Академический Документы
Профессиональный Документы
Культура Документы
VerDate jul<14>2003 15:41 Feb 17, 2005 Jkt 205001 PO 00000 Frm 00018 Fmt 4703 Sfmt 4703 E:\FR\FM\18FEN1.SGM 18FEN1
Federal Register / Vol. 70, No. 33 / Friday, February 18, 2005 / Notices 8355
the eLibrary link. Enter the docket The Commission’s Rules of Practice (202) 502–8659. A copy is also available
number excluding the last three digits in and Procedure require all intervenors for inspection and reproduction at the
the docket number field to access the filing documents with the Commission address in item h above.
document. Comments, protests, and to serve a copy of that document on You may also register online at
interventions may be filed electronically each person on the official service list http://www.ferc.gov/esubsribenow.htm
via the internet in lieu of paper. See 18 for the project. Further, if an intervenor to be notified via e-mail of new filings
CFR 385.2001(a)(1)(iii) and the files comments or documents with the and issuances related to this or other
instructions on the Commission’s Web Commission relating to the merits of an pending projects. For assistance, contact
site under the ‘‘e-Filing’’ link. The issue that may affect the responsibilities FERC Online Support. To view
Commission strongly encourages of a particular resource agency, they upcoming FERC events, go to http://
electronic filings. must also serve a copy of the document www.ferc.gov and click on ‘‘View Entire
on that resource agency. Calendar’’.
Magalie R. Salas, k. Description of Project: Verdant
Secretary. intends to deploy, for study purposes, a Magalie R. Salas,
[FR Doc. E5–671 Filed 2–17–05; 8:45 am] temporary (18-month), underwater Secretary.
BILLING CODE 6717–01–P kinetic hydropower array that would be [FR Doc. E5–676 Filed 2–17–05; 8:45 am]
located near New York City in the East BILLING CODE 6717–01–P
River. The experimental project would
DEPARTMENT OF ENERGY consist of: (1) Six turbines consisting of:
(a) A 5-meter-diameter, 3-bladed rotor DEPARTMENT OF ENERGY
Federal Energy Regulatory
mounted on; (b) a 30-inch-diameter, 7-
Commission Federal Energy Regulatory
foot-long nacelle or enclosed shelter
[Project No. 12178–000] mounted to; (c) a 9-foot-long vertical Commission
pylon that contains a yaw bearing [Docket No. EC05–43–000, et al.]
Verdant Power LLC; Notice of mounted on top of; (d) a 24-inch-
Declaration of Intent and Petition for diameter, 5 or 6-feet-high pile extending Exelon Corporation, et al.; Electric
Relief Filing and Soliciting Comments above the river bottom; (2) six Rate and Corporate Filings
February 11, 2005.
generating units with a combined
February 10, 2005.
Take notice that the following capacity of up 200 kW; (3) an
underwater power cable leading to a The following filings have been made
declaration of intent and petition for with the Commission. The filings are
control room and connected via a
relief from the requirements of listed in ascending order within each
generator controller and protective relay
hydropower licensing has been filed docket classification.
to two customer-side 480-volt service
with the Commission and is available
meters; and (4) appurtenant facilities. 1. Exelon Corporation Public Service
for public inspection. l. Petition for Declaratory Intent:
a. Type of Filing: Declaration of intent Enterprise Group Incorporated
Verdant Power asked that it be allowed
and petition for relief. [Docket No. EC05–43–000]
b. Project No.: 12178–000. to install and operate the facilities listed
above, and to deliver power from the Take notice that on February 4, 2005,
c. Date Filed: February 2, 2005. as supplemented on February 9, 2005,
d. Applicant: Verdant Power LLC. project into the facilities of
e. Name of Project: Roosevelt Island Consolidated Edison New York, for a Exelon Corporation and its subsidiaries
Tidal Energy Study Project. test period of 18 months, without a that are electric utilities subject to the
f. Location: In the East channel of the license under Part I of the Federal Commission’s jurisdiction (collectively,
East River, in New York City, New York. Power Act. The 18-month deployment Exelon) and Public Service Enterprise
The project would not occupy Federal would provide information about Group Incorporated and its subsidiaries
lands. project operation and identify potential that are electric utilities subject to the
g. Filed Pursuant to: 18 Code of affects on environment resources in the Commission’s jurisdiction (collectively,
Federal Regulations part 24, section East River as part of Verdant Power’s PSEG) submitted a filing pursuant to
24.1. effort in preparing a license application section 203 of the Federal Power Act
h. Applicant Contact: Mr. Ronald F. for a fully-developed project. Such a and part 33 of the Commission’s
Smith, Chairman and Chief Operating project would consist of a series of Regulations requesting that the
Officer, 4640 13th Street, Arlington, VA ‘‘free-flowing’’ bi-directional Commission approve a transaction that
22207 (703) 528–6445. submersible turbines totaling between 5 includes: (1) Exelon’s acquisition of
i. FERC Contact: Tom Dean at (202) and 10 MW that would convert PSEG and the resulting indirect merger
502–6041, thomas.dean@ferc.gov. mechanical power from the tidal of Exelon’s and PSEG’s regulated public
j. Deadline for filing comments: 30 currents of the East River into electrical utilities; and (2) the consolidation of
days from the issuance date of this power without constructing a dam, Exelon’s and PSEG’s unregulated
notice. reservoir, penstock, or powerhouse. generation companies and corporate
All documents (original and eight m. A copy of the application is restructuring of the subsidiaries of their
copies) should be filed with: Magalie R. available for review at the Commission unregulated generation companies.
Salas, Secretary, Federal Energy in the Public Reference Room or may be Comment Date: 5 p.m. eastern time on
Regulatory Commission, 888 First viewed on the Commission’s Web site at April 11, 2005.
Street, NE., Washington, DC 20426. http://www.ferc.gov using the
2. TPF Chesapeake, LLC, TM Delmarva
Documents may be filed electronically ‘‘eLibrary’’ link. Enter the docket
Power LLC, Commonwealth
via the Internet in lieu of paper. The number excluding the last three digits in
Chesapeake Company, LLC
Commission strongly encourages the docket number field to access the
electronic filings. See 18 CFR document. For assistance, contact FERC [Docket No. EC05–44–000]
385.2001(a)(1)(iii) and the instructions Online Support at Take notice that on February 7, 2005,
on the Commission’s Web site (http:// FERCOnlineSupport@ferc.gov or toll- TPF Chesapeake, LLC (TPF), TM
www.ferc.gov) under the ‘‘eFiling’’ link. free at 1–866–208–3676, or for TTY, Delmarva Power LLC (TMDP), and
VerDate jul<14>2003 15:41 Feb 17, 2005 Jkt 205001 PO 00000 Frm 00019 Fmt 4703 Sfmt 4703 E:\FR\FM\18FEN1.SGM 18FEN1