Federal Register / Vol. 70, No.

110 / Thursday, June 9, 2005 / Notices 33745

the documents. Go to the eSubscription If you are a landowner receiving this inch-diameter pipe and replacement of
link on the FERC Internet Web site. notice, you may be contacted by a a 4-inch ultrasonic meter with an 8-inch
pipeline company representative about ultrasonic meter.
Linda Mitry,
the acquisition of an easement to The general location of Tennessee’s
Deputy Secretary. construct, operate, and maintain the proposed facilities is shown on the map
[FR Doc. E5–2957 Filed 6–8–05; 8:45 am] proposed facilities. The pipeline attached as Appendix 1.4
BILLING CODE 6717–01–P company would seek to negotiate a
Land Requirements for Construction
mutually acceptable agreement.
However, if the project is approved by Construction of Tennessee’s proposed
DEPARTMENT OF ENERGY the Commission, that approval conveys facilities would require about 113.7
with it the right of eminent domain. acres of land for the construction right-
Federal Energy Regulatory of-way for the pipelines, additional
Therefore, if easement negotiations fail
Commission temporary workspaces, staging areas,
to produce an agreement, the pipeline
company could initiate condemnation and access roads. Of this land, 18.63
[Docket Nos. CP05–352–000 and CP05–355– proceedings in accordance with state would be permanently maintained by
000] law. Tennessee. The construction right-of-
A fact sheet prepared by the FERC way for the pipelines would typically be
National Fuel Gas Supply Corporation; 100 feet wide with 25 feet overlapping
entitled ‘‘An Interstate Natural Gas
Tennessee Gas Pipeline Company; Tennessee’s permanently maintained
Facility On My Land? What Do I Need
Notice of Intent To Prepare an existing right-of-way in uplands. In
To Know?’’ is available for viewing on
Environmental Assessment for the wetland areas it would be reduced to 75
the FERC Web site (http://
Proposed Northeast Connexion-NY/NJ feet. Following construction, a 50-foot-
www.ferc.gov). This fact sheet addresses
Project and Request for Comments on wide permanent right-of-way would be
a number of typically asked questions,
Environmental Issues maintained.
including the use of eminent domain
June 3, 2005. and how to participate in the At Compressor Stations 313 and 317
The staff of the Federal Energy Commission’s proceedings. It is and the Ramsey Meter Station, the
Regulatory Commission (FERC or available for viewing on the FERC proposed work would take place within
Commission) will prepare an Internet Web site (http://www.ferc.gov). the existing fee-owned property or
environmental assessment (EA) that will easement boundaries. These areas are
Summary of the Proposed Project included in the above acreage estimates.
discuss the environmental impacts of
Tennessee 1 proposes to: Construction access to Tennessee’s
the Northeast ConneXion-NY/NJ Project
• Construct 2 two separate 30-inch- project would be via existing and new
involving construction and operation of
diameter pipeline loops 3 (2.0 miles in access roads. Tennessee has identified
facilities by Tennessee Gas Pipeline
Bradford County and 4.0 miles in nine existing private access roads and
Company (Tennessee) and National Fuel
Susquehanna County, Pennsylvania); four new access roads necessary for the
Gas Supply Corporation (National) in • Construct a pig launcher, receiver,
Bradford, Potter, and Susquehanna construction of its project.
