Вы находитесь на странице: 1из 4

9942 Federal Register / Vol. 70, No.

39 / Tuesday, March 1, 2005 / Notices

Federal Energy Regulatory Commission, of the Commission’s regulations (18 CFR become a party must file a notice of
888 First Street, NE., Washington, DC 154.210). Anyone filing an intervention intervention or motion to intervene, as
20426. or protest must serve a copy of that appropriate. Such notices, motions, or
This filing is accessible on-line at document on the Applicant. Anyone protests must be filed on or before the
http://www.ferc.gov, using the filing an intervention or protest on or date as indicated below. Anyone filing
‘‘eLibrary’’ link and is available for before the intervention or protest date an intervention or protest must serve a
review in the Commission’s Public need not serve motions to intervene or copy of that document on the Applicant.
Reference Room in Washington, DC. protests on persons other than the Anyone filing an intervention or protest
There is an ‘‘eSubscription’’ link on the Applicant. on or before the intervention or protest
Web site that enables subscribers to The Commission encourages date need not serve motions to intervene
receive email notification when a electronic submission of protests and or protests on persons other than the
document is added to a subscribed interventions in lieu of paper using the Applicant.
docket(s). For assistance with any FERC ‘‘eFiling’’ link at http://www.ferc.gov. The Commission encourages
Online service, please e-mail Persons unable to file electronically electronic submission of protests and
FERCOnlineSupport@ferc.gov, or call should submit an original and 14 copies interventions in lieu of paper using the
(866) 208–3676 (toll free). For TTY, call of the protest or intervention to the ‘‘eFiling’’ link at http://www.ferc.gov.
(202) 502–8659. Federal Energy Regulatory Commission, Persons unable to file electronically
888 First Street, NE., Washington, DC should submit an original and 14 copies
Magalie R. Salas,
20426. of the protest or intervention to the
Secretary.
This filing is accessible on-line at Federal Energy Regulatory Commission,
[FR Doc. E5–814 Filed 2–28–05; 8:45 am] http://www.ferc.gov, using the 888 First Street, NE., Washington, DC
BILLING CODE 6717–01–P ‘‘eLibrary’’ link and is available for 20426.
review in the Commission’s Public This filing is accessible on-line at
Reference Room in Washington, DC. http://www.ferc.gov, using the
DEPARTMENT OF ENERGY There is an ‘‘eSubscription’’ link on the ‘‘eLibrary’’ link and is available for
Federal Energy Regulatory Web site that enables subscribers to review in the Commission’s Public
Commission receive e-mail notification when a Reference Room in Washington, DC.
document is added to a subscribed There is an ‘‘eSubscription’’ link on the
[Docket No. RP05–187–000] docket(s). For assistance with any FERC Web site that enables subscribers to
Online service, please e-mail receive e-mail notification when a
Overthrust Pipeline Company; Notice FERCOnlineSupport@ferc.gov, or call document is added to a subscribed
of Proposed Changes in FERC Gas (866) 208–3676 (toll free). For TTY, call docket(s). For assistance with any FERC
Tariff (202) 502–8659. Online service, please e-mail
February 23, 2005. FERCOnlineSupport@ferc.gov, or call
Magalie R. Salas,
Take notice that on February 16, 2005, (866) 208–3676 (toll free). For TTY, call
Secretary. (202) 502–8659.
Overthrust Pipeline Company
[FR Doc. E5–817 Filed 2–28–05; 8:45 am] Comment Date: 5 p.m. Eastern Time
(Overthrust) tendered for filing as part
of its FERC Gas Tariff, First Revised BILLING CODE 6717–01–P on March 4, 2005.
Volume No. 1–A, the following tariff Magalie R. Salas,
sheets, to become effective March 21, Secretary.
DEPARTMENT OF ENERGY
2005:
[FR Doc. E5–816 Filed 2–28–05; 8:45 am]
Sixth Revised Sheet No. 68, Federal Energy Regulatory BILLING CODE 6717–01–P
Sixth Revised Sheet No. 69, Commission
Second Revised Sheet No. 78J,
Fourth Revised Sheet No. 78K. [Docket No. RP05–184–000]
DEPARTMENT OF ENERGY
Overthrust states it is proposing to Wyoming Interstate Company, Ltd.;
clean-up and clarify specific aspects of Notice of Limited Case-Specific Waiver Federal Energy Regulatory
its tariff language. Commission
Overthrust states that copies of the February 23, 2005.
[Docket No. EC05–52–000, et al.]
filing have been served upon Take notice that on February 14, 2005,
Overthrust’s customers and the public Wyoming Interstate Company, Ltd., Trans-Elect, Inc., et al.; Electric Rate
service commissions of Utah and (WIC) tendered for filing a petition for and Corporate Filings
Wyoming. limited, case-specific waiver and
Any person desiring to intervene or to request for expedited consideration. February 22, 2005.
protest this filing must file in WIC states that copies of the filing are The following filings have been made
accordance with Rules 211 and 214 of being served upon all shippers on WIC’s with the Commission. The filings are
the Commission’s Rules of Practice and system and interested state regulatory listed in ascending order within each
Procedure (18 CFR 385.211 and commission. docket classification.
385.214). Protests will be considered by Any person desiring to intervene or to
1. Trans-Elect, Inc. on behalf of
the Commission in determining the protest this filing must file in
Michigan Electric Transmission
appropriate action to be taken, but will accordance with Rules 211 and 214 of
Company, LLC and Trans-Elect NTD
not serve to make protestants parties to the Commission’s Rules of Practice and
Path 15, LLC
the proceeding. Any person wishing to Procedure (18 CFR 385.211 and
become a party must file a notice of 385.214). Protests will be considered by [Docket No. EC05–52–000]
intervention or motion to intervene, as the Commission in determining the Take notice that on February 16, 2005,
appropriate. Such notices, motions, or appropriate action to be taken, but will Trans-Elect, Inc. (Trans-Elect), on behalf
protests must be filed in accordance not serve to make protestants parties to of Michigan Electric Transmission
with the provisions of Section 154.210 the proceeding. Any person wishing to Company, LLC (METC) and Trans-Elect

