33470 Federal Register / Vol. 70, No.

109 / Wednesday, June 8, 2005 / Notices

in Status and a revised market-based Docket Numbers: ER05–936–001. Washington, DC. There is an
rate tariffs, pursuant to Order 652. Applicants: Black Hills Power, Inc. eSubscription link on the Web site that
Filed Date: 05/27/2005. Description: Black Hills Power, Inc enables subscribers to receive e-mail
Accession Number: 20050602–0060. submits a replacement tariff sheet for notification when a document is added
Comment Date: 5 p.m. Eastern Time the canceled Common Use Agreement to a subscribed dockets(s). For
on Friday, June 17, 2005. in conformance with Order 614 et al. assistance with any FERC Online
Docket Numbers: ER05–654–002. under ER05–936. service, please e-mail
Applicants: Phoenix Energy Trading, Filed Date: 05/27/2005. FERCOnlinSupport@ferc.gov. or call
LLC. Accession Number: 20050601–0015. (866) 208–3676 (toll free). For TTY, call
Description: Phonenx Energy Trading, Comment Date: 5 p.m. Eastern Time (202) 502–8659.
LLC submits amended Phoenix Rate on Friday, June 17, 2005.
Linda Mitry,
Schedule FERC 1 under ER05–654. Docket Numbers: ER05–990–001.
Filed Date: 05/27/2005. Deputy Secretary.
Applicants: Southwest Power Pool.
Accession Number: 20050601–0012. [FR Doc. E5–2930 Filed 6–7–05; 8:45 am]
Description: Southwest Power Pool
Comment Date: 5 p.m. Eastern Time submits a revision to their 5/19/05 filing BILLING CODE 6717–01–P
on Friday, June 17, 2005. to revise its Open Access Transmission
Docket Numbers: ER05–692–001. Tariff to implement a rate change for
Applicants: PJM Interconnection DEPARTMENT OF ENERGY
Westar Energy, Inc.
L.L.C. Filed Date: 05/27/2005. Federal Energy Regulatory
Description: PJM Interconnection LLC Accession Number: 20050601–0011. Commission
submits revisions to Schedule 2 of the Any person desiring to intervene or to
PJM Open Access Transmission Tariff to protest in any of the above proceedings [Docket No. CP05–8–000]
revise the effective date of Buckeye must file in accordance with Rules 211
Power Inc.’s revenue requirement for Starks Gas Storage L.L.C.; Notice of
and 214 of the Commission’s Rules of
providing cost-based Reactive Support Availability of the Environmental
Practice and Procedure (18 CFR 385.211
and Voltage Control from Generation Assessment for the Proposed Starks
and 385.214) on or before 5 p.m. Eastern
Sources Service. Gas Storage Project
time on the specified comment date. It
Filed Date: 05/27/2005. is not necessary to separately intervene June 2, 2005.
Accession Number: 20050601–0010. again in a subdocket related to a The staff of the Federal Energy
Comment Date: 5 p.m. Eastern Time compliance filing if you have previously Regulatory Commission (FERC or
on Friday, June 17, 2005. intervened in the same docket. Protests Commission) has prepared an
Docket Numbers: ER05–766–001. will be considered by the Commission environmental assessment (EA) on the
Applicants: Soyland Power in determining the appropriate action to natural gas pipeline facilities proposed
Cooperative, Inc. be taken, but will not serve to make by Starks Gas Storage L.L.C. (Starks Gas
Description: Soyland Power protestants parties to the proceeding. Storage) in the above-referenced docket
Cooperative, Inc. submits Revised Rate Anyone filing a motion to intervene or number.