and mainline valve (MLV) on the
Counties, Pennsylvania, and Bergen Bradford County loop, and a pig The EA Process
County, New Jersey. Tennessee’s and launcher and MLV on the Susquehanna We 5 are preparing the EA to comply
National’s project purpose is to increase County loop; with the National Environmental Policy
capacity on Tennessee’s Line 300 by up • Add 2,370 horsepower (hp) of Act (NEPA) which requires the
to 50,000 dekatherms per day (Dth/d) compression and enhanced dehydration Commission to take into account the
and 51,500 Dth/d of incremental storage facilities at Tennessee’s existing environmental impacts that could result
deliverability to Public Service Electric Compressor Station 313 in Potter from an action whenever it considers
and Gas Company. In general, the County, Pennsylvania; the issuance of a Certificate of Public
project consists of about 6.0 miles of • Uprate an existing compressor unit Convenience and Necessity. NEPA also
pipeline, adding additional compression from 6,330 hp to 13,400 hp through requires us to discover and address
at both the 313 and 317 Compressor modifications to computer software at concerns the public may have about
Stations, upgrades to the Ramsey Meter Compressor Station 317 in Bradford proposals. This process is referred to as
Station, and enhancement of County, Pennsylvania; and ‘‘scoping’’. The main goal of the scoping
dehydration facilities at Compressor • Upgrade the existing Ramsey Meter process is to focus the analysis in the
Station 313. Station in Bergen County, New Jersey. EA on the important environmental
This notice announces the opening of The upgrade would consist of replacing issues. By this Notice of Intent, the
the scoping period that will be used to 250 feet of 8-inch-diameter pipe with 16 Commission staff requests public
gather environmental input from the comments on the scope of the issues to
public and interested agencies on the 1 National’s interest in the project is in the
address in the EA. All comments
project. Please note that the scoping modification of the dehydration tower at
Compressor Station 313 in Potter County, received are considered during the
period will close on July 5, 2005. Pennsylvania. This project, (Docket No. CP05–352–
This notice is being sent to potentially 000), was filed with the Commission under section 4 The appendices referenced in this notice are not
affected landowners; federal, state, and 7 of the Natural Gas Act and Part 157 of the being printed in the Federal Register. Copies of all
local government agencies; elected Commission’s regulations. Any reference to appendices, other than appendix 1 (maps), are
Tennessee from this point forth will refer to the available on the Commission’s website at the
officials; environmental and public overall project which includes National’s interests. ‘‘eLibrary’’ link or from the Commission’s Public
interest groups; Native American Tribes; 2 Tennessee’s application was filed with the Reference Room, 888 First Street, NE., Washington,
other interested parties; local libraries Commission under section 7 of the Natural Gas Act DC 20426, or call (202) 502–8371. For instructions
and newspapers. State and local and Part 157 of the Commission’s regulations. on connecting to eLibrary refer to the last page of
government representatives are asked to 3 A loop is a segment of pipeline installed this notice. Copies of the appendices were sent to
adjacent to an existing pipeline and which connects all those receiving this notice in the mail.
notify their constituents of this planned to the existing pipeline at both ends of the loop. 5 ‘‘We’’, ‘‘us’’, and ‘‘our’’, refer to the
project and encourage them to comment The loop allows more gas to be moved through the environmental staff of the Office of Energy Projects
on their areas of concern. system. (OEP).

VerDate jul<14>2003 12:52 Jun 08, 2005 Jkt 205001 PO 00000 Frm 00016 Fmt 4703 Sfmt 4703 E:\FR\FM\09JNN1.SGM 09JNN1
33746 Federal Register / Vol. 70, No. 110 / Thursday, June 9, 2005 / Notices

preparation of the EA. By this notice, we comments are received in time and at 1–866–208–FERC or on the FERC
are also asking Federal, State, and local properly recorded: Internet Web site (http://www.ferc.gov)
agencies with jurisdiction and/or • Send an original and two copies of using the eLibrary link. Click on the
special expertise with respect to your letter to: Magalie R. Salas, eLibrary link, click on ‘‘General Search’’
environmental issues to formally Secretary, Federal Energy Regulatory and enter the docket number excluding
cooperate with us in the preparation of Commission, 888 First St., N.E., Room the last three digits in the Docket
the EA. Agencies that would like to 1A, Washington, DC 20426; Number field. Be sure you have selected
request cooperating status should follow • Label one copy of the comments for an appropriate date range. For
the instructions for filing comments the attention of Gas Branch 1. assistance, please contact FERC Online
below. • Reference Docket Nos. CP05–355– Support at FERC
Our independent analysis of the 000, et al. OnlineSupport@ferc.gov or toll free at
issues will be in the EA. Depending on • Mail your comments so that they 1–866–208–3676, or for TTY, contact
the comments received during the will be received in Washington, DC on (202) 502–8659. The eLibrary link also
scoping process, the EA may be or before July 6, 2005. provides access to the texts of formal
published and mailed to Federal, State, Please note that the Commission documents issued by the Commission,
and local agencies, public interest strongly encourages electronic filing of such as orders, notices, and
groups, interested individuals, affected any comments or interventions or rulemakings.
