ANNEXURE- I

SECTION - II
SUMMARY FOR CIVIL WORKS - COMPOUND WALL WORKS (SEZ AREA)

It. No.
A
1

Description of Items
COMPOUND WALL
Compound wall - SEZ Area
Building Workers welfare Cess - 1%
TOTAL

Amount (Rs.)

91,186,771.60
911,867.72
92,098,639.32

Amount (Rs.)

SECTION - II
TCS , HYDERABAD AT ADIBATLA
BOQ FOR COMPOUND WALL CIVIL WORKS IN SEZ AREA
BILL OF QUANTITIES
It. No.

ITEM

DESCRIPTION OF ITEMS
PREAMBLE
The description of an item shall be deemed to include all preambles,
headings, sub-headings and references to other documents. The
detailed description of work and materials, given in the
Specification are not necessarily repeated in the Bill of Quantities.
The Preamble to the Bills of Quantities must be read with the
Drawings, Conditions of Contract and the Specification and the
tenderer shall be deemed to have examined the Drawings,
Specifications, Conditions of Contract and to have acquainted
himself with the Works to be done and the way in which they are to
be carried out. This preamble to the Bills of Quantities shall form
part of the Contract.
Tenderers are instructed to quote "rate only" for all QRO items
without fail and not to enter any amount in the amount column. The
rates quoted under QRO items is negotiable during the evaluation of
the tender and the rationalised rate only will be considered if there is
a need to operate QRO items during execution. Any percentage of
discount / rebate offered by the tenderer during negotiation is
applicable on all the quoted rates of the tendered items including
"QRO" Items.
Providing and forming all temporary roads / Pathways, cross over,
foot path, tracks, hard standings, Temporary ramp to approach the
excavated level etc. within the site and shall provide temporary foot
path outside the boundaries if required to protect the public entering
into the construction area at no extra cost.
Providing and maintaining Field Laboratory in a satisfactory manner
till the completion of work to ensure site control on quality of
materials and the works and shall strictly comply with provision of
Indian/ International Standards at no extra cost. All other regular
tests including requisite materials shall be carried out as directed
either at approved laboratory or at site at no extra cost.
The Tenderers are requested to inspect the site and obtain for
themselves at their own expense all necessary information and
particulars to enable them to submit the tender.
The dimensions shown in the drawings shall have to be verified by
the contractor at site before execution of the items and necessary
allowance's have to be made as per the actual dimensions available
at site.
For the items of works having Basic rate of material, price
adjustment will be made only on the actual quantity measured.
Wastage shall be to Contractors account. Basic rate indicates
landed cost at site including transportation charges, loadingunloading and all other levies and taxes as applicable.
The contractor should refer to the detailed drawings for details. All
the rates so quoted should be inclusive of all materials. In case of
discrepancy between drawing and Bill of Quantity the drawing
supersedes, unless specifically mentioned in the BOQ.
The work shall be carried out as per drawings, specifications, the
description of the items in the schedule and / or engineers
instructions.
All pre-fabrication works wherever possible shall be carried outside
the client's premises, only assembling and finishing work will be
allowed within the Site.
Items of work provided in this schedule but not covered in the
specifications shall be executed strictly as per instructions of the
engineer.

UNIT

Quantity

RATE
(Rs.)

AMOUNT (Rs.)

Remarks

It. No.

