Вы находитесь на странице: 1из 1

11238 Federal Register / Vol. 70, No.

44 / Tuesday, March 8, 2005 / Notices

Additional Conditions in the Commission Meeting Room on Dennis Bethel, American Electric Power
It is critical that new sales of STF the second floor of the offices of the Allen Mosher, American Public Power
transmission service not degrade the value of Federal Energy Regulatory Commission, Association
the conditional firm transmission product. 888 First Street, NE., Washington, DC. David Bertagnolli, ISO New England
All CF contract amounts will be treated as Steve Wofford, Constellation Energy
All interested persons may attend, and Commodities Group, Inc.
firm obligations when determining the registration is not required.
amounts of STF and nonfirm transmission John Lucas, Southern Company
Commissioners are expected to John Simpson, Reliant Energy, Inc.
available for future periods. The renewable
participate. Attached is the agenda for Scott Helyer, Tenaska, Inc.
generators propose that CF customers be
upgraded to firm service during conditional the conference. 1 p.m.—Lunch Break
months when firm service is determined Transcripts of the conference will be 2 p.m.—Panel III—Prospective Reactive
immediately available from Ace Power Solutions
available on a monthly, weekly, daily or
Reporting Company (202–347–3700 or Panelists:
hourly basis. Once CF customers are
1–800–336–6646) for a fee. They will be Fernando Alvarado, IEEE–USA Energy
upgraded to firm, additional STF could then
Policy Committee
be sold during the same time frame and available for the public on the Michael Calviou, National Grid USA
without gaining the reduction in capacity Commission’s eLibrary system seven Mayer Sasson, Consolidated Edison of New
availability priority over CF customers. If calendar days after FERC receives the York
there is more than one conditional-firm transcript. Additionally, Capitol Steven Naumann, Exelon Corporation
customer impacting a constrained path, and
the available STF on that path is less than the
Connection offers the opportunity for David Clarke, Navigant Consulting, Inc.
remote listening and viewing of the Harry Terhune, American Transmission
combination of CF customer requests, the Company LLC
available STF must be allocated among those conference. It is available for a fee, live
over the Internet, by phone or via Robert D’Aquila, GE Energy
customers in a fair and reasonable way. Kris Zadlo, Calpine
Customers offered new CF Agreements will satellite. Persons interested in receiving Andy Ott, PJM Interconnection, L.L.C.
be provided clear guidance on the risk of the broadcast, or who need information 4 p.m.—Adjourn
reductions in the capacity availability based on making arrangements should contact
on historic transmission usage data. David Reininger or Julia Morelli at the [FR Doc. E5–965 Filed 3–7–05; 8:45 am]
Price Capitol Connection (703–993–3100) as BILLING CODE 6717–01–P

Renewable generators and other soon as possible or visit the Capitol


independent power producers who have Connection Web site at http://
expressed interest in this product believe that www.capitolconnection.gmu.edu and DEPARTMENT OF ENERGY
the price should reflect the fact that click on ‘‘FERC.’’
customers of conditional-firm are more likely FERC conferences are accessible Federal Energy Regulatory
to experience reductions in capacity under Section 508 of the Rehabilitation Commission
availability than customers with firm Act of 1973. For accessibility [Docket No. PL04–3–000]
transmission. Given this increased accommodations please send an e-mail
curtailment potential, there is an expectation to accessibility@ferc.gov or call toll free Natural Gas Interchangeability; Notice
on the renewable generator’s part that the Seeking Comments
resulting cost would be less than a full year
866–208–3372 (voice) or 202–208–1659
of firm transmission. In order to avoid the (TTY), or send a FAX to 202–208–2106
March 2, 2005.
need for a rate case, the renewable generators with the required accommodations.
For more information about the On February 28, 2005, the Natural Gas
propose a pricing structure that uses current Council filed two reports in the
TBL transmission rates. The proposal is that conference, please contact Derek
CF customers pay firm transmission rates for Bandera at (202) 502–8031 captioned docket: White Paper on
the percentage of the year that they are (Derek.bandera@ferc.gov) or Sarah Liquid Hydrocarbon Drop Out in
guaranteed to receive firm transmission. For McKinley at (202) 502–8004 Natural Gas Infrastructure and White
example, if a customer is offered a CF (sarah.mckinley@ferc.gov). Paper on Natural Gas Interchangeability
product that will be firm 95% of the year, and Non-Combustion End Use:
this customer will pay 95% of the cost of a Linda Mitry, Representatives of the Natural Gas
year of PTP service. We invite other opinions Deputy Secretary. Council summarized the reports at the
and suggestion on this pricing issue. Commission’s March 2 open meeting.
Reactive Power Conference
[FR Doc. E5–963 Filed 3–7–05; 8:45 am] The Commission has posted these
BILLING CODE 6717–01–P March 8, 2005—Agenda reports on its Web site at http://
9 a.m.—Opening Remarks www.ferc.gov and is soliciting public
Richard O’Neill, Federal Energy Regulatory comment on them. In addition, the
DEPARTMENT OF ENERGY Commission reports are accessible on-line at http://
9:15 a.m.—Panel I—Reliability and Technical www.ferc.gov, using the ‘‘eLibrary’’ link
Federal Energy Regulatory Issues and are available for review in the
Commission Panelists: Commission’s Public Reference Room in
Donald Benjamin, NERC Washington, DC. The Commission will
[Docket No. AD05–1–000] Philip Fedora, Northeast Power
Coordinating Council use the reports and comments received
Principles for Efficient and Reliable Michael Connolly, CenterPoint Energy to inform its decisions as to how it
Reactive Power; Notice of Technical Ronald Snead, Cinergy Services (MISO should address issues of natural gas
Conference Transmission Owners) quality and natural gas
Michael Calimano, New York ISO interchangeability.
March 2, 2005. Anjan Bose, Washington State University Comments should be filed no later
As announced in a Notice of Robert O’Connell, Williams Power than thirty days from the date of this
Company, Inc.
Technical Conference issued on January Notice, as indicated by the comment
Terry Winter, American Superconductor
31, 2005, in the above referenced Eric John, ABB Inc. date below. The Commission
proceeding, a technical conference will 11:15 a.m.—Panel II—Short-Term Reactive encourages electronic submission of
be held on March 8, 2005, from Power Issues comments in lieu of paper using the
approximately 9 a.m. until 5 p.m. (EST), Panelists: ‘‘eFiling’’ link at http://www.ferc.gov.

VerDate jul<14>2003 19:54 Mar 07, 2005 Jkt 205001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:\FR\FM\08MRN1.SGM 08MRN1

Вам также может понравиться