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00033 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices 9943

NTD Path 15, LLC (NTD Path 15), in the two QFs, O.L.S. Energy— 6. Northern Iowa Windpower LLC
(collectively, Applicants,) filed an Camarillo and O.L.S. Energy—Chino. [Docket No. ER02–257–004]
application, pursuant to section 203 of Comment Date: March 15, 2005.
Take notice that on February 14, 2005,
the Federal Power Act, requesting all
3. AG-Energy, L.P.; Power City Northern Iowa Windpower LLC (NIW)
authorizations and approvals necessary
Partners, L.P.; Seneca Power Partners, submitted a notice of change in status
for the indirect disposition of METC’s
L.P.; Sterling Power Partners, L.P.; and a triennial updated market analysis.
and NTD Path 15’s Federal Power Act- NIW states that copies of the filing
Sithe/Independent Power Partners, L.P.;
jurisdictional facilities in connection were served on the parties on the
Sithe Energy Marketing, L.P.
with the proposed acquisition of all of official service listed in this proceeding.
the capital stock of Trans-Elect by [Docket Nos. ER98–2782–008, ER03–42–008,
Comment Date: 5 p.m. Eastern Time
Trans-Elect Holding Company. ER02–2202–007]
on March 7, 2005.
Applicants request privileged treatment Take notice that on February 14, 2005,
for certain documents associated with AG-Energy, L.P. (AG-Energy), Power 7. California Independent System
the application pursuant to 18 CFR 33.9. City Partners, L.P. (Power City), Seneca Operator Corporation
Comment Date: 5 p.m. Eastern Time Power Partners, L.P. (Seneca), Sterling [Docket No. ER03–683–007]
on March 9, 2005. Power Partners, L.P. (Sterling), Sithe/ Take notice that on February 14, 2005,
Independent Power Partners, L.P., and the California Independent System
2. Investigation of Certain Enron- Sithe Energy Marketing, L.P.
Affiliated QFs, OLS Energy-Camarillo, Operator Corporation (ISO) submitted a
(collectively, Sithe Entities) submitted filing in compliance with the
OLS Energy-Chino an amendment to their revised triennial Commission’s order issued January 6,
[Docket Nos. EL03–47–004, QF–84–447–005, market power update in response to the 2005 in Docket Nos. ER03–683–004 and
QF84–443–005] Commission’s January 5, 2005 004, 110 FERC ¶ 61,007.
Take notice that on February 1, 2005, deficiency letter. In addition, AG- Comment Date: 5 p.m. Eastern Time
Enron North America Corp., Joint Energy, Power City, Seneca and Sterling on March 7, 2005.
Energy Development Investments II submitted amended tariffs to comply
Limited partnership, and Enron Wind with the Commission’s November 17, 8. PSEG Power Connecticut, LLC
LLC (collectively Enron North America), 2003 order in Docket No. EL01–118–000 [Docket No. ER05–231–002]
filed a supplement (February 1, 2005 establishing Market Behavior Rules. Take notice that on February 14, 2005,
supplement) to Docket No. EL03–47– Sithe Entities state that copies of the PSEG Power Connecticut, LLC
000 to disclose ownership interests in filing were served on the parties on the submitted a compliance filing pursuant
two additional qualifying facilities official service list in this proceeding. to the Commission’s order issued
(QFs). Comment Date: 5 p.m. Eastern Time January 14, 2005 in Docket No. ER05–
On May 2, 2003, in an order initiating on March 7, 2005. 231–000, 110 FERC ¶ 61,020 (2004).
investigation and establishing hearing 4. Pittsfield Generating Company, L.P. Comment Date: 5 p.m. Eastern Time