ITEM

DESCRIPTION OF ITEMS
Unless otherwise mentioned in the contract, the tenderer shall quote
for the finished items and shall provide for the complete cost towards
labour, materials, plant and machinery, operational costs, levies,
taxes, transport, repairs, rectification, maintenance till handing over,
revenue expenses, contingencies, overheads, profits and all
incidental items not specifically mentioned but reasonably implied
and necessary to complete the works according to the contract.
The quantities of the various items mentioned in the schedule of
items are approximate and may vary up to any extent or be deleted
altogether. The quoted rates of each item shall remain firm as long
as the variation in the total value of the works executed under this
contract including extra items, if any, remain within + 25% of the
tendered value of the works. The contractor, in his own interest,
should get an indication of the probable extent of the work to be
executed under any particular item in this schedule, before
undertaking any preliminary and enabling work or purchasing bought
out components related to the work.
Rates shall be quoted both in figures and in words in clear legible
writing. No overwriting is allowed. All scoring and cancellations
should be countersigned by the tenderer. In case of illegibility, the
interpretation of the engineer shall be final. All entries shall be in
English language.
The Engineer-in-charge's decision shall be final and binding on the
contractor regarding clarifications of items in this schedule with
respect to the other sections of the Contract.
It may be noted that the total work or any part / parts of the same
may be awarded as mentioned in this schedule of items.
The rates quoted shall be inclusive of all mock-ups, associated
samples prior to any mass production or procurement as per
complete satisfaction of the Client and Architect. Inclusive of
dismantling, demolishing and carting the material and making good
of the surface.
Any debris generated out of the said work may please be cleared on
priority basis from the Site. The contractor to allow for work to be
executed on the upper Floors, temporary storage of material on the
Ground Floor, for hoisting material to the upper floors, for bringing
debris and waste down, for co-ordinating and scheduling movement
of material with facilities available on site. The disposal of debris will
be the sole responsibility of the Contractor.
Any fault that occurs during the time of production, shifting or
installation of finished materials should be replaced with good one as
per the instruction from Engineer-in-charge.
Basic Prices for Cement OPC 53 Grade - 210 Rs/ Bag ( SEZ) &
Reinforcement steel ( Fe 500) - 40,000 Rs/MT
The abbreviations used in the Specification and Bill of Quantities
shall be read as follows :
IS :- Indian Standard
A.S.T.M :- American Society for Testing and Materials
EIC-Engineer in Charge
MM or mm :- Millimetre /s
CM and cm :- Centimetre /s
RM (rm) / RMT (rmt) :- Running metre /s
KG (kg) :- Kilogram /s
Tonne/t/MT :- Metric ton/s (1000 Kilogram's)
Dia. :- Diameter
Sqm :- Square metre
Cum:- Cubic metre
No.:- Number/s
Qty.:- Quantity
L.S :- Lump sum.
QRO:- Quote rate only.
Drg. No. :- Drawing number
PCC:- Plain Cement Concrete
RCC:- Reinforced cement concrete
HSD:- High Yield strength Deformed bars.
MS:- Mild Steel
CRS:- Corrosion resistance steel.
CTD:- Cold Twisted Deformed steel.
TMT :- Thermo Mechanically Treated Bars

UNIT

Quantity

RATE
(Rs.)

AMOUNT (Rs.)

