Вы находитесь на странице: 1из 14

SINGA GAS

DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

Job No. : 07001

1 of 13

Doc. No. : SGA L CC 50 002

CLIENT

MEDCO E & P LEMATANG

PROJECT TITLE

SINGA GAS DEVELOPMENT PROJECT

LOCATION

LEMATANG BLOCK, SOUTH SUMATERA

31-Mar-09

Issued for Approval

25-Aug-08

Issued for Review

ASW

SFL

BHK

REV. NO.

DATE

DESCRIPTION

PREPD

CHKD

APPD

Rev 1

SINGA GAS
DEVELOPMENT PROJECT

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

3 of 13

Job No. : 07001

Doc. No. : SGA L CC 50 002

REVISION CONTROL SHEET

REV. NO

DATE

DESCRIPTION

25-Aug-08

Issued for Review

31-Mar-09

Issued for Approval


Based on Transmittal No. SGA-T-IJKL-00030
IKPT Comment

TABLE OF CONTENTS
1. INTRODUCTION

2. SCOPE

3. DEFINITIONS

4
Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

4 of 13

Job No. : 07001

Doc. No. : SGA L CC 50 002

4. ENVIRONMENTAL CONDITIONS

5. REFERENCE

6. DESIGN BASIS AND PIPELINE CHARACTERISTICS

7. DESCRIPTION OF LOAD CASES

8. PIPING SUPPORTS

9. STRESS ANALYSIS REPORT

ATTACHMENT
APPENDIX-1
APPENDIX-2
APPENDIX-3
APPENDIX-4
APPENDIX-5

COMPUTER PLOT AND STRESS ISOMETRIC


INPUT FILE
STRESS RESULT
RESTRAIN SUMMARY
DISPLACEMENT REPORT

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS
1.

Job No. : 07001

5 of 13

Doc. No. : SGA L CC 50 002

INTRODUCTION

This document provides the report of Stress Analysis at critical area long of onshore
Sales Gas Pipeline required for SINGA field in Lematang Block South Sumatera
operated by Contractor, hereinafter referred as COMPANY.
The result of this Stress Analysis document will be used for pipe stress analysis.
2.

SCOPE

This document provided modeling for stress and flexibility calculation for above
ground & buried/underground pipeline section in Lematang South Sumatera for SINGA
GAS DEVELOPMENT PROJECT.
Flexibility stress analysis of the pipeline has been performed to achieve the followings:

To ensure that the above ground piping stress are within the allowable
limit as per design code ASME B31.8

To make a sure that the under ground pipeline stress are within the
allowable limit as per design code ASME B 31.8

To locate the special pipe supports requirement (if any)

Optimize the pipe support location and the piping load on to the support

To determine the anchor loads at both ends of the above ground piping
stress
3.

DEFINITIONS

Within the contents of this Stress Analysis Procedure :


COMPANY means PT Medco E&P Lematang.
CONTRACTOR means IKPT who is specifying/purchasing the equipment materials
and services for and on behalf of the COMPANY.
The SUBCONTRACTOR means PT. Kelsri, who has been subcontracted to perform
the detailed engineering of Sales Gas Pipeline.
CERTIFICATION AGENCY is Third Party Inspection Agency appointed by PT
Medco E&P Lematang
.
4.
ENVIRONMENTAL CONDITIONS
The climate is tropical monsoon, which is characterized by hot and humid condition
throughout the year. There are two distinct seasons, the dry season and rainy season.
The rainy season occurs from November to May and the dry season occurs from June to
October.
Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

Job No. : 07001

6 of 13

Doc. No. : SGA L CC 50 002

1. Temperature
2. Ambient Temperature
a. Maximum
b. Minimum
c. Average
3. Relative Humidity
a. Maximum
b. Minimum
c. Average
4. Soil Resistivity / Characteristics

5.

REFERENCE

API 5L

American Petroleum Institute


Specification for Linepipe

ASME

American Society of Mechanical Engineers


B 31.8 Gas Transmission and Distribution Piping Systems

ANSI

American National Standard Institute B16.9Factory-Made


Wrought Steel Butt welding Fittings

SGA-G-GL-00-001

Engineering Design Basis

SGA-L-ES-00-002

Pipeline Data

6.

