20888 Federal Register / Vol. 70, No.

77 / Friday, April 22, 2005 / Notices

20. The Commission has long rejected, as discussed in the body of this Procedure (18 CFR 385.211 and
established that compliance filings must order. 385.214). Protests will be considered by
be limited to the specific directives (E) FirstEnergy Companies are the Commission in determining the
ordered by the Commission. The directed, within 30 days of the date of appropriate action to be taken, but will
purpose of a compliance filing is to issuance of this order, to revise their not serve to make protestants parties to
make the directed changes and the market-based rate tariffs to include the the proceeding. Any person wishing to
Commission’s focus in reviewing them change in status reporting requirement become a party must file a notice of
is whether they comply with the adopted in Order No. 652. intervention or motion to intervene, as
Commission’s previously-stated (F) FirstEnergy Companies’ revised appropriate. The Respondent’s answer
directives.16 In this instance, tariff sheet(s) incorporating the and all interventions, or protests must
FirstEnergy Companies identified their Commission’s market behavior rules are be filed on or before the comment date.
December 31, 2003 Filing as a triennial accepted for filing, effective December The Respondent’s answer, motions to
updated market power analysis and 17, 2003. intervene, and protest must be served on
stated that they had submitted this (G) FirstEnergy Companies’ June, the Complainants.
analysis pursuant to the various orders 2004, request for rehearing is dismissed The Commission encourages
granting FirstEnergy Companies market- as moot. electronic submission of protests and
based rate authorization; however, they (H) The Secretary is hereby directed interventions in lieu of paper using the
included with the updated market to publish a copy of this order in the ‘‘eFiling’’ link at http://www.ferc.gov.
power analysis changes to their market- Federal Register. Persons unable to file electronically
based rate tariffs not directed by the By the Commission. should submit an original and 14 copies
underlying orders. Therefore, the Linda Mitry, of the protest or intervention to the
Commission will reject these proposed Federal Energy Regulatory Commission,
Deputy Secretary.
changes to the FirstEnergy Companies’ 888 First Street, NE., Washington, DC
[FR Doc. E5–1918 Filed 4–21–05; 8:45 am]
market-based rate tariffs submitted with 20426.
BILLING CODE 6717–01–P
the December 31, 2003 Updated Market This filing is accessible on-line at
Power Analysis Filing as outside the http://www.ferc.gov, using the
scope of that compliance filing. We ‘‘eLibrary’’ link and is available for
DEPARTMENT OF ENERGY
reaffirm that compliance filings must review in the Commission’s Public
only provide the changes directed by Federal Energy Regulatory Reference Room in Washington, DC.
the Commission. Accordingly, market- Commission There is an ‘‘eSubscription’’ link on the
based rate tariff revisions that are Web site that enables subscribers to
beyond the scope of a Commission- [Docket No. EL05–93–000] receive e-mail notification when a
directed compliance filing will be document is added to a subscribed
PJM Industrial Customer Coalition,
deemed automatically rejected at the docket(s). For assistance with any FERC
Complainant v. PJM Interconnection,
time of filing. Online service, please e-mail
L.L.C. and American Electric Power
The Commission orders: FERCOnlineSupport@ferc.gov, or call
Service Corporation, Respondents;
(A) FirstEnergy Companies’ updated (866) 208–3676 (toll free). For TTY, call
Notice of Complaint
generation market power analysis is (202) 502–8659.
hereby accepted for filing, subject to April 15, 2005. Comment Date: 5 p.m. eastern time on
Commission acceptance of the Take notice that on April 15, 2005, May 5, 2005.
compliance filing directed in Ordering the PJM Industrial Customer Coalition Magalie R. Salas,
Paragraph (B), as discussed in the body filed a formal complaint against PJM Secretary.
of this order. Interconnection, L.L.C. and American
[FR Doc. E5–1898 Filed 4–21–05; 8:45 am]
(B) FirstEnergy Companies are Electric Power Service Corporation
BILLING CODE 6717–01–P
directed, within 30 days of the date of pursuant to sections 206 and 306 of the
issuance of this order, to submit a Federal Power Act and Rule 206 of the
compliance filing to address whether Commission’s Rules of Practice and DEPARTMENT OF ENERGY
FirstEnergy Companies satisfy the Procedure, alleging that Respondents’
Commission’s concerns with regard to refusal to allow members of the PJM Federal Energy Regulatory
affiliate abuse, as discussed in the body Industrial Customer Coalition, located Commission
of this order. in American Electric Power Service
(C) FirstEnergy Companies’ next Corporation’s service territory, to [Docket No. EL05–62–001, et al.]
updated market power analysis is due participate in PJM Interconnection,
within three years of the date of this L.L.C.’s emergency and economic load PJM Interconnection, L.L.C., et al.;
order. response programs contravenes Electric Rate and Corporate Filings
(D) FirstEnergy Companies’ revised Respondents’ obligations under the PJM
open access transmission tariff. April 13, 2005.
tariff sheets (e.g. revising the code of
conduct and affiliate sales provision), The PJM Industrial Customer The following filings have been made
with the exception of those discussed in Coalition certifies that copies of the with the Commission. The filings are
Ordering Paragraph (F) below, are complaint were served on the contacts listed in ascending order within each
for PJM Interconnection, L.L.C. and docket classification.
16 Pacific Gas and Electric Company, 109 FERC American Electric Power Service 1. PJM Interconnection, L.L.C.
¶ 61,336 at P5 (2004); Midwest Independent Corporation as listed on the
Transmission System Operator, Inc., 99 FERC Commission’s list of corporate officials. [Docket No. EL05–62–001]
¶ 61,302 at 62,264 (2002); ISO New England, Inc., Any person desiring to intervene or to Take notice that on March 28, 2005,
91 FERC ¶ 61,016 at 61,060 (2000); Sierra Pacific
Power Company, 80 FERC ¶ 61,376 at 62,271
protest this filing must file in PJM Interconnection, L.L.C. submitted a
(1997); Delmarva Power & Light Company, 63 FERC accordance with Rules 211 and 214 of compliance filing pursuant to the
¶ 61,321 at 63,160 (1993). the Commission’s Rules of Practice and Commission’s order issued February 25,

VerDate jul<14>2003 15:27 Apr 21, 2005 Jkt 205001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\22APN1.SGM 22APN1

Вам также может понравиться