Federal Register / Vol. 70, No.

62 / Friday, April 1, 2005 / Notices 16807

DEPARTMENT OF DEFENSE resources in the project area, as well as roadway across the American River in
other issues of concern. To facilitate the the vicinity of Folsom Dam.
Department of the Army; Corps of process, the Corps and the City held 4. Alternatives: The Corps will be
Engineers three initial scoping meetings. The first evaluating various alignment
meeting was held on March 9, 2004, in alternatives for the bridge crossing and
Intent To Prepare a Draft Supplemental El Dorado Hills. The second meeting associated roadway. During evaluation
Environmental Impact Report/ was held on March 10, 2004, in Granite of the preliminary alternatives, some
Supplemental Environmental Impact Bay, and the third meeting was held on parts of the alternatives may be
Statement for the American River March 11, 2004, in Folsom. An modified or changed; some alternatives
Watershed, California, Folsom Bridge additional public meeting will be held may be eliminated; and additional
Project, Sacramento County, CA at the Folsom Community Center (see alternatives may be added. All
AGENCY: Department of the Army; U.S. DATES and ADDRESSES). All comments alternatives would intersect Folsom
Army Corps of Engineers, DoD. received will be considered in the Dam Road on the east, cross the areas
ACTION: Notice of intent. preparation of the draft SEIS/SEIR. between the dam and the Folsom State
The Corps will announce availability Prison, rise over the American River via
SUMMARY: In accordance with the of the draft supplemental document in the new bridge, and intersect with
National Environmental Policy Act the Federal Register and other media, Folsom-Auburn Road on the west. Some
(NEPA) and the California and will provide the public, potential alternatives include (1) No
Environmental Policy Act (CEQA), the organizations, and agencies with an Action, (2) Alignment A—North
U.S. Army Corps of Engineers (Corps), opportunity to submit comments, which Alignment through Bureau Facilities; (3)
Sacramento District, and City of Folsom will be addressed in the final SEIS/ Alignment B—Alignment Between
(City) are preparing a draft SEIR. A 45-day public review period Bureau Facilities and Apartments Just
Supplemental Environmental Impact will be provided for individuals and South of Alignment A, (4) Alignment
Statement/Supplemental Environmental agencies to review and comment on the C—South Alignment Between the
Impact Report (SEIS/SEIR) to support a draft SEIS/SEIR. All interested parties Apartments and Inwood Avenue South
project for the construction of a are encouraged to respond to this notice of Bureau Facilities.
permanent bridge spanning the and provide a current address if they
Dated: March 23, 2005.
American River near Folsom Dam, wish to be notified of the draft SEIS/
SEIR circulation. Ronald N. Light,
California. The permanent bridge is part
2. Project Information: The American Colonel, Corps of Engineers, District Engineer.
of the American River Watershed
Project and was authorized by Congress River Watershed Project provides a plan [FR Doc. 05–6486 Filed 3–31–05; 8:45 am]
in the energy and Water Development for flood protection along the main stem BILLING CODE 3710–EZ–M