Remarks

It. No.
1.00
1.01

ITEM

DESCRIPTION OF ITEMS

IRC: - Indian Road Congress


COMPOUND WALL
Excavatio Excavation
n
Rate to include Clearing and Grubbing of the fill area including,
curing and removal of shrubs, plants and stumps, disposal of
rubbish / excavated stuff to contractor's own disposal ground.
The rate for excavation should include carting away the debris,
pieces of rock , earth etc. to the dumping ground for all lifts and
leads (Inside the CMC/TCS premises as per the instruction or
outside the site premises with the permission of local authority)
The rate should also include dewatering the all excavation area filled
by the rain water or any other external source and pools of water in
the building area by using diesel driven pumps or other devices,
including disposing of the water to a safe distance as directed.
PCC, outer dimension of foundation shall be considered for the
mass and local excavation measurement for payment/certification.
The rate for excavation shall include for shoring the sides or
trenches with approved timber/steel accessories wherever
necessary to prevent the sides from falling including bailing or
pumping out of water (naturally occurring water met with while
excavating the pits, ) if found necessary. If there are any shrubs,
bushes, trees etc., are to be removed, roots of the trees should be
removed for minimum depth 50. All these materials should be
neatly stacked at site and to be handed over to the clients.
Individual boulders which may be encountered in the excavations
and which can be removed by crow bars/bucket of poclain excavator
from the parent-matrix shall be removed and shall form part of this
item and no separate payment will be made.
Contour level to be taken jointly before starting any excavation/
filling at every 3 / 5 mt grids.
Should contractor excavate to a greater depth or width than shown
on the drawing or instructed by PMC/Client, the contractor shall at
his own expense fill in such greater depth or width of excavation with
PCC. bedding as described for foundation by structural consultant.
Tree cutting and disposing (if any) to be done as per site engineer's
(in charge) instructions.
Carrying out excavation in the specified type of soil, inclusive of dewatering to keep the area clear from water ponding at all times, to
the required depth and profile as shown on drawings. Rate includes
removal of old buildings, foundations, plinth beams, floor concrete,
trenches, sewers, pipelines, column stubs, any other retaining
structure etc. with or without reinforcement and other embedment
and carting away the debris. No separate payment will be made on
account of breaking, removing and carting away of such existing
structures within the excavation area.
The excavated material, as directed by Project Manager/Engineer-incharge, shall be retained at the locations within the site or disposed
off outside the plot boundary in the approved dump yard of Local
Municipal Authority or any other place . The rate of excavation
includes cost of all necessary licences, Royalty charges and
permissions for the disposing the unsuitable earth from appropriate
authorities. No additional lead or lift shall be claimed either for inside
or outside dumping of the excavated material
Contractor shall take all necessary steps to ensure that the
temporary soil retention system (touching piles, diaphragm wall or
any other shoring system) is not damaged or disturbed during the
excavation activity. In case any damages occurred, the Contractor
shall make good such damages during the progress of the work at
his own cost.
The final approved founding strata shall be left absolutely clean by
removing loose, slushy soil, murrum and weathered rocks with
necessary tools & tackles, cleaning the surface by wire brush and
carting away the debris, dewatering to keep site dry at all times till
laying and curing of PCC etc. are all complete to the approval of
PM/Engineer-in-Charge.

UNIT

Quantity

RATE
(Rs.)

AMOUNT (Rs.)

Remarks

It. No.

ITEM

DESCRIPTION OF ITEMS

RATE
(Rs.)

UNIT

Quantity

Cum
Cum

7,978
QRO

Cum

QRO

856

Cum

QRO

3210

AMOUNT (Rs.)

The rates of excavation are inclusive of providing and maintaining in


good condition, barricading all along excavated pits with minimum 75
mm dia bullies of 2 m height with signs of danger on it.

A
B
C
D

1.02

Back
filling

1.02a Back
filling
1.03 Rubble
Soling

1.04

1.05

1.06

Excavation in all kinds of soils, soft or hard murrum, soft rock, hard
rock, loose or stiff clay in foundations, trenches, rafts, column pits,
pile caps up to depth mentioned below the ground level including
providing strutting and shoring, dressing to excavated sides as
required, excavation.
For measurement of depth of excavation, the average slope of the
particular building should be calculated and the average level should
be considered at "0.00" level i.e. the average ground level. All below
depths shall be measured from this level
Soft soil and Murrum
Soft rock, moderately weathered or disintegrated rock, loose
boulders
Hard rock (requiring controlled blasting). The rate shall include
obtaining required permissions from relevant authorities.
Hard rock (requiring chiselling by pneumatic breaker). The rate
shall include obtaining required permissions from relevant
authorities.
Backfilling the trenches for compound wall
with selected
excavated earth in layers not exceeding 150 mm thickness,
including spreading, leveling, watering, ramming and consolidating
as per relevant specification and dressing, leveling to the required
profiles, etc. all complete as directed by the Engineer but excluding
excavation.
Same as above but by earth brought from outside

Providing and laying rubble packing 230mm thick using hard


stone rubble, handset one on edge, consolidating the same with
power roller 8 to 10 tonnes wherever possible, or ramming with
heavy wooden rammers, watering, filling, interstices with hand
broken stone spalls and binding the top with hard murrum / stone
dust at least 0.5 Cum. per 10 Sqm. preliminary rolling / ramming of
sub-grade watering, rolling and ramming etc. complete as directed
by PMC.
PCC 1:3:6 Providing and laying plain cement concrete 1:3:6 using coarse
graded aggregate of 20 mm and down size for levelling course
including laying layers of specified thickness as directed including
form work wherever necessary and well compacted etc. all
complete, as directed.

