Вы находитесь на странице: 1из 8

FTTX Wireline Access Design

Requirements For
FTTH 2010

Huawei
S-0053755
Revision No:

Marzook N Al Otaibi
Date Printed: 27/10/2010

Network Design

I. Main
1. General
By assuming
a- All dwelling units (Residential & Commercial) unit will be fibered
b- The type of ONT to serve each unit is single family unit (SFU) or single business unit (SBU).
c- 1:2 splitters will be installed in the frame distribution frame (FDF) in the CO area and 1:32 splitters in FDT
located in OSP. Each 1:32 splitter will be distributed through secondary network.

Date Printed: 27/10/2010

Sow No: S-0053755

Rev. #: 1

Page 2 of 8

Network Design

2. General Requirements
All equipment must by have type approval from STC.
All MOP documentation must be depending on RFP.
Optical splitters should be preconnectorized with LC/APC connectors for mounting in pre-assembled
splitters cabinets.
Maximum distance (Reach) between OLT and ONT is 20Km.
Single fiber (Single Mode fiber G657) is used to connect the OLT located in the Central Office (CO), and the
ONTs located at the customer premises.
The routing and location of feeder route should consider the overall link budget which is 28dB, (Class B+), and
the position/location to ensure an easy access for the splitter cabinet.
Central Office (OLT) Requirements
The OLT PON port offers 2.5 Gbps bandwidth in down link and 1.25 Gbps in uplink.

Date Printed: 27/10/2010

Sow No: S-0053755

Rev. #: 1

Page 3 of 8

Network Design

3. Scope Description
This is scope to Install one OLTat at Mutlaq Exchange, Site No. 303-00 will be installed in the same location
of the existing EA of IP MPLS Network it will be connected direct without transmission Equipment because it is
colocated sites. Provide 2x10G uplink to the EA. these OLT facilities is to be in line with GPON FTTH
technology compliant with ITU-T standard G. 984 and enabling the provision of Triple Play services (Voice,
Video, and Data).

Date Printed: 27/10/2010

Sow No: S-0053755

Rev. #: 1

Page 4 of 8

Network Design

II. Summary of Scope of Work


The following table summarizes the equipment/services to be installed on each site and ring, if applicable, for
this Scope of Work.

Ring

Site Name
303-00-000
Mutlaq

303-00-000
Mutlaq

303-00-000
Mutlaq

Date Printed: 27/10/2010

Sow No: S-0053755

Elem Grp/Elem.
FTTX
FTTX

FTTX
FTTX

FTTX
FTTX

Equipment /Model Name


OLT
AXS 1800

ODN Material and Installation


ODN

DCDP MODEL
this Model for Add DCDP item for
Mutlag Exchange

Rev. #: 1

Page 5 of 8

Network Design

III. CUL Requirements


Quantity Table For

Installation

Equipment Model/Services :

DCDP MODEL

Ring No :
Site Number :

303-00-000

Mutlaq

Unit Code

Unit Description

FN9DTDCDP0001a

Power Junction Box (DCDP)

FN9DF25030446a

Wire,450/750V,227 IEC 02(RV)120mm^2,black,320A

FN9DF25030444a

Wire,450/750V,227 IEC 02(RV)120mm^2,yellow green,320A

FN9DF25030447a

Wire,450/750V,227 IEC 02(RV)120mm^2,blue,320A

Qty
1.00
100.00
50.00
100.00

Remarks :

Equipment Model/Services :

ODN Material and Installation

Ring No :
Site Number :

303-00-000

Mutlaq

Unit Code

Unit Description

Qty

FN10EN2010138d

Installation of ODF, including ODF (equipment room) fixing;cables entrying, stripping


,fixing rack installation , per cabinet

1.00

ODN02080897a

72-Core Splicing & Termination Unit

2.00

ODN99041FBQa

Optical Splitter Frame (OSF) and Accessories, 16 x 1:2 , LC/APC Connector

2.00

ODN02081398a

DF,GYR-1,Optical cable import unit,19"