Appropriations Act of 2004 (Pub. L. of the American River by modifying


108–137). The basic study authority for levees to increase conveyance capacity,
the American River Watershed study as well as an ecosystem restoration plan DEPARTMENT OF DEFENSE
was provided under the Flood Control at selected sites along the Lower
American River. The American River Department of the Army; Corps of
Act of 1962. Engineers
DATES: A public meeting will be held on
Watershed Project also increases flood
April 27, 2005, at the Folsom control storage at Folsom Reservoir by Intent To Prepare a Draft Programmatic
Community Center from 4 p.m. to 6 p.m. raising the dam. The project area for the
Environmental Impact Statement
permanent bridge is located within the
and 7 p.m. to 9 p.m. (DPEIS) for the Onondaga Lake
city limits of Folsom, California, in
ADDRESSES: Send written comments and Watershed Management Plan
Sacramento County.
suggestions concerning this study to Ms. As described in the final (OLWMP), Feasibility Study, City of
Jane Rinck, U.S. Army Corps of Supplemental Plan Formulation Report/ Syracuse, Onondaga County, Central
Engineers, Sacramento District, Attn: EIS/EIR for the American River New York State, and Onondaga Nation
Planning Division (CESPK–PD–R), 1325 Watershed, California, Long-Term AGENCY: Department of the Army; Corps
J Street, Sacramento, CA 95814. Study, February 2002, the Corps of Engineers, DoD.
Requests to be placed on the mailing list initially proposed the construction of a ACTION: Notice of intent.
should also be sent to this address. The 2,400-foot-long temporary bridge
public meeting address is Folsom downstream of the dam. The temporary SUMMARY: The Onondaga Lake
Community Center, 52 Natoma Street, bridge would have been provided a Watershed Management Plan (OLWMP)
Folsom, CA. detour route across the American River project has been initiated through the
FOR FURTHER INFORMATION CONTACT: Ms. during project-related construction Onondaga Lake Partnership (OLP) to
Jane Rinck, email at when the Folsom Dam Road would be help coordinate and implement various
Jane.L.Rinck@usace.army.mil, telephone closed. After completion of the flood improvement projects in the watershed
(916) 557–6715, or fax (916) 557–7856. protection project, traffic would have to benefit the public. The project entails
SUPPLEMENTARY INFORMATION: been returned to the Folsom Dam Road. developing a multi-purpose/multi-
1. Public Involvement: The Folsom At the discretion of the U.S. Bureau of objective evaluation of the Onondaga
Bridge Project is being coordinated Reclamation (Bureau), the temporary Lake watershed to (1) integrate existing
between Federal., State, and local bridge would have been dismantled or projects/plans/studies; (2) assess
governments; local stake holders; left in service to facilitate dam program/project progress; and (3) plan
special interest groups; and other maintenance. However, this temporary future lake and watershed revitalization
interested individuals and bridge was replaced by a permanent programs and projects into a
organizations. Scoping meetings have bridge per Congressional direction in comprehensive Onondaga Lake
been held to discuss the alternatives and 2004. Watershed Management Plan. The final
effects to be evaluated in the SEIS/SEIR. 3. Proposed Action: The proposed product will be used as a tool for the
The process provides an opportunity for action is limited to construction of a OLP to move toward the rehabilitation
the public to identify significant permanent bridge and associated of the Onondaga Lake watershed.

VerDate jul<14>2003 17:15 Mar 31, 2005 Jkt 205001 PO 00000 Frm 00017 Fmt 4703 Sfmt 4703 E:\FR\FM\01APN1.SGM 01APN1
16808 Federal Register / Vol. 70, No. 62 / Friday, April 1, 2005 / Notices

