

0
0
0
0
0
0
0

1368

146

0
0
0
0
0
0
0

317

1715

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

162

57

1368

146

317

1715

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.478

1.478

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.378

1.378

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2078

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1393

Lane
Volume

1
0
0
0
2
0
0

726

1393

726

1393

58

58

58

58

318

318

318

318

1039

2078

1039

2078

77
1044
1121

77
1044
1121

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1393

58

0
0
0
0
0
0
0

318

2078

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.019

1.019

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.919

0.919

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1253
28

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

320

1253

320

1253

28

28

28

28

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1049

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

525

1049

525

1049

295

295

532
631
1163

532
631
1163

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

0
0
0
0
0
0
0

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1253

28

15

1049

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1265
909

0
1775
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1265

633

1265

205

909

205

909

592

1775

592

1775

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

1775

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1265

909

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1775

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
536

0
0

0
847
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

25

536

25

536

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

847

494

847

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

536

0
0
0
0
0
0
0

0
0
0
0
0
0
0

847

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
415
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

402

415

402

415

402

220

402

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

415

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

85
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

85

85

85

85

252

309

252

309

252

24

252

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

498
586
1084

498
586
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

85

309

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

85

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.788

0.788

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.688

0.688

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

899
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

315

899

315

899

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
548
1084

536
548
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

899

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

899

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.204

1.204

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.104

1.104

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

167

19
286

51
12

3
1208
99

329
1527
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

115

167

115

167

115

51

115

51

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

604

1208

604

1208

27

99

27

99

329

329

329

329

793

1527

793

1527

59

59

59

59

268
933
1201

268
933
1201

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

167

51

12

0
0
0
0
0
0
0

1208

99

0
0
0
0
0
0
0

329

1527

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

167

51

12

1208

99

329

1527

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.501

1.501

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.401

1.401

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1231
29

315
2009
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

630

1231

630

1231

29

29

29

29

315

315

315

315

1005

2009

1005

2009

43
1005
1048

North-South:
East-West:
SUM:

43
1005
1048

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1231

29

0
0
0
0
0
0
0

315

2009

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.048

1.048

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.948

0.948

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1786
37

46
1051
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

456

1786

456

1786

37

37

37

37

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

526

1051

526

1051

279

279

503
760
1263

North-South:
East-West:
SUM:

503
760
1263

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

0
0
0
0
0
0
0

46

1051

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1786

37

46

1051

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
900

0
1538
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

246

900

246

900

513

1538

513

1538

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

1538

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

900

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1538

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
832

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

220

832

220

832

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

832

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
338
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

327

338

327

338

327

207

327

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

338

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

75
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

75

75

75

75

195

293

195

293

195

21

195

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

254
472
726

North-South:
East-West:
SUM:

254
472
726

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

75

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

75

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.528

0.528

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.428

0.428

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

920
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

322

920

322

920

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

537
539
1076

North-South:
East-West:
SUM:

537
539
1076

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

920

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.345

1.345

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.245

1.245

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:19 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION A PREFERRED HAUL ROUTE: SUNSET

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

176

21
224

54
9

6
1546
175

256
2161
129

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

123

21

123

21

224

224

1
0
0
0
0
1
0

120

176

120

176

120

54

120

54

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

773

1546

773

1546

101

175

101

175

256

256

256

256

1145

2161

1145

2161

129

129

129

129

269
1151
1420

269
1151
1420

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

21

224

0
0
0
0
0
0
0

176

54

0
0
0
0
0
0
0

1546

175

0
0
0
0
0
0
0

256

2161

129

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

21

224

176

54

1546

175

256

2161

129

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.033

1.033

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.933

0.933

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
893
85

363
2419
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

489

893

489

893

85

85

85

85

363

363

363

363

1210

2419

1210

2419

57
1210
1267

North-South:
East-West:
SUM:

57
1210
1267

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

893

85

0
0
0
0
0
0
0

363

2419

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

893

85

0
0
0
0
0
0
0
0
0
0
0
0
0
0

363

2419

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.889

0.889

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.789

0.789

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1523
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

778

1523

778

1523

778

32

778

32

320
803
1123

320
803
1123

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

1523

32

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1523

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1418

78
1666
62

11
1030
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

737

1418

737

1418

2
0
1
1
0
0
0

43

78

43

78

432

1666

432

1666

62

62

62

62

11

11

11

11

515

1030

515

1030

259

259

815
558
1373

North-South:
East-West:
SUM:

815
558
1373

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1418

78

1666

62

11

1030

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1418

0
0
0
0
0
0
0

78

1666

62

0
0
0
0
0
0
0

11

1030

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.999

0.999

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.899

0.899

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

819

0
591

0
0

0
1129
790

0
824
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

819

819

819

819

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

790

790

275

824

275

824

819
565
1384

819
565
1384

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

819

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

790

0
0
0
0
0
0
0

824

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

819

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

790

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.923

0.923

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.823

0.823

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

475
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

475

475

475

475

425

849

425

849

32
1097
1129

North-South:
East-West:
SUM:

32
1097
1129

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

475

849

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

429

224

177

1006

1009

349

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

364
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

376

364

376

364

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

453
343
796

453
343
796

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

364

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

364

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.559

0.559

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
937
80

11
870
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

476

870

476

870

82

82

82

82

447
568
1015

North-South:
East-West:
SUM:

447
568
1015

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

107

195

37

0
0
0
0
0
0
0

108

188

22

0
0
0
0
0
0
0
0
0
0
0
0
0
0

92

937

80

11

870

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.738

0.738

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.638

0.638

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1521
41

58
1630
1018

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1018

1018

502
604
1106

North-South:
East-West:
SUM:

502
604
1106

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1521

41

58

1630

1018

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

66

171

110

0
0
0
0
0
0
0

1119

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1018

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.804

0.804

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.704

0.704

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

19

32

26

66

33

931

47

825

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0
0
0
0
0
0
0
0

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

171

52
382

61
5

2
1383
146

317
1720
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

119

171

119

171

119

61

119

61

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

692

1383

692

1383

43

146

43

146

317

317

317

317

904

1720

904

1720

87

87

87

87

336
1009
1345

North-South:
East-West:
SUM:

336
1009
1345

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

171

61

0
0
0
0
0
0
0

1383

146

0
0
0
0
0
0
0

317

1720

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

171

61

1383

146

317

1720

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.494

1.494

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.394

1.394

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2083

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1415

Lane
Volume

1
0
0
0
2
0
0

737

1415

737

1415

58

58

58

58

318

318

318

318

1042

2083

1042

2083

77
1055
1132

77
1055
1132

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1415

58

0
0
0
0
0
0
0

318

2083

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1415

58

0
0
0
0
0
0
0

318

2083

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.029

1.029

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.929

0.929

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1269
34

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

326

1269

326

1269

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1054

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1054

527

1054

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1269

34

0
0
0
0
0
0
0

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1269

34

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
922

0
1780
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

212

922

212

922

593

1780

593

1780

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

922

0
0
0
0
0
0
0

1780

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

922

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1780

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
540

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

29

540

29

540

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

841

516

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

736

165

236

967

841

516

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

62

434

170

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
419
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

404

419

404

419

404

220

404

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

256

309

256

309

256

24

256

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

91

277

45

89

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

309

24

0
0
0
0
0
0
0

164

938

137

65

731

112

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

903
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

316

903

316

903

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
548
1084

536
548
1084

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

903

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

903

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.204

1.204

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.104

1.104

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:20 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