landowners, newspapers, libraries, and protests to this proceeding. See 18 CFR In addition, the Commission now
the Commission’s official service list for 385.2001(a)(1)(iii) and the instructions offers a free service called eSubscription
this proceeding. A comment period will on the Commission’s Web site at which allows you to keep track of all
be allotted for review if the EA is http://www.ferc.gov under the ‘‘e- formal issuances and submittals in
published. We will consider all Filing’’ link and the link to the User’s specific dockets. This can reduce the
comments on the EA before we make Guide. Before you can file comments amount of time you spend researching
our recommendations to the you will need to create an account proceedings by automatically providing
Commission. which can be created on-line. you with notification of these filings,
document summaries and direct links to
Currently Identified Environmental Becoming an Intervenor the documents. Go to http://
Issues In addition to involvement in the EA www.ferc.gov/esubscribenow.htm.
In the EA, we will discuss impacts scoping process, you may want to Linda Mitry,
that could occur as a result of the become an official party to the Deputy Secretary.
construction and operation of the proceeding known as an ‘‘intervenor’’.
[FR Doc. E5–2959 Filed 6–8–05; 8:45 am]
project. We will also evaluate possible Intervenors play a more formal role in
BILLING CODE 6717–01–P
alternatives to the proposed project or the process. Among other things,
portions of the project. intervenors have the right to receive
We have already identified some copies of case-related Commission
issues that we think deserve attention documents and filings by other ENVIRONMENTAL PROTECTION
based on a preliminary review of the intervenors. Likewise, each intervenor AGENCY
proposed facilities and the must send one electronic copy (using [OW–2005–0006, FRL–7922–9]
environmental information provided by the Commission’s e-Filing system) or 14
Tennessee. This preliminary list of paper copies of its filings to the Agency Information Collection
issues may be changed based on your Secretary of the Commission and must Activities: Proposed Collection;
comments and our analysis. send a copy of its filings to all other Comment Request; Willingness To Pay
Project-related impact on: parties on the Commission’s service list Survey for Section 316(b) Phase III
• Pipeline crossings of four perennial for this proceeding. If you want to Cooling Water Intake Structures:
waterbodies, three of which are cold become an intervenor, you must file a Instrument, Pre-Test, and
water fisheries in Susquehanna County, motion to intervene according to Rule Implementation, EPA ICR Number
Pennsylvania; 214 of the Commission’s Rules of 2155.02
• Eleven wetland crossings; Practice and Procedure (18 CFR
• Noise and air quality; AGENCY: Environmental Protection
385.214, see Appendix 2).6 Only Agency.
• Nearby residences; and intervenors have the right to seek
• Groundwater and wells due to rehearing of the Commission’s decision. ACTION: Notice.
blasting in areas of shallow bedrock. Affected landowners and parties with SUMMARY: In compliance with the
Public Participation environmental concerns may be granted Paperwork Reduction Act (44 U.S.C.
You can make a difference by intervenor status upon showing good 3501 et seq.), this document announces
providing us with your specific cause by stating that they have a clear that EPA is planning to submit a
comments or concerns about the project. and direct interest in this proceeding proposed Information Collection
By becoming a commentor, your which would not be adequately Request (ICR) to the Office of
concerns will be addressed in the EA represented by any other parties. You do Management and Budget (OMB). This is
and considered by the Commission. You not need intervenor status to have your a request for a new collection. Before
should focus on the potential environmental comments considered. submitting the ICR to OMB for review
environmental effects of the proposal, Additional Information and approval, EPA is soliciting
alternatives to the proposal (including comments on specific aspects of the
Additional information about the proposed information collection as
alternative locations and routes), and
project is available from the described below.
measures to avoid or lessen
Commission’s Office of External Affairs, DATES: Comments must be submitted on
environmental impact. The more
specific your comments, the more useful 6 Interventions may also be filed electronically via
or before August 8, 2005.
they will be. Please carefully follow the Internet in lieu of paper. See the previous ADDRESSES: Submit your comments,
these instructions to ensure that your discussion on filing comments electronically. referencing docket ID number OW–