proceedings, the Commission ordered on March 7, 2005.
Enron Corporation (Enron) to identify [Docket No. ER98–4400–008]
Take notice that on February 15, 2005, 9. Southern Company Services, Inc.
all qualifying facilities in which Enron,
or any Enron affiliate, or their Pittsfield Generating Company, L.P. [Docket No. ER05–404–001]
employees, holds any ownership (Pittsfield) tendered for filing with the Take notice that, on February 16,
interest and/or control over, or had held Commission an updated market power 2005, Southern Company Services, Inc.
any ownership interest and/or control analysis and request for market-based acting as agent for Alabama Power
over at any time from the date of rate authority for ancillary services in Company, Georgia Power Company,
Enron’s merger with Portland General the above proceeding. Gulf Power Company, Mississippi
Corporation.1 The Commission stated Pittsfield states that copies of the Power Company, and Savannah Electric
that it would set for hearing the issue of filing were served upon the parties and Power Company (collectively,
whether any facility on that list, which, listed on the service list in this Southern Companies), submitted for
following submission of that list, is proceeding. filing additional information on Service
claimed by Commission Trial Staff or Comment Date: 5 p.m. Eastern Time Agreement No. 469 under the Open
any party to these proceedings to have on March 8, 2005. Access Transmission Tariff of Southern
failed to meet the ownership criteria for 5. Kansas City Power and Light Companies, FERC Electric Tariff, Fourth
QF status, has failed to meet at any time Company and Great Plains Power, Inc. Revised Volume No. 5, filed on
the ownership criteria for QF status. December 30, 2004.
In response, on June 3, 2003, as [Docket Nos. ER99–1005–004, ER02–725– Comment Date: 5 p.m. Eastern Time
005] on March 9, 2005.
supplemented on July 8, 2003, Enron
North America identified seventeen QFs Take notice that on February 15, 2005,
10. Transmission Owners of the
in which it held ownership interests Kansas City Power & Light Company, on
Midwest Independent Transmission
and or control over. behalf of itself and its Great Plains
System Operator Inc.
In the February 1, 2005 supplement, Power, Inc. affiliate (collectively KCPL)
submitted a Delivered Price Test [Docket No. ER05–447–003]
Enron North America states it identified
two additional QFs as the result of analysis in response to the Take notice that on February 17, 2005,
efforts to respond to discovery in Commission’s December 17, 2004 Order the Transmission Owners of the
another proceeding. Enron North in Docket No. ER99–1005–001, et al., Midwest Independent Transmission
America determined that it had 109 FERC ¶ 61,277. System Operator (Midwest ISO
upstream indirect ownership interests KCPL states that copies of the filing Transmission Owners) submitted for
were served on the parties on the filing a change in the effective date of
1 Investigation of certain Enron-Affiliated QFs, official service list in these proceedings. the proposed Schedule 23 to the
Docket No. EL03–47–000, et al., 103 ¶ FERC 61,122 Comment Date: 5 p.m. Eastern Time Midwest Independent Transmission
(2003). on March 8, 2005. System Operator, Inc.’s tariff filed on

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
9944 Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices

January 13, 2005, as amended January Comment Date: 5 p.m. Eastern Time Interconnection Agreement (Port
26, 2005 and February 11, 2005. on March 9, 2005. Washington Generating Facility) among
The Midwest ISO Transmission Wisconsin Electric Power Company, the
Owners state that they are serving this 14. Portland General Electric Company
Midwest ISO and American
filing on all Midwest ISO’s affected [Docket No. ER05–585–000] Transmission Company LLC.
customers as well as on all applicable Take notice that on February 16, 2005, Midwest ISO states that a copy of this
state commissions. The Midwest ISO Portland General Electric Company filing was served on the parties to this
also states that it will post a copy on its (PGE) tendered for filing new and Interconnection Agreement.
home page. revised tariff sheets to its Open Access Comment Date: 5 p.m. Eastern Time
Comment Date: 5 p.m. Eastern Time Transmission Tariff. PGE states that the on March 9, 2005.
on March 2, 2005. new and revised sheets are intended to
18. Westar Energy, Inc.
11. New England Power Company incorporate the changes to the Pro
Forma Large Generator Interconnection [Docket No. ER05–601–000]
[Docket No. ER05–582–000]
Procedures and Large Generator Take notice that on February 4, 2005,
Take notice that on February 16, 2005, Interconnection Agreement issued by Westar Energy, Inc. (Westar) submitted
New England Power Company (NEP) the Commission in FERC Order No. for filing a Notice of Cancellation for
submitted for filing a Fourth Revised 2003-B on December 20, 2004. PGE Rate Schedule FERC No. 276, the Coal
Service Agreement No. 20 between NEP requests an effective date of April 15, Participation Power Agreement between
and its affiliates, Massachusetts Electric 2005 for the changes. Westar and the City of Burlington,
Company (MECO) and Nantucket PGE states that a copy of this filing Kansas.
Electric Company (Nantucket) under was supplied to the Public Utility Westar states that copies of the filing
NEP’s FERC Electric Tariff, Original Commission of Oregon.
Volume No. 1. were served upon the City of
Comment Date: 5 p.m. Eastern Time Burlington, Kansas and the Kansas
NEP states that copies of this filing on March 9, 2005.
have been served on MECO, Nantucket, Corporation Commission.
and regulators in the Commonwealth of 15. Kentucky Utilities Company Comment Date: 5 p.m. Eastern Time
Massachusetts. on March 4, 2005.
[Docket No. ER05–586–000]
Comment Date: 5 p.m. Eastern Time Standard Paragraph
on March 9, 2005. Take notice that on February 16, 2005,
Kentucky Utilities (KU), a subsidiary of Any person desiring to intervene or to
12. San Diego Gas & Electric Company LG&E Energy LLC, tendered for filing protest this filing must file in
[Docket No. ER05–583–000] two fully executed amendments to the accordance with Rules 211 and 214 of
Take notice that on February 16, 2005, contract between KU and the City of the Commission’s Rules of Practice and
San Diego Gas & Electric Company Owensboro Kentucky dealing with the Procedure (18 CFR 385.211 and
(SDG&E) tendered for filing Service pricing of power received from the 385.214). Protests will be considered by
Agreements Numbers 20 and 21 to its Southeastern Power Administration. the Commission in determining the
FERC Electric Tariff, First Revised Comment Date: 5 p.m. Eastern Time appropriate action to be taken, but will
Volume No. 6. SDG&E states that these on March 9, 2005. not serve to make protestants parties to
agreements provide for SDG&E to 16. Virginia Electric and Power the proceeding. Any person wishing to
construct, operate and maintain the Company become a party must file a notice of
proposed interconnection facilities intervention or motion to intervene, as
[Docket No. ER05–587–000] appropriate. Such notices, motions, or
required for a wind generation project
being constructed and owned by Take notice that on February 16, 2005, protests must be filed on or before the
Kumeyaay Wind, LLC in San Diego Virginia Electric and Power Company comment date. Anyone filing a motion
County. SDG&E requests an effective (Virginia Electric), tendered for filing to intervene or protest must serve a copy
date of February 16, 2005. revised sheets to its Rate Schedule FERC of that document on the Applicant and
SDG&E states that copies of the filing No. 109, a power sales agreement with all parties to this proceeding.
have been served on the Kumeyaay Virginia Municipal Electric Association The Commission encourages
Wind, LLC, the California Independent Number 1 (VMEA). Virginia Electric electronic submission of protests and
System Operator Corporation and the states that the revised sheets incorporate interventions in lieu of paper using the
California Public Utilities Commission. changes to reflect their commencement ‘‘eFiling’’ link at http://www.ferc.gov.
Comment Date: 5 p.m. Eastern Time of operations as a member of the PJM Persons unable to file electronically
on March 9, 2005. Interconnection, L.L.C. and to make should submit an original and 14 copies
effective rate changes to which the of the protest or intervention to the
13. Midwest Independent Transmission parties have previously agreed. Federal Energy Regulatory Commission,
System Operator, Inc. Virginia Electric states that copies of 888 First Street, NE., Washington, DC
[Docket No. ER05–584–000] the filing were served on VMEA and the 20426.
Take notice that on February 16, 2005, Virginia State Corporation Commission. This filing is accessible on-line at
the Midwest Independent Transmission Comment Date: 5 p.m. Eastern Time http://www.ferc.gov, using the
System Operator, Inc. (Midwest ISO) on March 9, 2005. ‘‘eLibrary’’ link and is available for
submitted a Large Generator 17. Midwest Independent Transmission review in the Commission’s Public
Interconnection Agreement among System Operator, Inc. Reference Room in Washington, DC.
Northern States Power Company d/b/a There is an ‘‘eSubscription’’ link on the
Xcel Energy-Generation, Northern States [Docket No. ER05–590–000] Web site that enables subscribers to
Power Company d/b/a Xcel Energy- Take notice that on February 16, 2005, receive email notification when a
Transmission and the Midwest ISO. the Midwest Independent Transmission document is added to a subscribed
Midwest ISO states that a copy of this System Operator, Inc. (Midwest ISO) docket(s). For assistance with any FERC
filing was served on the parties to this submitted Amendment No. 1 to a Online service, please email
Interconnection Agreement. Generation-Transmission FERCOnlineSupport@ferc.gov, or call