Schedules in compliance with FERC’s protest must serve a copy of that The EA was prepared to satisfy the
5/6/05 letter order. document on the Applicant. In reference requirements of the National
Filed Date: 05/27/2005. to filings initiating a new proceeding, Environmental Policy Act. The staff
Accession Number: 20050601–0266. interventions or protests submitted on concludes that approval of the proposed
Comment Date: 5 p.m. Eastern Time or before the comment deadline need project, with appropriate mitigating
on Friday, June 17, 2005. not be served on persons other and the measures, would not constitute a major
Docket Numbers: ER05–833–001. Applicant. Federal action significantly affecting the
Applicants: American Transmission The Commission encourages quality of the human environment.
Company LLC. electronic submission of protests and The EA assesses the potential
Description: American Transmission interventions in lieu of paper, using the environmental effects of the
Co, LLC submits a replacement page to FERC Online links at http:// construction and operation of the
the Table of Contents of the Amended www.ferc.gov. To facilitate electronic proposed Starks Gas Storage Project in
and Restated Generation Transmission service, persons with Internet access Calcasieu and Beauregard Parishes,
Interconnection Agreement that was who will eFile a document and/or be Louisiana. The Starks Gas Storage
filed on 4/13/05 under ER05–833. listed as a contact for an intervenor Project would initially utilize Starks No.
Filed Date: 05/27/2005. must create and validate an 1 cavern to store approximately 13.3
Accession Number: 20050601–0008. eRegistration account using the billion cubic feet (Bcf) of natural gas,
Comment Date: 5 p.m. Eastern Time eRegistration link. Select the eFiling comprised of approximately 8.8 Bcf of
on Friday, June 17, 2005. link to log on and submit the working or top gas and approximately
Docket Numbers: ER05–834–001. intervention or protests. 4.5 Bcf of base or cushion gas. Facilities
Applicants: American Transmission Persons unable to file electronically would be designed to allow cycling of
Company LLC. should submit an original and 14 copies the entire storage volume 5 to 6 times
Description: American Transmission of the intervention or protest to the per year with injections and
Co, LLC submits two replacement pages Federal Energy Regulatory Commission, withdrawals of approximately 400
to the Table of Contents of the Amended 888 First St., NE., Washington, DC million cubic feet per day (MMcfd).
& Restated Generation Transmission 20426. Starks No. 2 cavern would be available
Interconnection Agreement that was The filings in the above proceedings for similar conversion to gas storage
filed on 4/14/05 under ER05–834. are accessible in the Commission’s approximately 18 months later, adding
Filed Date: 05/27/2005. eLibrary system by clicking on the an incremental working gas volume of
Accession Number: 20050601–0007. appropriate link in the above list. They approximately 10.4 Bcf and
Comment Date: 5 p.m. Eastern Time are also available for review in the approximately 5.3 Bcf of base gas and
on Friday, June 17, 2005. Commission’s Public Reference Room in the overall project injection and

VerDate jul<14>2003 18:08 Jun 07, 2005 Jkt 205001 PO 00000 Frm 00030 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1
Federal Register / Vol. 70, No. 109 / Wednesday, June 8, 2005 / Notices 33471

withdrawal rates would double. The integral emission control catalysts, and • Reference Docket No. CP05–8–000;
total storage volume of Starks No. 2 related piping, valves, controls, and and
cavern would be approximately 15.6 buildings; two triethylene glycol (TEG) • Mail your comments so that they
Bcf. dehydration units and appurtenant, will be received in Washington, DC on
In Docket No. CP05–8–000, Starks Gas auxiliary facilities with one vapor or before July 5, 2005.