DESIGN BASIS AND PIPELINE CHARACTERISTICS


To Perform Stress Analysis of pipeline should be prepared list of pipe characteristic
and soil characteristics which is as follow :

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

Job No. : 07001

Doc. No. : SGA L CC 50 002

PIPE CHARACTERISTICS
Descriptions
Design Pressure

Unit

Value

(P1)

Psig

1330

Operating Pressure (P2)

Psig

1050

Maximum Operating Pressure (mop)

Psig

1194

Hydrotest Pressure (P3)

Psig

1672 (1.4 x mop)

Design Temperature

(T1)

170

Operating Temperature (T2)

120

Hydrotest Temperature (T3)

80

Avg. ambient temperature

80

Avg. Relative humidity

83

Design life

year

Min 20

Design Factor

0.5

Corrosion allowance

inch

0.125

Resistivity of Soil

Ohm-meter

0.35

Avg Ambient Soil Temperature


(normal)

70

Weight of Content/Density

t/m3

0.97-1.98

F
F
F

Rev 1

7 of 13

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

Job No. : 07001

8 of 13

Doc. No. : SGA L CC 50 002

SOIL CHARACTERISTICS
Descriptions

Unit

Value

Friction Coefficient

Kg/cm

0.13 1.22

Soil Density

t/m3

0.97 1.98

Burried Depth to Top of Pipe

1.5

Friction Angle

deg

1.1-17.2

Undrained Shear Strength

Kg/cm2

0.43-1.87

7.
7.1

DESCRIPTION OF LOAD CASES


Elementary Load Cases
Elementary load cases chosen as follows:

7.2

Thermal in Design Condition (T1)

Thermal in Service Condition (T2)

Combination Load Cases


Load combinations adopted for stress analysis of the piping line are as
follows:

7.3

Sustained in Design Conditions (W+P1)

Sustained in Operating Conditions (W+P2)

Design Condition (W+T1+P1)

Service Condition (W+T2+P2)

Hydrotest
Load case for Hydrotest can be given as follow :

Sustain load (W + P3)

Operating load (W + T3 + P3)


Rev 1

SINGA GAS
DEVELOPMENT PROJECT
Job No. : 07001

SALES GAS PIPELINE STRESS ANALYSIS

9 of 13

Doc. No. : SGA L CC 50 002

Note :

7.4

: Full weight

P1

: Design Pressure

P2

: Operating Pressure

P3

: Hydrotest Pressure

T1

: Design Temperature

T2

: Operating Temperature

T3

: Water Temperature

Stress Limit Criterion


Stress constraints and limit are defined as follows:
SL

: calculated stress for sustained loads

SE

: calculated stress for thermal loads

Sy

: Yield strength at ambient temperature

Slp

: Longitudinal stress due to internal pressure

SB

: Nominal bending stress in straight pipe

St

: Longitudinal stress due to thermal expansion

SE + SL < Syield

(OPE)

SL = Slp+SB < 0.75 Sy

(SUS)

SE = sqrt (SB^2 + 4St^2) < 0.72 Sy

(EXP)

7.5

Flange Leakage Check

7.6

Anchor Block

8.
8.1

PIPING SUPPORTS
General
This section presents the type of piping supports to be used to keep the line
system stress within the allowable limit and the summary of piping loads.

8.2

General Supports

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

Job No. : 07001

10 of 13

Doc. No. : SGA L CC 50 002

The number and location of supports have been chosen to satisfy static free span
requirement. Fix type and guide of support attached to the piping system is
chosen to compensate elongation due to combined load both of design,
operating and test condition.
9.

STRESS ANALYSIS REPORT

Toward to the pipeline, after the pig launcher area, before and after the LBCV at Kp.
16+000 & Kp. 32+000, and before the pig receiver, the pipes are buried to the ground.
Due to temperature changes and pressure, buried pipe deforms laterally in areas
immidiately adjacent to changes in directions (bends). In areas far from bends, the
deformation is primarily axial.
Stress analysis of the piping has been carried out using a non linear computer program
Caesar II Version 4.2. The pipeline has been modeled from pipeline anchor block area
between buried pipe and above ground pipeline (at surface of the ground). Both the ends
of above ground pipeline are anchored. Initially the number and the location of supports
were chosen to satisfy the free span requirement. Environmental loads are ignored for
static stress analysis.
Stress analysis is performed for different load cases defined in section 7.0 and found that
the system stresses are within the allowable limit as per ASME B 31.8. The result
summary of stresses has been presented in Table 9.1.1. until Table 9.3.2. Computer plot
and the stress isometric have been presented in Attachment-1.

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

11 of 13

Job No. : 07001

Doc. No. : SGA L CC 50 002

Table 9.1.1. Summary of maximum stresses as per ASME B 31.8 at Pig Launcher (Above
Ground) Burried Pipe Sales Gas Pipeline
Allowable Stress (Psi)

Load
Case
No.

@Node
No.