1.00

ODN02081399a

DF,GPX147-FH-PQU,4U Fiber Winding Unit,4U,19"

1.00

Date Printed: 27/10/2010

Sow No: S-0053755

Rev. #: 1

Page 6 of 8

Network Design

ODNOFC00048a

Patch Cord, SM, LC/APC, 1.6mm Dia. x 3m Length

64.00

ODN99041QBRa

LC/APC patch cord

288.00

ODN14300009a

Adapter (2LC/APC-2LC/APC)

144.00

ODN02081388a

DF,GPX147-ODF102,Optical Cabinet,2200*800*300mm

1.00

Remarks :

Equipment Model/Services :

OLT

Ring No :
Site Number :

303-00-000

Mutlaq

Unit Code

Unit Description

Qty

FN9DT82300535b

GPON Port License,Based on per GPON Port it cover ( devices , port , subscriber ,
service's , management , provisioning , inventory, multicast , .)

FN9DT88032901b

MA5600T Broadband Main Control Board Backup Function Software

1.00

FN9DT88030DFMb

SCUN V800R007 System Software Package

1.00

FN10EN2010106p

Project management Per Site

1.00

FN10EN2010072f

Site verification for New Site of Access Network Equipment , per site

1.00

FN10EN2010030d

MA5600T/MA5680T hardware installation and software commissioningintegration and


PAT ,per set

1.00

FN9DT21134315a

Blank Panel for Common Interface Board Slot (Shielded)

FN10EN2010064e

Design of Method of Procedures(MOP) and As-built Document for New Site of Access
Network Equipment(MA5600T/MA5680T/MA5603T/MA5683T/MA5606T), per site

1.00

FN9DT04060213a

External Power Cable,Assembled Cabinet -48V Power


Cable,20.00m,25mm^2,Blue,T25^2BR,227IEC02-25^2BL,OT25-8,C&C08B

1.00

FN9DT02113122a

2.2m Front-access ETSI Assembly Integration Cabinet(-48V/-60V,BPDB,Default Including


1 Service Subrack,Maximum Supporting 2 Service Subracks)

1.00

FN9DT03020KAXa

Super Control Unit Board, H80-SCUN

2.00

FN9DT03020KKPa

2-port 10GE Uplink Interface Card,support SyncE

2.00

FN9DT03020NDEa

Connect Power Board-H80-PRTE

2.00

FN9DT03020PFNa

8-port GPON OLT Interface Board

3.00

Date Printed: 27/10/2010

Sow No: S-0053755

24.00

13.00

Rev. #: 1

Page 7 of 8

Network Design

FN9DT04060219a

External Power Cable,Assembled Cabinet GND Power


Cable,20.00m,25mm^2,Black,T25^2BR,227IEC02-25^2B,OT25-8,C&C08B

1.00

FN9DT04060409a

External Power Cable,PGND For Assembled Cabinet,20.00m,25mm^2,Yellow


Green,T25^2BR,227IEC02-25^2Y&G,OT25-8!,C&C08B

1.00

FN9DT14130147a

Patch Cord,SC/PC-SC/PC,Singlemode,3mm,20m

24.00

FN9DT14130274a

Patch Cord,FC/PC,LC/PC,Single Mode,2mm,20m

8.00

FN9DT34060495a

Optical transceiver,SFP+,1310nm,10Gb/s,-8.2~0.5dBm,-12.6dBm,LC,SM,10km

4.00

FN9DTS4016729a

Optical
Transceiver,SFP,1490nm(Tx)/1310(Rx)nm,1.25Gb/s,2~7dBm,-27dBm,SC/PC,SM,20km

24.00

Remarks :

IV. PRN's And Customers

The following table indicates the Planning Reference Numbers (PRN) and the STC internal customers that are
served by this SoW.
This table is for STC internal use only.
Site No./Site Name

PRN

Ring No.

Customer

303-00-000

Interface

Assigned
Capacity
0.00

Mutlaq

V. Scope of Work Attachments

List of attachments.

End of Document