20

28

15

41

24

672

34

774

19

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0
0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
834

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

222

834

222

834

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

939

544

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

599

211

304

779

939

544

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

49

530

187

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

180

677

236

233

782

138

110

942

50

99

1283

45

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

154

939

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:21 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION B: BARRINGTON-SAN VICENTE-WILSHRIE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

176

171

22
224

55
9

6
1519
202

256
2134
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

176

176

176

176

123

22

123

22

224

224

1
0
0
0
0
1
0

118

171

118

171

118

55

118

55

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

760

1519

760

1519

114

202

114

202

256

256

256

256

1129

2134

1129

2134

124

124

124

124

294
1135
1429

294
1135
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

176

22

224

0
0
0
0
0
0
0

171

55

0
0
0
0
0
0
0

1519

202

0
0
0
0
0
0
0

256

2134

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

176

22

224

171

55

1519

202

256

2134

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.039

1.039

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.939

0.939

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
866
85

363
2392
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

476

866

476

866

85

85

85

85

363

363

363

363

1196

2392

1196

2392

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
62

11
1028
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

62

62

62

62

11

11

11

11

514

1028

514

1028

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

62

11

1028

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

62

0
0
0
0
0
0
0

11

1028

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
824
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

275

824

275

824

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

475
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

475

475

475

475

425

849

425

849

32
1097
1129

North-South:
East-West:
SUM:

32
1097
1129

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

391
4

77
363
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

391

403

391

77

77

77

77

368

363

368

363

368

218

368

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

480
343
823

480
343
823

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

391

77

363

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

391

0
0
0
0
0
0
0

77

363

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.578

0.578

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.478

0.478

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

135

195
37

188
22

92
937
80

11
870
109

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

135

135

135

135

173

188

173

188

173

22

173

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

490

870

490

870

109

109

109

109

474
582
1056

North-South:
East-West:
SUM:

474
582
1056

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

135

188

22

92

937

80

11

870

109

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

135

188

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

109

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.768

0.768

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.668

0.668

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1146
136
16

61
1521
41

58
1630
1045

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

401

1146

401

1146

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1045

1045

511
604
1115

North-South:
East-West:
SUM:

511
604
1115

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1146

136

16

61

1521

41

58

1630

1045

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1146

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1045

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.811

0.811

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.711

0.711

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

62
5

2
1373
156

317
1720
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

62

118

62

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

687

1373

687

1373

53

156

53

156

317

317

317

317

904

1720

904

1720

87

87

87

87

335
1004
1339

North-South:
East-West:
SUM:

335
1004
1339

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

62

0
0
0
0
0
0
0

1373

156

0
0
0
0
0
0
0

317

1720

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

62

1373

156

317

1720

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.488

1.488

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.388

1.388

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2083

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1405

Lane
Volume

1
0
0
0
2
0
0

732

1405

732

1405

58

58

58

58

318

318

318

318

1042

2083

1042

2083

77
1050
1127

77
1050
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.025

1.025

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.925

0.925

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
34

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1054

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1054

527

1054

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

0
0
0
0
0
0
0

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1780
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1780

593

1780

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1780

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1780

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
540

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

29

540

29

540

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
429
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

409

429

409

429

409

220

409

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

99
309
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

99

99

99

99

266

309

266

309

266

24

266

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

512
586
1098

512
586
1098

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

99

309

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

99

309

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.799

0.799

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.699

0.699

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

913
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

320

913

320

913

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

539
548
1087

539
548
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

913

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

913

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
834

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

222

834

222

834

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:23 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION C: BARRINGTON-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
104

197
99

61
1092
169

172
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

104

104

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

172

172

172

172

635

1052

635

1052

218

218

218

218

393
718
1111

North-South:
East-West:
SUM:

393
718
1111

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

104

238

197

99

61

1092

169

172

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.808

0.808

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.708

0.708

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1071
10

104
1560
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

541

1071

541

1071

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

830

1560

830

1560

100

100

100

100

North-South:
East-West:
SUM:

133
841
974

North-South:
East-West:
SUM:

133
841
974

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1071

10

104

1560

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1071

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1560

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.649

0.649

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.549

0.549

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
783
4

30
1832
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

394

783

394

783

30

30

30

30

916

1832

916

1832

121

121

121

121

142
951
1093

North-South:
East-West:
SUM:

142
951
1093

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

783

30

1832

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

783

0
0
0
0
0
0
0

30

1832

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.729

0.729

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.629

0.629

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

176

171

22
224

55
9

6
1519
202

256
2134
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

176

176

176

176

123

22

123

22

224

224

1
0
0
0
0
1
0

118

171

118

171

118

55

118

55

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

760

1519

760

1519

114

202

114

202

256

256

256

256

1129

2134

1129

2134

124

124

124

124

294
1135
1429

294
1135
1429

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

176

22

224

0
0
0
0
0
0
0

171

55

0
0
0
0
0
0
0

1519

202

0
0
0
0
0
0
0

256

2134

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

176

22

224

171

55

1519

202

256

2134

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.039

1.039

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.939

0.939

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
866
85

363
2392
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

476

866

476

866

85

85

85

85

363

363

363

363

1196

2392

1196

2392

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
62

11
1028
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

62

62

62

62

11

11

11

11

514

1028

514

1028

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

62

11

1028

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

62

0
0
0
0
0
0
0

11

1028

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
824
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

275

824

275

824

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

475
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

475

475

475

475

425

849

425

849

32
1097
1129

North-South:
East-West:
SUM:

32
1097
1129

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

429

0
0

0
224

177
1006
0

0
1009
349

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

236

429

236

429

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

113

349

113

349

236
682
918

North-South:
East-West:
SUM:

236
682
918

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

1009

349

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

429

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

349

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.644

0.644

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.544

0.544

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

235
122

22
154
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

179

235

179

235

122

122

122

122

22

22

22

22

77

154

77

154

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

201
1004
1205

North-South:
East-West:
SUM:

201
1004
1205

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

235

122

22

154

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

235

122

0
0
0
0
0
0
0

22

154

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.846

0.846

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.746

0.746

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

391
4

77
363
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

403

391

403

391

77

77

77

77

368

363

368

363

368

218

368

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

480
343
823

480
343
823

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

391

77

363

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

391

0
0
0
0
0
0
0

77

363

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.578

0.578

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.478

0.478

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

222
37

215
22

92
937
80

11
870
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

366

222

366

222

37

37

0
1
0
1
0
0
0

108

108

108

108

173

215

173

215

173

22

173

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

339

937

339

937

80

80

80

80

11

11

11

11

476

870

476

870

82

82

82

82

474
568
1042

North-South:
East-West:
SUM:

474
568
1042

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

222

37

108

215

22

92

937

80

11

870

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

222

37

108

215

22

0
0
0
0
0
0
0

92

937

80

0
0
0
0
0
0
0

11

870

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.758

0.758

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.658

0.658

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

262

394
145

421
77

71
1313
84

80
1454
61

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

262

262

262

262

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

61

61

459
798
1257

459
798
1257

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

262

421

77

71

1313

84

80

1454

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

262

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

61

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.838

0.838

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.738

0.738

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1119
136
16

61
1548
41

58
1657
1018

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

392

1119

392

1119

152

136

152

136

16

16

16

16

61

61

61

61

530

1548

530

1548

41

41

41

41

58

58

58

58

552

1657

552

1657

1018

1018

502
613
1115

North-South:
East-West:
SUM:

502
613
1115

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1119

136

16

61

1548

41

58

1657

1018

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1119

136

16

0
0
0
0
0
0
0

61

1548

41

0
0
0
0
0
0
0

58

1657

1018

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.811

0.811

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.711

0.711

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1045
389

66
866
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

523

1045

523

1045

121

389

121

389

66

66

66

66

433

866

433

866

268
589
857

268
589
857

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

866

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1045

389

66

866

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.601

0.601

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.501

0.501

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

279
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

279

279

279

279

498

845

498

845

150

150

150

150

577
582
1159

577
582
1159

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

279

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

279

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.843

0.843

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.743

0.743

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1660
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

857

1660

857

1660

54

54

54

54

214
876
1090

North-South:
East-West:
SUM:

214
876
1090

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1660

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1660

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.211

1.211

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.111

1.111

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1669
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

835

1669

835

1669

40

40

40

40

116
877
993

116
877
993

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1669

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1669

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.103

1.103

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.003

1.003

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

62
5

2
1373
156

317
1720
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

62

118

62

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

687

1373

687

1373

53

156

53

156

317

317

317

317

904

1720

904

1720

87

87

87

87

335
1004
1339

North-South:
East-West:
SUM:

335
1004
1339

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

62

0
0
0
0
0
0
0

1373

156

0
0
0
0
0
0
0

317

1720

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

62

1373

156

317

1720

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.488

1.488

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.388

1.388

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2083

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1405

Lane
Volume

1
0
0
0
2
0
0

732

1405

732

1405

58

58

58

58

318

318

318

318

1042

2083

1042

2083

77
1050
1127

77
1050
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.025

1.025

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.925

0.925

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
34

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1054

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1054

527

1054

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

0
0
0
0
0
0
0

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1780
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1780

593

1780

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1780

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1780

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
540

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

29

540

29

540

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

736

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

405

736

405

736

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

111

516

111

516

405
657
1062

North-South:
East-West:
SUM:

405
657
1062

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

736

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.745

0.745

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.645

0.645

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
193
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

97

193

97

193

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

193

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

193

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
429
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

409

429

409

429

409

220

409

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

429

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
319
24

164
938
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

261

319

261

319

261

24

261

24

164

164

164

164

358

938

358

938

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

89

319

24

164

938

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

319

24

0
0
0
0
0
0
0

164

938

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

301

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

301

301

301

301

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

626
835
1461

North-South:
East-West:
SUM:

626
835
1461

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

301

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.623

1.623

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.523

1.523

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

903
301
16

21
1257
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

316

903

316

903

317

301

317

301

16

16

16

16

21

21

21

21

430

1257

430

1257

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

536
551
1087

536
551
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

903

301

16

21

1257

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

903

301

16

21

1257

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1099
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

550

1099

550

1099

244

606

244

606

172

172

172

172

423

846

423

846

362
722
1084

North-South:
East-West:
SUM:

362
722
1084

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.761

0.761

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.661

0.661

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
834

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

222

834

222

834

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:22 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

HAUL ROUTE OPTION D: BUNDY-SAN VICENTE-WILSHIRE

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

23

69

19
27

29
6

9
1090
22

35
1019
30

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

23

23

23

23

69

19

69

19

27

27

69

69

69

69

104

29

104

29

556

1090

556

1090

22

22

22

22

35

35

35

35

525

1019

525

1019

30

30

30

30

138
591
729

138
591
729

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

23

19

27

69

29

0
0
0
0
0
0
0

1090

22

0
0
0
0
0
0
0

35

1019

30

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

23

19

27

0
0
0
0
0
0
0

69

29

0
0
0
0
0
0
0

1090

22

35

1019

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.512

0.512

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.512

0.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

139

238

155
131

197
99

61
1092
169

199
1052
218

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
1
0
1
0
0

139

139

139

139

155

155

155

155

131

131

1
0
1
0
1
0
0

238

238

238

238

197

197

197

197

69

99

69

99

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

61

61

61

61

546

1092

546

1092

100

169

100

169

199

199

199

199

635

1052

635

1052

218

218

218

218

393
745
1138

North-South:
East-West:
SUM:

393
745
1138

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

139

155

131

238

197

99

61

1092

169

199

1052

218

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

139

155

131

238

197

99

61

1092

169

199

1052

218

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.828

0.828

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.728

0.728

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

2
0
2
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
2
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
2
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
2
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-2
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

16

43

31
59

15
10

11
1098
10

104
1587
100

CRITICAL VOLUMES

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
0
0
0

16

16

16

16

90

31

90

31

59

59

1
0
0
1
0
0
0

43

43

43

43

25

15

25

15

10

10

1
0
1
1
0
0
0

11

11

11

11

554

1098

554

1098

10

10

10

10

1
0
1
1
0
0
0

104

104

104

104

844

1587

844

1587

100

100

100

100

North-South:
East-West:
SUM:

133
855
988

North-South:
East-West:
SUM:

133
855
988

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

16

31

59

43

15

10

11

1098

10

104

1587

100

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

16

31

59

0
0
0
0
0
0
0

43

15

10

0
0
0
0
0
0
0

11

1098

10

0
0
0
0
0
0
0

0
0
0
0
0
0
0

104

1587

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.659

0.659

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.559

0.559

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

7
39
14

53
11
71

35
810
4

30
1859
121

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

60

39

60

39

14

14

53

53

53

53

135

11

135

11

71

71

35

35

35

35

407

810

407

810

30

30

30

30

930

1859

930

1859

121

121

121

121

142
965
1107

North-South:
East-West:
SUM:

142
965
1107

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

39

14

53

11

71

35

810

30

1859

121

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

39

14

0
0
0
0
0
0
0

53

11

71

0
0
0
0
0
0
0

35

810

0
0
0
0
0
0
0

30

1859

121

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.738

0.738

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.638

0.638

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

4
1
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
1
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
4
1
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
1
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

149

171

21
224

54
10

7
1519
175

256
2134
124

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

149

149

149

149

123

21

123

21

224

224

1
0
0
0
0
1
0

118

171

118

171

118

54

118

54

10

10

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

760

1519

760

1519

101

175

101

175

256

256

256

256

1129

2134

1129

2134

124

124

124

124

267
1136
1403

267
1136
1403

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

149

21

224

0
0
0
0
0
0
0

171

54

10

0
0
0
0
0
0
0

1519

175

0
0
0
0
0
0
0

256

2134

124

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

149

21

224

171

54

10

1519

175

256

2134

124

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.020

1.020

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.920

0.920

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

57
0
401

0
0
0

0
866
85

363
2392
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

57

57

57

57

401

401

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

476

866

476

866

85

85

85

85

363

363

363

363

1196

2392

1196

2392

57
1196
1253

North-South:
East-West:
SUM:

57
1196
1253

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

57

401

0
0
0
0
0
0
0

0
0
0
0
0
0
0

866

85

0
0
0
0
0
0
0

363

2392

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.879

0.879

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.779

0.779

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

152

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

252
332

639
0

5
13

1498
0
32

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

1
0
0
0
0
0
1

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

126

252

126

252

332

332

152

152

152

152

320

639

320

639

0
0
0
0
0
1
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

25

25

13

13

765

1498

765

1498

765

32

765

32

320
790
1110

320
790
1110

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

252

332

152

639

13

1498

32

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

252

332

0
0
0
0
0
0
0

152

639

0
0
0
0
0
0
0

13

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1498

32

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.740

0.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.640

0.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30

614

4
83

168
1393

78
1639
62

11
1028
259

No. of
Lanes

Lane
Volume

1
1
0
0
2
0
0
2
0
3
1
0
0
0
1
0
2
0
2
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

