Вы находитесь на странице: 1из 3

11002 Federal Register / Vol. 70, No.

43 / Monday, March 7, 2005 / Notices

proceeding can ask for court review of the Commission’s December 20, 2004 System Operator, Inc. (Midwest ISO)
Commission orders in the proceeding. order in the above-captioned submitted a compliance filing pursuant
The Commission strongly encourages proceedings. Public Service Company of to the Commission’s January 24, 2005
electronic filings of comments, protests, New Mexico, 109 FERC ¶ 61,296 (2004) Order in Midwest Independent
and interventions via the Internet in lieu (December 20 Order). PNM states that Transmission System Operator, Inc., et
of paper. See 18 CFR 385.2001(a)(1)(iii) the purpose of its filing is to submit al., 110 FERC ¶ 61,049 (2005). The
and the instructions on the revised market power analyses and Midwest ISO has requested an April 1,
Commission’s Web site (http:// information as required by the 2005 effective date for the tariff pages
www.ferc.gov) under the ‘‘e-Filing’’ link. Commission in the December 20 Order. submitted in the compliance filing.
Comment Date: March 9, 2005. PNM states that copies of the filing The Midwest ISO has requested
were served on parties on the official waiver of the service requirements set
Magalie R. Salas,
service lists in the above-captioned forth in 18 CFR 385.2010. The Midwest
Secretary. proceedings. ISO states that it has electronically
[FR Doc. E5–914 Filed 3–4–05; 8:45 am] Comment Date: 5 p.m. Eastern Time served a copy of this filing, with
BILLING CODE 6717–01–P on March 11, 2005. attachments, upon all Midwest ISO
Members, Member representatives of
3. Pinnacle West Capital Corporation, Transmission Owners and Non-
DEPARTMENT OF ENERGY Arizona Public Service Company, Transmission Owners, the Midwest ISO
Pinnacle West Energy Corporation, APS Advisory Committee participants, as
Federal Energy Regulatory Energy Services, Inc. well as all state commissions within the
Commission [Docket Nos. ER00–2268–010, EL05–10–000, region. In addition, Midwest states that
[Docket No. EG05–47–000, et al.] ER99–4124–008, EL05–11–0000, ER00– the filing has been electronically posted
3312–009, EL05–12–000, ER99–4122–011, on the Midwest ISO’s Web site at
CER Termobahia, LLC, et al.; Electric EL05–13–000] http://www.midwestiso.org under the
Rate and Corporate Filings Take notice that on February 18, 2005, heading ‘‘Filings to FERC’’ for other
the Pinnacle West Capital Corporation interested parties in this matter. The
February 28, 2005. (PWCC), the Arizona Public Service Midwest ISO will provide hard copies
The following filings have been made Company (APS), the Pinnacle West to any interested parties upon request.
with the Commission. The filings are Energy Corporation (PWEC) and APS Comment Date: 5 p.m. Eastern Time
listed in ascending order within each Energy Services Company, Inc. (APSES) on March 16, 2005.
docket classification. (collectively, Pinnacle West Companies)
6. New England Power Pool
1. CER Termobahia, LLC filed with the Commission a response to
the Commission’s Order dated [Docket No. ER04–1255–001]
[Docket No. EG05–47–000] December 20, 2004, directing Pinnacle Take notice that on February 18, 2005
Take notice that on February 24, 2005, West Companies to provide additional ISO New England Inc. (the ISO) and the
CER Termobahia, LLC, a Delaware information to the Commission to New England Power Pool (NEPOOL)
limited liability company (Applicant), supplement its market update for Participants Committee submitted a
with its principal executive office at authorization to sell at market-based compliance filing, including a report
1930 Burnt Boat Drive, Bismarck, North rates and various tariff amendments entitled The Costs and Benefits of
Dakota, 58503, filed with the Federal filed on August 11, 2004. Implementing a Day-Ahead Load
Energy Regulatory Commission an Comment Date: 5 p.m. Eastern Time Response Program and revisions to
application for determination of exempt on March 11, 2005. Appendix E to Section III of the ISO’s
wholesale generator status pursuant to Transmission, Markets and Services
part 365 of the Commission’s 4. Frederickson Power L.P.; EPCOR
Tariff (the Tariff), in response to the
regulations and section 32 of the Public Merchant and Capital (US) Inc.; EPCOR
requirements of the Commission’s
Utility Holding Company Act of 1935, Power Development, Inc.; EPDC, Inc.
December 21, 2004 order in Docket No.
as amended. [Docket Nos. ER01–2262–005, ER02–783– ER04–1255–000. NEPOOL and the ISO
Applicant states it will own, in part, 003, ER02–852–003, ER02–855–003] requested a June 1, 2005 effective date
a 190 MW natural-gas fired, combined- Take notice that, on February 22, for the revisions to the tariff.
cycle electrical generating facility 2005, Frederickson Power L.P., EPCOR The ISO and the NEPOOL
located in the State of Bahia, near Merchant and Capital (US), Inc., EPCOR Participants Committee state that copies
Salvador, Brazil (the facility). Applicant Power Development, Inc., and EPDC, of the compliance filing were sent to the
further states that it will be engaged Inc. (collectively, the EPCOR Parties) NEPOOL Participants and the New
directly and exclusively in the business submitted a triennial updated market- England state governors and regulatory
of owning and operating an eligible based rate analysis. commissions, as well as all parties on
facility and none of the electric energy The EPCOR Parties state that copies of the official service lists in the above-
produced from the facility will be sold the filing were served on parties on the captioned proceeding.
into the United States either at retail or official service lists in the above- Comment Date: 5 p.m. Eastern Time
otherwise. referenced proceedings. on March 11, 2005.
Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern
7. Unitil Energy Systems, Inc.
on March 17, 2005. Standard Time March 15, 2005.
[Docket No. ER05–320–001]
2. Public Service Company of New 5. Midwest Independent Transmission
Take notice that on February 23, 2005,
Mexico System Operator, Inc.; Public Utilities
Unitil Energy Systems, Inc. (UES)
with Grandfathered Agreements in the
[Docket Nos. ER96–1551–011, ER01–615– submitted a compliance filing pursuant
008] Midwest ISO Region
to the Commission’s order issued on
Take notice that on February 18, 2005, [Docket Nos. ER04–691–027, EL04–104–026 ] February 2, 2005 in Docket No. ER05–
Public Service Company of New Mexico Take notice that on February 23, 2005, 320–000, Unitil Energy Systems, Inc.,
(PNM) submitted a filing in response to the Midwest Independent Transmission 110 FERC ¶ 61,089 (2005).

