25038 Federal Register / Vol. 70, No.

91 / Thursday, May 12, 2005 / Notices

document is added to a subscribed 4. Virginia Electric and Power effective date July 1, 2005 and January
docket(s). For assistance with any FERC Company 1, 2006, respectively.
Online service, please e-mail [Docket No. ER04–1021–001]
PSI states that the copies of the filing
FERCOnlineSupport@ferc.gov, or call were served upon the affected
Take notice that on April 28, 2005,
(866) 208–3676 (toll free). For TTY, call customers and the Indiana Utility
Virginia Electric and Power Company,
(202) 502–8659. Regulatory Commission.
(Dominion Virginia Power) tendered for Comment Date: 5 p.m. Eastern Time
Magalie R. Salas, filing Eleventh Revised Service on May 10, 2005.
Secretary. Agreement Nos. 253 and 49 under
[FR Doc. E5–2364 Filed 5–11–05; 8:45 am] Virginia Electric and Power Company 7. Southwest Power Pool, Inc.
BILLING CODE 6717–01–P FERC Electric Tariff, Second Revised [Docket No. ER05–666–001]
Volume No. 5, unexecuted agreements
Take notice that on April 28, 2005,
with Sempra Trading Corp. The April
Southwest Power Pool, Inc. (SPP)
DEPARTMENT OF ENERGY 28, 2005 filing amends Dominion
submitted a response to the
Virginia Power’s filing submitted on
Federal Energy Regulatory Commission’s April 21, 2005 deficiency
July 15, 2004 in Docket No. ER04–1021–
Commission letter regarding SPP’s March 1, 2005
000. Dominion Virginia Power requests
filing in Docket No. ER05–666–000. SPP
an effective date of November 1, 2004.
Dominion Virginia Power states that requests severance of the liability
[Docket Nos. ER99–2156–003, et al.]
copies of this filing were served upon components from its March 1, 2005
Cordova Energy Company, LLC, et al.; Sempra Energy Trading Corp. filing and approval of the other
Electric Rate and Corporate Filings Comment Date: 5 p.m. Eastern Time revisions to its regional Open Access
on May 19, 2005. Transmission Tariff. SPP requests an
May 5, 2006. effective date of May 1, 2005.
The following filings have been made 5. Virginia Electric and Power Comment Date: 5 p.m. Eastern Time
with the Commission. The filings are Company on May 19, 2005.
listed in ascending order within each [Docket No. ER04–1023–001] 8. Carolina Power & Light Company,
docket classification. Take notice that on April 28, 2005, Florida Power Corporation
1. Cordova Energy Company LLC Virginia Electric and Power Company,
[Docket No. ER05–882–000]
(Dominion Virginia Power) tendered for
[Docket No. ER99–2156–003] Take notice that on April 29, 2005,
filing Second Revised Service
Take notice that on April 28, 2005, Agreement Nos. 379 and 380 under Carolina Power & Light Company
Cordova Energy Company LLC Virginia Electric and Power Company (CP&L) and Florida Power Corporation
submitted an updated market power FERC Electric Tariff, Second Revised (FPC) submitted revised tariff sheets
analysis. Volume No. 5, service agreements with replacing the existing Transmission
Comment Date: 5 p.m. Eastern Time Ingenco Wholesale Power LLC. The Loading Relief (TLR) procedures in
on May 19, 2005. April 28, 2005 filing amends Dominion CP&L’s open-access transmission tariff,
Virginia Power’s filing submitted on FERC Electric Tariff, Third Revised Vol.