78

83

78

83

391

614

391

614

391

168

391

168

723

1393

723

1393

2
0
1
1
0
0
0

43

78

43

78

425

1639

425

1639

62

62

62

62

11

11

11

11

514

1028

514

1028

259

259

801
557
1358

North-South:
East-West:
SUM:

801
557
1358

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

83

614

168

1393

78

1639

62

11

1028

259

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

30

83

0
0
0
0
0
0
0

614

168

1393

0
0
0
0
0
0
0

78

1639

62

0
0
0
0
0
0
0

11

1028

259

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.988

0.988

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.888

0.888

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

816

0
591

0
0

0
1129
766

0
824
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

816

816

816

816

325

591

325

591

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

565

1129

565

1129

766

766

275

824

275

824

816
565
1381

816
565
1381

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

816

591

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1129

766

0
0
0
0
0
0
0

0
0
0
0
0
0
0

824

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.921

0.921

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.821

0.821

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

32
0
385

0
0
0

0
1099
144

475
849
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

32

32

32

32

385

385

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

622

1099

622

1099

144

144

144

144

475

475

475

475

425

849

425

849

32
1097
1129

North-South:
East-West:
SUM:

32
1097
1129

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

32

385

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1099

144

0
0
0
0
0
0
0

475

849

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.792

0.792

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.692

0.692

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

456

0
0

0
224

177
1006
0

0
1009
376

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

251

456

251

456

47

224

47

224

1
0
2
0
0
0
0

177

177

177

177

503

1006

503

1006

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

505

1009

505

1009

125

376

125

376

251
682
933

North-South:
East-West:
SUM:

251
682
933

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

456

224

0
0
0
0
0
0
0

177

1006

1009

376

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

456

224

0
0
0
0
0
0
0

177

1006

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1009

376

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.655

0.655

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.555

0.555

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
7:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

189

WESTBOUND

36

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

125

CRITICAL VOLUMES

262
122

22
181
129

879
8

785
21

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

36

36

36

36

192

262

192

262

122

122

122

122

22

22

22

22

91

181

91

181

129

129

129

129

1
0
1
0
1
0
0

189

189

189

189

879

879

879

879

1
0
1
0
1
0
0

125

125

125

125

785

785

785

785

21

21

21

21

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

214
1004
1218

North-South:
East-West:
SUM:

214
1004
1218

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

36

262

122

22

181

129

189

879

125

785

21

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

36

262

122

0
0
0
0
0
0
0

22

181

129

0
0
0
0
0
0
0

189

879

0
0
0
0
0
0
0

125

785

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

271

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

14

364
4

77
336
218

122
37

51
72

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

376

364

376

364

77

77

77

77

354

336

354

336

354

218

354

218

1
0
0
1
0
0
0

271

271

271

271

159

122

159

122

37

37

1
0
1
1
0
0
0

14

14

14

14

51

51

51

51

72

72

72

72

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

453
343
796

453
343
796

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

364

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

364

0
0
0
0
0
0
0

77

336

218

0
0
0
0
0
0
0

271

122

37

0
0
0
0
0
0
0

0
0
0
0
0
0
0

14

51

72

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.559

0.559

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.459

0.459

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

107

108

195
37

188
22

92
964
80

11
897
82

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
1
0

107

107

107

107

339

195

339

195

37

37

0
1
0
1
0
0
0

108

108

108

108

159

188

159

188

159

22

159

22

1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

92

92

92

92

348

964

348

964

80

80

80

80

11

11

11

11

490

897

490

897

82

82

82

82

447
582
1029

North-South:
East-West:
SUM:

447
582
1029

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

107

195

37

108

188

22

92

964

80

11

897

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

107

195

37

108

188

22

0
0
0
0
0
0
0

92

964

80

0
0
0
0
0
0
0

11

897

82

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.748

0.748

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.648

0.648

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
7:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

112

235

394
145

421
77

71
1313
84

80
1454
34

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

112

112

112

112

197

394

197

394

105

145

105

145

1
0
1
1
0
0
0

235

235

235

235

249

421

249

421

77

77

77

77

1
0
2
0
1
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

71

71

71

71

657

1313

657

1313

28

84

28

84

80

80

80

80

727

1454

727

1454

34

34

432
798
1230

432
798
1230

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

112

394

145

235

421

77

71

1313

84

80

1454

34

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

112

394

145

235

421

77

0
0
0
0
0
0
0

71

1313

84

0
0
0
0
0
0
0

80

1454

34

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.820

0.820

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.720

0.720

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

4
1
0
1
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
0

Project
Traffic

4
1
0
1
2
0

SB-WB--

NB-EB--

2
0

SB-WB--

Conducted by:
7:00
4
1
0
1
2
0

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:
4
1
0
1
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
2
SB-0
0
WB-1
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

66
171
110

1146
136
16

61
1521
41

58
1630
1045

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

66

66

66

66

86

171

86

171

110

110

110

110

401

1146

401

1146

152

136

152

136

16

16

16

16

61

61

61

61

521

1521

521

1521

41

41

41

41

58

58

58

58

543

1630

543

1630

1045

1045

511
604
1115

North-South:
East-West:
SUM:

511
604
1115

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

66

171

110

1146

136

16

61

1521

41

58

1630

1045

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

66

171

110

1146

136

16

0
0
0
0
0
0
0

61

1521

41

0
0
0
0
0
0
0

58

1630

1045

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.811

0.811

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.711

0.711

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
7:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

469

0
66

0
0

0
1072
389

66
893
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

268

469

268

469

268

66

268

66

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
0
0
1

536

1072

536

1072

121

389

121

389

66

66

66

66

447

893

447

893

268
602
870

268
602
870

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1072

389

0
0
0
0
0
0
0

0
0
0
0
0
0
0

66

893

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

469

66

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1072

389

66

893

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.611

0.611

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.511

0.511

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

17

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_AM.xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:
3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Sunset Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
0
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

19

66

32
26

33
8

6
931
9

47
825
21

No. of
Lanes

Lane
Volume

0
0
0
0
0
1
0
0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

19

19

19

19

77

32

77

32

26

26

66

66

66

66

107

33

107

33

470

931

470

931

47

47

47

47

423

825

423

825

21

21

21

21

143
517
660

North-South:
East-West:
SUM:

143
517
660

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

19

32

26

66

33

0
0
0
0
0
0
0

931

0
0
0
0
0
0
0

47

825

21

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

19

32

26

0
0
0
0
0
0
0

66

33

0
0
0
0
0
0
0

931

47

825

21

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.463

0.463

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.463

0.463

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

NB-EB--

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

159

156

259
76

418
108

57
606
323

289
845
150

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

159

159

159

159

259

259

259

259

76

76

1
0
1
0
1
0
0

156

156

156

156

418

418

418

418

80

108

80

108

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
1
0
1
0
0

57

57

57

57

303

606

303

606

244

323

244

323

289

289

289

289

498

845

498

845

150

150

150

150

577
592
1169

577
592
1169

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

159

259

76

156

418

108

57

606

323

289

845

150

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

159

259

76

0
0
0
0
0
0
0

156

418

108

0
0
0
0
0
0
0

57

606

323

0
0
0
0
0
0
0

0
0
0
0
0
0
0

289

845

150

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.850

0.850

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.750

0.750

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
2
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
2
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

