AP2243A
Lecturers Name
Order
Typical Order
General Purpose
To inform
Specific Purpose
Central Idea
Introduction
I.
II.
III.
IV.
Have you watch a video about a construction in Dongting Lake which is located at Hunan Province,
China where they built 30-story building in 15 days.
A. The entire component of building such as floor and wall has been made offsite and become a
material, which is precast.
B. Then the material is sent onsite to install on the building.
The method that they use is Industrialised Building System (IBS)
A. According to Izatul (2014), IBS can be described as the construction technique that involved
the using of prefabricated construction components that are manufactured in a controlled
environment, transported, positioned and assembled with minimal additional site.
B. Izatul (2014) also states that IBS project can be assumed as multi-complex task and project.
My Research Methodology lecturer, Dr. Norizan Ahmad always said that to achieve project success,
it must include cost, time and quality.
A. Our construction industry, which still uses conventional construction, is hard to achieve
project success as sometimes the project sum is over budget, the construction is not
complete on time or the material quality is not good enough.
But by using IBS, we actually can achieve the project success.
(Transition: Now let me explain the advantage of IBS in terms of project success)
Body
I.
Conclusion
I.
II.
III.
IV.
IBS can provide the best solution to be used to improve construction project in Malaysia.
Using IBS not only can get project success, also better product success which is functionality and
sustainability which is for clients requirement.
CIDB should play their roles on how to promote IBS construction method to the industry.
By doing this, many construction people will get the knowledge about the advantages of IBS
comparable to the conventional project and the effects of using IBS to the building in a long term
period.
Bibliography
Journal
1. Izatul, J., Faridah, I., Abdul Rashid, A., Nur Mardhiyah, A. (2014) Industrialized Building System
Projects: A Survey of Construction Project Managers Competencies in Malaysia. [Online] Australian
Journal of Basic and Applied Sciences, 8(2) February 2014, Pages: 294-300. Available from:
http://www.ajbasweb.com [Accessed: 4th April 2015]
2. Mardhiah, Z., (2009) Effectiveness of Industrialised Building System (IBS) Implementation for
Malaysian Construction Industry. [Online] UTHM Institutional Repository, ID Code: 1700. Available
from: http://eprints.uthm.edu.my/1700/ [Accessed: 5th April 2015]