2. Walton Electric Membership
July 15, 2004 in Docket No. ER04–1023– No. 3 and in FPC’s open-access
Corporation
000. Dominion Virginia Power requests transmission tariff, FERC Electric Tariff,
[Docket No. ER02–2001–000, ER01–1400– an effective date of November 1, 2004. Second Revised Vol. No. 6 with the
000] Dominion Virginia Power states that revised TLR procedures proposed by the
Take notice that on July 6, 2004, copies of this filing were served upon North American Electric Reliability
Walton Electric Membership Ingenco Wholesale Power LLC. Counsel (NERC), and accepted by the
Corporation filed a Request for Waiver Comment Date: 5 p.m. Eastern Time Commission in North American Electric
of Order No. 2001 Electric Quarterly on May 19, 2005. Reliability Council, 110 FERC ¶ 61,388
Reports Requirements. (2005). CP&L states requests an effective
Comment Date: 5 p.m. Eastern Time 6. PSI Energy, Inc. date of April 1, 2005.
on May 26, 2005. [Docket No. ER05–225–001] CP&L states that copies of the filing
Take notice that on April 29, 2005, were served upon the utilities’
3. Pacific Gas & Electric Company
PSI Energy, Inc. (PIS) submitted an transmission customers and on the
[Docket No. ER03–198–002] errata to its November 17, 2004 North Carolina Utilities Commission,
Take notice that on April 28, 2005, submittal in Docket No. ER05–225–000 the Public Service Commission of South
Pacific Gas & Electric Company (PG&E) regarding a Stipulation and Agreement Carolina, and the Florida Public Service
submitted for filing a notification of dated November 8, 2004 for an Commission.
change in status due to PG&E’s recent uncontested three-step increase in PSI’s Comment Date: 5 p.m. Eastern Time
execution (and receipt of regulatory wholesale electric rates with Indiana on May 20, 2005.
approval) of energy procurement Municipal Power Agency and other 9. Tampa Electric Company
contracts with various counterparties. customers receiving wholesale electric
PG&E states that this transmittal will service from PSI. PSI states that the [Docket No. ER05–884–000]
ensure compliance with the purpose of the errata filing is to correct Take notice that on April 29, 2005,
Commission’s recently finalized the header information on certain tariff Tampa Electric Company (Tampa
reporting requirement, issued on sheets included in the November 17, Electric) tendered for filing revised rate
February 10, 2005, Reporting 2004, filing in accordance with Order schedule sheets containing updated
Requirement for Changes in Status for No. 614 and that no information on the caps on energy charges for emergency
Public Utilities with Market-Based Rate previously filed tariff sheets has been assistance service under its interchange
Authority, 110 FERC, 61,097 (2005). revised. PSI indicates that the affected service contract with Alabama Power
Comment Date: 5 p.m. Eastern Time tariff sheets are for phases 2 and 3 of the Company, Georgia Power Company,
on May 19, 2005. three-step rate increase. PSI requests an Gulf Power Company, Mississippi

VerDate jul<14>2003 19:04 May 11, 2005 Jkt 205001 PO 00000 Frm 00025 Fmt 4703 Sfmt 4703 E:\FR\FM\12MYN1.SGM 12MYN1
Federal Register / Vol. 70, No. 91 / Thursday, May 12, 2005 / Notices 25039

Power Company, and Savannah Electric OATT, as well as the Florida and for the operation of their electrical
and Power Company, as represented by Georgia Public Service Commissions. equipment: Wisconsin Rapids-West;
agent Southern Company Services, Inc. Comment Date: 5 p.m. Eastern Time Wisconsin Rapids-East; and Kiel. AECS
(collectively, Southern Companies). on May 20, 2005. requests an effective date of April 1,
Tampa Electric requests an effective 2005.
13. Virginia Electric and Power
date of May 1, 2005. AECS states that a copy of this filing
Company
Tampa Electric states that a copy of has been served upon the Public Service
the filing has been served upon [Docket No. ER05–902–000] Commission of Wisconsin.
Southern Companies and the Florida Take notice that on April 29, 2005, Comment Date: 5 p.m. Eastern Time
Public Service Commission. Virginia Electric and Power Company on May 20, 2005.