VerDate jul<14>2003 18:15 Mar 04, 2005 Jkt 205001 PO 00000 Frm 00068 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1
Federal Register / Vol. 70, No. 43 / Monday, March 7, 2005 / Notices 11003

UES states that copies of the filing Electric Tariff Third Revised Volume ISO’s Day 2 markets (currently expected
were served on parties on the official No. 6. AEPSC requests an effective date to be April 1, 2005).
service list in the above-captioned of February 1, 2005. Comment Date: 5 p.m. Eastern Time
proceeding and on the New Hampshire AEPSC states that a copy of the filing on March 16, 2005.
Public Utility Commission. was served upon the Party and the 15. Brascan Power Piney & Deep Creek
Comment Date: 5 p.m. Eastern Time Virginia Public Service Commission. LLC
on March 16, 2005. Comment Date: 5 p.m. Eastern Time
on March 15, 2005. [Docket No. ER05–639–000]
8. Hot Spring Power Company, LP Take notice that on February 23, 2005,
[Docket No. ER05–570–001]
12. Midwest Independent Transmission Brascan Power Piney & Deep Creek LLC
System Operator, Inc. (Brascan Power PDC) submitted for
Take notice that on February 23, 2005,
Hot Spring Power Company, LP (Hot [Docket No. ER05–636–000] filing an application for market-based
Spring) filed a supplement to its Take notice that on February 23, 2005, rate authorization to sell energy,
application filed February 11, 2005 in the Midwest Independent Transmission capacity, and ancillary services, and
Docket No. ER05–570–000 for System Operator, Inc. (Midwest ISO) reassign transmission capacity and
authorization to make wholesale sales of submitted a Large Generator resell firm transmission rights. Brascan
electric energy, capacity, and ancillary Interconnection Agreement among Power PDC also requests the waivers
services at market-based rates, to Columbia Community Windpower LLC, and exemptions from regulation
reassign transmission capacity, and to American Transmission Company LLC typically granted to the holders of
resell firm transmission rights. and the Midwest ISO. market-based rate authorization. In
Comment Date: 5 p.m. Eastern Time Midwest ISO states that a copy of this addition, Brascan Power PDC requests
on March 16, 2005. filing was served on the parties to this waiver of the 60-day prior notice
Interconnection Agreement. requirement and requests expedited
9. Puget Sound Energy, Inc. consideration of its application for
Comment Date: 5 p.m. Eastern Time
[Docket No. ER05–609–000] on March 16, 2005. market-based rate authorization.
Take notice that on February 18, 2005, Comment Date: 5 p.m. Eastern Time
13. Wisconsin Public Service on March 16, 2005.
Puget Sound Energy Inc. (PSE) Corporation
submitted revised tariff sheets to its 16. Cinergy Services, Inc.
open access transmission tariff [Docket No. ER05–637–000]
[Docket No. ER05–640–000]
incorporating the changes directed by Take notice that on February 23, 2005,
Take notice that on February 23, 2005,
the Commission in Order No. 2003-B, Wisconsin Public Service Corporation
Cinergy Services, Inc. (Cinergy
Standardization of Generator (WPSC) tendered for filing, the actual
Services), on behalf of The Cincinnati
Interconnection Agreements and 2004 values for billing for post-
Gas & Electric Company (CG&E), PSI
Procedures, 109 FERC ¶ 61,287 (2004). employment benefits (PEB) and post-
PSE states that electronic copies of the Energy, Inc. (PSI) and Cinergy Power