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1
Federal Register / Vol. 70, No. 39 / Tuesday, March 1, 2005 / Notices 9945

(866) 208–3676 (toll free). For TTY, call may affect the responsibilities of a persons listed on the service list
(202) 502–8659. particular resource agency, they must prepared by the Commission in this
also serve a copy of the document on proceeding, in accordance with 18 CFR
Linda Mitry,
that resource agency. 4.34(b), and 385.2010.
Deputy Secretary. Comments and recommendations may You may also register online at
[FR Doc. E5–802 Filed 2–28–05; 8:45 am] be filed electronically via the Internet in http://www.ferc.gov/esubscribenow.htm
BILLING CODE 6717–01–P lieu of paper. The Commission strongly to be notified via e-mail of new filings
encourages electronic filings. See CFR and issuances related to this or other
385.2001(a)(1)(iii) and the instructions pending projects. For assistance, contact
DEPARTMENT OF ENERGY on the Commission’s Web site (http:// FERC Online Support.
www.ferc.gov) under the ‘‘eFiling’’ link. n. Pre-Filing Consultation and
Federal Energy Regulatory k. This application has been accepted,
Commission Scoping: The standard 3-stage
and is ready for environmental analysis consultation process required by the
[Project No. 2710–035] at this time. Commission’s regulations at 18 CFR
l. Project Description: The Orono
16.8, is hereby waived as requested in
PPL Maine, LLC; Notice of Application Hydroelectric Project consists of the
comments filed in accordance with the
Ready for Environmental Analysis, following facilities: (1) The existing
‘‘Lower Penobscot River Multiparty
Waiving Standard Three-Stage 1,174-foot-long by 15-foot-high dam
Settlement Agreement’’. We are also
Consultation, Establishing an with 2.4-foot-high flashboards; (2) a 2.3-
substituting the pre-filing consultation
Expedited Schedule for Relicensing, mile-long reservoir, which has a surface
process that has occurred on this project
and Soliciting Comments, area of 175 acres at the normal full pond
elevation of 72.4 feet above mean sea for our standard National
Recommendations, Terms and
level; (3) three new 10-foot-diameter Environmental Policy Act scoping
Conditions, and Prescriptions
penstocks; (4) a new restored process.
February 23, 2005. powerhouse containing four generating o. Procedural Schedule: Commission
Take notice that the following units with total installed generating staff propose to issue an Environmental
hydroelectric application has been filed capacity of 2.3 megawatts (MW); and (4) Assessment (EA) rather than issuing a
with the Commission and is available appurtenant facilities. The restored draft and final EA. Staff intends to allow
for public inspection. project would have an average annual 30 days for comments on the EA, and
a. Type of Application: New major generation of 17,821 megawatt-hours. will take into consideration all
license. The dam and existing project facilities comments received before final action is
b. Project No.: P–2710–035. are owned by the applicant. taken on the license application. The
c. Date Filed: June 25, 2004. m. A copy of the application is application will be processed according
d. Applicant: PPL Maine, LLC. available for review at the Commission to the following schedule, but revisions
e. Name of Project: Orono in the Public Reference Room or may be to the schedule may be made as
Hydroelectric Project. viewed on the Commission’s Web site at appropriate:
f. Location: On the Stillwater Branch http://www.ferc.gov using the ‘‘elibrary Issue Notice of availability of EA: June 30,
of the Penobscot River, near the town of link’’. Enter the docket number 2005.
Buxton, Penobscot County, Maine. This excluding the last three digits in the Ready for Commission decision on the
project does not occupy federal lands. docket number field to access the application: August 1, 2005.
g. Filed Pursuant to: Federal Power document. For assistance, contact FERC Magalie R. Salas,
Act, 16 U.S.C. 791(a)–825(r) Online Support at
Secretary.
h. Applicant Contact: Mr. Scott Hall, FERCOnlineSupport@ferc.gov or toll-
PPL Maine, LLC, Davenport Street, PO free at (866) 208–3676, or for TTY, (202) [FR Doc. E5–813 Filed 2–28–05; 8:45 am]
Box 276, Milford, Maine 04461, (207) 502–8659. A copy is also available for BILLING CODE 6717–01–P

