SECTION - II
SUMMARY FOR CIVIL WORKS - COMPOUND WALL WORKS (SEZ AREA)
It. No.
A
1
Description of Items
COMPOUND WALL
Compound wall - SEZ Area
Building Workers welfare Cess - 1%
TOTAL
Amount (Rs.)
91,186,771.60
911,867.72
92,098,639.32
Amount (Rs.)
SECTION - II
TCS , HYDERABAD AT ADIBATLA
BOQ FOR COMPOUND WALL CIVIL WORKS IN SEZ AREA
BILL OF QUANTITIES
It. No.
ITEM
DESCRIPTION OF ITEMS
PREAMBLE
The description of an item shall be deemed to include all preambles,
headings, sub-headings and references to other documents. The
detailed description of work and materials, given in the
Specification are not necessarily repeated in the Bill of Quantities.
The Preamble to the Bills of Quantities must be read with the
Drawings, Conditions of Contract and the Specification and the
tenderer shall be deemed to have examined the Drawings,
Specifications, Conditions of Contract and to have acquainted
himself with the Works to be done and the way in which they are to
be carried out. This preamble to the Bills of Quantities shall form
part of the Contract.
Tenderers are instructed to quote "rate only" for all QRO items
without fail and not to enter any amount in the amount column. The
rates quoted under QRO items is negotiable during the evaluation of
the tender and the rationalised rate only will be considered if there is
a need to operate QRO items during execution. Any percentage of
discount / rebate offered by the tenderer during negotiation is
applicable on all the quoted rates of the tendered items including
"QRO" Items.
Providing and forming all temporary roads / Pathways, cross over,
foot path, tracks, hard standings, Temporary ramp to approach the
excavated level etc. within the site and shall provide temporary foot
path outside the boundaries if required to protect the public entering
into the construction area at no extra cost.
Providing and maintaining Field Laboratory in a satisfactory manner
till the completion of work to ensure site control on quality of
materials and the works and shall strictly comply with provision of
Indian/ International Standards at no extra cost. All other regular
tests including requisite materials shall be carried out as directed
either at approved laboratory or at site at no extra cost.
The Tenderers are requested to inspect the site and obtain for
themselves at their own expense all necessary information and
particulars to enable them to submit the tender.
The dimensions shown in the drawings shall have to be verified by
the contractor at site before execution of the items and necessary
allowance's have to be made as per the actual dimensions available
at site.
For the items of works having Basic rate of material, price
adjustment will be made only on the actual quantity measured.
Wastage shall be to Contractors account. Basic rate indicates
landed cost at site including transportation charges, loadingunloading and all other levies and taxes as applicable.
The contractor should refer to the detailed drawings for details. All
the rates so quoted should be inclusive of all materials. In case of
discrepancy between drawing and Bill of Quantity the drawing
supersedes, unless specifically mentioned in the BOQ.
The work shall be carried out as per drawings, specifications, the
description of the items in the schedule and / or engineers
instructions.
All pre-fabrication works wherever possible shall be carried outside
the client's premises, only assembling and finishing work will be
allowed within the Site.
Items of work provided in this schedule but not covered in the
specifications shall be executed strictly as per instructions of the
engineer.
UNIT
Quantity
RATE
(Rs.)
AMOUNT (Rs.)
Remarks
It. No.
ITEM
DESCRIPTION OF ITEMS
Unless otherwise mentioned in the contract, the tenderer shall quote
for the finished items and shall provide for the complete cost towards
labour, materials, plant and machinery, operational costs, levies,
taxes, transport, repairs, rectification, maintenance till handing over,
revenue expenses, contingencies, overheads, profits and all
incidental items not specifically mentioned but reasonably implied
and necessary to complete the works according to the contract.
The quantities of the various items mentioned in the schedule of
items are approximate and may vary up to any extent or be deleted
altogether. The quoted rates of each item shall remain firm as long
as the variation in the total value of the works executed under this
contract including extra items, if any, remain within + 25% of the
tendered value of the works. The contractor, in his own interest,
should get an indication of the probable extent of the work to be
executed under any particular item in this schedule, before
undertaking any preliminary and enabling work or purchasing bought
out components related to the work.
Rates shall be quoted both in figures and in words in clear legible
writing. No overwriting is allowed. All scoring and cancellations
should be countersigned by the tenderer. In case of illegibility, the
interpretation of the engineer shall be final. All entries shall be in
English language.
The Engineer-in-charge's decision shall be final and binding on the
contractor regarding clarifications of items in this schedule with
respect to the other sections of the Contract.
It may be noted that the total work or any part / parts of the same
may be awarded as mentioned in this schedule of items.
The rates quoted shall be inclusive of all mock-ups, associated
samples prior to any mass production or procurement as per
complete satisfaction of the Client and Architect. Inclusive of
dismantling, demolishing and carting the material and making good
of the surface.
Any debris generated out of the said work may please be cleared on
priority basis from the Site. The contractor to allow for work to be
executed on the upper Floors, temporary storage of material on the
Ground Floor, for hoisting material to the upper floors, for bringing
debris and waste down, for co-ordinating and scheduling movement
of material with facilities available on site. The disposal of debris will
be the sole responsibility of the Contractor.
Any fault that occurs during the time of production, shifting or
installation of finished materials should be replaced with good one as
per the instruction from Engineer-in-charge.
Basic Prices for Cement OPC 53 Grade - 210 Rs/ Bag ( SEZ) &
Reinforcement steel ( Fe 500) - 40,000 Rs/MT
The abbreviations used in the Specification and Bill of Quantities
shall be read as follows :
IS :- Indian Standard
A.S.T.M :- American Society for Testing and Materials
EIC-Engineer in Charge
MM or mm :- Millimetre /s
CM and cm :- Centimetre /s
RM (rm) / RMT (rmt) :- Running metre /s
KG (kg) :- Kilogram /s
Tonne/t/MT :- Metric ton/s (1000 Kilogram's)
Dia. :- Diameter
Sqm :- Square metre
Cum:- Cubic metre
No.:- Number/s
Qty.:- Quantity
L.S :- Lump sum.