employment benefits other than
filing were served on the Washington Investments, Inc. submitted for filing a
pensions (PBOP) in its formula rates for:
Utilities and Transportation revised Joint Generation Dispatch
(1) The W–1A tariff for full
Commission and PSE’s jurisdictional Agreement between PSI and CG&E.
requirements service; (2) the W–2A Cinergy Services states that copies of
customers. tariff for partial requirements service; the filing were served upon the Indiana
Comment Date: 5 p.m. Eastern Time and (3) Rate Schedule No. 51 for partial Utility Regulatory Commission.
on March 11, 2005. requirements service for the City of Comment Date: 5 p.m. Eastern Time
10. PSI Energy, Inc. Marshfield. WPSC has also requests on March 16, 2005.
waiver of the notice requirements to
[Docket No. ER05–634–000] allow it to apply the 2004 PEB and Standard Paragraph
Take notice that on February 22, 2005, PBOP values to the true-up of these Any person desiring to intervene or to
PSI Energy, Inc. (PSI) tendered for filing wholesale customers’ estimated capacity protest this filing must file in
the transmission and local facilities rate billings for service during 2004 and accordance with Rules 211 and 214 of
agreement for calendar year 2003 for estimated billing as of April 1, 2005. the Commission’s Rules of Practice and
reconciliation between PSI and Wabash WPSC states that copies of the filing Procedure (18 CFR 385.211 and
Valley Power Association, Inc., and were served upon WPSC’s affected 385.214). Protests will be considered by
between PSI and Indiana Municipal wholesale customers, the Public Service the Commission in determining the
Power Agency, designated as PSI’s Rate Commission of Wisconsin and the appropriate action to be taken, but will
Schedule FERC No. 253. Michigan Public Service Commission. not serve to make protestants parties to
Comment Date: 5 p.m. Eastern Time Comment Date: 5 p.m. Eastern Time the proceeding. Any person wishing to
on March 15, 2005. on March 16, 2005. become a party must file a notice of
11. American Electric Power Service 14. Illinois Power Company intervention or motion to intervene, as
Corporation appropriate. Such notices, motions, or
[Docket No. ER05–638–000] protests must be filed on or before the
[Docket No. ER05–635–000] Take notice that on February 23, 2005, comment date. Anyone filing a motion
Take notice that on February 22, 2005, Illinois Power Company (Illinois Power) to intervene or protest must serve a copy
the American Electric Power Service submitted a Market-Based Rate Tariff of that document on the Applicant and
Corporation (AEPSC), tendered for filing authorizing AmerenIP to engage in the all parties to this proceeding.
an Interconnection and Local Delivery sale of electric energy, capacity and firm The Commission encourages
Service Agreement for Blue Ridge Power rights at market-based rates and to electronic submission of protests and
Association (Blue Ridge), designated as reassign transmission capacity rights at interventions in lieu of paper using the
Substitute Service Agreement No. 181, negotiated rates. Illinois Power requests ‘‘eFiling’’ link at http://www.ferc.gov.
to the Operating Companies of the an effective date of the later of April 1, Persons unable to file electronically
American Electric Power System FERC 2005, or the first day of the Midwest should submit an original and 14 copies