Stress (Psi)

SUS 1
(W+P1)

25

SUS 2
(W+P2)

SUS 3
(W+P3)

Load Case

Ratio

SL

SE

Sy

(%)

11143.6

45000

24.76

25

9153.0

45000

20.34

25

13574.9

45000

30.17

EXP (T1)

70

137.7

43200

0.32

EXP (T2)

70

109.3

43200

0.25

OPE
(W+T1+P1)

25

11013.3

60000

18.36

OPE
(W+T2+P1)

25

11040.1

60000

18.40

OPE
(W+T3+P3)

25

13562.3

60000

22.60

Table 9.1.2. From calculated stress Pig Launcher Burried Pipe SGP, the maximum
operational condition load at Anchor Block will be given as follow:
Forces (lb)
Load Case
OPE (W+T1+P1)

@Node
70

Fx

Fy

Fz

-166

-278

-16

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

12 of 13

Job No. : 07001

Doc. No. : SGA L CC 50 002

Table 9.1.3. From calculated stress Pig Launcher Burried Pipe SGP, the maximum
displacement report will be given as follow:
Translation (in)
Load Case

Rotation (deg)

@Node

OPE (W+T1+P1)

Dx

Dy

Dz

Rx

Ry

Rz

-0.55

-0.02

0.012

Table 9.2.1. Summary of maximum stresses as per ASME B 31.8 at LBCV Kp. 16+000 and
LBCV Kp. 32+000
Allowable Stress (Psi)

Load
Case
No.

@Node
No.

Stress (Psi)

SUS 1
(W+P1)

120

SUS 2
(W+P2)

SUS 3
(W+P3)

EXP (T1)

EXP (T2)

OPE
(W+T1+P1)

OPE
(W+T2+P1)

OPE
(W+T3+P3)

Load Case

120
120
120
120
120
120
120

Ratio
(%)

SL

SE

Sy

12376.6

45000

27.50

10386.0

45000

23.08

14807.9

45000

32.91

16087.0

43200

37.24

7884.0

43200

18.25

25874.9

60000

43.12

18991.9

60000

31.65

16111.8

60000

26.85

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
SALES GAS PIPELINE STRESS ANALYSIS

13 of 13

Job No. : 07001

Doc. No. : SGA L CC 50 002

Table 9.2.2. From calculated stress LBCV 16+000 & 32+000 SGP, the maximum
operational condition load at Anchor Block will be given as follow:
Forces (lb)
Load Case

@Node

OPE (W+T1+P1)

Condition

Fx

Fy

Fz

30

-41530

-6313

Design

OPE (W+T2+P1)

30

-20690

-3180

Operation

OPE (W+T3+P3)

30

-4607

-762

Hydrotest

Table 9.2.3. From calculated stress LBCV 16+000 & 32+000 SGP, the maximum
displacement report will be given as follow:
Translation (in)
Load Case

Rotation (deg)

@Node

OPE (W+T1+P1)

109

Dx

Dy

Dz

Rx

Ry

Rz

-0.14

-0.87

0.018

Table 9.3.1. Summary of maximum stresses as per ASME B 31.8 at Burried Pipe - Pig
Receiver (Above Ground) SGP
Allowable Stress (Psi)

Load
Case
No.

@Node
No.

Stress (Psi)

SUS 1
(W+P1)

80

SUS 2

80

Load Case

Ratio

SL

SE

Sy

(%)

11378.5

45000

25.29

9387.9

45000

20.86

Rev 1

SINGA GAS
DEVELOPMENT PROJECT
14 of 13

Job No. : 07001

SALES GAS PIPELINE STRESS ANALYSIS

Doc. No. : SGA L CC 50 002

(W+P2)
SUS 3
(W+P3)

80

13809.9

45000

30.69

EXP (T1)

50

4515.5

43200

10.45

EXP (T2)

50

3583.8

43200

8.30

OPE
(W+T1+P1)

50

13506.3

60000

22.51

OPE
(W+T2+P1)

50

12670.4

60000

21.12

OPE
(W+T3+P3)

50

13789.5

60000

22.98

Table 9.3.2. From calculated stress Burried Pipe - Pig Receiver (Above Ground) SGP, the
maximum operational condition load at Anchor Block will be given as follow:
Forces (lb)
Load Case
OPE (W+T1+P1)

@Node

50

Fx

Fy

Fz

1354

-97

6408

Table 9.3.3. From calculated stress LBCV 16+000 & 32+000 SGP, the maximum
displacement report will be given as follow:
Translation (in)
Load Case
OPE (W+T1+P1)

Rotation (deg)

@Node
2

Dx

Dy

Dz

Rx

Ry

Rz

-0.68

Rev 1