Cum

Cum

4,050

QRO

214.00
535

171.00

1,707,292.00

692,550.00

531.00

Cum

917

1,112.80

1,020,437.60

Cum

564

6152.50

3,470,010.00

Cum
Cum
Cum
Cum
Cum

1,886
323
1,099
304
447

8150.00
9764.00
10313.00
9399.00
9887.00

15,370,900.00
3,153,772.00
11,333,987.00
2,857,296.00
4,419,489.00

Cum

1,583

7227.00

11,440,341.00

RCC [M- Providing and constructing RCC M-25 grade concrete as per
25] Grade design as instructed by EIC / drawings, inclusive of shuttering, etc.
Concrete all complete to the satisfaction of EIC.
a)
b)
c)
d)
e)

Footing [M-25]
Column [M-25]
Retaining wall [M-25]
Base Beam [M-25]
Retention Beam [M-25]

Coursed
Rubble
Masonry

Providing and constructing Coursed Rubble Masonry both side


dressed Random Rubble (undulation in dressing is max. 2") stone
masonry for walls/ retaining wall in CM 1:4 using granite/ trap
stones, course height not less than 150mm high, edges of stones
hammer dressed, through bond stones every 1.5 m to 2.0m
intervals, joints between stones packed with spalls and cement
mortar, exposed joints of stone masonry neatly racked, including
scaffolding tools and plant, curing, etc. complete. The masonry shall
be so constructed such that the percentage of cement mortar shall
not be more than 30% of the total volume of masonry. The stones
shall be so hammer dresses such that the joints between the stones
in finished masonry work shall not be more than 25mm.
Above Ground

Remarks

It. No.

ITEM

1.06.1 Coursed
Rubble
Masonry

A
1.07

A
B
1.08

Random
Rubble
Masonry

External
Single
coat
Plaster

1.09

Pointing

1.10

Granite
Cladding

1.11

Steel
reinforce
ment

DESCRIPTION OF ITEMS

RATE
(Rs.)

UNIT

Quantity

AMOUNT (Rs.)

Below Ground
Providing and constructing Un-Coarsed Random Rubble Stone
Masonry for walls/ retaining wall in CM 1:4 using granite/ trap
stones, course height not less than 150mm high, edges of stones
hammer dressed, through bond stones every 1.5m to 2.0m intervals,
joints between stones packed with spalls and cement mortar,
exposed joints of stone masonry neatly racked, including weep holes
of 100 mm dia. A.C. Pipes if required, Making smooth finish to cutouts shown in drawing, required scaffolding tools and plant, curing,
etc. complete. The masonry shall be so constructed such that the
percentage of cement mortar shall not be more than 30% of the total
volume of masonry. The stones shall be so hammer dresses such
that the joints between the stones in finished masonry work shall not
be more than 25mm.

Cum

1,355

Below Ground
Above Ground
Providing and applying 15mm thick External Plaster in one coats
for external surfaces of masonry, RCC. pergola, Chajja etc. in
cement mortar 1:4 with the addition of water proofing compound and
100% virgin polypropylene fibres of approved make and finishing
rough to take on cladding. The rate should also be inclusive of all
scaffolding for single as well as double/multiple height areas, surface
preparation, curing both the coats, sills, pattas, grooves, providing
GI chicken mesh as mentioned in the notes above to a width of
150mm at the junctions of masonry and concrete works including
tying in position by using suitable nails / clamps / screws and as
directed etc. complete at all levels.

Cum
Cum
Sqm

QRO
QRO
QRO

Sqm
Sqm

11,817
40

64.00
3745.00

756,288.00
149,800.00

386

58000.00

22,388,000.00

Providing and constructing Coursed Rubble Masonry one side


dressed Random Rubble (undulation in dressing is max. 2") stone
masonry for walls/ retaining wall in CM 1:4 using granite/ trap
stones, course height not less than 150mm high, edges of stones
hammer dressed, through bond stones every 1.5 m to 2.0m
intervals, joints between stones packed with spalls and cement
mortar, exposed joints of stone masonry neatly racked, including
scaffolding tools and plant, curing, etc. complete. The masonry shall
be so constructed such that the percentage of cement mortar shall
not be more than 30% of the total volume of masonry. The stones
shall be so hammer dresses such that the joints between the stones
in finished masonry work shall not be more than 25mm.