VerDate jul<14>2003 18:15 Mar 04, 2005 Jkt 205001 PO 00000 Frm 00069 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1
11004 Federal Register / Vol. 70, No. 43 / Monday, March 7, 2005 / Notices

of the protest or intervention to the independent review of the document, it • Use 13 pipe storage and contractor
Federal Energy Regulatory Commission, concludes that its comments and yards on a temporary basis to support
888 First Street, NE., Washington, DC suggestions have been satisfied. construction activities.
20426. The Washington State Department of Northwest proposes to begin
This filing is accessible on-line at Ecology (WDOE) is participating as a construction in March 2006 3 and place
http://www.ferc.gov, using the cooperating agency in the preparation of the facilities in service by November 1,
‘‘eLibrary’’ link and is available for the EIS because it has been designated 2006. Abandonment of the 26-inch-
review in the Commission’s Public the lead agency under the State diameter facilities that are currently in
Reference Room in Washington, DC. Environmental Policy Act (SEPA) and is service cannot be completed until the
There is an ‘‘eSubscription’’ link on the responsible for compliance with SEPA Capacity Replacement Project is placed
Web site that enables subscribers to procedural requirements as well as for in service. All abandonment activities
receive e-mail notification when a compiling and assessing information on would be completed on or before
document is added to a subscribed the environmental aspects of the December 31, 2006.
docket(s). For assistance with any FERC proposal for all agencies with The FERC, the COE, and the WDOE
Online service, please e-mail jurisdiction in Washington. NEPA have three alternative courses of action
FERCOnlineSupport@ferc.gov, or call documents may be used to meet SEPA in considering Northwest’s proposal.
(866) 208–3676 (toll free). For TTY, call requirements if the requirements of the These options include granting
(202) 502–8659. State of Washington Administrative authorizations with or without
Code (WAC) 197–11–610 and 197–11– conditions, denying authorizations, or
Linda Mitry, 630 are met. In compliance with SEPA postponing action pending further
Deputy Secretary. requirements, this Notice of Availability study. In accordance with the Council
[FR Doc. E5–904 Filed 3–4–05; 8:45 am] includes the information required for a on Environmental Quality (CEQ)
BILLING CODE 6717–01–P SEPA EIS Cover Letter and Fact Sheet. regulations implementing NEPA, no
When the final EIS is completed, the agency decision on the proposed action
WDOE would adopt it if an independent may be made until 30 days after the U.S.
DEPARTMENT OF ENERGY review of the document confirms that it Environmental Protection Agency (EPA)
meets the WDOE’s environmental publishes a Notice of Availability of the
Federal Energy Regulatory review standards. final EIS in the Federal Register.
Commission The purpose of the Capacity However, the CEQ regulations provide
[Docket Nos. CP05–32–000 and CP05–32– Replacement Project is to replace the an exception to this rule when an
001] majority of the delivery capacity of agency decision is subject to a formal
Northwest’s existing 268-mile-long, 26- internal appeal process that allows other
Northwest Pipeline Corporation; Notice inch-diameter pipeline between Sumas agencies or the public to make their
of Availability of the Draft and Washougal, Washington in response views known. This is the case at the
Environmental Impact Statement for to a Corrective Action Order issued by FERC, where any Commission decision