Comment Date: 5 p.m. Eastern Time (VEPCO), tendered for filing Third
on May 20, 2005. Revised Rate Schedule FERC No. 132, 16. Celerity Energy Partners San Diego
an agreement with the Southeastern LLC
10. Tampa Electric Company
Power Administration (SEPA). VEPCO [Docket No. ER05–905–000]
[Docket No. ER05–883–000] states that the revised sheets incorporate
Take notice that on April 29, 2005, changes to reflect VEPCO’s Take notice that on April 29, 2005,
Tampa Electric Company (Tampa commencement of operations as a Celerity Energy Partners San Diego LLC
Electric) tendered for filing revised rate member of the PJM Interconnection, (Celerity-SD) tendered for filing, under
schedule sheets containing updated L.L.C. and make other changes to the section 205 of the Federal Power Act, a
transmission service rates under its arrangements between VEPCO and request for authorization to sell
agreements to provide qualifying facility SEPA with respect to the use by certain electricity at market-based rates under
transmission service for Cargill of the VEPCO’s wholesale customers of its market-based tariff. Celerity-SD
Fertilizer, Inc. (Cargill) and Auburndale capacity and energy from SEPA’s requests an effective date of May 31,
Power Partners, Limited Partnership hydroelectric generating facilities. 2005.
(Auburndale). Tampa requests an VEPCO requests an effective date of May Comment Date: 5 p.m. Eastern Time
effective date of May 1, 2005. 1, 2005. on May 20, 2005.
Tampa Electric states that copies of VEPCO states that copies of the filing 17. Virginia Electric and Power
the filing have been served on Cargill, were served on SEPA and the Virginia Company
Auburndale, and the Florida Public State Corporation Commission.
Service Commission. Comment Date: 5 p.m. Eastern Time [Docket No. ER05–906–000]
Comment Date: 5 p.m. Eastern Time on May 20, 2005. Take notice that on April 29, 2005
on May 20, 2005. Virginia Electric and Power Company,
14. Consolidated Edison Energy
11. MidAmerican Energy Company Massachusetts (VEPCO) tendered for filing a Notice of
Cancellation and an Order No. 614
[Docket No. ER05–886–000] [Docket No. ER05–903–000] compliant canceled rate schedule sheet
Take notice that on April 29, 2005, Take notice that on April 29, 2005, terminating the Interconnection and
the MidAmerican Energy Company Consolidated Edison Energy Operating Agreement between the
(MidAmerican) submitted a filing to Massachusetts, Inc. (CEEMI) submitted VEPCO and Old Dominion Electric
confirm that its open Access for filing a Reliability Must Run Cooperative (ODEC). VEPCO requests an
Transmission Tariff is in compliance Agreement between CEEMI, effective date of May 1, 2005.
with the North American Electric Consolidated Edison Energy, Inc., acting VEPCO states that copies of the filing
Reliability Council’s most recent version as Agent for CEEMI, and ISO New were served upon ODEC.
of its Transmission Loading Relief England Inc. (ISO–NE) for a 107 MW
oil- and gas-fired steam electric Comment Date: 5 p.m. Eastern Time
procedures.
Comment Date: 5 p.m. Eastern Time operating unit located at a generation on May 20, 2005.
on May 20, 2005. facility owned and operated by CEEMI 18. Western Electricity Coordinating
in West Springfield, Massachusetts. Council
12. MidAmerican Energy Company
CEEMI requests an effective date of May
[Docket No. ER05–907–000]
[Docket No. ER05–901–000] 1, 2005.