Providing and carrying out Pointing in Cement Mortar 1:3 of joints


of rubble or block masonry works including racking out joints 5mm
deep, cleaning, pressing cement mortar finishing and curing
including cost of materials, labour, scaffolding for all leads and lifts
etc. complete as per the direction of Engineer-in-charge
Sunk type.
Providing and cladding on walls machine cut and machine prepolished Granite slab 19mm thick of size as per drawings set on
backing coat of cement mortar 1:3 not exceeding 19mm thick,
including pointing with matching cement paste with pigmented
additives to match the shade of the slab. The rate should also be
inclusive of applying temporary supports to the cladded stone as
directed by the Architect at site. Cost to be inclusive of hand
buffing/cleaning on surface etc complete as per directions. Cost of
Granite Rs.1900/Sqm.
Providing and fixing steel reinforcement for RCC including
material, fabricating as per IS-2502, transporting, storing, de-coiling,
straightening, cutting, bending, spirally hooping and placing in
position at all levels, including all labour, equipments, supplies,
incidentals, sampling and testing as prescribed in IS codes including
all charges thereon for requisite tests, supervision and binding with
18 gauge approved quality GI Annealed binding wire. The
measurement shall be as per IS 1200 Part- and unit weight shall be
derived as mentioned in IS 1786. The rolling margin shall be on
Contractors own cost. The rate shall include cost of cover blocks,
binding wire, chairs, spacers and pins to be provided as per
specifications and will not be measured separately for payment.
Quantity of steel as per drawing and with authorized overlaps only
shall be measured and paid for.

MT

6882.00

9,325,110.00

5350
5618
171

Remarks

It. No.

ITEM

DESCRIPTION OF ITEMS

RATE
(Rs.)

UNIT

Quantity

AMOUNT (Rs.)

Rmt

2,909

1011.00

2,940,999.00

Nos

1.00

160500.00

160,500.00

The quoted rate will include welding of reinforcement with low


hydrogen low heat welding electrodes for the welding length
mentioned in the drawings in place of conventional laps, if the
consultants have recommended the same, for which no extra shall
be claimed. Replacing conventional laps with welding splices will be
entirely at consultants discretion and will have to be borne by the
Contractor. Such unclaimed welding will also include welding of
reinforcement to already fixed insert plates, structural steel members
etc. Shear connectors prepared from the reinforcing steel welded to
structural steel members shall be measured in the reinforcement
item.
The rate also includes protecting the reinforcing bars in their virgin
form or in the fabricated form, or when placed and tied up position
or as dowels left for future continuation of work or at construction
joint against corrosion due to exposure to weather if left exposed
and un-encased for more than three weeks from the date of delivery
to the site. Cement wash shall be given to such bars if they are likely
to be exposed for more that three weeks and less than twelve
weeks. Process of application of cement slurry shall be repeated
after every twelve weeks if the exposure period is stretched.

1.12

1.13

High yield strength deformed bars conforming to IS:1786 with


Fy = 500N/sq.mm
Concrete Provding and fixing precast concrete coping of M15 grade as per
Coping
the drawing. The steel will be measured and paid separately. The
rate quoted shall include all necessary materials, form work, tools,
tackles, staging, erection equipments etc., complete.
Sliding
Gates

Supplying and fixing Manually Operated Sliding Gate of size


7000mm x 1750mm. made up in MS frameworks as per design and
detailed drawings including all accessories and bottom angle, roller
tracks with heavy duty roller at bottom of gates and all fabricated and
fixed as shown in the drawing, including buffing, painting 3 coats with
approved shade synthetic enamel paint over a coat of Zinc chromate
primer etc. complete and all as directed. Rate shall include for fixing
in position, alignment, grouting the MS support for sliding panels
using cement concrete 1:2:4 and finishing the surface neat and
smooth etc. as per drawing and specification complete as directed.

GRAND TOTAL

91,186,771.60

Remarks