Вы находитесь на странице: 1из 20

BV CPS-I TM E02 Revision: 01

Hi-pot Test Training


Reference: UL153

Prepared By:

Emily Tang / Ada Ge

Approved By: Herbert Zhu

Date:
Date: Jan.19, 05

For the benefit of business and people


BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Training Objectives

Training Objective
To understand why do Hi-pot test
To know of basic knowledge of Hi-pot test circuit
To understand operation procedure of Hi-pot test
To understand how to present the result

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Why
Why do
do High-pot
High-pot test
test

Hi-pot Test Purpose


Check the insulation according with
safety requirement.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

High-pot
High-pot test
test circuit
circuit

Hi-pot test circuit


Probe with Hi- pot

Inspected sample
Another probe

Current tester

Alarm
system

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

High-pot
High-pot test
test circuit
circuit

Explain of Hi-pot test circuit


The test equipment include a transformer having a
sinusoidal output,for our inspection this voltage is
adjusted to the voltage required in protocol.
A current tester system is existed in the equipment to
calculate breakdown current, for our inspection we must
set up limited of breakdown current which is obtained
form protocol.when calculated current out of limit, alarm
system will cut off voltage output and alarm.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Operation
Operation procedure
procedure

Equipment: Hi-pot tester

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Verification

Operation
Operation procedure
procedure

Verify the equipment


Check this tester visually for any physical damage,
correctly/promptly connection and suitable power
source.
Turn the Power Switch to ON, turn the voltage to the
lowest position.
Press the Start button, and set the voltage at a low
value.
Short circuit the two probes, alert activate, OK. If no alert
activate, try to ask the factory change another tester.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Where need do

Operation
Operation procedure
procedure

First internal check product to detect construction


and determine where need to conduct Hi-pot test:
All accessible metal part ready to become live
during normal operation (see note i)
Output of transformer or adaptor
Assemble gap
Note I: normal operation including:
a) Replacing a lamp;
b) Removal or cleaning of all parts not secured
by use of tools
BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Setting equipment

Operation
Operation procedure
procedure

Setting data
Test Voltage Knob
Start button
Stop button

LED display
BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

Operation
Operation procedure
procedure

Start test

Procedure
Step A : set up the tester at appropriate
breakdown current limit and appropriate
voltage(below value for reference only)

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

10

Start test

Operation
Operation procedure
procedure

Step B : all of the switch and setting on


the sample should be placed at
ON and at MAX which appropriate

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

11

Start test

Operation
Operation procedure
procedure

Step C : connect live & neutral plug pin


or lead wire together to the
either polarity of test,otherwise
checking should be conducted
on each of them.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

12

Start test

Operation
Operation procedure
procedure

Step D : connect opposite polarity of


tester to accessible metal part, earth pin
or earth lead wire, press start button,then
maintain 1 second

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

13

Start test

Operation
Operation procedure
procedure

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

14

Estimation

Operation
Operation procedure
procedure

After the test, no breakdown or flashover shall occur; in


the meantime pay attention to the voltage displays on Hipot tester to ensure the voltage will not drop down.
Alarm

Voltage drop down

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

15

Notice

Operation
Operation procedure
procedure

Hi-pot test time must keep on 1 second,do not only strike


probe on inspected sample.
When Hi-pot test is failed at required breakdown current
on protocol,try to recheck with max setting of equipment
and call back to office.
For European product, sometimes different voltage will
be applied on product, for example class I product with
class II construction, these two type of class need
different voltage.
Since output voltage of Hi-pot tester is always exceed
1000V, all operation must obey safety rule.
BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

16

Safety caution

Operation
Operation procedure
procedure

Turn off Hi-pot tester when you need not to use


For safety reason, remember to turn off switch
before you conduct function check.
When you do Hi-pot test,keep any part of you
body away form product, especially dont touch
product which being conducted Hi-pot test.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

17

Safety caution
Wrong action

Correct action

Operation
Operation procedure
procedure

Wrong action

Correct action

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

18

How
How to
to present
present the
the result?
result?

If breakdown was found, visual check the product and


find the reason (neednt to open the unit), then record
the defect as critical defect. For example:
Hi-pot test was failed when test on lampholder at
1200Vac,30mA (max setting of Hi-pot tester)
Note: Both workmanship and on site test should be failed
on this case.

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

19

END

BUREAU VERITAS PROPRIETARY copyright Bureau Veritas [2004] DO NOT DISCLOSE OUTSIDE YOUR ORGANISATION
WITHOUT BUREAU VERITAS PRIOR WRITTEN CONSENT.

20

Вам также может понравиться