Take notice that on April 29, 2005, Comment Date: 5 p.m. Eastern Time Take notice that on April 29, 2005,
Tampa Electric Company (Tampa on May 20, 2005. the Western Electricity Coordinating
Electric) tendered for filing revised rate Council (WECC) filed with the
15. Alliant Energy Corporate Services, Commission a Fifth Amendment to the
schedule sheets containing updated Inc.
rates for emergency interchange service Reliability Criteria Agreement under the
and scheduled/short-term firm [Docket No. ER05–904–000] WECC’s Reliability Management
interchange service under its Take notice that on April 28, 2005, System. The WECC states that the Fifth
interchange contract with each of 17 Alliant Energy Corporate Services, Inc., Amendment makes the following
other utilities. Tampa Electric also (AECS) on behalf of Wisconsin Power modifications and additions to the
tendered for filing revised sheets for and Light Company (WPL), submitted criteria agreement: (1) incorporates
inclusion in its open access for filing with the Commission a Master changes to the qualified path
transmission tariff (OATT) that contain Power Supply Agreement (Supply unscheduled flow relief criterion
an updated system average transmission Agreement) between Great Lakes approved by the WECC Board of
loss percentage. Tamp Electric requests Utilities (GLU) and WPL. AECS states Directors, and (2) corrects an incorrect
an effective date of May 1, 2005. that under the Supply Agreement, WPL section cross-reference. The WECC
Tampa Electric states that a copy of agrees to furnish and sell, and GLU requests an effective date of May 1,
the filing has been served upon each of agrees to purchase all of the electricity 2005.
the parties to the affected interchange required by the following GLU members Comment Date: 5 p.m. Eastern Time
contracts and each customer under its for service to their retail customers and on May 20, 2005.

VerDate jul<14>2003 19:04 May 11, 2005 Jkt 205001 PO 00000 Frm 00026 Fmt 4703 Sfmt 4703 E:\FR\FM\12MYN1.SGM 12MYN1
25040 Federal Register / Vol. 70, No. 91 / Thursday, May 12, 2005 / Notices

19. El Paso Electric Company 22. Pacific Gas and Electric Company integrated into the current effective
[Docket No. ER05–908–000] [Docket No. ER05–911–000] tariff sheets, and to correct minor
typographical and formatting errors.
Take notice that El Paso Electric Take notice that on April 29, 2005,
PJM requests an effective date of May 1,
Company (EPE), on April 29, 2005, Pacific Gas and Electric Company
(PG&E) tendered for filing 5 Large 2005.
tendered for filing proposed changes in
its Rate Schedule FERC No. 16 between facilities agreements and 15 small PJM states that copies of this filing
EPE and Public Service Company of facilities agreements, submitted have been served electronically on all
New Mexico (PNM). EPE requests an pursuant to the Procedures for PJM members and each state electric
effective date of July 1, 2005. Implementation of section 3.3 of the utility regulatory commission in the
EPE states that copies of the filing 1987 Agreement between PG&E and the PJM region, and asks for any waivers
were served upon PNM. City and County of San Francisco (City) necessary to allow such electronic
Comment Date: 5 p.m. Eastern Time (Procedures) that were approved by this service.
on May 20, 2005. Commission in FERC Docket No. ER99– Comment Date: 5 p.m. Eastern Time
2532–000 and recently updated in a on May 20, 2005.
20. Black Hills Power, Inc. negotiated Clarifying Supplement filed
[Docket No. ER05–909–000] in the Parties’ Settlement in FERC Standard Paragraph
Take notice that on April 29, 2005, Docket No. ER04–215–000. PG&E’s
ninth quarterly filing submitted Any person desiring to intervene or to
Black Hills Power, Inc. (Black Hills protest this filing must file in
Power), as Joint Tariff Administrator of pursuant to section 4 of the procedures,
which provides for the quarterly filing accordance with Rules 211 and 214 of
the Joint Open Access Transmission the Commission’s Rules of Practice and
Tariff of Black Hills Power, Basin of facilities and the third filing of
executed agreements pursuant to the Procedure (18 CFR 385.211 and
Electric Power Cooperative, and Powder 385.214). Protests will be considered by
River Energy Corporation Commission clarifying supplement.