26

94

44
76

80
88

19
830
30

183
1670
54

No. of
Lanes

1
0
0
1
0
0
0
1
0
0
1
0
0
0
1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

26

26

26

26

120

44

120

44

76

76

94

94

94

94

168

80

168

80

88

88

19

19

19

19

430

830

430

830

30

30

30

30

183

183

183

183

862

1670

862

1670

54

54

54

54

214
881
1095

North-South:
East-West:
SUM:

214
881
1095

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

26

44

76

94

80

88

19

830

30

183

1670

54

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

26

44

76

0
0
0
0
0
0
0

94

80

88

0
0
0
0
0
0
0

19

830

30

0
0
0
0
0
0
0

0
0
0
0
0
0
0

183

1670

54

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.217

1.217

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.117

1.117

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

7
43
46

20
5
42

42
1420
8

43
1679
40

No. of
Lanes

0
0
0
0
0
1
0
1
0
1
1
0
0
0
1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

96

43

96

43

46

46

20

20

20

20

67

67

42

42

42

42

42

42

714

1420

714

1420

43

43

43

43

840

1679

840

1679

40

40

40

40

116
882
998

116
882
998

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

43

46

20

42

42

1420

43

1679

40

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

46

0
0
0
0
0
0
0

20

42

0
0
0
0
0
0
0

42

1420

0
0
0
0
0
0
0

43

1679

40

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.109

1.109

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.009

1.009

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
900

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
900

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
1
0
0
2
900

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

206

169

52
382

61
6

2
1373
146

317
1720
87

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
1
1
0
0

206

206

206

206

217

52

217

52

382

382

1
0
0
0
0
1
0

118

169

118

169

118

61

118

61

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

687

1373

687

1373

43

146

43

146

317

317

317

317

904

1720

904

1720

87

87

87

87

335
1004
1339

North-South:
East-West:
SUM:

335
1004
1339

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

206

52

382

0
0
0
0
0
0
0

169

61

0
0
0
0
0
0
0

1373

146

0
0
0
0
0
0
0

317

1720

87

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

206

52

382

169

61

1373

146

317

1720

87

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.488

1.488

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.388

1.388

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1100

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1100

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
1100

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
0
0
0
2
1100

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1100

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

No. of
Lanes

77
0
617

0
0
0

58

77

77

77

21

617

21

617

0
0
0
0
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Total
Volume

Lane
Volume

1
0
2
0
0
0
0

318
2083

Added
Volume

Total
Volume

77

0
0
1
1
0
0
0

0
1405

Lane
Volume

1
0
0
0
2
0
0

732

1405

732

1405

58

58

58

58

318

318

318

318

1042

2083

1042

2083

77
1050
1127

77
1050
1127

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

77

617

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1405

58

0
0
0
0
0
0
0

318

2083

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.025

1.025

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.925

0.925

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1596

CRITICAL VOLUMES

666
301

69
286
0

6
19

2
82

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

333

666

333

666

301

301

69

69

69

69

143

286

143

286

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

839

1596

839

1596

839

82

839

82

North-South:
East-West:
SUM:

402
874
1276

North-South:
East-West:
SUM:

402
874
1276

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

666

301

69

286

10

19

1596

82

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

666

301

0
0
0
0
0
0
0

69

286

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1596

82

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.851

0.851

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.751

0.751

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
1
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

96

559

No. of
Lanes

11
68

186
1049

192
1259
34

295

Total
Volume

Lane
Volume

96

29

96

11

11

11

11

61

68

61

68

1
1
0
0
2
0
0

373

559

373

559

373

186

373

186

471

1049

471

1049

2
0
3
1
0
0
0

106

192

106

192

323

1259

323

1259

34

34

34

34

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Added
Volume

Total
Volume

29

1
0
2
0
2
0
0

15
1054

Lane
Volume

2
0
1
1
0
0
0

15

15

15

15

527

1054

527

1054

295

295

532
633
1165

532
633
1165

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

0
0
0
0
0
0
0

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

96

11

68

0
0
0
0
0
0
0

559

186

1049

0
0
0
0
0
0
0

192

1259

34

15

1054

295

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.847

0.847

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.747

0.747

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
2
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

295

0
212

0
0

0
1266
913

0
1780
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

295

295

295

295

117

212

117

212

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

633

1266

633

1266

207

913

207

913

593

1780

593

1780

295
633
928

North-South:
East-West:
SUM:

295
633
928

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

1780

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

295

212

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1266

913

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1780

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.619

0.619

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.519

0.519

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

3
0

NB-EB--

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

214

0
540

0
0

0
848
140

511
1356
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

214

214

214

214

29

540

29

540

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
1
0
0

494

848

494

848

140

140

140

140

511

511

511

511

678

1356

678

1356

214
1005
1219

214
1005
1219

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

511

1356

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

214

540

0
0
0
0
0
0
0

0
0
0
0
0
0
0

848

140

0
0
0
0
0
0
0

0
0
0
0
0
0
0

511

1356

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.855

0.855

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.755

0.755

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

10

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

746

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

236

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

0
0

0
165

967
0

0
841
516

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

0
0
0
0
0
0
0

2
0
0
0
1
0
0

410

746

410

746

165

165

1
0
2
0
0
0
0

236

236

236

236

484

967

484

967

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

421

841

421

841

106

516

106

516

410
657
1067

North-South:
East-West:
SUM:

410
657
1067

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

746

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

746

165

0
0
0
0
0
0
0

236

967

0
0
0
0
0
0
0

0
0
0
0
0
0
0

841

516

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.749

0.749

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.649

0.649

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

11

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
3:00
3
0
2
2
2
0

Fehr & Peers

Reviewed by:

NB-EB--

2
2

Date:
Project:

3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

62
434
170

40
203
193

238
1027
32

157
764
58

No. of
Lanes

1
0
1
1
0
0
0
1
0
2
1
0
0
0
1
0
1
0
1
0
0
1
0
1
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

62

62

62

62

302

434

302

434

170

170

170

170

40

40

40

40

102

203

102

203

193

193

193

193

238

238

238

238

1027

1027

1027

1027

32

32

32

32

157

157

157

157

764

764

764

764

58

58

58

58

342
1184
1526

342
1184
1526

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

62

434

170

40

203

193

238

1027

32

157

764

58

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

62

434

170

0
0
0
0
0
0
0

40

203

193

0
0
0
0
0
0
0

238

1027

32

0
0
0
0
0
0
0

157

764

58

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.071

1.071

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.971

0.971

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

12

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Montana Ave

East-West Street:

0
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

355

WESTBOUND

32

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

19

CRITICAL VOLUMES

548
17

84
419
220

166
47

64
172

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

32

32

32

32

597

548

597

548

17

17

84

84

84

84

404

419

404

419

404

220

404

220

1
0
0
1
0
0
0

355

355

355

355

213

166

213

166

47

47

1
0
1
1
0
0
0

19

19

19

19

64

64

64

64

172

172

172

172

North-South:
East-West:
SUM:

681
527
1208

North-South:
East-West:
SUM:

681
527
1208

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

32

548

17

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

32

548

17

0
0
0
0
0
0
0

84

419

220

0
0
0
0
0
0
0

355

166

47

0
0
0
0
0
0
0

0
0
0
0
0
0
0

19

64

172

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.848

0.848

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.748

0.748

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

13

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:
4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
4
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

91
277
45

89
309
24

164
948
137

65
731
112

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

91

91

91

91

413

277

413

277

45

45

89

89

89

89

256

309

256

309

256

24

256

24

164

164

164

164

362

948

362

948

137

137

137

137

65

65

65

65

422

731

422

731

112

112

112

112

502
586
1088

502
586
1088

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

91

277

45

89

309

24

164

948

137

65

731

112

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

91

277

45

0
0
0
0
0
0
0

89

309

24

0
0
0
0
0
0
0

164

948

137

0
0
0
0
0
0
0

65

731

112

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.791

0.791

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.691

0.691

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

14

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Wilshire Blvd

East-West Street:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
900

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
900

NB-EB--

0
0

SB-WB--

Conducted by:
3:00
0
0
0
0
2
900

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

144

291

649
144

713
119

105
1465
64

102
1118
77

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
2
0
1
0
0

144

144

144

144

325

649

325

649

93

144

93

144

1
0
1
1
0
0
0

291

291

291

291

416

713

416

713

119

119

119

119

1
0
2
0
1
0
0

105

105

105

105

733

1465

733

1465

64

64

1
0
2
0
1
0
0

102

102

102

102

559

1118

559

1118

77

77

North-South:
East-West:
SUM:

616
835
1451

North-South:
East-West:
SUM:

616
835
1451

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

102

1118

77

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

144

649

144

0
0
0
0
0
0
0

291

713

119

0
0
0
0
0
0
0

105

1465

64

0
0
0
0
0
0
0

0
0
0
0
0
0
0

102

1118

77

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.612

1.612

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.512

1.512

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

15

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Peak Hour:

Projection Year:

2
0

NB-EB--

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
900

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
900

NB-EB--

2
0

SB-WB--

Conducted by:
4:00
0
1
0
1
2
900

Fehr & Peers

Reviewed by:

NB-EB--

2
0

Date:
Project:

SB-WB--

0
1
0
1
2
900

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
900

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

61
292
219

913
301
16

21
1247
33

121
1369
876

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

61

61

61

61

146

292

146

292

219

219

219

219

320

913

320

913

317

301

317

301

16

16

16

16

21

21

21

21

427

1247

427

1247

33

33

33

33

121

121

121

121

456

1369

456

1369

876

876

539
548
1087

539
548
1087

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

61

292

219

913

301

16

21

1247

33

121

1369

876

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

61

292

219

0
0
0
0
0
0
0

913

301

16

21

1247

33

0
0
0
0
0
0
0
0
0
0
0
0
0
0

121

1369

876

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.208

1.208

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.108

1.108

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

16

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

NB-EB--

0
3

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

San Vicente Blvd

East-West Street:

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
3:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

0
3

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

547

0
176

0
0

0
1109
606

172
846
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

362

547

362

547

362

176

362

176

0
0
0
0
0
0
0

0
0
2
0
1
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

555

1109

555

1109

244

606

244

606

172

172

172

172

423

846

423

846

362
727
1089

North-South:
East-West:
SUM:

362
727
1089

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1109

606

0
0
0
0
0
0
0

172

846

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

547

176

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1109

606

0
0
0
0
0
0
0

0
0
0
0
0
0
0

172

846

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.764

0.764

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.664

0.664

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(3-4).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
1

Cliffwood Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

3
0
0
0
0
0

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
0
0
0
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
0
0
0
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
0
0
0
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
0
WB-0
0
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

41

28
15

24
7

3
672
8

34
774
19

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

20

20

20

20

63

28

63

28

15

15

0
0
0
0
0
1
0

41

41

41

41

72

24

72

24

1
0
1
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
1
0

340

672

340

672

34

34

34

34

397

774

397

774

19

19

19

19

104
400
504

104
400
504

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

20

28

15

41

24

0
0
0
0
0
0
0

672

0
0
0
0
0
0
0

34

774

19

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

20

28

15

0
0
0
0
0
0
0

41

24

0
0
0
0
0
0
0

672

34

774

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.354

0.354

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.354

0.354

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
2

Kenter Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

Sunset Blvd

East-West Street:

3
0

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

173
293
88

32
271
37

24
243
180

316
713
100

No. of
Lanes

1
0
1
0
1
0
0
1
0
1
0
1
0
0
1
0
2
0
1
0
0

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

173

173

173

173

293

293

293

293

88

88

32

32

32

32

271

271

271

271

25

37

25

37

24

24

24

24

122

243

122

243

94

180

94

180

1
0
1
1
0
0
0

316

316

316

316

407

713

407

713

100

100

100

100

North-South:
East-West:
SUM:

444
438
882

North-South:
East-West:
SUM:

444
438
882

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

173

293

88

32

271

37

24

243

180

316

713

100

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

173

293

88

0
0
0
0
0
0
0

32

271

37

0
0
0
0
0
0
0

24

243

180

0
0
0
0
0
0
0

0
0
0
0
0
0
0

316

713

100

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.641

0.641

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.541

0.541

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
3

Bundy Dr

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
2
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
2
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
2
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
2
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-2
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

29
82
113

38
52
31

15
440
28

164
1659
47

No. of
Lanes

1
0
0
1
0
0
0

1
0
1
1
0
0
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

29

29

29

29

195

82

195

82

113

113

38

38

38

38

83

52

83

52

31

31

1
0
0
1
0
0
0

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

15

15

15

15

234

440

234

440

28

28

28

28

164

164

164

164

853

1659

853

1659

47

47

47

47

233
868
1101

233
868
1101

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

29

82

113

38

52

31

15

440

28

164

1659

47

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

29

82

113

0
0
0
0
0
0
0

38

52

31

0
0
0
0
0
0
0

15

440

28

0
0
0
0
0
0
0

0
0
0
0
0
0
0

164

1659

47

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.376

1.376

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.276

1.276

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
4

Saltair Ave

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

3
87
53

12
1
26

30
744
4

31
1638
18

No. of
Lanes

0
0
0
0
0
1
0

Lane
Volume

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

Total
Volume

Lane
Volume

143

87

143

87

53

53

12

12

12

12

39

39

26

26

0
0
0
0
0
1
0
1
0
1
1
0
0
0

Added
Volume

Total
Volume

30

30

30

30

374

744

374

744

31

31

31

31

819

1638

819

1638

18

18

18

18

155
849
1004

North-South:
East-West:
SUM:

155
849
1004

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

87

53

12

26

30

744

31

1638

18

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

87

53

0
0
0
0
0
0
0

12

26

0
0
0
0
0
0
0

30

744

0
0
0
0
0
0
0

31

1638

18

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.255

1.255

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.155

1.155

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
5

Barrington Ave

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
0
2
800

NB-EB--

3
0

Project
Traffic

SB-WB--

0
1
0
0
2
800

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
1
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

3
0

Date:
Project:

SB-WB--

0
1
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
3
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