QRO:- Quote rate only.
Drg. No. :- Drawing number
PCC:- Plain Cement Concrete
RCC:- Reinforced cement concrete
HSD:- High Yield strength Deformed bars.
MS:- Mild Steel
CRS:- Corrosion resistance steel.
CTD:- Cold Twisted Deformed steel.
TMT :- Thermo Mechanically Treated Bars
UNIT
Quantity
RATE
(Rs.)
AMOUNT (Rs.)
Remarks
It. No.
1.00
1.01
ITEM
DESCRIPTION OF ITEMS
UNIT
Quantity
RATE
(Rs.)
AMOUNT (Rs.)
Remarks
It. No.
ITEM
DESCRIPTION OF ITEMS
RATE
(Rs.)
UNIT
Quantity
Cum
Cum
7,978
QRO
Cum
QRO
856
Cum
QRO
3210
AMOUNT (Rs.)
A
B
C
D
1.02
Back
filling
1.02a Back
filling
1.03 Rubble
Soling
1.04
1.05
1.06
Excavation in all kinds of soils, soft or hard murrum, soft rock, hard
rock, loose or stiff clay in foundations, trenches, rafts, column pits,
pile caps up to depth mentioned below the ground level including
providing strutting and shoring, dressing to excavated sides as
required, excavation.
For measurement of depth of excavation, the average slope of the
particular building should be calculated and the average level should
be considered at "0.00" level i.e. the average ground level. All below
depths shall be measured from this level
Soft soil and Murrum
Soft rock, moderately weathered or disintegrated rock, loose
boulders
Hard rock (requiring controlled blasting). The rate shall include
obtaining required permissions from relevant authorities.
Hard rock (requiring chiselling by pneumatic breaker). The rate
shall include obtaining required permissions from relevant
authorities.
Backfilling the trenches for compound wall
with selected
excavated earth in layers not exceeding 150 mm thickness,
including spreading, leveling, watering, ramming and consolidating
as per relevant specification and dressing, leveling to the required
profiles, etc. all complete as directed by the Engineer but excluding
excavation.
Same as above but by earth brought from outside
Cum
Cum
4,050
QRO
214.00
535
171.00
1,707,292.00
692,550.00
531.00
Cum
917
1,112.80
1,020,437.60
Cum
564
6152.50
3,470,010.00
Cum
Cum
Cum
Cum
Cum
1,886
323
1,099
304
447
8150.00
9764.00
10313.00
9399.00
9887.00
15,370,900.00
3,153,772.00
11,333,987.00
2,857,296.00
4,419,489.00
Cum
1,583
7227.00
11,440,341.00
RCC [M- Providing and constructing RCC M-25 grade concrete as per
25] Grade design as instructed by EIC / drawings, inclusive of shuttering, etc.
Concrete all complete to the satisfaction of EIC.
a)
b)
c)
d)
e)
Footing [M-25]
Column [M-25]
Retaining wall [M-25]
Base Beam [M-25]
Retention Beam [M-25]
Coursed
Rubble
Masonry
Remarks
It. No.
ITEM
1.06.1 Coursed
Rubble
Masonry
A
1.07
A
B
1.08
Random
Rubble
Masonry
External
Single
coat
Plaster
1.09
Pointing
1.10
Granite
Cladding
1.11
Steel
reinforce
ment
DESCRIPTION OF ITEMS
RATE
(Rs.)
UNIT
Quantity
AMOUNT (Rs.)
Below Ground
Providing and constructing Un-Coarsed Random Rubble Stone
Masonry for walls/ retaining wall in CM 1:4 using granite/ trap
stones, course height not less than 150mm high, edges of stones
hammer dressed, through bond stones every 1.5m to 2.0m intervals,
joints between stones packed with spalls and cement mortar,
exposed joints of stone masonry neatly racked, including weep holes
of 100 mm dia. A.C. Pipes if required, Making smooth finish to cutouts shown in drawing, required scaffolding tools and plant, curing,
etc. complete. The masonry shall be so constructed such that the
percentage of cement mortar shall not be more than 30% of the total
volume of masonry. The stones shall be so hammer dresses such
that the joints between the stones in finished masonry work shall not
be more than 25mm.
Cum
1,355
Below Ground
Above Ground
Providing and applying 15mm thick External Plaster in one coats
for external surfaces of masonry, RCC. pergola, Chajja etc. in
cement mortar 1:4 with the addition of water proofing compound and
100% virgin polypropylene fibres of approved make and finishing
rough to take on cladding. The rate should also be inclusive of all
scaffolding for single as well as double/multiple height areas, surface
preparation, curing both the coats, sills, pattas, grooves, providing
GI chicken mesh as mentioned in the notes above to a width of
150mm at the junctions of masonry and concrete works including
tying in position by using suitable nails / clamps / screws and as
directed etc. complete at all levels.
Cum
Cum
Sqm
QRO
QRO
QRO
Sqm
Sqm
11,817
40
64.00
3745.00
756,288.00
149,800.00
386
58000.00
22,388,000.00
MT
6882.00
9,325,110.00
5350
5618
171
Remarks
It. No.
ITEM
DESCRIPTION OF ITEMS
RATE
(Rs.)
UNIT
Quantity
AMOUNT (Rs.)
Rmt
2,909
1011.00
2,940,999.00
Nos
1.00
160500.00
160,500.00
1.12
1.13
GRAND TOTAL
91,186,771.60
Remarks