827–5364. inspection and reproduction at the


i. FERC Contact: Patrick Murphy, address in item h. above.
(202) 502–8755, All filings must: (1) Bear in all capital DEPARTMENT OF ENERGY
patrick.murphy@ferc.gov. letters the title ‘‘COMMENTS’’, ‘‘REPLY Federal Energy Regulatory
j. Deadline for filing comments, COMMENTS’’, Commission
recommendations, terms and ‘‘RECOMMENDATIONS’’, ‘‘TERMS
conditions, and prescriptions: 60 days AND CONDITIONS’’, or Sunshine Act Meeting; Notice of Vote,
from the issuance date of this notice; ‘‘PRESCRIPTIONS’’; (2) set forth in the Explanation of Action Closing Meeting
reply comments are due 105 days from heading the name of the applicant and and List of Persons To Attend
issuance date of this notice. the project number of the application to
All documents (original and eight which the filing responds; (3) furnish February 23, 2005.
copies) should be filed with: Magalie R. the name, address, and telephone The following notice of meeting is
Salas, Secretary, Federal Energy number of the person submitting the published pursuant to Section 3(a) of
Regulatory Commission, 888 First filing; and (4) otherwise comply with the Government in the Sunshine Act
Street, NE., Washington, DC 20426. the requirements of 18 CFR 385.2001 (Pub. L. 94–409), 5 U.S.C. 552b:
The Commission’s Rules of Practice through 385.2005. All comments, Agency Holding the Meeting: Federal
and Procedure require all intervenors recommendations, terms and Energy Regulatory Commission.
filing documents with the Commission conditions, or prescriptions must set Date and Time: March 2, 2005. (Within a
to serve a copy of that document on forth their evidentiary basis and relatively short time after the Commission’s
open meeting on March 2, 2005).
each person whose name appears on the otherwise comply with the requirements Place: Room 3M 4A/B, 888 First Street,
official service list for the project. of 18 CFR 4.34(b). Agencies may obtain NE., Washington, DC 20426.
Further, if an intervenor files comments copies of the application directly from Status: Closed.
or documents with the Commission the applicant. Each filing must be Matters to be Considered: Non-Public
relating to the merits of an issue that accompanied by proof of service on all Investigations and Inquiries, Enforcement

VerDate jul<14>2003 14:21 Feb 28, 2005 Jkt 205001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\01MRN1.SGM 01MRN1

Вам также может понравиться