Storage proposes to construct, operate, recovery/condensing unit and one Please note that we are continuing to
and maintain the following facilities. thermal oxidizer; experience delays in mail deliveries
The proposed natural gas and brine • Three new interconnect valve from the U.S. Postal Service. As a result,
disposal pipelines connected with the stations connecting to existing natural we will include all comments that we
future natural gas storage caverns and gas pipelines at the Tennessee Gas (MP receive within a reasonable time frame
debrining operations of the existing 1.80), Transco (MP 29.80), and Texas in our environmental analysis of this
brine wells west of the proposed Starks Eastern pipelines (MP 33.77) on project. However, the Commission
Compressor Station are designated as Segments 2 and 3; strongly encourages electronic filing of
mileposts (MP) 0.00—0.68 on Segment • Three temporary natural gas fueled any comments or interventions or
1. The proposed natural gas and brine reciprocating engine driven protests to this proceeding. See 18 CFR
disposal pipelines east of the proposed reciprocating compressor units each 385.2001(a)(1)(iii) and the instructions
Starks Compressor Station are rated at 1,150 BHP, with three exhaust on the Commission’s Web site at
designated as MPs 0.00–33.77 on noise silencers with integral emission http://www.ferc.gov under the ‘‘e-
Segments 2 and 3. The proposed control catalysts for dewatering existing Filing’’ link and the link to the User’s
facilities include: brine extraction well (PPG–9), located at Guide. Before you can file comments
• Conversion of two existing brine the Starks Compressor Station; you will need to create a free account
extraction wells (formerly called PPG– • Three new natural gas fueled which can be created by clicking on
10 and PPG–9) to natural gas storage reciprocating engine driven centrifugal ‘‘Sign-up.’’
caverns (Starks No. 1 at MP 0.68 and multi-stage pumps rated at 860 BHP, Comments will be considered by the
Starks No. 2 at MP 0.47, respectively, on with three exhaust noise silencers with Commission but will not serve to make
Segment 1) with a combined maximum integral emission control catalysts for the commentor a party to the
capacity to store approximately 28.9 Bcf injecting dewatered brine from the proceeding. Any person seeking to
of natural gas, comprised of caverns into two disposal wells, located become a party to the proceeding must
approximately 19.2 Bcf of working at the Starks Compressor Station; file a motion to intervene pursuant to
capacity and approximately 9.7 Bcf of • Two new brine injection (SWD) Rule 214 of the Commission’s Rules of
cushion gas, with withdrawal rates of wells, MP 1.21 on Segment 2, located on Practice and Procedures (18 CFR
800 million cubic feet per day (MMcfd) a two-acre tract to dispose of any 385.214).1 Only intervenors have the
and peak injection rates of 750 MMcfd; surplus brine removed from the two right to see rehearing of the
• About 0.88 mile of two new 16-inch caverns as they are converted to gas Commission’s decision.
diameter natural gas pipelines and two storage service; and Affected landowners and parties with
new collocated 10-inch diameter brine • One temporary skid mounted brine environmental concerns may be granted
disposal pipelines associated with the disposal meter system, first located at intervenor status upon showing good
interconnects on the Starks salt dome Starks No. 1 (MP 0.68) and then at cause by stating that they have a clear
west of the Starks Compressor Station Starks No. 2 (MP 0.47) on Segment 1. and direct interest in this proceeding
from MP 0.00 to 0.68 (identified as The EA has been placed in the public which would not be adequately
Segment 1); files of the FERC. A limited number of represented by any other parties. You do
• About 1.80 miles of new 30-inch copies of the EA are available for not need intervenor status to have your
diameter natural gas pipeline from the distribution and public inspection at: comments considered.