the Proposed Capacity Replacement the U.S. Department of Transportation. on the proposed action would be subject
Project The proposed facilities are designed to to a 30-day rehearing period. Therefore,
March 1, 2005.
provide up to 360 thousand dekatherms the lead agency decision may be made
per day of natural gas transportation at the same time that notice of the final
The staff of the Federal Energy
capacity. EIS is published by the EPA, allowing
Regulatory Commission (Commission or This draft EIS addresses the potential
FERC) has prepared a draft the appeal periods to run concurrently.
environmental effects (beneficial and After notice of the final EIS is
environmental impact statement (EIS) adverse) of Northwest’s proposal to: published by the EPA, the COE would
on the natural gas pipeline facilities and • Construct and operate 79.5 miles of issue its own Record of Decision (ROD)
abandonment activities proposed by new 36-inch-diameter pipeline in 4 adopting the EIS. The ROD would
Northwest Pipeline Corporation separate loops 1 in Whatcom, Skagit, include the COE’s section 404(b)(1)
(Northwest) in the above-referenced Snohomish, King, Pierce, and Thurston analysis. After issuance of the ROD, the
docket. The Capacity Replacement Counties; COE could issue the section 404 and
Project would be located in various • Modify 5 existing compressor section 10 permits.
counties in Washington. stations, one each in Whatcom, Skagit, After the final EIS is issued, the
The draft EIS was prepared to satisfy Snohomish, Lewis, and Clark Counties WDOE would adopt it by identifying the
the requirements of the National for a total of 10,760 net horsepower of document and stating why it is being
Environmental Policy Act (NEPA). The new compression; adopted using the adoption form in
FERC staff concludes that approval of • Install various pig 2 launchers, pig WAC 197–11–965. The adoption form
the proposed project with appropriate receivers, and mainline valves; would be circulated to agencies with
mitigating measures as recommended, • Abandon the existing 26-inch- jurisdiction and to persons or
would have limited adverse diameter pipeline between Sumas and organizations that have expressed an
environmental impact. Washougal with the exception of a short interest in the proposal. No action may
The U.S. Army Corps of Engineers segment within and between the be taken on the proposal until 7 days
(COE) is participating as a cooperating existing Jackson Prairie Meter Station after the statement of adoption form has
agency in the preparation of the EIS and the Chehalis Compressor Station; been issued. Once the 7-day waiting
because the project would require and period is completed, the WDOE could
permits pursuant to section 404 of the begin issuing permits. Other state and
Clean Water Act (33 United States Code 1 A loop is a segment of pipeline that is usually
local agencies cannot issue permits until
(U.S.C.) 1344) and section 10 of the installed adjacent to an existing pipeline and
the adoption procedure is complete.
Rivers and Harbors Act (33 U.S.C. 403). connected to it at both ends. The loop allows more
gas to be moved through the system.
The COE would adopt the EIS pursuant 2 A pig is an internal tool that can be used to 3 Northwest has requested that three river
to Title 40 Code of Federal Regulations clean and dry a pipeline and/or to inspect it for crossings be authorized to begin in late 2005 if
(CFR) Section 1506.3 if, after an damage or corrosion. weather permits.

VerDate jul<14>2003 18:15 Mar 04, 2005 Jkt 205001 PO 00000 Frm 00070 Fmt 4703 Sfmt 4703 E:\FR\FM\07MRN1.SGM 07MRN1

Вам также может понравиться