The quarterly filing process the Commission in determining the
several long-term transmission service appropriate action to be taken, but will
streamlines the procedures for filing
agreements under the Joint Tariff. not serve to make protestants parties to
numerous facilities, and facilitates
Comment Date: 5 p.m. Eastern Time the proceeding. Any person wishing to
payment of PG&E’s costs of designing,
on May 20, 2005. become a party must file a notice of
constructing, procuring, testing, placing
21. California Power Exchange in operation, owning, operating and intervention or motion to intervene, as
Corporation maintaining the customer-specific appropriate. Such notices, motions, or
facilities required for firm transmission protests must be filed on or before the
[Docket No. ER05–910–000] comment date. Anyone filing a motion
and distribution service requested by
Take notice that on April 29, 2005, City under these facilities agreements. to intervene or protest must serve a copy
the California Power Exchange PG&E states that copies of this filing of that document on the Applicant. On
Corporation (CalPX) tendered for filing have been e-served upon City, the or before the comment date, it is not
its rate schedule for Rate Period 7, the California Independent System Operator necessary to serve motions to intervene
period from July 1, 2005 through Corporation, and the California Public or protests on persons other than the
December 31, 2005. CalPX states that it Utilities Commission. Applicant.
filed this rate schedule pursuant to the Comment Date: 5 p.m. Eastern Time The Commission encourages
Commission’s Orders of August 8, 2002 on May 20, 2005. electronic submission of protests and
(100 FERC ¶ 61,178) in Docket No.
23. Calpine Construction Finance interventions in lieu of paper using the
ER02–2234–000, and April 1, 2003 (103
Company, L.P. ‘‘eFiling’’ link at http://www.ferc.gov.
FERC ¶ 61,001) issued in Docket Nos.
EC03–20–000 and EC03–20–001, which Persons unable to file electronically
[Docket No. ER05–912–000]
require CalPX to make a new rate filing should submit an original and 14 copies
Take notice that on April 29, 2005, of the protest or intervention to the
every six months to recover current Calpine Construction Finance Company,
expenses. CalPX also states that the rate Federal Energy Regulatory Commission,
L.P. (CCFC) submitted for filing, 888 First Street, NE., Washington, DC
schedule therefore covers expenses pursuant to section 205 of the Federal
projected for the period July 1, 2005 20426.
Power Act (16 U.S.C. 824d), and part 35
through December 31, 2005, and CalPX of the Commission’s regulations (18 CFR This filing is accessible on-line at
requests an effective date of July 1, 35), a rate schedule for reactive power http://www.ferc.gov, using the
2005. CalPX also proposes a from the Sutter Energy Center. CCFC ‘‘eLibrary’’ link and is available for
methodology to allocate CalPX’s requests an effective date of June 1, review in the Commission’s Public
expenses for both Rate Period 7 and 2005. Reference Room in Washington, DC.
retroactively for Rate Periods 1 through Comment Date: 5 p.m. Eastern Time There is an ‘‘eSubscription’’ link on the
6, or alternatively, proposes that the on May 20, 2005. Web site that enables subscribers to
Commission defer the determination of receive e-mail notification when a
an allocation methodology and billing 24. PJM Interconnection, L.L.C. document is added to a subscribed
thereon until after a determination of [Docket No. ER05–913–000] docket(s). For assistance with any FERC
who owes what to whom in the Refund Take notice that on April 29, 2005, Online service, please e-mail
Proceeding. PJM Interconnection, L.L.C. (PJM) FERCOnlineSupport@ferc.gov, or call
CalPX states that it has served copies submitted for filing revisions to the PJM (866) 208–3676 (toll free). For TTY, call
of the filing on its participants, on the Open Access Transmission Tariff and (202) 502–8659.
California ISO, the California Public the Amended and Restated Operating
Magalie R. Salas,
Utilities Commission, and the California Agreement of PJM Interconnection,
Electricity Oversight Board. L.L.C. to incorporate language accepted Secretary.
Comment Date: 5 p.m. Eastern Time by the Commission in prior versions of [FR Doc. E5–2351 Filed 5–11–05; 8:45 am]
on May 20, 2005. these documents, but not previously BILLING CODE 6717–01–P