Starks Compressor Station to the Federal Energy Regulatory Commission, Additional information about the
Tennessee Gas Pipeline Company Public Reference and Files Maintenance project is available from the
(Tennessee Gas) interconnect from MP Branch, 888 First Street, NE., Room 2A, Commission’s Office of External Affairs,
0.0 to MP 1.8 (identified as Segment 2) Washington, DC 20426. (202) 502–8371. at 1–866–208–FERC or on the FERC
and about 1.2 miles of new collocated Copies of the EA have been mailed to Internet Web site (http://www.ferc.gov)
10-inch diameter brine disposal line Federal, state and local agencies, public using the eLibrary link. Click on the
from the Starks Compressor Station to interest groups, interested individuals, eLibrary link, click on ‘‘General Search’’
the salt water disposal (SWD) injection newspapers, and parties to this and enter the docket number excluding
wells from MP 0.00 to 1.21 (identified proceeding. the last three digits in the Docket
as Segment 2a); Any person wishing to comment on Number field. Be sure you have selected
• About 31.97 miles (a continuation) the EA may do so. To ensure an appropriate date range. For
of the new 30-inch diameter natural gas consideration prior to a Commission assistance, please contact FERC Online
pipeline from the Tennessee Gas decision on the proposal, it is important Support at FercOnlineSupport@ferc.gov
interconnect terminating at the Texas that we receive your comments before or toll free at 1–866–208–3676, or for
Eastern Transmission LP (Texas Eastern) the date specified below. Please TTY, contact (202) 502–8659. The
interconnect in Beauregard Parish from carefully follow these instructions to eLibrary link also provides access to the
MP 1.80 to 33.77 (identified as Segment ensure that your comments are received texts of formal documents issued by the
3); in time and properly recorded: Commission, such as orders, notices,
• A new compressor station with • Send an original and two copies of and rulemakings.
dehydration facilities (Starks your comments to: Secretary, Federal In addition, the Commission now
Compressor Station) at MP 0.00, Energy Regulatory Commission, 888 offers a free service called eSubscription
including seven natural gas fueled First St., NE., Room 1A, Washington, DC which allows you to keep track of all
reciprocating engine driven 20426.
reciprocating compressor units each • Label one copy of the comments for 1 Interventions may also be filed electronically via
rated at 4,735 brake horsepower (BHP), the attention of the Gas Branch 2, the Internet in lieu of paper. See the previous
with seven exhaust noise silencers with PJ11.2. discussion on filing comments electronically.

VerDate jul<14>2003 18:08 Jun 07, 2005 Jkt 205001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1
33472 Federal Register / Vol. 70, No. 109 / Wednesday, June 8, 2005 / Notices

formal issuances and submittals in relating to the merits of an issue that applicant and the project number of the
specific dockets. This can reduce the may affect the responsibilities of a application to which the filing
amount of time you spend researching particular resource agency, they must responds; (3) furnish the name, address,
proceedings by automatically providing also serve a copy of the document on and telephone number of the person
you with notification of these filings, that resource agency. protesting or intervening; and (4)
document summaries and direct links to Motions to intervene and protests may otherwise comply with the requirements
the documents. Go to http:// be filed electronically via the Internet in of 18 CFR 385.2001 through 385.2005.
www.ferc.gov/esubscribenow.htm. lieu of paper. The Commission strongly Agencies may obtain copies of the
encourages electronic filings. See CFR application directly from the applicant.
Linda Mitry, 385.200 (a)(1)(iii) and the instructions A copy of any protest or motion to
Deputy Secretary. on the Commission’s Web site (http:// intervene must be served upon each
[FR Doc. E5–2921 Filed 6–7–05; 8:45 am] www.ferc.gov) under the ‘‘eFiling’’ link. representative of the applicant specified
BILLING CODE 6717–01–P k. This application has been accepted, in the particular application.
but is not ready for environmental o. Procedural schedule and final
analysis at this time. amendments: The application will be
DEPARTMENT OF ENERGY l. The Holyoke No. 4 Canal Hydro processed according to the following
Project consists of the following existing Hydro Licensing Schedule. Revisions to
Federal Energy Regulatory facilities: (a) Two 7-foot-diameter, 76- the schedule will be made as
Commission foot-long penstocks drawing water from appropriate. The Commission staff
[Project No. 7758–004] the first level canal of the Holyoke Canal proposes to issue one environmental
System; (b) a powerhouse with two 375 assessment rather than issue a draft and
City of Holyoke Gas & Electric; Notice kW generating units with a total final EA. Comments, terms and
of Application Accepted for Filing and installed capacity of 750 kW; (c) two 13- conditions, recommendations,
Soliciting Motions To Intervene and foot-wide, 300-foot-long tailraces prescriptions, and reply comments, if
Protest discharging into the second level canal; any, will be addressed in the EA. Staff
(d) a 25-foot-long, 4.8-kV transmission intends to give at least 30 days for
June 2, 2005. line; and (e) appurtenant facilities. One
Take notice that the following entities to comment on the EA before
of the generating units was destroyed in final action is taken on the license
hydroelectric application has been filed an October 2004 fire; unit rehabilitation
with the Commission and is available application.
has yet to be determined.
for public inspection. m. A copy of the application is Issue Scoping Document for Comments:
a. Type of Application: Subsequent available for review at the Commission June 2005.