144

169

19
286

53
12

3
1210
99

329
1529
59

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

144

144

144

144

153

19

153

19

286

286

1
0
0
0
0
1
0

117

169

117

169

117

53

117

53

12

12

1
0
2
0
1
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
1
1
0
0

605

1210

605

1210

27

99

27

99

329

329

329

329

794

1529

794

1529

59

59

59

59

270
934
1204

270
934
1204

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

144

19

286

0
0
0
0
0
0
0

169

53

12

0
0
0
0
0
0
0

1210

99

0
0
0
0
0
0
0

329

1529

59

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

144

19

286

169

53

12

1210

99

329

1529

59

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.505

1.505

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.405

1.405

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
6

Barrington Pl

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

3
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
1000

NB-EB--

3
0

Project
Traffic

SB-WB--

0
0
0
0
2
1000

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
1000

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:

SB-WB--

0
0
0
0
2
1000

NB-EB--

No. of
Lanes

Lane
Volume

Added
Volume

2/15/2012
Archer School for Girls
0
0
3
SB-0
0
WB-0
2
1000

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

43
0
630

0
0
0

0
1235
29

315
2011
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
2
0
0

43

43

43

43

32

630

32

630

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

632

1235

632

1235

29

29

29

29

315

315

315

315

1006

2011

1006

2011

43
1006
1049

North-South:
East-West:
SUM:

43
1006
1049

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

Total
Volume

0
0
0
0
0
0
0

43

630

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1235

29

0
0
0
0
0
0
0

315

2011

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.049

1.049

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.949

0.949

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
7

N Church Ln

North-South Street:

Year of Count:

I-405 SB On/Off Ramps

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:
2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

10

WESTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

1722

812
232

72
287
0

6
19

0
61

No. of
Lanes

0
0
2
0
2
0
0
1
0
2
0
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

406

812

406

812

232

232

72

72

72

72

144

287

144

287

0
0
0
0
0
1
0

10

10

10

10

35

35

19

19

1
0
0
0
0
0
1

892

1722

892

1722

892

61

892

61

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

478
927
1405

478
927
1405

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

812

232

72

287

10

19

1722

61

0
0
0

North-South:
East-West:
SUM:

Total
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

812

232

0
0
0
0
0
0
0

72

287

0
0
0
0
0
0
0

10

19

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1722

61

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.937

0.937

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.837

0.837

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
8

Church Ln

North-South Street:

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Year of Count:

Sunset Blvd

East-West Street:

NB-EB--

0
0

4
1
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
1
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
1
3
3
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
1
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
1
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

141

667

23
92

201
1135

426
1788
39

46
1053
279

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
1
1
0
0
0

43

141

43

141

23

23

23

23

69

92

69

92

1
1
0
0
2
0
0

434

667

434

667

434

201

434

201

390

1135

390

1135

2
0
3
1
0
0
0

234

426

234

426

457

1788

457

1788

39

39

39

39

1
0
2
0
2
0
0
North-South:
East-West:
SUM:

46

46

46

46

527

1053

527

1053

279

279

503
761
1264

North-South:
East-West:
SUM:

503
761
1264

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

0
0
0
0
0
0
0

46

1053

279

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

141

23

92

0
0
0
0
0
0
0

667

201

1135

0
0
0
0
0
0
0

426

1788

39

46

1053

279

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.919

0.919

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.819

0.819

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
9

I-405 NB On/Off Ramps

North-South Street:

Year of Count:

Sunset Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

NB-EB--

0
3

2
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

2
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
2
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

2
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
2
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

249

0
195

0
0

0
1382
901

0
1540
0

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

249

249

249

249

107

195

107

195

0
0
0
0
0
0
0

0
0
2
0
2
0
0
0
0
3
0
0
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
0
0
2
0
0

691

1382

691

1382

247

901

247

901

513

1540

513

1540

249
691
940

249
691
940

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

1540

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

249

195

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1382

901

0
0
0
0
0
0
0

0
0
0
0
0
0
0

1540

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.627

0.627

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.527

0.527

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
10

North-South Street:

Veteran Ave

Year of Count:

East-West Street:

Sunset Blvd

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

3
0

3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

3
0

Project
Traffic

Ambient Growth: (%):

2012

Peak Hour:
3
0
0
0
2
0

SB-WB--

NB-EB--

3
0

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

NB-EB--

3
0

Date:
Project:

Reviewed by:
3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
3
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

438

0
834

0
0

0
800
147

612
1170
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
1
0
0

438

438

438

438

222

834

222

834

0
0
0
0
0
0
0

0
0
1
1
0
0
0
1
0
2
0
0
0
0
North-South:
East-West:
SUM:

474

800

474

800

147

147

147

147

612

612

612

612

585

1170

585

1170

438
1086
1524

North-South:
East-West:
SUM:

438
1086
1524

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

612

1170

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

438

834

0
0
0
0
0
0
0

0
0
0
0
0
0
0

800

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

612

1170

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.069

1.069

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.969

0.969

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

10

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
11

S. Bundy Dr (W)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
0

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
3
3
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

3
0
3
3
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
3
0
3
3
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

3
0
3
3
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-3
0
WB-3
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

599

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

304

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

0
0

0
211

779
0

0
939
544

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

2
0
0
0
1
0
0

329

599

329

599

211

211

1
0
2
0
0
0
0

304

304

304

304

390

779

390

779

0
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

0
0
0
0
0
0
0

470

939

470

939

215

544

215

544

329
774
1103

329
774
1103

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

599

211

0
0
0
0
0
0
0

304

779

0
0
0
0
0
0
0

0
0
0
0
0
0
0

939

544

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.774

0.774

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.674

0.674

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

11

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
12

San Vicente Blvd

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2012

Year of Count:

Montana Ave

East-West Street:

2
2

3
0
2
2
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

2
2

Project
Traffic

3
0
2
2
2
0

SB-WB--

NB-EB--

2
2

SB-WB--

Conducted by:
5:00
3
0
2
2
2
0

Fehr & Peers

NB-EB--

2
2

Date:
Project:

Reviewed by:
3
0
2
2
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
2
SB-2
2
WB-2
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

287

WESTBOUND

49

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

167

CRITICAL VOLUMES

530
187

42
189
179

918
27

797
89

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

49

49

49

49

359

530

359

530

187

187

187

187

42

42

42

42

95

189

95

189

179

179

179

179

1
0
1
0
1
0
0

287

287

287

287

918

918

918

918

27

27

27

27

1
0
1
0
1
0
0

167

167

167

167

797

797

797

797

89

89

89

89

1
0
1
1
0
0
0
1
0
2
1
0
0
0

North-South:
East-West:
SUM:

401
1085
1486

North-South:
East-West:
SUM:

401
1085
1486

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

49

530

187

42

189

179

287

918

27

167

797

89

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

49

530

187

0
0
0
0
0
0
0

42

189

179

0
0
0
0
0
0
0

287

918

27

0
0
0
0
0
0
0

167

797

89

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.043

1.043

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.943

0.943

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

12

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
13

S. Barrington Ave

North-South Street:

Year of Count:

Montana Ave

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2011

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT
Volume

NORTHBOUND
SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

156

WESTBOUND

15

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

20

410
0

54
340
207

334
64

99
298

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

15

15

15

15

425

410

425

410

54

54

54

54

328

340

328

340

328

207

328

207

1
0
0
1
0
0
0

156

156

156

156

398

334

398

334

64

64

1
0
1
1
0
0
0

20

20

20

20

99

99

99

99

298

298

298

298

479
454
933

North-South:
East-West:
SUM:

North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

479
454
933

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0

Added
Volume

Total
Volume

15

410

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

15

410

0
0
0
0
0
0
0

54

340

207

0
0
0
0
0
0
0

156

334

64

0
0
0
0
0
0
0

20

99

298

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.166

1.166

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.066

1.066

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

13

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
14

S. Barrington Ave

North-South Street:

NB-EB--

0
0

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2011

Year of Count:

San Vicente Blvd

East-West Street:

4
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
0

Project
Traffic

4
0
0
0
2
0

SB-WB--

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
4
0
0
0
2
0

Fehr & Peers

NB-EB--

0
0

Date:
Project:

Reviewed by:
4
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
4
0
0
SB-0
0
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

30
109
40

77
293
21

75
755
110

79
724
70

No. of
Lanes

0
0
0
0
0
1
0
0
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
1
1
0
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

30

30

30

30

179

109

179

109

40

40

77

77

77

77

196

293

196

293

196

21

196

21

75

75

75

75

288

755

288

755

110

110

110

110

79

79

79

79

397

724

397

724

70

70

70

70

256
472
728

North-South:
East-West:
SUM:

256
472
728

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Total
Volume

30

109

40

77

293

21

75

755

110

79

724

70

0
0
0

North-South:
East-West:
SUM:

Added
Volume

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

30

109

40

0
0
0
0
0
0
0

77

293

21

0
0
0
0
0
0
0

75

755

110

0
0
0
0
0
0
0

79

724

70

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.529

0.529

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.429

0.429

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

14

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
15

S. Barrington Ave

North-South Street:

Year of Count:

Wilshire Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

Ambient Growth: (%):

2006

Peak Hour:

Projection Year:

0
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
0
0
0
2
800

NB-EB--

0
0

Project
Traffic

SB-WB--

0
0
0
0
2
800

NB-EB--

0
0

SB-WB--

Conducted by:
5:00
0
0
0
0
2
800

Fehr & Peers

Reviewed by:

NB-EB--

0
0

Date:
Project:

SB-WB--

0
0
0
0
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
0
0
SB-0
0
WB-0
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

180

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

233

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

110

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

677
236

782
138

942
50

99
1283
45

No. of
Lanes

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

180

180

180

180

339

677

339

677

187

236

187

236

1
0
1
1
0
0
0

233

233

233

233

460

782

460

782

138

138

138

138

1
0
2
0
1
0
0

110

110

110

110

471

942

471

942

50

50

1
0
2
0
1
0
0
North-South:
East-West:
SUM:

CRITICAL VOLUMES

Lane
Volume

1
0
2
0
1
0
0

99

99

99

99

642

1283

642

1283

45

45

640
752
1392

640
752
1392

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

0
0
0
0
0
0
0

99

1283

45

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

180

677

236

0
0
0
0
0
0
0

233

782

138

0
0
0
0
0
0
0

110

942

50

99

1283

45

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.740

1.740

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.640

1.640

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):


REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

0.000

v/c after mitigation:

NO

15

Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
16

San Vicente Blvd/Federal Ave

North-South Street:

NB-EB--

Peak Hour:

Projection Year:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

Ambient Growth: (%):

2008

Year of Count:

Wilshire Blvd

East-West Street:

2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

0
1
0
1
2
800

NB-EB--

2
0

Project
Traffic

SB-WB--

0
1
0
1
2
800

NB-EB--

2
0

SB-WB--

Conducted by:
5:00
0
1
0
1
2
800

Fehr & Peers

NB-EB--

2
0

Date:
Project:

Reviewed by:

SB-WB--

0
1
0
1
2
800

NB-EB--

2/15/2012
Archer School for Girls
0
1
2
SB-0
0
WB-1
2
800

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

89
384
215

922
266
7

8
1215
17

128
1578
878

No. of
Lanes

1
0
2
0
1
0
0
2
1
0
1
0
0
0
1
0
2
1
0
0
0
1
0
3
0
1
0
0
North-South:
East-West:
SUM:

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

89

89

89

89

192

384

192

384

215

215

215

215

323

922

323

922

273

266

273

266

411

1215

411

1215

17

17

17

17

128

128

128

128

526

1578

526

1578

878

878

538
539
1077

North-South:
East-West:
SUM:

538
539
1077

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

89

384

215

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

0
0
0
0
0
0
0

89

384

215

0
0
0
0
0
0
0

922

266

0
0
0
0
0
0
0

1215

17

0
0
0
0
0
0
0

128

1578

878

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

1.346

1.346

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

1.246

1.246

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

16

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Level of Service Workheet


(Circular 212 Method)
I/S #:
17

S. Bundy Dr (E)

North-South Street:

Year of Count:

San Vicente Blvd

East-West Street:

No. of Phases
Opposed 'ing: N/S-1, E/W-2 or Both-3?
Right Turns: FREE-1, NRTOR-2 or OLA-3?

NB-EB--

0
3

Ambient Growth: (%):

2012

Peak Hour:

Projection Year:
3
0
0
0
2
0

SB-WB--

ATSAC-1 or ATSAC+ATCS-2?
Override Capacity

NB-EB--

0
3

Project
Traffic

3
0
0
0
2
0

SB-WB--

NB-EB--

0
3

SB-WB--

Conducted by:
5:00
3
0
0
0
2
0

Fehr & Peers

Reviewed by:

NB-EB--

0
3

Date:
Project:

3
0
0
0
2
0

SB-WB--

NB-EB--

2/15/2012
Archer School for Girls
3
0
0
SB-0
3
WB-0
2
0

FUTURE CONDITION W/ PROJECT

MOVEMENT

NORTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

SOUTHBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

EASTBOUND

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right

WESTBOUND

Volume

Left
Left-Through
Through
Through-Right
Right
Left-Through-Right
Left-Right
CRITICAL VOLUMES

566

0
147

0
0

0
927
449

154
939
0

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

Total
Volume

Lane
Volume

1
0
0
0
0
0
1

357

566

357

566

357

147

357

147

0
0
0
0
0
0
0

0
0
2
0
1
0
0

464

927

464

927

92

449

92

449

1
0
2
0
0
0
0

154

154

154

154

470

939

470

939

North-South:
East-West:
SUM:

357
618
975

North-South:
East-West:
SUM:

357
618
975

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

Added
Volume

Total
Volume

566

147

0
0
0
0
0
0
0

0
0
0
0
0
0
0

927

449

0
0
0
0
0
0
0

0
0
0
0
0
0
0

154

939

0
0
0

North-South:
East-West:
SUM:

No. of
Lanes

Lane
Volume

0
0
0
0
0
0
0

0
0

0
0
0
0
0
0
0

0
0
0
0
0
0
0

0
0

0
0

0
0
0
0
0
0
0

0
0
0

0
0
0

North-South:
East-West:
SUM:

VOLUME/CAPACITY (V/C) RATIO:

0.684

0.684

0.000

0.000

0.000

V/C LESS ATSAC/ATCS ADJUSTMENT:

0.584

0.584

0.000

0.000

0.000

LEVEL OF SERVICE (LOS):

REMARKS:

PROJECT IMPACT

Version: 1i Beta; 8/4/2011

Change in v/c due to project:


Significant impacted?
1/29/2014-8:24 AM

17

0.000
NO

v/c after mitigation:


Fully mitigated?

0.000
N/A

2511_CONST_CalcaDB_PM(5-6).xls

Вам также может понравиться