Projects shall be consistent with the resource improvements in the use of and economic growth in the
1993 Onondaga Lake Management Plan watershed. watershed.
and comply with the Amended Consent Alternatives: The No Action (Without Scoping Meeting: Federal, Tribal,
Judgment (ACJ) and the Project Labor Project Conditions) alternative is always
State, and local interests have already
Agreement (PLA) for the environmental a consideration. Under this alternative,
been involved with initiation of the
restoration, conservation, and no study/project action would be taken.
Onondaga Lake Partnership and this
management of Onondaga Lake. This serves as the basis of comparison
for other alternatives. project (OLWMP) and coordination is
Within the framework of the OLWMP already being conducted. At least one
project, an integrated rehabilitation Associated alternatives may include
those relative to: institutional processes, new formal scoping meeting is
approach will be applied to recognize anticipated with the specific date, time,
Comprehensive Environmental water and land use management, HTRW
(hazardous, toxic, radioactive waste) and location to be determined.
Response, Compensation and Liability
Act (CERCLA) and National Resource remediation, water quality sediment Availability: It is expected that the
Damage Assessment (NRDA) activities load reduction measures, water quality Draft Programmatic Environmental
within the lake and watershed. While contamination control measures, water Impact Statement (DPEIS) (a
CERCLA and NRDA are pursued under supply measures, water treatment programmatic plan development and
those authorities (Superfund) and are measures, navigation measures, flood implementation overview
not subject to NEPA, per se, processes damage reduction measures, erosion documentation) will be made available
are similar. The Onondaga Lake protection measures, environmental to agencies, tribes, interests, and the
Watershed Management Plan reports restoration measures, recreational public about May 2007.
will discuss and provide an overview of development, and transportation
considerations. Dated: March 23, 2005.
all pertinent on-going watershed
Scoping Process: The Onondaga Lake Timothy B. Touchette,
programs and projects in appropriate
Management Conference (OLMC) was Lieutenant Colonel, Corps of Engineers,
relative detail.
conducted to discuss significant water District Engineer.
Study efforts will include: resources problems and potential [FR Doc. 05–6485 Filed 3–31–05; 8:45 am]
Identification of various study/project remedial actions for Onondaga Lake and
authorities; identification of existing BILLING CODE 3710–GP–M
developed the 1993 Onondaga Lake
and anticipated lake and watershed Management Plan (OLMP).
conditions (including completed and The Onondaga Lake Partnership
ongoing projects); identification of lake DEPARTMENT OF DEFENSE
(OLP) was formed in 1998 and was
and watershed water resources authorized to make revisions to the Department of the Navy
problems, needs, goals, and objectives; OLMP via Section 573 of the Water
identification of considered alternatives; Resources Development Act (WRDA) Notice of Availability of Government-
assessment of impacts of considered 1999. Associated with these efforts, the Owned Inventions; Available for
alternatives; evaluation (trade-off Onondaga Lake Watershed Management Licensing
analyses) of alternatives and associated Plan study has been initiated to further
impacts (including required planning evaluate, formulate, and integrate AGENCY: Department of the Navy, DoD.
and environmental coordination and beneficial water resources programs/
compliance, and consideration of projects in the watershed. ACTION: Notice.
agency and public views); and selection Coordination and meetings have
and pursuit of appropriate lake and already occurred relative to the SUMMARY: The inventions listed below
watershed water resources alternatives/ Onondaga Lake Partnership activities are assigned to the United States
projects. Studies shall also provide and projects, as well as, for this Government as represented by the
tools, as appropriate, for continued Onondaga Lake Watershed Management Secretary of the Navy and is available
study/project development, Plan study. Public involvement for licensing by the Department of the
management, and monitoring purposes. processes include an outreach program, Navy.
ADDRESSES: Correspondence should be public meetings, written and verbal U.S. Patent number 6,317,694 entitled
addressed to: Mr. Tod Smith, U.S. Army correspondence/coordination, and draft ‘‘Method and Apparatus for Selecting a
Corps of Engineers, Buffalo District, and final report review procedures. A Sand Pack Mesh for a Filter Pack and a
Environmental Analyses Section, 1776 study supplemental Scoping Fact Sheet Well Casing Slot size for a Well.’’ U.S.
Niagara Street, Buffalo, New York is being coordinated with various Patent number 6,305,878 entitled
14207–3199. Federal, State, and local agencies and ‘‘Adjustable Depth Air Sparging Well.’’
interests, and the Onondaga Nation. U.S. Patent number 6,644,230 entitled
FOR FURTHER INFORMATION CONTACT: Mr.
Study teams will meet on a routine ‘‘Locking Marine Bitt.’’
Tod Smith at 716–879–4175.
basis. Additional input from potentially
SUPPLEMENTARY INFORMATION: affected Federal, Tribal, State, and local ADDRESSES: Requests for copies of the
Authority: This study is being interests is sought by this notice. patent applications cited should be
conducted under the authority of Information regarding the Onondaga directed to Kurt Buehler, NFESC, Code
Section 573 of the Water Resources Lake Partnership is available at http:// 423, 1100 23rd Ave, Port Hueneme, CA
Development Act (WRDA) 1999. www.onlakepartners.org/. 93043–4370, and must include the U.S.
Proposed Action: The study will Significant Issues: The primary issues Patent number.
involve a comprehensive evaluation of of this study include the substantial
Onondaga Lake and watershed water water resource problems in Onondaga FOR FURTHER INFORMATION CONTACT: Kurt
resource problems, including studies Lake and its watershed and the effective Buehler, Office of Research and
and research necessary for the formulation and integration of their Technology Applications, NFESC, Code
identification, integration, and existing and potential remedial actions. 423, 1100 23rd Ave, Port Hueneme, CA,
implementation of projects and These significant water resource 93043–4370, telephone 805–982–4897.
programs that will facilitate water problems adversely affect the optimal (Authority: 35 U.S.C. 207, 37 CFR Part 404.)