License. Notice application ready for
in the Public Reference Room or may be
b. Project No.: P–7758–004. environmental analysis: September
viewed on the Commission’s Web site at
c. Date Filed: February 25, 2005. 2005.
http://www.ferc.gov using the Notice of the availability of the EA:
d. Applicant: City of Holyoke Gas & ‘‘eLibrary’’ link. Enter the docket
Electric Department. March 2006.
number excluding the last three digits in Ready for Commission’s decision on the
e. Name of Project: Holyoke Canal No. the docket number field to access the Application: April 2006.
4 Project. document. For assistance, contact FERC Final amendments to the application
f. Location: Adjacent to the Online Support at must be filed with the Commission no
Connecticut River in Hampden County, FERCOnlineSupport@ferc.gov or toll- later than 30 days from the issuance
Massachusetts. The project does not free at 1–866–208–3676, or for TTY, date of the notice of ready for
occupy any federal lands. (202) 502–8659. A copy is also available environmental analysis.
g. Filed Pursuant to: Federal Power for inspection and reproduction at the
Act 16 U.S.C. 791(a)–825(r). address in item h. above. Linda Mitry,
h. Applicant Contact: Mr. Paul You may also register online at Deputy Secretary.
Ducheney, Superintendent-Hydro, http://www.ferc.gov/esubscribenow.htm [FR Doc. E5–2924 Filed 6–7–05; 8:45 am]
Holyoke Gas & Electric Department, One to be notified via email of new filings BILLING CODE 6717–01–P
Canal Street, Holyoke, MA 01040, (413) and issuances related to this or other
536–9340 or ducheney@hged.com. pending projects. For assistance, contact
i. FERC Contact: Jack Hannula, FERC Online Support. ENVIRONMENTAL PROTECTION
john.hannula@ferc.gov, or call (202) n. Anyone may submit a protest or a AGENCY
502–8917. motion to intervene in accordance with
j. Deadline for filing motions to the requirements of Rules of Practice [FRL–7922–3]
intervene and protest: 60 days from the and Procedure, 18 CFR 385.210,
issuance date of this notice. 385.211, and 385.214. In determining Agency Information Collection
All documents (original and eight the appropriate action to take, the Activities: Proposed Collection;
copies) should be filed with: Magalie R. Commission will consider all protests Comment Request; Regulatory Pilot
Salas, Secretary, Federal Energy filed, but only those who file a motion Projects (Project XL); EPA ICR Number
Regulatory Commission, 888 First to intervene in accordance with the 1755.06, OMB Control Number 2010–
Street, NE., Washington, DC 20426. Commission’s Rules may become a 0026
The Commissions Rules of Practice party to the proceeding. Any protests or AGENCY: Environmental Protection
and Procedure require all intervenors motions to intervene must be received Agency (EPA).
filing documents with the Commission on or before the specified deadline date ACTION: Notice.
to serve a copy of that document on for the particular application.
each person whose name appears on the All filings must (1) bear in all capital SUMMARY: In compliance with the
official service list for the project. letters the title ‘‘PROTEST’’ or Paperwork Reduction Act (44 U.S.C.
Further, if an intervenor files comments ‘‘MOTION TO INTERVENE’’; (2) set 3501 et seq.), this document announces
or documents with the Commission forth in the heading the name of the that EPA is planning to submit for

VerDate jul<14>2003 18:08 Jun 07, 2005 Jkt 205001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\08JNN1.SGM 08JNN1